Water tank structure and ventilation treatment equipment
By arranging gas humidification parts in the water tank structure of the ventilation therapy equipment, multi-point contact between gas and humidification liquid is achieved, the humidification capacity is improved, the problem of poor humidification effect is solved, and the user experience and treatment effect are improved.
Patent Information
- Application Number
- CN202323667668.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Ventilation therapy equipment has poor humidification capabilities, resulting in poor humidification of therapeutic gases and affecting the user experience.
A water tank structure is designed. By arranging a gas humidification component in the chamber, the gas humidification component includes a humidification channel. The gas entering from the air inlet channel not only contacts the humidification liquid in the chamber, but also contacts the gas humidification component to further humidify Then enter the humidification channel to enhance the humidification effect.
It improves the humidification capacity of the water tank structure, improves the user experience and the therapeutic effect of the ventilation therapy equipment.
Smart Images

Figure CN221845744U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of therapeutic equipment, and specifically relates to a water tank structure and ventilation therapeutic equipment. Background Art
[0002] A ventilation therapy device is a device that generates a certain pressure of gas through a fan and transmits the gas to the user's respiratory tract through a pipeline. In order to improve the problem of airflow dryness, most ventilation therapy devices use a humidification mechanism to reduce the irritation of the airflow to the respiratory mucosa.
[0003] At present, the humidification mechanism of ventilation therapy equipment generally inputs a certain pressure of therapeutic gas into a water tank structure containing a humidifying liquid, and after the therapeutic gas contacts the humidifying liquid in the water tank structure, the humidified therapeutic gas is delivered to the user for use. However, the contact area between the therapeutic gas entering the water tank structure and the humidifying liquid in the water tank structure is limited, so the humidification effect of the therapeutic gas is also limited. Utility Model Content
[0004] The purpose of the embodiments of the present application is to provide a water tank structure and ventilation therapy equipment, which can solve the problem of poor humidification ability of the water tank structure.
[0005] In a first aspect, an embodiment of the present application provides a water tank structure, the water tank structure comprising:
[0006] a housing, the housing comprising a chamber, the chamber being configured to store a humidification liquid for humidifying the gas entering the chamber;
[0007] The box body is provided with an air inlet channel and an air outlet channel;
[0008] A gas humidifier is arranged in the chamber, and the gas humidifier includes a humidification channel. The gas entering the chamber from the air inlet channel enters the humidification channel via the gas humidifier, and the humidification channel is connected to the air outlet channel.
[0009] Optionally, the gas transmitted to the chamber through the air inlet passage is a heated gas at a preset temperature threshold.
[0010] Optionally, the chamber includes a first inner cavity and a second inner cavity that are separated, the air inlet channel is connected to the first inner cavity, a connecting air inlet is provided between the first inner cavity and the second inner cavity, the humidification liquid is stored in the second inner cavity, and the gas humidification element is arranged in the second inner cavity.
[0011] Optionally, the water tank structure further includes a baffle;
[0012] The baffle separates the chamber into the first inner cavity and the second inner cavity, and the air inlet is opened on the baffle.
[0013] Optionally, the box body includes an upper cover and a base;
[0014] The upper cover is connected to the base, the baffle is connected between the upper cover and the base, the cavity between the upper cover and the baffle constitutes the first inner cavity, and the cavity between the base and the baffle constitutes the second inner cavity.
[0015] Optionally, the air outlet channel is opened at the top of the upper cover, the air inlet channel is opened at the side of the upper cover, a transfer channel is provided on the baffle, and the humidification channel is connected to the air outlet channel through the transfer channel.
[0016] Optionally, the air inlet channel includes a first channel and a second channel, the second channel is connected to the air outlet channel, the first channel is connected to the first inner cavity, and the cross-sectional area of the first channel is greater than the cross-sectional area of the second channel.
[0017] Optionally, the second channel is communicated with the switching channel, so that the second channel is communicated with the air outlet channel through the switching channel.
[0018] Optionally, a pipeline interface is provided on one side of the transfer channel, and the second channel is connected to the air outlet channel through the pipeline interface.
[0019] Optionally, the end of the second channel or the end of the pipeline interface is provided with a semi-enclosed shielding structure extending out of the end;
[0020] When the second channel is connected to the pipeline interface, the end of the second channel is aligned with the end of the pipeline interface, and the shielding structure partially shields the area around the aligned position.
[0021] Optionally, the bottom end of the air outlet channel and the top end of the transfer channel are sealed and connected via a sealing ring.
[0022] Optionally, the air inlet and the first channel are respectively located on two sides of the central axis of the first inner cavity.
[0023] Optionally, the cross-sectional area of the air inlet in the first plane is greater than or equal to the cross-sectional area of the first channel in the second plane, wherein the first plane and the second plane are perpendicular to each other, and the first plane is a plane perpendicular to the central axis of the first inner cavity.
[0024] Optionally, the baffle is further connected to a positioning ring, and the positioning ring is arranged around the circumference of the baffle;
[0025] The upper cover and the baffle are positioned and fixed by the positioning ring.
[0026] Optionally, the first inner cavity includes a heat preservation cavity and an airflow cavity;
[0027] The heat preservation cavity is located at the peripheral side of the air flow cavity, wherein the air inlet passage is communicated with the air flow cavity, and the air flow cavity is communicated with the second inner cavity through the air inlet.
[0028] Optionally, the heat-insulating cavity and the airflow cavity are separated by a guide plate.
[0029] Optionally, the upper cover and the base are detachably connected via a cover buckle.
[0030] Optionally, the upper cover and the base are pivotally connected to achieve an open and closed state of the water tank.
[0031] Optionally, at least part of the structure of the gas humidifier is set to a water-absorbing material. When a certain volume of humidifying liquid is stored in the chamber of the water tank, the gas humidifier absorbs part of the humidifying liquid, so that the gas entering the chamber enters the humidification channel after being humidified by the gas humidifier.
