Fabricated detachable tall construction operation platform

By arranging structures such as railings and support columns on the construction operation platform, the problem of lack of protective measures in the existing technology is solved, the safety of construction personnel and the stability of the platform are achieved, and the construction operation is simplified.

CN221837908UActive Publication Date: 2024-10-15XIANGYANG XINHENGDA METAL PRODUCTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322543295.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-09-19
Publication Date
2024-10-15
Estimated Expiration
2033-09-19

AI Technical Summary

Technical Problem

The existing prefabricated and detachable tall construction operating platforms lack protective measures and cannot effectively ensure the safety of workers, and there is a risk of falling accidents.

Method used

A construction operation platform including a workbench, connecting grooves, support columns, support nets, load-bearing bins, installation grooves, railing fixing blocks, transverse support rods and solid steel pipes is designed to provide stable support and protection by setting railings and support columns. , prevents falling, and simplifies the installation and removal process with a pull ring.

Benefits of technology

Effectively protect construction workers, prevent falling accidents, ensure safety and stability during the construction process, and simplify the installation and disassembly operations of the platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837908U_ABST
    Figure CN221837908U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction platforms, and discloses an assembly type detachable high and large construction operation platform which comprises a workbench, a connecting groove is fixedly connected to the lower surface of the workbench, a supporting column is fixedly connected to the lower surface of the connecting groove, a supporting net is arranged on the upper surface of the workbench, and a bearing bin is formed in the workbench. A mounting groove is formed in the upper surface of the workbench, a handrail fixing block is arranged in the mounting groove, and a transverse supporting rod is fixedly connected to the upper surface of the workbench. The utility model has the following advantages and effects: by arranging the connecting groove, the supporting column and the workbench, the supporting column is mounted according to the height required by work during use, the supporting column connecting block is inserted into the connecting groove, the transverse handrail and the handrail supporting column are mounted well, and the whole is inserted into the mounting groove on the surface of the workbench; therefore, the construction operation platform is installed, the safety of constructors can be protected through the arrangement of the handrails, and dangers caused by falling during working are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction platforms, in particular to an assembled and detachable tall construction operation platform. Background Art

[0002] In steel structure construction and installation technology, some projects need to build some temporary construction operation platforms to ensure the smooth installation of the structure. The quality and safety of the platform directly affect whether the construction can be smoothly implemented, and the appearance of the platform directly affects the civilized style of the project.

[0003] According to Chinese patent No. CN108104449A, an assembled and detachable tall construction operation platform is provided, including truss columns, truss beams, truss secondary beams, platform secondary beams, platform plates, sleeve nodes and angle steel connectors; the column feet of the truss columns are assembled with the roadbed box or the cross frame through the sleeve nodes on the column feet and then placed on the ground, the truss columns are assembled through the sleeve nodes of the columns, the truss beams and the truss columns are assembled through the sleeve nodes of the beams, the truss secondary beams and the truss beams are assembled through the sleeve nodes of the beams, the platform secondary beams and the truss secondary beams are assembled through the horizontal angle steel connectors, the platform plates and the platform secondary beams, the truss secondary beams or the truss beams are assembled through the vertical angle steel connectors, so that the tall construction operation platform can be conveniently transported, installed and disassembled, and can be recycled.

[0004] The above patent provides a good supporting effect, but there are no protective measures and the safety of workers on the platform cannot be guaranteed. Utility Model Content

[0005] The utility model aims to provide an assembled and detachable tall construction operation platform, which has a guardrail to provide protection for workers.

[0006] The above technical objectives of the utility model are achieved through the following technical solutions: an assembled detachable tall construction operation platform, including a workbench, a connecting groove is fixedly connected to the lower surface of the workbench, a supporting column is fixedly connected to the lower surface of the connecting groove, a supporting net is arranged on the upper surface of the workbench, a load-bearing bin is arranged inside the workbench, an installation groove is arranged on the upper surface of the workbench, a railing fixing block is arranged inside the installation groove, a transverse supporting rod is fixedly connected to the upper surface of the workbench, the supporting column includes a supporting body, a supporting column connecting block is fixedly connected to the upper surface of the supporting body, and a supporting groove is arranged on the lower surface of the supporting body

[0007] By adopting the above technical solution, by setting the connecting groove, the support column and the workbench, the support column is installed according to the height required for the work when in use, the support column connecting block is inserted into the connecting groove, the transverse railing and the railing support column are installed, and the whole is inserted into the installation groove on the surface of the workbench. In this way, the construction operation platform is installed. The setting of the railing can protect the safety of the construction workers and prevent the danger of falling during work. By setting the supporting body, support can be provided for the workbench to ensure stability during the construction operation process.

[0008] The utility model is further configured as follows: a steel pipe is fixedly connected to the inner wall of the load-bearing bin, and the steel pipe is a solid steel pipe.

[0009] By adopting the above technical solution and arranging solid steel pipes, the safety and stability of the working platform can be ensured, and reliable support can be provided for the working table.

[0010] The utility model is further configured as follows: a railing support column is fixedly connected to the upper surface of the railing fixing block, and a connecting hole is opened on one side of the railing support column.

[0011] By adopting the above technical solution and setting railing support columns, stable support can be provided for the railing, ensuring that no accidents occur during the working process.

[0012] The utility model is further configured as follows: a fixing block is fixedly connected to the upper surface of the transverse support rod, and a pull ring is fixedly connected to the upper surface of the fixing block.

