Fine ore bin capable of reducing hardening of ore bin wall

By setting up mobile components outside the powder ore bin and using knocking balls to vibrate the outer wall of the tank, the problem of hardening of the ore bin walls is solved, space utilization is maintained, component operation is simplified, and convenient installation and maintenance are achieved.

CN221835958UActive Publication Date: 2024-10-15XINJIANG HUOSHAOYUN LEAD & ZINC MINE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323203397.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-27
Publication Date
2024-10-15
Estimated Expiration
2033-11-27

AI Technical Summary

Technical Problem

Existing powdered ore silos are prone to siding when storing ore powder. Existing solutions take up space and are inconvenient to install, disassemble and maintain.

Method used

A powder ore bin is designed that includes a tank and an external moving component. The moving component includes a fixed ring, a track frame, a rotating rod, a knocking ball and a fixed rod. The external knocking ball vibrates the outer wall of the tank to avoid adsorption. Ore powder causes hardening and facilitates removal and installation of components.

Benefits of technology

It effectively avoids hardening of the inner wall of the mine silo, maintains storage space utilization, and simplifies component installation and maintenance operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221835958U_ABST
    Figure CN221835958U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of fine ore bins, in particular to a fine ore bin capable of reducing hardening of an ore bin wall. According to the technical scheme, the device comprises a tank body and a moving assembly arranged on the outer side of the tank body, multiple sets of fixing rings are fixedly installed on the periphery of the tank body, and the moving assembly is provided with a disassembling assembly and a knocking assembly; the disassembling assembly comprises four sets of track frames fixedly installed on the peripheries of the two sets of fixing rings, and the peripheries of the top fixing ring and the bottom fixing ring are fixedly connected with the two sets of track frames correspondingly. Through mutual cooperation of the fixing frame, the track frame, the fixing rod and the knocking ball, ore powder adsorbed on the inner wall of the tank body can be vibrated off, hardening of the inner wall of the tank body is avoided, the situation that the occupied space in the tank body is affected is avoided, meanwhile, the situation that the internal structure of the fixing frame is affected by the ore powder and damaged is avoided, and the service life of the tank body is prolonged. And through mutual cooperation of the rail frame, the first fixing sleeve, the second fixing sleeve and the fixing cylinder, dismounting and mounting operation can be conveniently carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of powder ore bins, in particular to a powder ore bin capable of reducing the compaction of a ore bin wall. Background Art

[0002] A powder ore bin is a bin used to store ore powder. It is usually a vertical cylindrical shape. A powder ore bin usually stores ore powder produced after one or two stages of crushing. In the process of crushing the ore, it is necessary to store the crushed ore powder. When storing the crushed ore powder, it is necessary to use a powder ore bin to reduce the compaction of the bin wall.

[0003] In the prior art, there are the following problems:

[0004] Usually, after the powder ore bin is used to store ore powder, the ore powder is easily adsorbed on the inner wall of the powder ore bin, causing the inner wall of the powder ore bin to become compacted. Most of the time, the staff enters the powder ore bin to knock on the compacted surface, which is troublesome to operate. The existing solution is to set a knocking structure inside the powder ore bin, so that the knocking structure knocks on the inner wall of the powder ore bin, so that the inner wall of the powder ore bin vibrates and removes the ore powder adsorbed on the inner wall of the powder ore bin. However, the existing solution sets the knocking structure on the inner wall of the powder ore bin, which occupies a large amount of space and reduces the storage space of the powder ore bin. When the ore powder is introduced into the powder ore bin, the knocking structure will be submerged, which may easily cause damage to the knocking structure. At the same time, it is inconvenient to install and disassemble the knocking structure, and it is inconvenient to repair the knocking structure. Utility Model Content