[0032] Optionally, the water-absorbing material portion of the gas humidifier is configured as a porous cotton structure, and the gas entering the chamber is humidified by the porous cotton structure and then enters the humidification channel.
[0033] Optionally, the gas humidifying component is detachably disposed in the chamber.
[0034] Optionally, a fixing boss is provided at the bottom of the chamber, and the fixing boss is inserted into the humidification channel of the gas humidifier.
[0035] Optionally, the top of the upper cover is detachably connected with an air outlet joint, and the inner cavity of the air outlet joint constitutes the air outlet channel.
[0036] Optionally, the air outlet channel includes a connected third channel and a fourth channel, the third channel is connected to the first inner cavity, the central axis of the third channel is parallel to the central axis of the first inner cavity, the fourth channel is arranged on a side of the third channel away from the first inner cavity, and the angle between the central axis of the fourth channel and the central axis of the third channel is an obtuse angle.
[0037] In a second aspect, an embodiment of the utility model further provides a ventilation therapy device, the ventilation therapy device comprising a device body and a water tank structure as described in any embodiment of the first aspect;
[0038] The device body includes a heating element for heating gas, and the gas passing through the heating element flows into the air inlet passage.
[0039] In the embodiment of the utility model, the gas entering the chamber from the air inlet channel not only contacts the humidifying liquid in the chamber, but also contacts the gas humidifying component, so that the gas can enter the humidifying channel after being further humidified by the gas humidifying component, and finally enter the air outlet channel through the humidifying channel. In this way, the gas entering the chamber from the air inlet channel can be further humidified by the gas humidifying component, and enter the air outlet channel after being further humidified, so that the gas flowing out of the air outlet channel is further humidified, which can improve the humidification capacity of the water tank structure, thereby improving the user experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1 A schematic diagram showing an exploded structure of a water tank structure provided in an embodiment of the present application;
[0042] Figure 2 A schematic diagram showing the external structure of a water tank structure provided in an embodiment of the present application;
[0043] Figure 3 Indicates that a water tank structure provided in an embodiment of the present application is Figure 2 Schematic diagram of the cross-sectional structure in the AA direction;
[0044] Figure 4 One of the structural schematic diagrams showing an upper cover included in a water tank structure provided in an embodiment of the present application;
[0045] Figure 5 A second structural schematic diagram showing an upper cover included in a water tank structure provided in an embodiment of the present application;
[0046] Figure 6 A schematic structural diagram showing a baffle included in a water tank structure provided in an embodiment of the present application.
[0047] Reference numerals:
[0048] 1: housing; 2: gas humidifying component; 3: baffle; 4: sealing ring; 5: positioning ring; 6: cover buckle; 11: air outlet channel; 12: air inlet channel; 13: first inner cavity; 14: second inner cavity; 15: air inlet; 16: upper cover; 17: base; 21: humidifying channel; 31: transfer channel; 32: pipeline interface; 111: third channel; 112: fourth channel; 121: first channel; 122: second channel; 131: air flow cavity; 132: insulation cavity; 133: guide plate; 161: reinforcing rib structure; 171: fixing boss; 1221: shielding structure. DETAILED DESCRIPTION
[0049] The term "first" or "second" in the specification and claims of this application may include one or more of the features explicitly or implicitly. In the description of this application, unless otherwise specified, "plurality" means two or more. In addition, "and / or" in the specification and claims means at least one of the connected objects, and the character " / " generally means that the objects connected before and after are in an "or" relationship.
[0050] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0051] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0052] In a first aspect, an embodiment of the utility model provides a water tank structure. Figure 1 A schematic diagram showing an exploded structure of a water tank structure provided in an embodiment of the present application is shown. Figure 2 A schematic diagram showing the external structure of a water tank structure provided in an embodiment of the present application is shown. Figure 3 Indicates that a water tank structure provided in an embodiment of the present application is Figure 2The schematic diagram of the cross-sectional structure in the AA direction is as follows: Figures 1 to 3 As shown, the water tank structure includes:
[0053] The box body 1 comprises a chamber, wherein the chamber is configured to store a humidifying liquid for humidifying the gas entering the chamber. The box body 1 is provided with an air inlet channel 12 and an air outlet channel 11 .
[0054] The gas humidifier 2 is arranged in the chamber. The gas humidifier 2 includes a humidification channel 21. The gas entering the chamber from the air inlet channel 12 enters the humidification channel 21 through the gas humidifier 2. The humidification channel 21 is connected to the air outlet channel 11.
[0055] It can be seen from the above embodiments that in the embodiments of the utility model, since the box body 1 includes a chamber, the chamber is configured to store a humidifying liquid for humidifying the gas entering the chamber, and the box body 1 is provided with an air inlet channel 12 and an air outlet channel 11, and the gas humidifying component 2 is arranged in the chamber, and the gas humidifying component 2 includes a humidifying channel 21. The gas entering the chamber from the air inlet channel 12 enters the humidifying channel 21 via the gas humidifying component 2, and the humidifying channel 21 is connected to the air outlet channel 11, so that the gas entering the chamber from the air inlet channel 12 not only contacts the humidifying liquid in the chamber, but also contacts the gas humidifying component 2, so that the gas can enter the humidifying channel 21 after further humidification via the gas humidifying component 2, and finally enter the air outlet channel 11 via the humidifying channel 21. In this way, the gas entering the chamber from the air inlet channel 12 can be further humidified through the gas humidifier 2, and enter the air outlet channel after further humidification, so that the gas flowing out from the air outlet channel 11 is further humidified, which can enhance the humidification capacity of the water tank structure and thereby improve the user experience.
[0056] In the above embodiment, the housing 1 may be a square housing structure, a cylindrical housing structure, or a housing structure of other shapes, which is not limited in the embodiment of the utility model. The air inlet channel 12 and the air outlet channel 11 may be tubular structures arranged on the housing 1.
