Full-automatic vehicle door hinge production line
By designing a fully automated hinge production line and using automated equipment and cylinder transmission systems for precise processing of hinge blocks, the problems of low efficiency, poor safety and high cost in the existing technology have been solved, and efficient and safe hinge production has been achieved.
Patent Information
- Application Number
- CN202420423493.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-06
AI Technical Summary
The existing hinge production line has low efficiency, requires a lot of personnel and equipment, has poor safety and high cost, making it difficult to control production quality.
A fully automatic door hinge production line is designed, including the equipment body, preliminary auxiliary equipment and material distribution auxiliary equipment. The hinge block is processed through an automated process, using drilling drills, slotted hole chamfering drills, through-hole step drills and other equipment. Precise processing, auxiliary loading parts and loading cylinders realize automatic loading and clamping, and the material distribution auxiliary equipment realizes automatic material distribution and unloading through cylinders and push rods.
Improved production efficiency, reduced the number of workers and equipment, reduced production costs, enhanced operational safety and improved quality control of the production process.
Smart Images

Figure CN221849305U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of hinge production, and in particular to a full-automatic vehicle door hinge production line. Background Art
[0002] A hinge is a mechanical device used to connect two solid bodies and allow them to rotate relative to each other. A hinge can be made of movable components or foldable materials.
[0003] Most existing technologies use single-process processing, where one process is completed before entering the next process, and the process is operated by personnel, which is inefficient. At the same time, the unbalanced production rhythm is prone to produce stagnant materials and scrap, and the poor safety of manual operation is prone to work injuries. At the same time, a large number of personnel are required, and more equipment and space are occupied, resulting in high production costs and inconvenience in controlling the quality during the production process. How to invent a fully automatic car door hinge production line to improve these problems has become an urgent problem for technicians in this field. Utility Model Content
[0004] In order to make up for the above shortcomings, the utility model provides a fully automatic door hinge production line, which aims to improve the problems of low processing efficiency, high requirements for personnel and equipment, and inconvenience in controlling quality during the production process.
[0005] The utility model is implemented as follows: a fully automatic door hinge production line, comprising an equipment body and a hinge component, wherein the hinge component comprises a first hinge block and a second hinge block, and further comprising
[0006] Processing equipment, the processing equipment includes a hole-opening part and a further processing part, the hole-opening part includes a hole-opening drill, a slotting drill, a slot chamfering drill, a side hole drill and a machine plate, the further processing part includes a through-hole step drill, a first tapping drill, a second tapping drill and a lower hopper;
[0007] Preliminary auxiliary equipment, the preliminary auxiliary equipment comprising an auxiliary loading piece and a loading piece, the loading piece is installed and arranged correspondingly to the opening piece and the auxiliary loading piece;
[0008] The material dividing auxiliary equipment includes a conveying part, a step processing part and a tapping processing part. The conveying part is connected correspondingly to the loading part. The other end of the conveying part is arranged correspondingly to the step processing part and the further processing part. A tapping processing part is arranged on one side of the step processing part, and the tapping processing part is located directly below the further processing part.
[0009] In a preferred technical solution of the present invention, the first hinge block and the second hinge block are both provided with a hole groove, a through hole, a side hole and a through hole step.
[0010] In a preferred technical solution of the present invention, the feeding part includes a material guide frame, one side of the material guide frame is limitedly and slidably connected with a feeding trough block, the material guide frame and the feeding trough block are both provided with grooves matching the first hinge block and the second hinge block, the tail of the feeding trough block is connected to a feeding cylinder, a plurality of mounting plates are equally spacedly installed on the machine disk, support blocks and extrusion blocks are respectively arranged on both sides of the mounting plates, and the first hinge block and the second hinge block are located between the support block and the extrusion block.
[0011] In a preferred technical solution of the utility model, a cylinder is fixedly connected to one side of the extrusion block, and the extrusion block is slidably mounted on the mounting plate through the cylinder limit.
[0012] In a preferred technical solution of the utility model, an auxiliary feeding cylinder is fixedly mounted on the machine disc via a mounting frame, and the auxiliary feeding cylinder is located on one side of the guide frame and is arranged corresponding to the hinge part between the support block and the extrusion block.