[0005] The utility model aims to provide a powder ore bin which can reduce the compaction of the ore bin wall, so as to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a powder ore bin for reducing the compaction of the ore bin wall, comprising a tank body and a moving assembly arranged on the outside of the tank body, a plurality of groups of fixing rings are fixedly installed on the periphery of the tank body, and the moving assembly is provided with a splitting assembly and a knocking assembly; the splitting assembly comprises four groups of track frames fixedly installed on the peripheries of two groups of fixing rings, two groups of track frames are fixedly connected to the peripheries of the fixing rings at the top and the bottom respectively, a group of fixing frames are movably installed on the outsides of each two groups of the track frames, a first rotating rod is rotatably installed on the top of the fixing frame at the bottom, a first fixing sleeve is fixedly connected to the top of the first rotating rod, a second rotating rod is rotatably installed on the bottom of the fixing frame at the top, a fixing cylinder is slidably installed on the outside of the second rotating rod, and a second fixing sleeve is fixedly installed on the bottom of the fixing cylinder; the knocking assembly comprises a fixing rod fixedly connected between the first fixing sleeve and the second fixing sleeve, and a knocking ball is movably connected to the outside of the fixing rod.

[0007] By guiding the ore powder out of the tank body, it is easy to make some of the ore powder adsorbed on the inner wall of the tank body, by driving the first rotating rod and the second rotating rod to rotate, the fixed rod is driven to rotate synchronously, and the fixed rod drives the knocking ball to rotate to knock the outer wall of the powder ore bin, by driving the fixed frame to move along the track frame, and synchronously driving the fixed rod to move along the periphery of the tank body, the knocking ball can be easily used to fully knock the outer wall of the tank body, and the tank body can be vibrated, thereby shaking off the ore powder adsorbed on the inner wall of the tank body, avoiding compaction of the inner wall of the tank body, by pushing the fixed rod upward to separate the bottom of the fixed rod from the first fixed sleeve, and then removing the fixed rod downward to separate the top of the fixed rod from the second fixed sleeve, the fixed rod can be easily removed separately, and by separating the track frame and the fixed ring, the fixed frame can be easily removed as a whole, and the disassembly and installation operations can be conveniently performed.

[0008] Preferably, the moving assembly includes a shaft rotatably mounted inside a fixed frame, two sets of shafts are rotatably mounted on the inner side of each set of fixed frames, the central axis of each set of shafts passes through the fixed frame and is connected to a first motor, and the four sets of the first motors are respectively fixedly connected to the outer sides of the two sets of fixed frames through fixing members. The shaft can be driven to rotate by the first motor, and the gear plate can be driven to rotate synchronously, so that the gear plate can be fixed along the gear ring, and the fixed frame can be driven to move along the track frame.

[0009] Preferably, a gear plate is fixedly mounted on the outer side of the shaft, a gear ring meshing with the gear plate is fixedly connected to the outer periphery of the track frame, a support wheel corresponding to the track frame is rotatably mounted on the inner side of the fixed frame, and the track frame and the fixed ring are fixedly mounted via a mounting seat. The track frame is supported by the support wheel for rolling, so that the fixed frame can be easily moved along the track frame, and the track frame can be easily installed and fixed via the mounting seat.

[0010] Preferably, the central axis of the first rotating rod and the central axis of the second rotating rod respectively pass through the fixing frame and are connected to the second motor, and the two sets of the second motors are respectively fixedly installed inside the fixing frame through fixing members. The first rotating rod and the second rotating rod can be driven to rotate by the second motor.

[0011] Preferably, a movable disk extending into the interior of the fixed cylinder is fixedly installed at the bottom of the second rotating rod, a thrust spring is fixedly connected between the bottom of the movable disk and the fixed cylinder, and the movable disk and the fixed cylinder are slidably installed via a slide groove. The thrust of the thrust spring can push the fixed cylinder downward to prevent the fixed rod from falling off.