[0057] In some embodiments, the gas flow direction in the air inlet channel 12 intersects with the gas flow direction in the air outlet channel 11, that is, the axis of the air inlet channel 12 intersects with the axis of the air outlet channel 11, so that the heating element does not need to be set at the bottom of the box 1.
[0058] The gas humidifier 2 can be a hydrophilic material such as a water-absorbing resin, a water-absorbing fiber, a sponge, etc., and the embodiment of the utility model does not limit this. The gas humidifier 2 can be fixed in the chamber by connecting methods such as snap-on, plug-in, and bonding. In this way, the heated gas entering the chamber can be humidified under the action of the gas humidifier 2. A humidification channel 21 can be opened in the middle of the gas humidifier 2, and the humidification channel 21 and the air outlet channel 11 are connected. In this way, the gas humidified by the gas humidifier 2 can enter the air outlet channel 11 through the humidification channel 21, so that the gas flowing out of the air outlet channel 11 is further humidified.
[0059] In some embodiments, the gas delivered into the chamber through the gas inlet passage 12 is a heated gas at a predetermined temperature threshold.
[0060] It should be noted that the preset temperature threshold in the above embodiment is the threshold of the maximum temperature value and the minimum temperature value of the temperature range of the gas required for the user to breathe, such as 30°C to 34°C. In this way, since the gas transmitted to the chamber through the air inlet channel 12 is a heated gas at the preset temperature threshold, when the heated gas entering the chamber from the air inlet channel 12 contacts the humidifying liquid in the chamber (including the humidifying liquid stored at the bottom of the chamber absorbed by the gas humidifying component 2, and the humidifying liquid remaining at the bottom of the chamber after being absorbed by the gas humidifying component 2), the gas with temperature can improve the humidification effect of the gas when in contact with the liquid, so the heated gas output from the chamber into the air outlet channel 11 is a humidified gas with a certain temperature. Since the process of humidifying the heated gas consumes part of the heat of the heated gas, the temperature of the heated gas after humidification will be lower than the temperature input by the air inlet channel 12. In addition, since a gas humidifier 2 is provided in the chamber, the gas entering the chamber not only comes into contact with the liquid stored at the bottom of the chamber, but also comes into contact with the humidifying liquid absorbed on the gas humidifier 2 during the process of entering the humidification channel 21. This increases the total contact area between the heated gas and the humidifying liquid in the chamber, thereby improving the humidification effect of the heated gas.
[0061] Next, the specific structure and related assembly method of the water tank structure provided by the embodiment of the utility model are specifically introduced as follows:
[0062] In some feasible embodiments, the chamber includes a first inner cavity 13 and a second inner cavity 14 that are separated, the air inlet channel 12 is connected to the first inner cavity 13, a connecting air inlet port 15 is provided between the first inner cavity 13 and the second inner cavity 14, the humidification liquid is stored in the second inner cavity 14, and the gas humidification element 2 is arranged in the second inner cavity 14.
[0063] It should be noted that the housing 1 can be an integrated structure, with the first inner cavity 13 and the second inner cavity 14 separated by an internal baffle, or the housing 1 can also be a split structure, with the first inner cavity 13 and the second inner cavity 14 connected and separated by other structures. The separation of the first inner cavity 13 and the second inner cavity 14 can be understood as the first inner cavity 13 and the second inner cavity 14 are not connected to each other except for the connecting structure (the air inlet 15 in the embodiment of the utility model). In this way, the heated gas entering the second inner cavity 14 can enter the humidification channel 21 after being humidified by the gas humidifier 2, and then can enter the gas outlet channel 11 through the humidification channel 21. Since the air outlet channel 11 is connected to the humidification channel 21 in the second inner cavity 14, but not to the first inner cavity 13, the gas entering the first inner cavity 13 from the air inlet channel 12 will not flow out directly from the air outlet channel 11, but first enters the second inner cavity 14 through the air inlet 15, and after being fully contacted with the humidification liquid in the second inner cavity 14, it will flow out from the air outlet channel 11. Therefore, the humidification effect of the water tank structure is improved by setting the two partitioned chambers. At the same time, through the partition between the first inner cavity 13 and the second inner cavity 14, the gas is humidified only in the second inner cavity 14, which reduces the space for gas flow and humidification, and has a certain insulation effect on the gas entering the water tank chamber, especially the heating gas.
[0064] In some embodiments, Figure 3 and Figure 6 As shown, the water tank structure further includes a baffle 3 ; the baffle 3 separates the chamber into a first inner cavity 13 and a second inner cavity 14 , and an air inlet 15 is provided on the baffle 3 .
[0065] It should be noted that the baffle 3 can be a square plate, a circular plate, or a plate-like structure of other shapes. The specific shape of the baffle 3 is determined according to the inner cavity of the water tank structure, and the embodiment of the utility model does not limit this. The baffle 3 can be fixed in the inner cavity of the box body 1 by connecting methods such as clamping, welding or bonding, and then the box body 1 can be divided into a first inner cavity 13 and a second inner cavity 14. If the box body 1 is a split structure, the baffle 3 can also be used as a transition connector between the two split structures of the box body 1. In this way, the air inlet 15 can be set on the baffle 3, so that the heated gas entering the first inner cavity 13 can enter the second inner cavity 14 through the air inlet 15. It should also be noted that the air inlet 15 is a through hole or a through groove structure opened on the baffle 3. The air inlet 15 can be a circular hole structure, a square groove structure, or a through groove structure of other shapes. The air inlet area of the air inlet 15 is determined according to the gas flow resistance inside the box body 1, and the embodiment of the utility model does not limit this.
[0066] In the above embodiment, the chamber is divided into a first inner cavity 13 and a second inner cavity 14 by the baffle 3. On the one hand, the gas humidifier 2 arranged at the bottom of the baffle 3 can be limited and fixed to prevent the gas humidifier 2 from moving along the extension direction of the central axis of the chamber. On the other hand, the baffle 3 can be used to reduce the space for gas flow and humidification, thereby further improving the cooling and humidification effect.
