River slope structure

By arranging permeable concrete and geotextile trail components on the river slope, as well as the design of ladder structures and ecological blankets, the problem of insufficient water permeability of traditional trails is solved, achieving efficient drainage and smooth traffic on the river slope, while satisfying the viewing requirements. demand, with the characteristics of green environmental protection and low cost.

CN221837494UActive Publication Date: 2024-10-15CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323455425.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-10-15
Estimated Expiration
2033-12-18

AI Technical Summary

Technical Problem

Traditional pedestrian trails have insufficient water permeability, resulting in poor drainage of rivers. In extreme weather, river water inundates roads along the river, affecting traffic flow.

Method used

A river slope structure is designed, including a river bottom reinforcement layer, a first retaining wall component, a trail component, a second retaining wall component and an ecological blanket component. Permeable concrete and geotextile are used to improve water permeability, a ladder structure and an ecological unit. Used for drainage and viewing to ensure smooth water flow.

Benefits of technology

It improves the water permeability of the trail, avoids road water accumulation problems caused by poor drainage, ensures smooth traffic, and meets the viewing needs of citizens through the aesthetics of ecological plants. It has the advantages of green environmental protection, low cost and efficient construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837494U_ABST
    Figure CN221837494U_ABST
Patent Text Reader

Abstract

The utility model relates to a river slope structure, which comprises a river bottom reinforcing layer, a slope reinforcing layer and a slope reinforcing layer, the first retaining wall assembly is arranged on at least one side of the river bottom reinforcing layer; the footpath assembly is arranged at the top end of the first retaining wall assembly, and a handrail assembly is arranged between one side of the footpath assembly and the first retaining wall assembly; the second retaining wall assembly is arranged on the other side of the footpath assembly; the ecological blanket assembly is arranged at the top end of the second retaining wall assembly. The footpath assembly of the river slope structure is obliquely arranged in the direction of the river, so that water on the footpath assembly flows to the ecological unit and finally flows into the river, and the problem that water is accumulated on the footpath surface due to unsmooth drainage is avoided; the first retaining wall assembly and the second retaining wall assembly are arranged on the two sides of the footpath assembly respectively, river water is located at the first retaining wall assembly under the normal condition, the river water is located at the second retaining wall assembly under the flood drainage condition, the road above the second retaining wall assembly can be normally used, and smooth traffic is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of river channel slope construction, and relates to a pedestrian walkway on a river channel slope, in particular to a river channel slope structure. Background Art

[0002] Pedestrian walkways are important spatial factors in urban areas. They are set up on both sides of the road for pedestrians to pass through. They are important places in the daily lives of citizens. Among them, the pedestrian walkways set up on the slopes of the river not only have the function of passage, but also meet the needs of sightseeing and entertainment. There are the following problems:

[0003] 1. The river environment has high requirements for the water permeability of pedestrian walkways, but the traditional pedestrian walkways are not permeable enough, which easily leads to poor drainage, resulting in water accumulation on the road and affecting pedestrian traffic;

[0004] 2. Affected by the weather, the river water level is prone to rise in extreme weather or drainage, flooding the roads along the river and causing traffic inconvenience.

[0005] To this end, we propose a river slope structure to solve the above problems. Utility Model Content

[0006] The utility model aims to overcome the deficiencies of the prior art and provide a river channel slope structure with good water permeability and low cost.

[0007] To solve the above problems, the technical solution of the utility model is:

[0008] A river slope structure, comprising:

[0009] The riverbed reinforcement layer is laid on the bottom of the river;

[0010] A first retaining wall assembly is disposed on at least one side of the riverbed reinforcement layer;

[0011] A walkway assembly is arranged at the top end of the first retaining wall assembly, and a railing assembly is arranged between one side of the walkway assembly and the first retaining wall assembly;

[0012] A second retaining wall assembly is disposed on the other side of the walkway assembly;

[0013] An ecological blanket component is arranged at the top end of the second retaining wall component;

[0014] Under normal circumstances, the river water is located at the first retaining wall component; under drainage conditions, the river water is located at the second retaining wall component.

[0015] In a further embodiment, the riverbed reinforcement layer includes a plain concrete footing and a riverbed cushion layer, and the plain concrete footing is located on the riverbed cushion layer.

[0016] In a further embodiment, the first retaining wall assembly includes a first retaining wall gravel, a first retaining wall geotextile and an ecological unit, the ecological unit is steppedly arranged on the outside of the first retaining wall gravel, and the first retaining wall geotextile is arranged on the inside of the first retaining wall gravel;

[0017] The first retaining wall gravel and the first retaining wall geotextile are arranged on the first retaining wall bottom plate.

