Pile foundation structure for marine environment
By using petrolatum tape coating and fiber composite protective layer on the marine engineering pile foundation structure, the corrosion problem of steel pipe piles in the marine environment is solved, reducing maintenance costs and extending service life.
Patent Information
- Application Number
- CN202323211513.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-11-27
AI Technical Summary
Existing marine engineering structures are prone to corrosion in the marine environment, resulting in high maintenance costs and potential safety hazards. Existing anti-corrosion methods are complex and costly.
The pile foundation structure is a combination of petrolatum tape coating and fiber composite protective layer. The bottom layer of petrolatum paint and petrolatum tape layer are used to fill pits and depressions to form a water separation function, and the fiber composite protective layer and fixed structure are used to improve anti-corrosion performance.
It reduces the maintenance cost of steel pipe piles, extends their service life, provides good impact resistance and anti-corrosion properties, and simplifies structural design.
Smart Images

Figure CN221837576U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of marine engineering, in particular to a pile foundation structure used in a marine environment. Background Art
[0002] Marine engineering is mainly based on reinforced concrete and steel structures, and offshore engineering is basically based on steel structures. Due to the strong corrosion characteristics of the ocean, my country spends huge amounts of money every year on the maintenance of marine structural engineering. Statistics show that all coastal countries have varying degrees of marine engineering structural corrosion problems. Therefore, the annual maintenance cost is huge and there are major safety hazards.
[0003] In the existing technology, steel pipe piles, as one of the structural foundations of marine engineering, usually adopt anti-corrosion coating method, cathodic protection method, FRP coating method, etc. to have a certain anti-corrosion effect, but there are also certain defects. For example, the anti-corrosion coating and FRP coating are generally used for 10 to 15 years under good preservation. However, due to the high humidity in the marine environment, corrosion is very likely to occur, so regular maintenance is usually required, which not only causes high maintenance costs, but also high maintenance costs. In addition, the cathode protection method and FRP coating method have relatively complex processes, so the maintenance cost is higher.
[0004] Therefore, how to provide a pile foundation structure for use in a marine environment that is not only simple in structure and low in cost, but can also improve the anti-corrosion performance of steel pipe piles and extend the service life of steel pipe piles is a technical problem that the utility model urgently needs to solve. Utility Model Content
[0005] In view of the shortcomings or deficiencies of the above-mentioned prior art, the technical problem to be solved by the present invention is how to provide a pile foundation structure for use in a marine environment, which is not only simple in structure and low in cost, but also can improve the anti-corrosion performance of the steel pipe piles and extend the service life of the steel pipe piles.
[0006] In order to solve the above technical problems, the utility model provides a pile foundation structure for use in a marine environment, comprising:
[0007] Steel pipe piles;
[0008] a petrolatum tape coating applied to the outer wall of the steel pipe pile;
[0009] A protective layer formed by fiber composite and used to cover the petrolatum tape coating;
[0010] A fixing structure for attaching the protective layer to the steel pipe pile;
[0011] The petrolatum tape coating comprises: a petrolatum paint base layer coated on the outer wall of the steel pipe pile, and a petrolatum tape layer covering the petrolatum paint base layer.
[0012] Further preferably, the thickness of the petrolatum paint base layer is 140-160 μm.
[0013] Further preferably, the thickness of the petrolatum tape layer is 2 to 4 mm.
[0014] Further preferably, the thickness of the protective layer is 3 to 5 mm.
[0015] Further preferably, the protective layer is a rollable fiber composite board.
[0016] Further preferably, the material of the protective layer is carbon fiber, basalt fiber or a combination thereof.
[0017] Further preferably, the petrolatum tape layer is formed by winding two or more layers of petrolatum tape and covering the petrolatum tape coating.
[0018] Further preferably, the material of the protective layer is carbon fiber, basalt fiber or a combination thereof.
[0019] Further preferably, the petrolatum strips are staggered, crossed, overlapped and wound.
[0020] Further preferably, the petrolatum tape coating is located in the area between 60 cm below the low tide level of the tidal plane and the top of the steel pipe pile.
[0021] Further preferably, the fixing structure comprises: a plurality of binding straps, and the binding straps bind the protective layer in sequence and in sections along the axial direction of the steel pipe pile.
[0022] Further preferably, the binding belt is a nylon belt.