[0067] As for the structure of the box body 1, the box body 1 can be an integrated structure or a split structure, which is not limited in the embodiment of the present utility model.
[0068] When the box body 1 is a split structure, the box body 1 includes an upper cover 16 and a base 17; the upper cover 16 is connected to the base 17, the baffle 3 is connected between the upper cover 16 and the base 17, the cavity between the upper cover 16 and the baffle 3 constitutes a first inner cavity 13, and the cavity between the base 17 and the baffle 3 constitutes a second inner cavity 14.
[0069] It should be noted that the upper cover 16 can be a shell structure with an opening at the bottom, and the base 17 can be a shell structure with an opening at the top. Under the action of the baffle 3, the cavity between the upper cover 16 and the baffle 3 constitutes the first inner cavity 13, and the cavity between the base 17 and the baffle 3 constitutes the second inner cavity 14. In this way, since the upper cover 16 and the base 17 are two independent parts, it is convenient to install the gas humidifier 2 in the second inner cavity 14 between the base 17 and the baffle 3. At the same time, since the upper cover 16 and the base 17 are two independent parts, it is convenient to subsequently repair and replace the box body 1.
[0070] Furthermore, for the split structure of the above-mentioned box body 1, in some embodiments, the air outlet channel 11 is opened on the top of the upper cover 16, the air inlet channel 12 is opened on the side of the upper cover 16, and a transfer channel 31 is provided on the baffle 3, and the humidification channel 21 is connected to the air outlet channel 11 through the transfer channel 31.
[0071] In addition, the baffle 3 is provided with a transfer channel 31 which may be at least one of a transfer cylinder, a transfer pipe or other connecting pipelines. In this way, the humidified gas flowing out of the humidification channel 21 can be directly introduced into the outlet channel 11 through the transfer channel 31, thereby reducing the heat loss of the humidified gas in the path of flowing into the outlet channel 11.
[0072] Regarding the structure of the air intake channel, in some embodiments, the air intake channel 12 includes a first channel 121 and a second channel 122 , the second channel 122 is in communication with the air outlet channel 11 , and the first channel 121 is in communication with the first inner cavity 13 .
[0073] It should be noted that, for the structure of the first channel 121 and the second channel 122, the first channel 121 and the second channel 122 can be two independent channels, that is, the first channel 121 and the second channel 122 are two parallel pipe structures. Alternatively, the second channel 122 can also be arranged in the first channel 121, that is, the first channel 121 is covered on the peripheral side of the second channel 122. In other words, in the second channel 122, the gap between the first channel 121 and the second channel 122 can allow the heated gas to pass through, that is, the heated gas enters the box body 1 with two channels. In this way, since the second channel 122 is connected to the air outlet channel 11, the heated gas entering the second channel 122 can flow directly into the air outlet channel 11, so that the slightly cooled humidified gas flowing out of the humidification channel in the air outlet channel 11 is temperature compensated, so that the humidified gas delivered to the user end by the air outlet channel 11 is at a comfortable temperature, thereby improving the user's use effect. In this way, the heated gas entering from the first channel 121 can be humidified by the gas humidifying element 2, and after being cooled and humidified, it can be mixed with the heated gas entering from the second channel 122, so that the gas flowing out from the gas outlet channel 11 is at a suitable treatment temperature. Since the function of the first channel 121 is to input pre-humidified gas into the box, it is the key to realizing the humidification function of the box, and the function of the second channel 122 is to compensate the temperature of the gas in the gas outlet channel 11, which is a secondary function, and the amount of high-temperature gas for temperature compensation does not need to be large, so under normal circumstances, the cross-sectional area of the first channel 121 is larger than the cross-sectional area of the second channel 122.
[0074] Furthermore, in some embodiments, the second channel 122 is connected to one side of the transfer channel 31, so that the second channel 122 is connected to the gas outlet channel 11 through the transfer channel 31. In this way, the heated gas flowing in from the second channel 122 can be introduced into the gas outlet channel 11 through the transfer channel 31, and the heated gas in the gas outlet channel 11 is "neutralized" with the gas after cooling and humidification by the gas humidifier 2, so that it is easy to control the temperature and humidity of the gas in the gas outlet channel 11, and avoid the gas directly passing through the heated gas in the gas outlet channel 11. The temperature is low and unsuitable for human use. In some embodiments, an opening can be provided on the transfer channel 31 corresponding to the end of the second channel 122, so that the end of the second channel 122 is aligned with the opening on the transfer channel 31, so that the heated gas in the second channel 122 that meets the preset temperature threshold enters the transfer channel 31 through the opening.
[0075] Optionally, a pipeline interface 32 is provided on one side of the switching channel 31 , and the second channel 122 is connected to the air outlet channel 11 through the pipeline interface 32 .
[0076] In the above embodiment, the second channel 122 is connected to the gas outlet channel 11 through the pipeline interface 32, and then the heated gas flowing in from the second channel 122 can be directly introduced into the gas outlet channel 11 through the adapter channel 31 in a docking manner, so that the second channel 122 and the adapter channel 31 are relatively easy to communicate with each other. Exemplarily, taking the adapter channel 31 as an adapter cylinder as an example, the adapter cylinder and the pipeline interface 32 together form a "three-way structure", and the specific three channels are the two ends of the adapter cylinder and the end of the pipeline interface 32 away from the adapter cylinder. In this way, the heated gas in the second channel 122 can be introduced into the adapter cylinder through the pipeline interface 32, and then flow into the gas outlet channel 11 through the adapter cylinder, and the heated gas in the first channel 121 can be blocked by the adapter cylinder, so that the heated gas in the first channel 121 can only flow through the air inlet 15 between the first inner cavity 13 and the second inner cavity 14. Among them, the adapter cylinder can be a square cylinder structure, or a circular cylinder structure, or a cylinder structure of other shapes. The pipe interface 32 and the second channel 122 are preferably connected by port docking, and a small gap is left between the end of the pipe interface 32 of the department and the end of the second channel 122 to avoid interference between the air inlet channel 12 set on the upper cover and the transfer channel 31 set on the baffle 3 when the water tank structure is installed. In addition, the angle between the axis of the air inlet channel 12 and the plane where the baffle 3 is located is an acute angle, that is, the air inlet channel 12 is tilted, so that the liquid that solidifies when it is cold can be prevented from flowing from the air inlet channel 12 into the transfer channel 31.
