Automatic lifting installation trolley for tunnel support sectional type steel arch
By designing a tunnel support segmented steel arch frame automatic lifting and installation trolley, using the walking system and forearm and top lifting equipment, the automatic installation of the steel arch frame is realized, which solves the problems of manual lifting and temporary support during construction, and improves the efficiency of construction. Efficiency and safety, reduced costs.
Patent Information
- Application Number
- CN202420195013.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-01-26
AI Technical Summary
The installation of steel arches in tunnel construction requires a lot of manpower, resulting in long construction periods, major safety hazards, high costs and low efficiency.
Design an automatic lifting and installation trolley for segmented steel arch frames for tunnel support. It uses a combination of walking system, forearm and top lifting equipment to realize automatic installation of steel arch frames and avoid manual lifting and temporary support.
It improves construction efficiency, reduces safety hazards, significantly shortens the construction period and saves costs, and realizes mechanized construction.
Smart Images

Figure CN221838360U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an arch frame installation trolley, in particular to an automatic lifting and installation trolley for a tunnel support multi-section steel arch frame. Background Art
[0002] During the tunnel construction process, in order to ensure the stability of the surrounding rock and the safety of construction, the installation and support of the steel arch frame must be carried out. At present, the installation of tunnel steel arch frames is mostly done manually. Due to the large weight and volume of the steel arch frame, a large amount of manpower is often required for the installation of the steel arch frame. There are also safety hazards during the construction. Not only is the construction period long, the manual labor intensity is high, the labor cost is also high, it is time-consuming and labor-intensive, and the installation efficiency is low. Utility Model Content
[0003] 1. Technical issues to be resolved
[0004] In view of this, the utility model adopts an automatic lifting and installation trolley for the segmented steel arch frame of the tunnel support, which avoids multiple auxiliary processes such as manual lifting of the steel arch frame during construction, manual support and adding temporary support during installation, thereby improving construction efficiency, reducing safety hazards, shortening construction period and saving construction costs.
[0005] (II) Technical solution
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A tunnel support segmented steel arch frame automatic lifting installation trolley, the installation trolley is symmetrical about the central longitudinal section of the tunnel as a whole, and comprises a main frame (1), a forearm (2), a top lifting device (3) and a walking system (4); the main frame (1) is welded from an I-beam (101) as a whole, a working platform is installed on both sides of the main frame (1), the working platform is connected to the I-beam (101), a stabilizing component (104) for stabilizing the main frame (1) in place is installed on the main frame (1), wheels (103) are installed at the bottom of the main frame (1), and the wheels (103) and the stabilizing component (104) are connected by The bottom beam I-beam (102) is connected; the main frame (1) is connected to the forearm (2) through the longitudinal I-beam (203), and the walking system (4) is installed on the working platform; the walking system (4) includes a slide groove (402), a limit plate (401) and a top beam I-beam (403), the front and rear ends of the top beam I-beam (403) are connected to the limit plate (401), and the left and right sides of the top beam I-beam (403) are provided with a slide groove (402); the top lifting device (3) includes a moving trolley (3b) and an upper fixing device (3a) connected to each other, and the pulley (315) on the moving trolley (3b) is located in the slide groove (402);
[0008] The forearm (2) comprises a vertical frame (201), a moving chain (202) and a lifting platform (206) connected in combination; the vertical frame (201) has a built-in moving chain (202), and the moving chain (202) is engaged with the lifting platform (206);
[0009] The upper fixing device (3a) comprises a fixing block (303), a rotating handle (301) and a fixing I-beam (304); the fixing block (303) and the rotating handle (301) are both arranged on the fixing I-beam (304), and a clamping groove (302) is formed between the fixing block (303) and the rotating handle (301); the fixing I-beam (304) is connected to an upper top plate (307) arranged on the moving trolley (3b); the size of the clamping groove (302) is adjusted by the rotating handle (301);
[0010] The mobile trolley (3b) is provided with an upper top plate (307) and a lower bottom plate (312), a support frame (309) is provided between the upper top plate (307) and the lower bottom plate (312), the upper and lower ends of the support frame (309) are respectively connected to the upper top plate (307) and the lower bottom plate (312), a cross frame (308) is connected to the support frame (309), a hydraulic push rod (310) is provided between the support frame (309) and the lower bottom plate (312), the upper end of the hydraulic push rod (310) is connected to the cross frame (308), and the upper end of the hydraulic push rod (310) is connected to the cross frame (308). The lower end of the hydraulic push rod (310) is connected to the lower base plate (312), and the middle and lower position of the hydraulic push rod (310) is connected to the hydraulic pipe (311); the longitudinal rotation of the support frame (309) is carried out by the bolt shaft (313) installed on the support frame (309); the mobile trolley (3b) also includes a walking device (314) installed at the bottom of the lower base plate (312), and a pulley (315) is installed on the walking device (314), and the pulley (315) moves longitudinally between the slide grooves (402).