[0018] In a further embodiment, the railing assembly includes a railing and a lattice ridge, the lattice ridge is arranged at the top end of the first retaining wall gravel, and the railing is fixedly mounted on the lattice ridge.

[0019] In a further embodiment, the walkway assembly includes permeable concrete and a walkway cushion layer, the walkway cushion layer is located on one side of the ridge, and the permeable concrete is arranged on the walkway cushion layer.

[0020] In a further embodiment, the second retaining wall assembly includes a grid, a second retaining wall geotextile, a second retaining wall and second retaining wall gravel, the second retaining wall step is arranged outside the second retaining wall gravel, the second retaining wall geotextile is arranged inside the second retaining wall gravel, and a plurality of grids are arranged vertically at intervals inside the second retaining wall gravel;

[0021] The second retaining wall gravel and the second retaining wall geotextile are arranged on the second retaining wall bottom plate, and the second retaining wall gravel and the second retaining wall geotextile are provided with a pressure top at the top end.

[0022] In a further embodiment, a central hole is formed in the middle of the second retaining wall, and fixing holes are arranged around the central hole;

[0023] Two adjacent second retaining walls are fixedly connected together by a fixing rod, the lower end of the fixing rod is located in the fixing hole of the lower second retaining wall, and the upper end of the fixing rod is located in the central hole of the upper second retaining wall.

[0024] In a further embodiment, the grid is arranged horizontally, one end of the grid is located at the second retaining wall, and the other end of the grid passes through the geotextile of the second retaining wall.

[0025] In a further embodiment, the ecological blanket assembly includes an ecological blanket and anchoring nails, the ecological blanket is fixed to the ground by the anchoring nails arranged at intervals, and plants are arranged on the ecological blanket.

[0026] In a further embodiment, a top pressure cap is provided at the top end of the ecological blanket.

[0027] Compared with the prior art, the beneficial effects of the utility model are:

[0028] 1. The trail components of the river slope structure include permeable concrete and a trail cushion layer to improve the permeability of the trail components. The trail components are tilted toward the river so that the water on the trail components will flow toward the ecological unit and eventually into the river, thus avoiding waterlogging on the trail surface due to poor drainage. A first retaining wall component and a second retaining wall component are respectively arranged on both sides of the trail component. Under normal circumstances, the river water is located at the first retaining wall component, and under drainage conditions, the river water is located at the second retaining wall component. The road above the second retaining wall component can be used normally to ensure smooth traffic.

[0029] 2. Several ecological units are set up on the steps of the first retaining wall component of the river slope structure, and an ecological blanket is set above the second retaining wall component. Plants are planted on both the ecological units and the ecological blanket, so that ecological plants are set on both the left and right sides of the trail component, which is neat and beautiful and meets the daily viewing and entertainment needs of citizens.

[0030] 3. This river slope structure is green and environmentally friendly, reducing secondary pollution to the river during construction. It can be applied to both sides of various rivers and has strong applicability. The use of templates during construction is reduced, which improves construction efficiency. The construction process is convenient and fast, with good social and economic benefits and value for wide promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of a river slope structure;

[0032] Figure 2 A schematic diagram of a railing of a river slope structure;

[0033] Figure 3 for Figure 2 A in the enlarged view;

[0034] Figure 4 A top view of an ecological blanket component of a river slope structure;

[0035] Figure 5 A top view of a second retaining wall of a river slope structure;

[0036] Figure 6 This is a schematic diagram of the second retaining wall connection of a river slope structure.

[0037] In the figure: 1, riverbed reinforcement layer; 11, plain concrete foot guard; 12, riverbed cushion layer; 2, first retaining wall assembly; 21, first retaining wall gravel; 22, first retaining wall geotextile; 23, ecological unit; 24, first retaining wall bottom plate; 3, railing assembly; 31, railing; 311, handle; 312, vertical bar; 313, horizontal bar; 314, connecting plate; 32, ridge; 4, trail assembly; 41, permeable concrete; 42, trail cushion layer; 5, second retaining wall assembly; 51, capping; 52, grille; 53, second retaining wall geotextile; 54, second retaining wall; 541, center hole; 542, fixing hole; 543, fixing rod; 55, second retaining wall gravel; 56, second retaining wall bottom plate; 6, ecological blanket assembly; 61, ecological blanket; 62, anchor nails; X, rising water level; Y, normal water level. DETAILED DESCRIPTION