[0077] Furthermore, the end of the second channel 122 or the end of the pipeline interface 32 is provided with a semi-enclosed shielding structure 1221 extending out of the end. When the second channel 122 and the pipeline interface 32 are connected, the end of the second channel 122 and the end of the pipeline interface 32 are aligned, and the shielding structure 1221 partially shields the surroundings of the aligned position. Figure 5 As shown, the shielding structure 1221 extends out from the end of the second channel 122, and when the end of the second channel 122 and the end of the pipe interface 32 are aligned, the gap of the alignment position is partially shielded around the top of the alignment position to reduce gas leakage from the gap of the alignment position when the second channel 122 and the pipe interface 32 are aligned.
[0078] To ensure the tightness of gas flow, in some embodiments, the bottom end of the gas outlet channel 11 and the top end of the transfer channel 31 are sealed and connected via a sealing ring 4 .
[0079] In this embodiment, the sealing ring 4 may include a first sealing portion and a second sealing portion, and the first sealing portion and the second sealing portion are connected. Taking the transfer channel 31 as a cylindrical barrel as an example, the first sealing portion and the second sealing portion are both annular structures, and the diameter of the first sealing portion is smaller than the diameter of the second sealing portion. In this way, when connected, the first sealing portion can be embedded in the chamber of the transfer channel 31, so that the first sealing portion and the transfer channel 31 are interference fit, and the second sealing portion and the air outlet channel 11 are embedded, so that the second sealing portion and the air outlet channel 11 are interference fit. In this way, the air outlet channel 11 and the transfer channel 31 can be in a sealed state through the sealing ring 4, thereby avoiding air leakage between the air outlet channel 11 and the transfer channel 31. The material of the sealing ring 4 can be a material with a certain sealing effect such as nitrile rubber, polyurethane rubber, polypropylene rubber, silicone rubber, fluororubber, butyl rubber, ethylene propylene rubber, chloroprene rubber, etc., which is not limited to this embodiment of the utility model.
[0080] Furthermore, the air inlet 15 and the first channel 121 are respectively located on two sides of the central axis of the first inner cavity 13 .
[0081] By respectively arranging the air inlet 15 and the first channel 121 on both sides of the central axis of the first inner cavity 13, that is, making the air inlet 15 and the first channel 121 located in two opposite directions on both sides of the central axis of the first inner cavity 13, it is possible to prevent the heating gas entering the first inner cavity 13 through the first channel 121 from flowing back, that is, the heating gas entering the first inner cavity 13 enters the second inner cavity 14 through the air inlet 15 after traveling a certain distance.
[0082] Optionally, the cross-sectional area of the air inlet 15 in the first plane is greater than or equal to the cross-sectional area of the first channel 121 in the second plane, wherein the first plane and the second plane are perpendicular to each other, and the first plane is a plane perpendicular to the central axis of the first inner cavity 13. Therefore, when the cross-sectional area of the first plane of the air inlet 15 is greater than or equal to the cross-sectional area of the first channel 121 in the second plane, it can be ensured that the air resistance when the first channel 121 enters the first inner cavity 13 is consistent with the air resistance when entering the second inner cavity 14 through the air inlet 15, thereby ensuring the normal circulation of the heated gas.
[0083] Regarding the connection method between the upper cover 16 and the baffle 3, in some embodiments, the baffle 3 is also connected to a positioning ring 5, which is arranged around the circumference of the baffle 3; at least part of the structure of the positioning ring is made of flexible material, such as silicone material, so that the baffle 3 is positioned and fixed in the box body 1 through the positioning ring 5.
[0084] Specifically, during installation, the positioning ring 5 can be first bonded to the outer ring around the baffle 3 so that the positioning ring 5 protrudes from the upper and lower surfaces of the baffle 3. During the connection and assembly process, the positioning ring 5 can be made to have an interference fit with the inner wall of the chamber of the box body 1 through silicone interference, thereby making the first inner cavity 13 and the second inner cavity 14 sealed except for the air inlet 15, and at the same time, it is convenient to disassemble the baffle 3 later and clean the water and scale in the box body 1. It should be noted that since at least part of the structure of the gas humidifier 2 is made of water-absorbing material, the gas humidifier 2 will expand after absorbing the humidifying liquid in the second inner cavity 14, so that the baffle 3 will be displaced in the box body 1. Based on this, a limiting structure such as a raised edge and a limiting claw can be set on the edge of the upper cover 16 facing the baffle 3 to prevent the gas humidifier 2 from lifting the baffle 3 after expansion, so as to avoid the baffle 3 from shifting in the box body 1. In addition, the edge position of the outer ring of the positioning ring 5 is at least partially made of flexible material, such as nitrile rubber, polyurethane rubber, polypropylene rubber, silicone rubber, fluororubber, butyl rubber, ethylene propylene rubber, chloroprene rubber and other materials with a certain sealing effect, so that the baffle 3 can isolate and seal the first inner cavity 13 and the second inner cavity 14.
[0085] Regarding the structure of the upper cover 16, in some embodiments, as Figure 4 and Figure 5 As shown, the first inner cavity 13 includes a thermal insulation cavity 132 and an air flow cavity 131; the thermal insulation cavity 132 is located on the peripheral side of the air flow cavity 131, wherein the first channel 121 in the air intake channel 12 is connected to the air flow cavity 131, and the air flow cavity 131 is connected to the second inner cavity 14 through the air intake port 15.