[0013] By adopting the above technical solution and providing a pull ring, the installation and disassembly of the workbench can be facilitated, thereby facilitating construction.

[0014] The utility model is further configured as follows: a transverse railing is arranged inside the connecting hole, and railing support columns are arranged at both ends of the transverse railing.

[0015] By adopting the above technical solution and setting up a transverse railing, the workbench can be protected to ensure that no accidental falling occurs during construction.

[0016] The beneficial effects of the utility model are as follows: by setting connecting grooves, support columns and a workbench, the support columns are installed according to the height required for the work when in use, the support column connecting blocks are inserted into the connecting grooves, the transverse railings and the railing support columns are installed, and the whole is inserted into the installation groove on the surface of the workbench, so that the construction operation platform is installed, and the setting of the railings can protect the safety of the construction workers and prevent the danger of falling during work. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 This is a schematic diagram of the axonometric structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the support column structure of the utility model;

[0020] Figure 3 This is a schematic diagram of the cross-sectional structure of the workbench of the utility model;

[0021] Figure 4 This is a schematic diagram of the structure of the railing support column of the utility model.

[0022] In the figure, 1, workbench; 2, connecting groove; 3, support column; 301, support body; 302, support column connecting block; 303, support groove; 4, support net; 5, load-bearing bin; 6, installation groove; 7, railing fixing block; 8, horizontal support rod; 9, steel pipe; 10, railing support column; 11, connecting hole; 12, fixing block; 13, pull ring; 14, horizontal railing. DETAILED DESCRIPTION

[0023] The technical solution of the utility model will be described clearly and completely below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Reference Figure 1-4A assembled detachable tall construction operation platform includes a workbench 1. A connecting groove 2 is fixedly connected to the lower surface of the workbench 1. A supporting column 3 is fixedly connected to the lower surface of the connecting groove 2. The supporting column 3 includes a supporting body 301. A supporting column connecting block 302 is fixedly connected to the upper surface of the supporting body 301. A supporting groove 303 is provided on the lower surface of the supporting body 301. By setting the supporting body, support can be provided for the workbench to ensure stability during the construction operation. A supporting net 4 is provided on the upper surface of the workbench 1. A load-bearing bin 5 is provided inside the workbench 1. A steel pipe 9 is fixedly connected to the inner wall of the load-bearing bin 5. The steel pipe 9 is made of solid steel pipe. By setting the solid steel pipe, the safety and stability of the work platform can be ensured, and reliable support can be provided for the workbench. An installation is provided on the upper surface of the workbench 1. Slot 6, a railing fixing block 7 is arranged inside the installation slot 6, a railing support column 10 is fixedly connected to the upper surface of the railing fixing block 7, a connecting hole 11 is opened on one side of the railing support column 10, a transverse railing 14 is arranged inside the connecting hole 11, and railing support columns 10 are arranged at both ends of the transverse railing 14. By setting the transverse railing, protection can be provided for the workbench to ensure that accidental falling will not occur during construction. By setting the railing support column, stable support can be provided for the railing to ensure that accidents will not occur during the work process. The upper surface of the workbench 1 is fixedly connected with a transverse support rod 8, the upper surface of the transverse support rod 8 is fixedly connected with a fixing block 12, and the upper surface of the fixing block 120 is fixedly connected with a pull ring 13. By setting the pull ring, the installation and disassembly of the workbench can be facilitated, which is convenient for construction.

[0025] In the utility model, by setting the connecting groove 2, the support column 3 and the workbench 1, when in use, the support column 3 is installed according to the height required for the work, the support column connecting block 302 is inserted into the connecting groove 2, the transverse railing 14 and the railing support column 10 are installed, and the whole is inserted into the installation groove 6 on the surface of the workbench, so that the construction operation platform is installed, and the setting of the railing can protect the safety of the construction workers and prevent the danger of falling during work.

[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An assembled and detachable tall construction operation platform, comprising a workbench (1), characterized in that: The lower surface of the workbench (1) is fixedly connected with a connecting groove (2), the lower surface of the connecting groove (2) is fixedly connected with a supporting column (3), the upper surface of the workbench (1) is provided with a supporting net (4), the interior of the workbench (1) is provided with a load-bearing bin (5), the upper surface of the workbench (1) is provided with a mounting groove (6), the interior of the mounting groove (6) is provided with a railing fixing block (7), the upper surface of the workbench (1) is fixedly connected with a transverse supporting rod (8), the supporting column (3) comprises a supporting body (301), the upper surface of the supporting body (301) is fixedly connected with a supporting column connecting block (302), and the lower surface of the supporting body (301) is provided with a supporting groove (303).

2. The assembled and detachable tall construction operation platform according to claim 1 is characterized by: The inner wall of the load-bearing bin (5) is fixedly connected with a steel pipe (9), and the steel pipe (9) is a solid steel pipe.

3. The assembled and detachable tall construction operation platform according to claim 1 is characterized by: A railing support column (10) is fixedly connected to the upper surface of the railing fixing block (7), and a connecting hole (11) is provided on one side of the railing support column (10).

4. The assembled and detachable tall construction operation platform according to claim 1 is characterized by: A fixing block (12) is fixedly connected to the upper surface of the transverse support rod (8), and a pull ring (13) is fixedly connected to the upper surface of the fixing block (12).

5. The assembled and detachable tall construction operation platform according to claim 3 is characterized by: A transverse railing (14) is arranged inside the connection hole (11), and railing support columns (10) are arranged at both ends of the transverse railing (14).