[0038] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0039] Embodiment 1:

[0040] A river slope structure, such as Figures 1 to 6As shown, it includes a riverbed reinforcement layer 1, a first retaining wall component 2, a railing component 3, a walkway component 4, a second retaining wall component 5 and an ecological blanket component 6. The riverbed reinforcement layer 1 is located at the bottom end of the river channel, at least one side of the riverbed reinforcement layer 1 is fixedly connected to the lower end of the first retaining wall component 2, the upper end of the first retaining wall component 2 is fixedly connected to one side of the bottom of the railing component 3, the other side of the bottom of the railing component 3 is fixedly connected to one side of the walkway component 4, the other side of the walkway component 4 is fixedly connected to the lower end of the second retaining wall component 5, the upper end of the second retaining wall component 5 is fixedly connected to the lower end of the ecological blanket component 6, and the top of the ecological blanket component 6 is the top of the embankment or other traffic road; under normal circumstances, the normal water level Y is located at the first retaining wall component 2, and pedestrians can use the pedestrian walkway normally; under extreme weather or drainage conditions, the rising water level X is located at the second retaining wall component 5, so that the road above the second retaining wall component 5 can be used normally, ensuring smooth traffic.

[0041] The riverbed reinforcement layer 1 includes a plain concrete foot guard 11 and a riverbed cushion layer 12. The riverbed cushion layer 12 is located on the river channel, and the plain concrete foot guard 11 is arranged on the riverbed cushion layer 12. One end of the plain concrete foot guard 11 and the riverbed cushion layer 12 is fixedly connected to the first retaining wall component 2. Preferably, the plain concrete foot guard 11 is 30 cm high, and the riverbed cushion layer 12 is a 5 cm high gravel layer.

[0042] The inclined first retaining wall component 2 includes a first retaining wall gravel 21, a first retaining wall geotextile 22, an ecological unit 23 and a first retaining wall base plate 24. The first retaining wall base plate 24 is fixedly connected to one end of the plain concrete footing 11 and the riverbed cushion layer 12. The first retaining wall gravel 21, the first retaining wall geotextile 22 and the ecological unit 23 are fixedly connected to the first retaining wall base plate 24. The first retaining wall gravel 21 is arranged on the outside of the first retaining wall geotextile 22. A plurality of ecological units 23 are arranged on the steps outside the first retaining wall gravel 21. The ecological units 23 are used for planting ornamental plants. The top ends of the first retaining wall gravel 21 and the first retaining wall geotextile 22 are fixedly connected to the bottom end of the railing component 3. Preferably, the ecological unit 23 is made of concrete of model C40, and the first retaining wall gravel 21 is 30 cm graded gravel (2 cm ~ 4 cm); the parameters of the first retaining wall geotextile 22 are: longitudinal and transverse breaking strength ≥ 10 kN / m, longitudinal and transverse tearing strength ≥ 0.25 kN, bursting strength ≥ 1.8 kN, vertical permeability coefficient 10-1 / cm / s ~ 10-2 / cm / s; both ends of the geotextile need to be pressed into the retaining wall or under the ridge by not less than 30 cm, and the geotextile overlap needs to be along the direction of water flow, and the overlap length is not less than 30 cm; the first retaining wall bottom plate 24 is made of concrete of model C30, with a seam every 10 m, a seam width of 2 cm, and a 2 cm thick polyethylene low-foam board filled in the seam. The bearing capacity of the retaining wall foundation shall not be less than 80 kPa.

[0043] like Figure 2 , Figure 3As shown, the railing assembly 3 includes a railing 31 and a ridge 32, the bottom end of the vertically arranged railing 31 is fixedly installed on the ridge 32, one side of the ridge 32 is fixedly connected to the first retaining wall gravel 21 and the first retaining wall geotextile 22, and the other side of the ridge 32 is fixedly connected to the walkway assembly 4 to protect the safety of pedestrians; the cross section of the ridge 32 is an "L"-shaped structure, and a steel plate is embedded in the top end of the ridge 32, which is fixedly connected to the railing 31 through the steel plate; the railing 31 includes a handle 311, a vertical rod 312 and a cross rod 313, a plurality of vertical rods 312 are fixedly installed on the embedded steel plate at longitudinal intervals, a plurality of commonly set cross rods 313 are fixedly installed on the vertical rod 312 at vertical intervals, the top end of the vertical rod 312 is fixedly installed with the handle 311 through a connecting plate 314, and the connecting plate 314 and the vertical rod 312 are fully welded. Preferably, the handle 311 is made of Larix gmelinii antiseptic wood handrail, and the vertical rod 312 and the horizontal rod 313 are made of stainless steel; the ridge 32 is made of model C20 concrete, with a seam every 20m, a seam width of 2cm, and a 2cm thick polyethylene low-foam board filled in the seam.