[0086] Specifically, in one possible implementation, the heat preservation cavity 132 can be subjected to vacuum treatment. Since the heat preservation cavity 132 is located on the peripheral side of the airflow cavity 131, the heat preservation cavity 132 can reduce the temperature loss rate of the heated gas inside the airflow cavity 131, thereby improving the heat preservation effect of the base 17. In another possible implementation, the heat preservation cavity 132 can be filled with heat preservation cotton, heat preservation silica gel and other materials, and the heat preservation cavity 132 can also reduce the temperature loss rate of the heated gas inside the airflow cavity 131. In addition, it should be noted that the heat preservation cavity 132 and the airflow cavity 131 can be separated by providing a structure such as a guide plate 133, so that after the upper cover 16 and the base 17 are assembled, the heat preservation cavity 132 and the airflow cavity 131 are two independent cavities. In addition, it should be noted that, when the air inlet channel 12 includes a first channel 121 and a second channel 122, it is the first channel 121 that is connected to the air flow cavity 131, and the air inlet 15 is arranged on the portion of the baffle 3 corresponding to the air flow cavity 131, so that the heated gas entering the air flow cavity 131 from the first channel 121 can enter the second inner cavity 14 via the air inlet 15.
[0087] Furthermore, the heat preservation cavity 132 is located between the air flow cavity 131 and separated by a guide plate 133, and the guide plate 133 is an arc-shaped plate. In this way, the edge of the heat preservation cavity 132 can be an arc-shaped edge, which is more conducive to guiding the heated gas in the air flow cavity 131 to the position where the air inlet 15 is set on the baffle 3. It should be noted that the guide plate 133 can be set on the side of the air flow cavity 131 close to the air inlet pipe, so as to facilitate the introduction of the heated gas.
[0088] As for the connection between the upper cover 16 and the base 17 , the upper cover 16 and the base 17 are detachably connected via a cover buckle 6 .
[0089] It should be noted that the number of cover buckles 6 can be two or more, so that the two opposite sides of the box body 1 can be connected by at least one cover buckle 6. The connection with one cover buckle 6 is used as an example for explanation. The top of the upper cover 16 can include a clamping platform, and an arc-shaped convex ring structure can be provided on the outer wall of the base 17. The cover buckle 6 can include two first clamping claws and a second clamping claw arranged at intervals, the first clamping claw is clamped at the clamping platform, and the second clamping claw is clamped at the arc-shaped convex ring structure, so that the upper cover 16 and the base 17 are detachably connected through the cover buckle 6, thereby facilitating the disassembly and assembly between the upper cover 16 and the base 17.
[0090] Furthermore, the upper cover 16 and the base 17 are pivotally connected to realize the open and closed states of the water tank 1 .
[0091] It should be noted that the pivot connection is a kind of hinged part that is mutually rotated along the rotation center by the pivot rod so that the connected parts are separated and locked. In this way, the upper cover 16 and the base 17 are pivotally connected, so that the upper cover 16 and the base 17 are not only stably connected, but also easier to open and close the box body 1. In addition, when the upper cover 16 and the base 17 are pivotally connected, a snap-locking structure is provided on the side of the cover 16 and the base 17 opposite to the pivoting side to ensure that the water tank 1 is in a stable locked state when closed.
[0092] Furthermore, the upper cover 16 and the base 17 are detachably connected by threaded connection, so as to facilitate opening and closing of the box body 1 .
[0093] For the gas humidifier 2, in some embodiments, at least part of the structure of the gas humidifier 2 is set to a water-absorbing material. When a certain volume of humidifying liquid is stored in the chamber of the water tank 1, the gas humidifier 2 absorbs part of the humidifying liquid, so that the gas entering the second inner cavity 14 enters the humidification channel 21 after being humidified by the gas humidifier 2.
[0094] It should be noted that, in this embodiment, the gas humidifier 2 can be made of water-absorbing material as a whole or partially, and the proportion of the water-absorbing material is determined according to the humidification effect and preparation process required by the gas humidifier 2, and the embodiment of the utility model does not limit this. The water-absorbing material can be a hydrophilic material such as a water-absorbing resin, a water-absorbing fiber, a sponge, etc., and the embodiment of the utility model does not limit this.
[0095] For example, in some embodiments, the water-absorbing material portion of the gas humidifier 2 is configured as a porous cotton structure, and the gas entering the chamber enters the humidification channel after being humidified and filtered by the porous cotton structure.
[0096] In this embodiment, the shape of the porous cotton structure is a rectangular parallelepiped with a hollow interior, or it may be a cylindrical shape with a hollow interior, or other hollow columnar structures, which is not limited in the embodiment of the utility model. The porous cotton structure can be completely soaked in a few seconds after contacting with water when it is completely dry. In addition, it should be noted that since the porous cotton structure has the advantages of high wettability and fast infiltration speed, the humidification effect of the water tank structure can be guaranteed when the gas humidifier 2 is a porous cotton structure soaked in water. In addition, since the porous cotton structure has the function of adsorption and filtration, the heated gas can be humidified and filtered by the porous cotton structure, thereby further improving the cleanliness of the gas reaching the gas outlet channel 11.
[0097] It should be noted that, as a preferred solution, the shape of the porous cotton structure is a hollow cylindrical shape, which is conducive to increasing the humidification area compared to the shape of the porous cotton structure being a hollow rectangular parallelepiped. And the height of the porous cotton structure (the axial dimension of the porous cotton structure in the base chamber) is set so that the top surface of the porous cotton structure is in contact with the lower surface of the baffle 3, which is conducive to the limited fixation of the porous cotton structure in the box.
[0098] Regarding the assembly between the porous cotton structure and the box body 1 , the porous cotton structure can be detachably arranged in the chamber by bonding, snapping, plugging, etc., so that the assembly and disassembly between the porous cotton structure and the box body 1 is convenient.