[0013] In a preferred technical solution of the present utility model, the hole drilling drill, slotting drill, slot hole chamfering drill and side hole drill are respectively located on one side of the machine disk and respectively correspond to a hinge component on a mounting plate, the hole drilling drill is arranged corresponding to the through holes on the first hinge block and the second hinge block, the slotting drill is arranged corresponding to the hole slots on the first hinge block and the second hinge block, the slot hole chamfering drill is arranged corresponding to the chamfer of the tail of the hole slot, and the side hole drill is arranged corresponding to the side holes on the first hinge block and the second hinge block.
[0014] In a preferred technical solution of the utility model, the conveying part includes a material guide pipe, one end of which is located below the machine disk and corresponds to the position of the mounting plate. A material discharge cylinder is provided on the back of the mounting plate, and a piston rod of the material discharge cylinder passes through the mounting plate and is corresponding to the hinge part between the support block and the extrusion block.
[0015] In a preferred technical solution of the utility model, the step processing part includes a limit block, which is located at the other end of the material guide tube, and a groove matching the hinge component is opened on the limit block. A first push rod is arranged on one side of the limit block through a cylinder, and a limit baffle is arranged on the opposite side of the first push rod. At the same time, a second push rod is arranged on one side of the limit baffle through a cylinder, and the second push rod is located on the back of the hinge component. The through hole step drill is located directly above the through holes on the first hinge block and the second hinge block, and the through hole step drill opens a through hole step.
[0016] In a preferred technical solution of the present invention, a ball head is connected to the top of the second push rod through a cylinder transmission, a support rod and a limit rod are provided on the side of the hinge component away from the ball head, and a third push rod is provided at one end of the limit block connected to the support rod through a cylinder transmission, and the third push rod is located between the support rod and the limit rod.
[0017] In a preferred technical solution of the utility model, the tapping workpiece includes a dividing block, which is slidably arranged at the other end of the support rod through a cylinder limit, and dividing cylinders are provided on both sides of the support rod for transmission, and fixed blocks are fixedly installed below the two dividing cylinders, and the other sides of the fixed blocks are connected to displacement blocks through cylinder transmission, and the displacement blocks are slidably arranged on a fixed seat, and there is a hollow setting directly below the displacement block, and a lower hopper is provided below the hollow.
[0018] The beneficial effect of the utility model is as follows: the utility model obtains a fully automatic door hinge production line through the above design. When the first hinge block (the second hinge block) is processed, the first hinge block (the second hinge block) is transported to the loading part through the auxiliary loading part, falls on the guide frame, and slides into the loading trough block through the guidance of the guide frame. The loading trough block is pushed into between the supporting block and the extrusion block through the transmission of the loading cylinder (at this time, the cylinder pulls the extrusion block away from the supporting block). At the same time, the auxiliary loading cylinder will push the first hinge block (the second hinge block) to make it close to the mounting plate. After placement, the cylinder will push the extrusion block to clamp the first hinge block (the second hinge block), and they are respectively displaced to the bottom of the hole drilling, the slot drilling, the slot chamfering drilling and the side hole drilling through the transmission of the machine plate for processing. After processing, the unloading cylinder pushes the first hinge block (the second hinge block) to make it transmitted to the groove of the limit block through the guide pipe, and the first push rod is controlled to push the first hinge block (the second hinge block) The hinge block) is close to the side wall, and the second push rod pushes the first hinge block (the second hinge block) tightly to fix the through hole step drill for processing. After the processing is completed, the ball head pushes the top corner of the first hinge block (the second hinge block) to make it tilt onto the support rod. At this time, the third push rod is driven by the cylinder to push the third push rod to move between the limit rod and the support rod, and move to the dividing block at the bottom. At this time, according to whether the first hinge block or the second hinge block is being processed, it enters the bottom of the first tapping drill or the second tapping drill, and the dividing block is pushed by the cylinder to move to the bottom of the first tapping drill or the second tapping drill, and is pushed to the displacement block directly below by the dividing cylinder for processing. After the processing is completed, the cylinder pulls the displacement block back into the fixed seat. At this time, the bottom of the first hinge block (the second hinge block) has no support and falls into the lower hopper, completing the processing, thereby improving production efficiency, while reducing the number of workers and equipment, reducing production costs, and improving operating safety and reducing work-related injuries. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a schematic diagram of the structure of the device body provided by the embodiment of the utility model;
[0021] Figure 2 A schematic diagram of the partial structure of preliminary auxiliary equipment provided for the implementation of the utility model;
[0022] Figure 3 A schematic diagram of the structure of the material distribution auxiliary equipment provided by the embodiment of the utility model;
[0023] Figure 4 for Figure 3 The enlarged view of part A and the schematic diagram of the structure of the hinge component;
[0024] Figure 5 A schematic diagram of the structure of a step processing part provided in an embodiment of the utility model;
[0025] Figure 6 A schematic diagram of the structure of a tapping workpiece provided in an embodiment of the utility model.