[0023] As a further preferred embodiment, the pile foundation structure for marine environment further comprises: a through hole provided on the fiber composite board, a detection cover for closing the through hole, a through opening provided on the detection cover, and a screw cap for closing and opening the through opening; wherein the detection cover is a hollow cylindrical structure and is protruded outward from the surface of the fiber composite board. The circumference of the detection cover is connected to the fiber composite board by hot-melt connection through a sealing tape or a part of the fiber composite board and is connected as a whole
[0024] Compared with the related technologies, the present application not only has a simple structure and low cost, but also can improve the anti-corrosion performance of the steel pipe piles and extend the service life of the steel pipe piles. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0026] Figure 1 : A schematic diagram of a transverse partial cross-sectional structure of a pile foundation structure for use in a marine environment in the first embodiment of the utility model;
[0027] Figure 2 : A schematic diagram of a transverse partial cross-sectional structure of a pile foundation structure for use in a marine environment in a second embodiment of the utility model;
[0028] Figure 3 : A three-dimensional structural schematic diagram of a pile foundation structure for use in a marine environment in the second embodiment of the utility model.
[0029] Figure numerals: 1. steel pipe pile; 2. petrolatum tape coating; 3. protective layer; detection cover body 8, screw cover 9, covering plate 10. DETAILED DESCRIPTION
[0030] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention.
[0031] Embodiment 1
[0032] like Figure 1 As shown, the first embodiment of the utility model provides a pile foundation structure for use in a marine environment, which can be composed of a steel pipe pile 1, a petrolatum tape coating 2 coated on the outer wall of the steel pipe pile 1, a protective layer 3 formed by a fiber composite and used to cover the petrolatum tape coating 2, and a fixing structure for attaching the protective layer 3 tightly to the steel pipe pile 1.
[0033] The petrolatum tape coating 2 comprises: a petrolatum paint base layer coated on the outer wall of the steel pipe pile 1, and a petrolatum tape layer covering the petrolatum paint base layer.
[0034] From the above content, it can be known that by using the petrolatum paint base layer in the petrolatum tape coating 2 to apply to the outside of the steel pipe pile 1, not only can the pits and depressions existing in the corroded steel pipe pile 1 be filled, but also when applying the petrolatum tape layer, the petrolatum paint base layer can be better adhered to the petrolatum tape layer, and then the protective layer 3 formed by the fiber composite can be better adhered through the petrolatum tape layer, so that the underwater construction can be realized by taking advantage of the function of separating water molecules of the petrolatum tape, so as to facilitate the later maintenance, and by covering the protective layer 3 formed by the fiber composite, a good armor structure can be formed, so as to effectively prevent the penetration and erosion of the ocean. In addition, by setting a fixed structure on the outer layer, the overall structure can have good impact resistance and strong stability.
[0035] It can be seen from the above that the pile foundation structure for marine environment provided by this embodiment is not only simple in structure and low in cost, but also can improve the anti-corrosion performance of the steel pipe pile 1 and extend the service life of the steel pipe pile 1.
[0036] Preferably, the thickness of the petrolatum paint bottom layer is 140-160 μm, which can effectively protect the outer surface of the steel pipe pile 1 and effectively protect the pits and depressions existing in the steel pipe pile 1, and prevent them from further breaking or enlarging.
[0037] Preferably, the petrolatum tape layer has a thickness of 2 to 4 mm. The petrolatum tape layer with this thickness can not only provide good protection for the petrolatum paint base layer, but also serve as the adhesion protection layer 3 .
[0038] Preferably, the protective layer 3 has a thickness of 3 to 5 mm. This thickness can not only provide armor protection and resist external impact, especially the impact of waves, but also, to a certain extent, slow down the time for seawater to penetrate into the petrolatum layer, thereby reducing the corrosion of the petrolatum layer at a controllable cost.
[0039] Further preferably, the protective layer 3 is a rollable fiber composite board.
[0040] Further preferably, the material of the protective layer 3 is carbon fiber, basalt fiber or a combination thereof.
[0041] Further preferably, the petrolatum tape layer is formed by winding two or more layers of petrolatum tape and covering the petrolatum tape coating 2 .
[0042] Further preferably, in order to facilitate construction and without the need to apply the lipid tape coating 2 as a whole to reduce corrosion and maintenance costs, the mineral lipid tape coating 2 is located in the area between 60 cm below the low tide level of the tidal plane and the bottom surface of the upper structure.
[0043] Further preferably, in order to facilitate underwater construction and subsequent maintenance, the above-mentioned fixing structure is mainly composed of a plurality of binding straps, and each binding strap is used to bind the protective layer 3 in sequence and in sections along the axial direction of the steel pipe pile 1 to form a binding structure.