[0099] Exemplarily, in some embodiments, a fixing boss 171 is provided at the bottom of the chamber, and the bottom of the humidification channel 21 of the gas humidifier 2 is plugged into the fixing boss 171. In this way, the stability of the position of the gas humidifier 2 can be ensured by the fixing boss 171.
[0100] Furthermore, in some embodiments, the top of the upper cover 16 is provided with an opening, on which a gas outlet connector is detachably connected, and the chamber of the gas outlet connector constitutes the gas outlet channel 11. In this embodiment, the gas outlet connector can be detachably connected to the top of the upper cover 16 by means of a snap connection, a threaded connection, etc., so as to facilitate the subsequent cleaning of the chamber of the gas outlet connector.
[0101] Furthermore, the air outlet channel 11 includes a third channel 111 and a fourth channel 112 connected to each other. The third channel 111 is connected to the first inner cavity 13. The central axis of the third channel 111 is parallel to the central axis of the first inner cavity 13. The fourth channel 112 is arranged on a side of the third channel 111 away from the first inner cavity 13. The angle between the central axis of the fourth channel 112 and the central axis of the third channel 111 is an obtuse angle.
[0102] In this way, through the above structure, the exhaust channel 11 can be made into a curved pipe structure, so that resistance can be created to the flow of the heated gas at the corners of the third channel 111 and the fourth channel 112 to reduce the flow rate of the heated gas, thereby making the heated gas more suitable for user use and improving user comfort.
[0103] Regarding the structure of the upper cover 16, in some embodiments, the outer wall of the upper cover 16 includes a plurality of reinforcing rib structures 161. The reinforcing rib structure 161 may be a block-shaped protruding structure, or a strip-shaped protruding structure, or a protruding structure of other shapes, which is not limited in the embodiments of the utility model. In this way, by providing a plurality of reinforcing rib structures 161 on the outer wall of the upper cover 16, the strength of the upper cover 16 can be improved.
[0104] Next, the assembly method of the water tank structure provided by the embodiment of the utility model and the flow process of the heated gas are specifically introduced as follows:
[0105] The assembly method of the water tank structure is as follows: first, fix the positioning ring 5 on the outer ring around the baffle 3 or set the positioning ring 5 and the baffle 3 as an integrated structure, and then set the sealing ring 4 on the end of the transfer channel 31 facing the upper cover 16. The baffle 3 is fixed by the positioning ring 5, and during the connection and assembly process, the inner wall of the chamber of the box body and the positioning ring 5 can be interference-fitted by silicone interference. Then, the gas humidifier 2 is fixed by the fixing boss 171 provided at the bottom of the base 17. Finally, the assembled upper cover 16 and the base 17 are assembled and fixed by the cover buckle 6.
[0106] The specific flow direction of the gas in the water tank structure is as follows: Figure 3 As shown, the gas first flows in from the first channel 121 and the second channel 122. The gas entering the second channel 122 can flow directly into the outlet channel 11. The gas entering the first channel 121 can flow from the first inner cavity 13 into the second inner cavity 14 through the air inlet 15. The gas entering the second inner cavity 14 can enter the humidification channel 21 after being humidified by the gas humidifier 2, and then can enter the outlet channel 11 through the humidification channel 21. The gas entering from the first channel 121 can be humidified by the gas humidifier 2, and after being cooled and humidified, it can be mixed with the gas entering from the second channel 122, so that the gas flowing out of the outlet channel 11 can be humidified at a suitable temperature. Among them, the flow direction of the gas in the second channel 122 is as follows: Figure 3 As shown in L1 in FIG. 1 , the flow direction of the gas in the first channel 121 is as follows: Figure 3 As shown in L2.
[0107] In summary, in order to improve the humidification capacity of the water tank structure, in the embodiment of the utility model, the gas entering the chamber from the air inlet channel 12 not only contacts the humidification liquid in the chamber, but also contacts the gas humidifying member 2, so that the gas can enter the humidification channel 21 after being further humidified by the gas humidifying member 2, and finally enter the gas outlet channel 11 through the humidification channel 21. In this way, the heated gas entering the chamber from the air inlet channel 12 can be further humidified by the gas humidifying member 2, and enter the gas outlet channel after being further humidified, so that the gas flowing out of the gas outlet channel 11 is further humidified, which can improve the humidification capacity of the water tank structure, and thus improve the user experience.
[0108] In addition, the partition between the first inner cavity 13 and the second inner cavity 14 can be used to reduce the space for gas flow and humidification, thereby further improving the humidification effect. Alternatively, the air inlet channel 1 is configured as the first channel 121 and the second channel 122, so that the second channel 122 is connected to the air outlet channel 11, and the first channel 121 is connected to the first inner cavity 13, so that the gas reaching the air outlet channel 11 has two paths, and the gas in the second channel 122 is mainly used to perform temperature compensation on the gas in the air outlet channel 11, thereby improving the humidification effect.
[0109] In the second aspect, an embodiment of the utility model also provides a ventilation therapy device, which includes a device body and a water tank structure described in any embodiment of the first aspect; the device body includes a heating element for heating the gas, and the heated gas generated by the heating element flows into the air inlet channel 12.
[0110] Among them, the heating element can be a heating rod, a heating resistor or other heating structures, and the ventilation therapy equipment can be a ventilator, a high-flow oxygen therapy device, a ventilation therapy machine and other equipment, which is not limited in the embodiments of the present utility model.
[0111] It can be seen from the above embodiments that in the embodiments of the utility model, since the gas entering the chamber from the air inlet channel 12 not only contacts the humidification liquid in the chamber, but also contacts the gas humidifying member 2, so that the gas can enter the humidification channel 21 after being further humidified by the gas humidifying member 2, and finally enter the gas outlet channel 11 through the humidification channel 21. In this way, the gas entering the chamber from the air inlet channel 12 can be further humidified by the gas humidifying member 2, and enter the gas outlet channel after being further humidified, so that the gas flowing out of the gas outlet channel 11 is further humidified, which can improve the humidification capacity of the water tank structure, and thus improve the therapeutic effect of the ventilation therapy device.