[0012] Preferably, the knocking ball is movably connected to the fixed rod via a connecting rope, the knocking ball is made of an outer rubber layer wrapped with an inner metal ball, and the top and bottom of the fixed rod are fixedly installed with fixing piles inserted into the first fixing sleeve and the second fixing sleeve. The fixing rod can be rotated by the connecting rope to drive the knocking ball to rotate synchronously, and the fixing piles can facilitate the installation and removal of the fixing rod.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. By setting up the mutual cooperation among the fixed frame, the track frame, the fixed rod and the knocking ball, by driving the fixed rod to rotate, the knocking ball can be synchronously driven to rotate to knock the outer wall of the powder ore bin; by driving the fixed frame to move along the track frame, the fixed rod can be driven to move along the periphery of the tank body, so that the knocking ball can be conveniently used to fully knock the outer wall of the tank body, and the tank body can be vibrated, so as to shake off the ore powder adsorbed on the inner wall of the tank body, and avoid the formation of compaction on the inner wall of the tank body; by arranging the fixed rod on the outside of the tank body, it can avoid affecting the space occupied in the tank body, and at the same time avoid the situation that the internal structure of the fixed frame is damaged by the influence of ore powder.

[0015] 2. By setting up the cooperation between the track frame, the first fixing sleeve, the second fixing sleeve and the fixing tube, by pushing the fixing rod upward to separate the fixing pile at the bottom of the fixing rod from the first fixing sleeve, and then taking the fixing rod downward to separate the fixing pile at the top of the fixing rod from the second fixing sleeve, it is convenient to remove the fixing rod separately, and by separating the track frame from the fixing ring, it is convenient to remove the fixing frame as a whole, and it is convenient to install and fix, and it is convenient to perform disassembly and installation operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0017] Figure 2 This is a schematic diagram of the split structure of the track frame of the utility model;

[0018] Figure 3 It is a schematic diagram of the cutaway structure of the fixing frame of the utility model;

[0019] Figure 4 This is a schematic diagram of the first rotating rod structure of the utility model;

[0020] Figure 5 This is a schematic diagram of the fixing rod structure of the utility model;

[0021] Figure 6 For the utility model Figure 5 The enlarged structural diagram of part A in the middle;

[0022] Figure 7 For the utility model Figure 5 The enlarged structural diagram of part B is shown in the figure.

[0023] In the figure: 1, tank body; 2, fixing ring; 3, track frame; 4, gear ring; 5, mounting seat; 6, fixing frame; 7, fixing rod; 8, connecting rope; 9, knocking ball; 10, shaft rod; 11, gear plate; 12, first motor; 13, supporting wheel; 14, second motor; 15, first rotating rod; 16, first fixing sleeve; 17, second rotating rod; 18, fixing cylinder; 19, slide groove; 20, movable plate; 21, thrust spring; 22, second fixing sleeve; 23, fixing pile. DETAILED DESCRIPTION

[0024] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0025] The utility model provides Figure 1-7 A powder ore bin for reducing the compaction of the ore bin wall shown in the figure comprises a tank body 1 and a moving assembly arranged on the outer side of the tank body 1, wherein a plurality of sets of fixing rings 2 are fixedly installed on the periphery of the tank body 1, and the moving assembly is provided with a splitting assembly and a knocking assembly; the splitting assembly comprises four sets of track frames 3 fixedly installed on the peripheries of two sets of fixing rings 2, two sets of track frames 3 are fixedly connected to the peripheries of the fixing rings 2 at the top and the bottom, respectively, a set of fixing frames 6 are movably installed on the outer sides of each two sets of the track frames 3, a first rotating rod 15 is rotatably installed on the top of the fixing frame 6 at the bottom, a first fixing sleeve 16 is fixedly connected to the top of the first rotating rod 15, a second rotating rod 17 is rotatably installed on the bottom of the fixing frame 6 at the top, a fixing cylinder 18 is slidably installed on the outer side of the second rotating rod 17, and a second fixing sleeve 22 is fixedly installed on the bottom of the fixing cylinder 18; the knocking assembly comprises a fixing rod 7 fixedly connected between the first fixing sleeve 16 and the second fixing sleeve 22, and a knocking ball 9 is movably connected to the outer side of the fixing rod 7;