[0044] Further preferably, in order to facilitate consolidation and not only be corrosion-resistant but also have good durability when immersed in seawater, the above-mentioned binding belt is a nylon belt.
[0045] Embodiment 2
[0046] This embodiment is a further improvement of the above-mentioned embodiment 1, and its improvements are as follows: Figure 2 and Figure 3As shown, the pile foundation structure for marine environment in this embodiment also includes: a through hole opened on the fiber composite board, a detection cover 8 for closing the through hole, a through opening opened on the detection cover 8, and a rotary cover 9 for closing and opening the through opening; wherein the detection cover 8 is a hollow cylindrical structure and protrudes outward from the surface of the fiber composite board. The circumference of the detection cover is connected to the fiber composite board by hot-melt connection through a sealing tape or a part of the fiber composite board and is connected as a whole.
[0047] By opening a through hole on the fiber composite board and setting a detection cover 8 on the fiber composite board, it is convenient to open the cover in real time to monitor the bonding condition between the petrolatum tape coating 2 and the steel pipe pile 1, as well as the bonding condition between the petrolatum paint base layer and the petrolatum tape layer, so as to conveniently monitor the surface status of the steel pipe pile 1 for subsequent maintenance.
[0048] Further preferably, a plurality of through holes may be arranged in different areas on the fiber composite plate for arranging corresponding detection covers and cover bodies, so as to monitor the surfaces of different areas of the steel pipe pile 1 .
[0049] Further preferably, the detection cover body 8 may be an integrally formed plastic part or a cylinder detachably connected by rivets or the like and a cover plate 10 for opening a through opening, while the present embodiment is only composed of a cylinder and a cover plate 10 detachably connected.
[0050] The above embodiments are only used to illustrate the technical solution of the utility model but not to limit it. The utility model is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that the technical solution of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the utility model, and should be included in the scope of the claims of the utility model.
Claims
1. A pile foundation structure for use in a marine environment, characterized in that: include: Steel pipe piles; a petrolatum tape coating applied to the outer wall of the steel pipe pile; A protective layer formed by fiber composite and used to cover the petrolatum tape coating; A fixing structure for attaching the protective layer to the steel pipe pile; The petrolatum tape coating comprises: a petrolatum paint base layer coated on the outer wall of the steel pipe pile, and a petrolatum tape layer covering the petrolatum paint base layer.
2. The pile foundation structure for marine environment according to claim 1, characterized in that: The thickness of the petrolatum paint bottom layer is 140-160 μm.
3. The pile foundation structure for marine environment according to claim 1, characterized in that: The thickness of the petrolatum belt layer is 2 to 4 mm.
4. The pile foundation structure for marine environment according to claim 1, characterized in that: The thickness of the protective layer is 3 to 5 mm.
5. The pile foundation structure for marine environment according to claim 1, characterized in that: The protective layer is a rollable fiber composite plate; the material of the protective layer is carbon fiber, basalt fiber or a combination thereof.
6. The pile foundation structure for use in a marine environment according to claim 1, characterized in that: The petrolatum tape layer is formed by winding more than two layers of petrolatum tape and covering the petrolatum tape coating; wherein each petrolatum tape is wound in a staggered, cross-over, overlapping manner.
7. The pile foundation structure for use in a marine environment according to claim 1, characterized in that: The petrolatum tape coating is located in the area between 60 cm below the low tide level of the sea tide plane and the top of the steel pipe pile.
8. The pile foundation structure for use in a marine environment according to claim 1, characterized in that: The fixing structure comprises: a plurality of binding belts, and the binding belts bind the protective layer in sequence and in sections along the axial direction of the steel pipe pile.
9. The pile foundation structure for use in a marine environment according to claim 8, characterized in that: The binding belt is a nylon belt.
10. The pile foundation structure for use in a marine environment according to any one of claims 1 to 9, characterized in that: Also includes: A through hole opened on the fiber composite board, a detection cover body for closing the through hole, a through opening opened on the detection cover body, and a screw cap for closing and opening the through opening; wherein the detection cover body is a hollow cylindrical structure and is protruded outward from the surface of the fiber composite board; the circumference of the detection cover body is hot-melt connected to the fiber composite board through a sealing tape or a part of the fiber composite board and is connected as a whole.
Citation Information
Cited By
Marine environment steel pipe pile anti-corrosion method based on basalt fibers and composite anti-corrosion layer
CN120925488A