[0112] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0113] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A water tank structure, characterized in that: The water tank structure comprises: a housing, the housing comprising a chamber, the chamber being configured to store a humidification liquid for humidifying the gas entering the chamber; The box body is provided with an air inlet channel and an air outlet channel; A gas humidifier is arranged in the chamber, and the gas humidifier includes a humidification channel. The gas entering the chamber from the air inlet channel enters the humidification channel via the gas humidifier, and the humidification channel is connected to the air outlet channel.
2. The water tank structure according to claim 1, characterized in that: The gas delivered into the chamber through the inlet passage is a heated gas at a preset temperature threshold.
3. The water tank structure according to claim 2, characterized in that: The chamber includes a first inner cavity and a second inner cavity that are separated from each other. The air inlet channel is connected to the first inner cavity. A connected air inlet is provided between the first inner cavity and the second inner cavity. The humidifying liquid is stored in the second inner cavity, and the gas humidifying element is arranged in the second inner cavity.
4. The water tank structure according to claim 3, characterized in that: The water tank structure also includes a baffle; The baffle separates the chamber into the first inner cavity and the second inner cavity, and the air inlet is opened on the baffle.
5. The water tank structure according to claim 4, characterized in that: The box body comprises an upper cover and a base; The upper cover is connected to the base, the baffle is connected between the upper cover and the base, the cavity between the upper cover and the baffle constitutes the first inner cavity, and the cavity between the base and the baffle constitutes the second inner cavity.
6. The water tank structure according to claim 5, characterized in that: The air outlet channel is opened at the top of the upper cover, the air inlet channel is opened at the side of the upper cover, a transfer channel is arranged on the baffle, and the humidification channel is connected with the air outlet channel through the transfer channel.
7. The water tank structure according to claim 6, characterized in that: The air inlet channel includes a first channel and a second channel, the second channel is communicated with the air outlet channel, the first channel is communicated with the first inner cavity, and a cross-sectional area of the first channel is greater than a cross-sectional area of the second channel.
8. The water tank structure according to claim 7, characterized in that: The second channel is in communication with the switching channel, so that the second channel is in communication with the air outlet channel through the switching channel.
9. The water tank structure according to claim 8, characterized in that: A pipeline interface is provided on one side of the transfer channel, and the second channel is communicated with the air outlet channel through the pipeline interface.
10. The water tank structure according to claim 9, characterized in that: The end of the second channel or the end of the pipeline interface is provided with a semi-enclosed shielding structure extending out of the end; When the second channel is connected to the pipeline interface, the end of the second channel is aligned with the end of the pipeline interface, and the shielding structure partially shields the area around the aligned position.
11. The water tank structure according to claim 6, characterized in that: The bottom end of the air outlet channel and the top end of the transfer channel are sealed and communicated with each other through a sealing ring.
12. The water tank structure according to claim 7, characterized in that: The air inlet and the first channel are respectively located on two sides of the central axis of the first inner cavity.
13. The water tank structure according to claim 12, characterized in that: The cross-sectional area of the air inlet in the first plane is greater than or equal to the cross-sectional area of the first channel in the second plane, wherein the first plane and the second plane are perpendicular to each other, and the first plane is a plane perpendicular to the central axis of the first inner cavity.
14. The water tank structure according to claim 5, characterized in that: The baffle is also connected to a positioning ring, which is arranged around the periphery of the baffle; The upper cover and the baffle are positioned and fixed by the positioning ring.
15. The water tank structure according to claim 3, characterized in that: The first inner cavity includes a heat preservation cavity and an air flow cavity; The heat preservation cavity is located at the peripheral side of the air flow cavity, wherein the air inlet passage is communicated with the air flow cavity, and the air flow cavity is communicated with the second inner cavity through the air inlet.
16. The water tank structure according to claim 15, characterized in that: The heat preservation cavity and the air flow cavity are separated by a guide plate.
17. The water tank structure according to claim 5, characterized in that: The upper cover and the base are detachably connected via a cover buckle.
18. The water tank structure according to claim 5, characterized in that: The upper cover and the base are pivotally connected to realize the opening and closing states of the water tank.
19. The water tank structure according to claim 1, characterized in that: At least part of the structure of the gas humidifier is set to a water-absorbing material. When a certain volume of humidifying liquid is stored in the chamber of the water tank, the gas humidifier absorbs part of the humidifying liquid, so that the gas entering the chamber enters the humidification channel after being humidified by the gas humidifier.
20. The water tank structure according to claim 19, characterized in that: The water-absorbing material portion of the gas humidifier is configured as a porous cotton structure, and the gas entering the chamber is humidified by the porous cotton structure and then enters the humidification channel.
21. The water tank structure according to claim 1, characterized in that: The gas humidifying component is detachably disposed in the chamber.
22. The water tank structure according to claim 21, characterized in that: A fixing boss is arranged at the bottom of the chamber, and the fixing boss is inserted into the humidification channel of the gas humidifying component.
23. The water tank structure according to claim 5, characterized in that: The top of the upper cover is detachably connected with an air outlet joint, and the inner cavity of the air outlet joint constitutes the air outlet channel.
24. The water tank structure according to claim 23, characterized in that: The air outlet channel includes a third channel and a fourth channel that are connected, the third channel is connected to the first inner cavity, the central axis of the third channel is parallel to the central axis of the first inner cavity, the fourth channel is arranged on a side of the third channel away from the first inner cavity, and the angle between the central axis of the fourth channel and the central axis of the third channel is an obtuse angle.
25. A ventilation therapy device, characterized in that: The ventilation therapy device comprises a device body and a water tank structure according to any one of claims 1 to 24; The device body includes a heating element for heating gas, and the gas passing through the heating element flows into the air inlet passage.
Citation Information
Cited By
Water tank structure and ventilation treatment equipment
CN117731908A
Water tank structure and ventilation therapy device
CN117731908B