[0011] Furthermore, the working platform comprises a bottom working platform (107), a middle working platform (109), an upper working platform (110) and a top working platform (111); a steel mesh (112) is laid on the surface of the working platform; a guardrail (108) is installed at the rear end of the bottom working platform (107), and a hydraulic push rod (106) is installed on the outer side of the bottom working platform (107).
[0012] Furthermore, the main vehicle frame (1) further comprises a ladder (105), and the ladder (105) is located in front of both sides of the main vehicle frame (1).
[0013] Furthermore, the stabilizing assembly (104) comprises a pad (104b), and the distance between the pad (104b) and the ground is controlled by adjusting the tightness of the tightening bolt (104a).
[0014] Furthermore, the forearm (2) further comprises an iron bolt (204), the lifting platform (206) is a triangular prism, and a bolt hole (205) for inserting the iron bolt (204) is provided on the top surface of the lifting platform (206).
[0015] Furthermore, a blocking bolt (305) is also installed on the fixed I-beam (304).
[0016] (III) Beneficial effects
[0017] Compared with the prior art, the utility model provides a tunnel support segmented steel arch frame automatic lifting installation trolley, which has the following beneficial effects:
[0018] 1. The automatic lifting and installation trolley for the segmented steel arch frame of the tunnel support can efficiently, safely and stably automatically transfer the steel arch frame from the ground to the layout position for installation by adopting the coordination of the walking system and the forearm and top lifting equipment, thus realizing mechanical automated construction.
[0019] 2. The automatic lifting and installation trolley of the tunnel support segmented steel arch frame avoids multiple auxiliary processes such as manual lifting of the steel arch frame during construction, manual support and adding temporary support during installation, etc., which improves construction efficiency, reduces safety hazards, significantly shortens construction period, saves construction costs, and has high practicality and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0021] Figure 2 It is a structural schematic diagram of the forearm of the utility model.
[0022] Figure 3 It is a structural schematic diagram of the top lifting device and the walking system of the utility model.
[0023] Markings in the figure: 1-main frame; 2-forearm; 3-top lifting device; 4-travel system; 5-steel arch; 101-I-beam; 102-bottom beam I-beam; 103-wheel; 104-stabilizing component; 104a-tightening bolts; 104b-pad; 105-ladder; 106-hydraulic push rod; 107-bottom working platform; 108-guardrail; 109-middle working platform; 110-upper working platform; 111-top working platform; 112-steel mesh; 201-vertical frame; 202-moving chain; 203-longitudinal working platform I-beam; 204-iron bolt; 205-bolt hole; 206-lifting platform; 3a-upper fixing device; 301-rotating handle; 302-slot; 303-fixing block; 304-fixed I-beam; 305-blocking bolt; 306-bolt; 3b-moving trolley; 307-upper top plate; 308-cross frame; 309-support frame; 310-hydraulic push rod; 311-hydraulic pipe; 312-lower bottom plate; 313-bolt shaft; 314-traveling device; 315-pulley; 401-limiting plate; 402-slideway; 403-top beam I-beam. DETAILED DESCRIPTION
[0024] In order to enable those skilled in the art to better understand the technical solution of the utility model, the utility model will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the utility model.
[0025] like Figure 1 , Figure 2 , Figure 3As shown, the utility model is a tunnel support segmented steel arch frame automatic lifting installation trolley, the installation trolley is symmetrical about the central longitudinal section of the tunnel as a whole, and the installation trolley includes a main frame 1, a forearm 2, a top lifting device 3 and a walking system 4; the main frame 1 is welded by I-beams 101 as a whole, and working platforms are installed on both sides of the main frame 1, and the working platforms are connected to the I-beams 101. A stabilizing component 104 for stabilizing the main frame 1 in place is installed on the main frame 1, and four sets of wheels 103 are installed at the bottom of the main frame 1, and the wheels 103 and the stabilizing component 104 are respectively connected by a bottom beam I-beam 1 02 connection; the main frame 1 is connected to the forearm 2 through the longitudinal I-beam 203, and the walking system 4 is installed on the working platform; the walking system 4 includes a slide 402, a limit plate 401 and a top beam I-beam 403, the front and rear ends of the top beam I-beam 403 are connected to the limit plate 401, and the left and right sides of the top beam I-beam 403 are provided with slides 402; the top lifting device 3 includes a moving trolley 3b and an upper fixing device 3a, the pulley 315 on the moving trolley 3b is located in the slide 402 on the walking system, and the top lifting device 3 is longitudinally moved through the slide 402 on the walking system.