[0026] The moving assembly includes a shaft 10 rotatably mounted inside the fixed frame 6, two sets of shafts 10 are rotatably mounted on the inner side of each set of the fixed frame 6, the central axis of each set of the shaft 10 passes through the fixed frame 6 and is connected to a first motor 12, and the four sets of the first motors 12 are respectively fixedly connected to the outer sides of the two sets of fixed frames 6 through fixing members;

[0027] A gear plate 11 is fixedly mounted on the outer side of the shaft 10, a gear ring 4 meshing with the gear plate 11 is fixedly connected to the outer periphery of the track frame 3, a support wheel 13 corresponding to the track frame 3 is rotatably mounted on the inner side of the fixed frame 6, and the track frame 3 is fixedly mounted to the fixed ring 2 via a mounting seat 5;

[0028] The central axis of the first rotating rod 15 and the central axis of the second rotating rod 17 respectively pass through the fixing frame 6 and are connected to the second motor 14. The two sets of the second motors 14 are respectively fixedly installed inside the fixing frame 6 through fixing members.

[0029] A movable disk 20 extending into the interior of the fixed cylinder 18 is fixedly installed at the bottom of the second rotating rod 17, a thrust spring 21 is fixedly connected between the bottom of the movable disk 20 and the fixed cylinder 18, and the movable disk 20 and the fixed cylinder 18 are slidably installed via a slide groove 19;

[0030] The knocking ball 9 is movably connected to the fixing rod 7 via a connecting rope 8. The knocking ball 9 is made of an outer rubber layer wrapped around an inner metal ball. The top and bottom of the fixing rod 7 are fixedly installed with fixing piles 23 inserted into the first fixing sleeve 16 and the second fixing sleeve 22.

[0031] The working principle of the powder ore bin for reducing the compaction of the ore bin wall according to the embodiment is as follows: the ore powder can be conveniently introduced into the tank body 1 through the top of the tank body 1, and the ore powder can be stored, and the ore powder can be conveniently discharged through the bottom of the tank body 1. After the ore powder is discharged, part of the ore powder is easily adsorbed on the inner wall of the tank body 1, and the first rotating rod 15 and the second rotating rod 17 are driven to rotate by the second motor 14, and the fixed rod 7 is driven to rotate synchronously, and the fixed rod 7 is driven to rotate by the connecting rope 8, so that the knocking ball 9 is driven to rotate, and the outer wall of the powder ore bin is knocked by the rotation of the knocking ball 9;

[0032] The shaft 10 is driven to rotate by the first motor 12, so that the shaft 10 drives the gear plate 11 to rotate synchronously. The gear plate 11 is meshed with the gear ring 4, so that the gear plate 11 can roll along the gear ring 4, and the fixing frame 6 can be driven to move along the track frame 3, and the fixing rod 7 can be driven to move along the periphery of the tank body 1 synchronously, so that the knocking ball 9 can be conveniently knocked on the outer wall of the tank body 1, so that the tank body 1 can be vibrated, so that the ore powder adsorbed on the inner wall of the tank body 1 can be shaken off, and the inner wall of the tank body 1 can be prevented from being compacted. By arranging the fixing rod 7 on the outside of the tank body 1, it can be avoided that the space in the tank body 1 is occupied, and at the same time, the internal structure of the fixing frame 6 can be prevented from being damaged by the ore powder.