[0044] The walkway component 4 includes permeable concrete 41 and a walkway cushion layer 42. One end of the walkway cushion layer 42 is located on the transverse structure of the ridge 32. The permeable concrete 41 is arranged on the walkway cushion layer 42 to facilitate rapid drainage. The other ends of the permeable concrete 41 and the walkway cushion layer 42 are fixedly connected to the bottom end of the second retaining wall component 5. The permeable concrete 41 and the walkway cushion layer 42 have a slope of 2% toward the water flow side to facilitate drainage. Preferably, the walkway cushion layer 42 is a crushed stone cushion layer with a thickness of 5mm to 25mm; the permeable concrete 41 is a C25 permeable concrete with a thickness of 10mm and a particle size, a total width of 1.9m, a contraction joint with a width of 5mm is set every 5m, an expansion joint with a width of 2cm is set every 30m, the filling material is asphalt mastic, and the roadbed compaction degree is not less than 0.93; the parameters of the permeable concrete 41 are: wear resistance ≤30mm (grinding pit length), permeability coefficient ≥0.5mm / s, continuous porosity greater than or equal to 10%, compressive strength (28d) ≥25MPa, flexural tensile strength (28d) ≥3MPa, frost resistance: compressive strength loss rate after 150 freeze-thaw cycles ≤20%, mass loss rate ≤5%; the lower layer 15cm of the permeable concrete 41 is ordinary permeable concrete, and the upper layer 5cm is blue permeable concrete.

[0045] like Figure 5 , Figure 6As shown, the second retaining wall assembly 5 includes a capping 51, a grid 52, a second retaining wall geotextile 53, a second retaining wall 54, a second retaining wall gravel 55 and a second retaining wall bottom plate 56. The second retaining wall bottom plate 56 is fixedly connected to one end of the permeable concrete 41 and the walkway cushion 42. The second retaining wall geotextile 53, the second retaining wall 54 and the second retaining wall gravel 55 are fixedly connected to the second retaining wall bottom plate 56. The second retaining wall gravel 55 is arranged outside the second retaining wall geotextile 53. A plurality of horizontally arranged grids 52 are arranged at intervals inside the second retaining wall geotextile 53 and the second retaining wall gravel 55. A plurality of second retaining walls 54 are arranged on the outer steps, and a top pressure 51 is arranged on the top of the geotextile 53 of the second retaining wall; the second retaining wall 54 is a shell-shaped structure, and a central hole 541 is formed in the middle of the second retaining wall 54, and fixing holes 542 arranged obliquely and spaced are formed on the second retaining walls 54 located on both sides of the central hole 541, respectively, and two adjacent second retaining walls 54 are fixed together by fixing rods 543, and the lower end of the fixing rod 543 is located in the fixing hole 542 of one of the second retaining walls 54, and the upper end of the fixing rod 543 is located in the central hole 541 of the other second retaining wall 54. Preferably, the second retaining wall gravel 55 is 30cm graded gravel (2cm~4cm), and the parameters of the second retaining wall geotextile 53 are consistent with the first retaining wall geotextile 22; the second retaining wall bottom plate 56 has a seam every 10m, the seam width is 2cm, and a 2cm thick polyethylene low-foam board is filled in the seam, and the bearing capacity of the retaining wall foundation shall not be less than 80kPa; the fixing rod 543 is made of glass fiber nylon, with a longitudinal impact strength of 20MPa~50MPa and a longitudinal bending strength of 550MP~900MP; the vertical and horizontal mesh size of the grid 52 is ≥19mm, the vertical and horizontal fracture strength is greater than 50kN / m, and the vertical and horizontal fracture elongation is ≤4%. The grid 52 must be covered with 30cm of soil before rolling, and a flat plate tamping or manual tamping is used within 1.0m of the surface layer; after each layer of the second retaining wall 54 is built, the inner side of the second retaining wall 54 is backfilled with plain soil in time, and the backfill soil should be compacted in layers, and the compaction degree is not less than 0.93.