[0026] The forearm 2 includes a vertical frame 201, a moving chain 202 and a lifting platform 206 connected in combination; the vertical frame 201 has a built-in moving chain 202, and the moving chain 202 is engaged with the lifting platform 206, so that the lifting platform 206 can be automatically lifted and lowered.
[0027] The upper fixing device 3a includes a fixing block 303, a rotating handle 301 and a fixing I-beam 304; the fixing block 303 and the rotating handle 301 are both arranged on the fixing I-beam 304, and a clamping groove 302 is formed between the fixing block 303 and the rotating handle 301; the fixing I-beam 304 is connected to an upper top plate 307 arranged on the moving trolley 3b by bolts 306; the size of the clamping groove 302 is adjusted by the rotating handle 301, and the top lifting device 3 fixes the steel arch frame 5 by the clamping groove 302;
[0028] The mobile trolley 3b is provided with an upper top plate 307 and a lower bottom plate 312, a support frame 309 is provided between the upper top plate 307 and the lower bottom plate 312, the upper and lower ends of the support frame 309 are respectively connected to the upper top plate 307 and the lower bottom plate 312 by bolts 306, a cross frame 308 is connected to the support frame 309, a hydraulic push rod 310 is provided between the support frame 309 and the lower bottom plate 312, the upper end of the hydraulic push rod 310 is connected to the cross frame 308, and the lower end of the hydraulic push rod 310 is connected to the cross frame 308. It is connected to the lower base plate 312, and the middle and lower position of the hydraulic push rod 310 is connected to the hydraulic pipe 311; the top lifting device 3 is lifted by the hydraulic push rod 310; the longitudinal rotation of the support frame 309 is rotated by the bolt shaft 313 installed on the support frame 309; the mobile trolley 3b also includes a walking device 314 installed at the bottom of the lower base plate 312, and the walking device 314 is equipped with four pulleys 315, and the pulley 315 moves longitudinally between the slide grooves 402.
[0029] Furthermore, the working platform includes a bottom working platform 107, a middle working platform 109, an upper working platform 110 and a top working platform 111; a steel mesh 112 is laid on the surface of the working platform; a guardrail 108 is installed at the rear end of the bottom working platform 107, and a hydraulic push rod 106 is installed on the outer side of the bottom working platform 107.
[0030] Furthermore, the main body frame 1 further includes a ladder 105 , and the ladder 105 is located in front of both sides of the main body frame 1 .
[0031] Furthermore, the stabilizing assembly 104 includes a pad 104b, and the distance from the pad 104b to the ground is controlled by adjusting the tightness of the tightening bolt 104a.
[0032] Furthermore, the lifting platform 206 is a triangular prism, and a bolt hole 205 for inserting an iron bolt 204 is opened on the top surface of the lifting platform 206; the steel arch frame 5 is fixed by inserting the iron bolt 204 into the bolt hole 205 to prevent the steel arch frame 5 from shifting during the upward lifting process and prevent it from falling and being hit.
[0033] Furthermore, a blocking bolt (305) is installed on the fixed I-beam (304), and the top lifting device 3 limits the longitudinal sliding of the steel arch frame 5 through the blocking bolt 305.
[0034] In the utility model, the working steps of the device are as follows:
[0035] After the installation trolley moves to a fixed position through the wheels 103, the height of the pad 104b is controlled by adjusting the tightness of the tightening bolts 104a in the stabilizing assembly 104 to limit the movement of the main frame 1; the processed steel arch frame 5 is transported and lifted into the lifting platform 206 at the forearm 2 of the installation trolley. After it is placed in place, check whether the steel arch frame 5 is fixed in place, and insert the iron bolt 204 into the bolt hole 205 reserved at the front end of the forearm 2 to prevent the displacement of the steel arch frame 5 during the upward lifting process. The remote control operating system lifts the lifting platforms 206 of the forearms 2 on both sides evenly upward, and the lifting platforms 206 are connected with the moving chain 202 to move together and lift to the top of the forearm 2.
[0036] After the steel arch frame 5 is lifted to the top of the forearm 2, the top lifting device 3 is moved to the front end of the walking system 4 through remote control. After the transported steel arch frame 5 is received by the slot 302 of the top lifting device 3, the rotating handle 301 is tightened to fix the steel arch frame 5, and the hydraulic push rod 310 of the moving trolley 3b is controlled to lift the support frame 309 upward to a certain height. After the height is higher than the top of the forearm 2, the top lifting devices 3 on both sides are moved backward in the slide groove 402 at the same time through the pulley 315 of the moving trolley 3b and transported to the construction area for installing the steel arch frame 5.