[0033] By pushing the fixing rod 7 upward, the fixing pile 23 at the bottom of the fixing rod 7 is separated from the first fixing sleeve 16, and then the fixing rod 7 is removed downward to separate the fixing pile 23 at the top of the fixing rod 7 from the second fixing sleeve 22, so that the fixing rod 7 can be easily removed separately, and by separating the track frame 3 from the fixing ring 2, the fixing frame 6 can be easily removed as a whole, and the disassembly operation can be conveniently performed. The track frame 3 can be installed and fixed to the outside of the fixing ring 2 through the mounting seat 5, and by inserting the fixing pile 23 at the top of the fixing rod 7 into the second fixing sleeve 22, and then pushing the second fixing sleeve 22 to drive the fixing tube 18 to move upward, the fixing pile 23 at the bottom of the fixing rod 7 can be easily inserted into the first fixing sleeve 16, so that the fixing rod 7 can be easily installed, and installation and fixing can be conveniently performed, and disassembly and installation operations can be conveniently performed.

[0034] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.

Claims

1. A powder ore bin for reducing ore bin wall compaction, comprising a tank body (1) and a moving assembly arranged outside the tank body (1), characterized in that: A plurality of sets of fixing rings (2) are fixedly mounted on the periphery of the tank body (1), and the moving assembly is provided with a splitting assembly and a knocking assembly; The split assembly comprises four groups of track frames (3) fixedly mounted on the peripheries of two groups of fixing rings (2), two groups of track frames (3) are fixedly connected to the peripheries of the top and bottom fixing rings (2) respectively, a group of fixing frames (6) is movably mounted on the outer sides of each of the two groups of track frames (3), a first rotating rod (15) is rotatably mounted on the top of the fixing frame (6) at the bottom, a first fixing sleeve (16) is fixedly connected to the top of the first rotating rod (15), a second rotating rod (17) is rotatably mounted on the bottom of the fixing frame (6) at the top, a fixing cylinder (18) is slidably mounted on the outer side of the second rotating rod (17), and a second fixing sleeve (22) is fixedly mounted on the bottom of the fixing cylinder (18); The knocking assembly comprises a fixing rod (7) fixedly connected between a first fixing sleeve (16) and a second fixing sleeve (22), and a knocking ball (9) is movably connected to the outer side of the fixing rod (7).

2. A powder ore silo for reducing silo wall compaction according to claim 1, characterized in that: The moving assembly comprises a shaft (10) rotatably mounted inside a fixed frame (6), two groups of shafts (10) are rotatably mounted on the inner side of each group of the fixed frames (6), the central axis of each group of the shafts (10) passes through the fixed frame (6) and is connected to a first motor (12), and the four groups of the first motors (12) are respectively fixedly connected to the outer sides of the two groups of fixed frames (6) through fixing parts.

3. A powder ore silo for reducing silo wall compaction according to claim 2, characterized in that: A gear plate (11) is fixedly mounted on the outer side of the shaft (10); a gear ring (4) meshing with the gear plate (11) is fixedly connected to the outer periphery of the track frame (3); a support wheel (13) corresponding to the track frame (3) is rotatably mounted on the inner side of the fixed frame (6); and the track frame (3) and the fixed ring (2) are fixedly mounted via a mounting seat (5).

4. The powder ore silo for reducing silo wall compaction according to claim 1, characterized in that: The central axis of the first rotating rod (15) and the central axis of the second rotating rod (17) respectively pass through the fixing frame (6) and are connected to the second motor (14), and the two groups of the second motors (14) are respectively fixedly mounted inside the fixing frame (6) through fixing parts.

5. The powder ore silo for reducing silo wall compaction according to claim 1, characterized in that: A movable disk (20) extending into the interior of the fixed cylinder (18) is fixedly installed at the bottom of the second rotating rod (17); a thrust spring (21) is fixedly connected between the bottom of the movable disk (20) and the fixed cylinder (18); and the movable disk (20) and the fixed cylinder (18) are slidably installed via a slide groove (19).

6. The powder ore silo for reducing silo wall compaction according to claim 1, characterized in that: The knocking ball (9) and the fixing rod (7) are movably connected via a connecting rope (8); the knocking ball (9) is made of an outer rubber layer wrapped around an inner metal ball; the top and bottom of the fixing rod (7) are fixedly mounted with fixing piles (23) inserted into a first fixing sleeve (16) and a second fixing sleeve (22).