[0046] like Figure 4 As shown, the ecological blanket assembly 6 includes an ecological blanket 61 and anchor nails 62. Plants are planted on the ecological blanket 61, which is fixed to the ground by anchor nails 62 arranged at intervals. A pressure cap 51 is arranged at the top of the ecological blanket 61. Preferably, the laying order of the ecological blanket 61 is: from the pressure foot to the pressure cap, from the downstream to the upstream direction, the overlapping part in the horizontal direction is 15cm, and the overlapping part in the vertical direction is 10cm. The connection of the ecological blanket 61 should be that the upstream side presses the downstream side, and the slope top side presses the slope foot side; the pressure cap and pressure foot fixing engineering structure of the ecological blanket 61 adopts C20 cast-in-place concrete ridge; after the ecological blanket 61 is laid, a certain amount of planting soil is sprinkled on the surface of the construction surface, with a thickness of 2cm, and the flatness of the slope surface can be adjusted at the same time.

[0047] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A river slope structure, characterized in that: include: The riverbed reinforcement layer (1) is laid on the riverbed; A first retaining wall assembly (2) is arranged on at least one side of the riverbed reinforcement layer (1); A walkway component (4) is arranged at the top end of the first retaining wall component (2), and a handrail component (3) is arranged between one side of the walkway component (4) and the first retaining wall component (2); A second retaining wall assembly (5) is arranged on the other side of the walkway assembly (4); An ecological blanket component (6) is arranged at the top end of the second retaining wall component (5); Under normal circumstances, the river water is located at the first retaining wall component (2); under flood drainage conditions, the river water is located at the second retaining wall component (5).

2. A river slope structure according to claim 1, characterized in that: The riverbed reinforcement layer (1) comprises a plain concrete foot guard (11) and a riverbed cushion layer (12), wherein the plain concrete foot guard (11) is located on the riverbed cushion layer (12).

3. A river slope structure according to claim 2, characterized in that: The first retaining wall component (2) comprises a first retaining wall gravel (21), a first retaining wall geotextile (22) and an ecological unit (23), wherein the ecological unit (23) is arranged in a stepped manner on the outside of the first retaining wall gravel (21), and the first retaining wall geotextile (22) is arranged on the inside of the first retaining wall gravel (21); The first retaining wall gravel (21) and the first retaining wall geotextile (22) are arranged on the first retaining wall bottom plate (24).

4. A river slope structure according to claim 3, characterized in that: The handrail assembly (3) comprises a handrail (31) and a ridge (32), wherein the ridge (32) is arranged at the top end of the first retaining wall gravel (21), and the handrail (31) is fixedly mounted on the ridge (32).

5. A river slope structure according to claim 4, characterized in that: The walkway component (4) comprises permeable concrete (41) and a walkway cushion layer (42), wherein the walkway cushion layer (42) is located on one side of the ridge (32), and the permeable concrete (41) is arranged on the walkway cushion layer (42).

6. A river slope structure according to claim 5, characterized in that: The second retaining wall assembly (5) comprises a grid (52), a second retaining wall geotextile (53), a second retaining wall (54) and a second retaining wall gravel (55); the second retaining wall (54) is arranged in steps on the outside of the second retaining wall gravel (55); the second retaining wall geotextile (53) is arranged on the inside of the second retaining wall gravel (55); and a plurality of grids (52) are arranged at vertical intervals inside the second retaining wall gravel (55); The second retaining wall gravel (55) and the second retaining wall geotextile (53) are arranged on the second retaining wall bottom plate (56), and the top ends of the second retaining wall gravel (55) and the second retaining wall geotextile (53) are provided with a pressing top (51).

7. A river slope structure according to claim 6, characterized in that: A central hole (541) is formed in the middle of the second retaining wall (54), and fixing holes (542) are arranged around the central hole (541); Two adjacent second retaining walls (54) are fixedly connected together via a fixing rod (543), wherein the lower end of the fixing rod (543) is located in the fixing hole (542) of the second retaining wall (54) below, and the upper end of the fixing rod (543) is located in the central hole (541) of the second retaining wall (54) above.

8. A river slope structure according to claim 7, characterized in that: The grid (52) is arranged horizontally, one end of the grid (52) is located at the second retaining wall (54), and the other end of the grid (52) passes through the second retaining wall geotextile (53).

9. A river channel slope structure according to claim 8, characterized in that: The ecological blanket assembly (6) comprises an ecological blanket (61) and anchoring nails (62); the ecological blanket (61) is fixed on the ground by the anchoring nails (62) arranged at intervals; and plants are arranged on the ecological blanket (61).

10. A river slope structure according to claim 9, characterized in that: The top end of the ecological blanket (61) is provided with the pressure top (51).