[0037] After measurement and positioning, first, the steel arch frames 5 on both sides are placed against the top lifting device 3 with one end, and then slid downward along the other side until the bottom of the steel arch frame slides to the bottom of the arch. The staff climbs up and down the working platform through the ladder 105, and controls the hydraulic push rod 106 of the bottom working platform 107 to push the fixed steel arch frame horizontally. The middle section of the steel arch frame 5 is moved up and down by the top lifting device 3 to the approximate installation position and remains stationary, thereby connecting the three sections of the steel arch frame 5.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An automatic lifting and installation trolley for segmented steel arch frame for tunnel support, characterized in that: The installation trolley is symmetrical about the central longitudinal section of the tunnel as a whole, and comprises a main frame (1), a forearm (2), a top lifting device (3) and a walking system (4); the main frame (1) is welded from I-beams (101) as a whole, working platforms are installed on both sides of the main frame (1), and the working platforms are connected to the I-beams (101); a stabilizing component (104) for stabilizing the main frame (1) in place is installed on the main frame (1); wheels (103) are installed at the bottom of the main frame (1), and the wheels (103) and the stabilizing component (104) are connected via the bottom beam I-beam (102). The main frame (1) is connected to the forearm (2) through a longitudinal I-beam (203), and the walking system (4) is installed on the working platform; the walking system (4) includes a slide groove (402), a limit plate (401) and a top beam I-beam (403), the front and rear ends of the top beam I-beam (403) are connected to the limit plate (401), and the left and right sides of the top beam I-beam (403) are provided with a slide groove (402); the top lifting device (3) includes a moving trolley (3b) and an upper fixing device (3a) connected to each other, and the pulley (315) on the moving trolley (3b) is located in the slide groove (402); The forearm (2) comprises a vertical frame (201), a moving chain (202) and a lifting platform (206) connected in combination; the vertical frame (201) has a built-in moving chain (202), and the moving chain (202) is engaged with the lifting platform (206); The upper fixing device (3a) comprises a fixing block (303), a rotating handle (301) and a fixing I-beam (304); the fixing block (303) and the rotating handle (301) are both arranged on the fixing I-beam (304), and a clamping groove (302) is formed between the fixing block (303) and the rotating handle (301); the fixing I-beam (304) is connected to an upper top plate (307) arranged on the moving trolley (3b); the size of the clamping groove (302) is adjusted by the rotating handle (301); The mobile trolley (3b) is provided with an upper top plate (307) and a lower bottom plate (312), a support frame (309) is provided between the upper top plate (307) and the lower bottom plate (312), the upper and lower ends of the support frame (309) are respectively connected to the upper top plate (307) and the lower bottom plate (312), a cross frame (308) is connected to the support frame (309), a hydraulic push rod (310) is provided between the support frame (309) and the lower bottom plate (312), the upper end of the hydraulic push rod (310) is connected to the cross frame (308), and the upper end of the hydraulic push rod (310) is connected to the cross frame (308). The lower end of the hydraulic push rod (310) is connected to the lower base plate (312), and the middle and lower position of the hydraulic push rod (310) is connected to the hydraulic pipe (311); the longitudinal rotation of the support frame (309) is carried out by the bolt shaft (313) installed on the support frame (309); the mobile trolley (3b) also includes a walking device (314) installed at the bottom of the lower base plate (312), and a pulley (315) is installed on the walking device (314), and the pulley (315) moves longitudinally between the slide grooves (402).
2. The automatic lifting and installation trolley for the segmented steel arch frame for tunnel support according to claim 1 is characterized in that: The working platform comprises a bottom working platform (107), a middle working platform (109), an upper working platform (110) and a top working platform (111); a steel mesh (112) is laid on the surface of the working platform; a guardrail (108) is installed at the rear end of the bottom working platform (107), and a hydraulic push rod (106) is installed on the outer side of the bottom working platform (107).
3. The automatic lifting and installation trolley for the segmented steel arch frame for tunnel support according to claim 1 is characterized in that: The main vehicle frame (1) further comprises a ladder (105), wherein the ladder (105) is located in front of both sides of the main vehicle frame (1).
4. The automatic lifting and installation trolley for segmented steel arch frame for tunnel support according to claim 1 is characterized in that: The stabilizing assembly (104) comprises a pad (104b), and the distance between the pad (104b) and the ground is controlled by adjusting the tightness of the tightening bolt (104a).
5. The automatic lifting and installation trolley for segmented steel arch frame for tunnel support according to claim 1 is characterized in that: The forearm (2) further comprises an iron bolt (204); the lifting platform (206) is a triangular prism; a bolt hole (205) for inserting the iron bolt (204) is provided on the top surface of the lifting platform (206).
6. The automatic lifting and installation trolley for the segmented steel arch frame for tunnel support according to claim 1 is characterized in that: A blocking bolt (305) is also installed on the fixed I-beam (304).