[0026] In the figure: 1-equipment body; 10-hinge component; 11-first hinge block; 12-second hinge block; 13-hole groove; 14-through hole; 15-side hole; 16-through hole step; 100-processing equipment; 110-hole opening member; 111-hole opening drill; 112-slotting drill; 113-slot chamfering drill; 114-side hole drill; 115-machine plate; 120-continued processing member; 121-through hole step drill; 122-first tapping drill; 123-second tapping drill; 124-lower hopper; 200-preliminary auxiliary equipment; 210-auxiliary feeding member; 220-feeding member; 221-material guide frame; 222-upper Trough block; 223-feeding cylinder; 224-auxiliary feeding cylinder; 225-support block; 226-extrusion block; 227-mounting plate; 300-material distribution auxiliary equipment; 310-conveyor; 311-material guide pipe; 312-feeding cylinder; 313-baffle; 320-step processing part; 321-limiting block; 322-first push rod; 323-second push rod; 324-ball head; 325-limiting rod; 326-support rod; 327-third push rod; 330-tapping processing part; 331-material distribution block; 332-fixed block; 333-displacement block; 334-fixed seat; 335-material distribution cylinder. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] See also Figures 1 to 4 The utility model provides a technical solution: a fully automatic door hinge production line, including a device body 1, and a hinge component 10, the hinge component 10 includes a first hinge block 11 and a second hinge block 12, and also includes
[0029] Processing equipment 100, the processing equipment 100 includes a hole opening member 110, a further processing member 120, the hole opening member 110 includes a hole opening drill 111, a slotting drill 112, a slot chamfering drill 113, a side hole drill 114 and a machine plate 115, the further processing member 120 includes a through hole step drill 121, a first tapping drill 122, a second tapping drill 123 and a lower hopper 124, and a preliminary auxiliary device 200, the preliminary auxiliary device 200 includes an auxiliary loading member 210 and a loading member 220, the loading member 220 is installed to be aligned with the hole opening member 110 and the auxiliary loading member 210 A material dividing auxiliary equipment 300 should be provided. The material dividing auxiliary equipment 300 includes a conveying part 310, a step processing part 320 and a tapping processing part 330. The conveying part 310 is connected correspondingly to the loading part 220. The other end of the conveying part 310 is provided correspondingly to the step processing part 320 and the further processing part 120. A tapping processing part 330 is provided on one side of the step processing part 320. The tapping processing part 330 is located directly below the further processing part 120. The processing equipment 100 processes the workpieces on the preliminary auxiliary equipment 200 and the material dividing auxiliary equipment 300 respectively.
[0030] See also Figure 4 The first hinge block 11 and the second hinge block 12 are both provided with a hole slot 13 , a through hole 14 , a side hole 15 and a through hole step 16 .
[0031] See also Figure 2 and Figure 4The loading piece 220 includes a material guide frame 221, and a loading trough block 222 is slidably connected to one side of the material guide frame 221. Grooves matching the first hinge block 11 and the second hinge block 12 are provided on the material guide frame 221 and the loading trough block 222. The tail of the loading trough block 222 is connected to a loading cylinder 223. A plurality of mounting plates 227 are equally spaced and installed on the machine disk 115. A support block 225 and an extrusion block 226 are respectively provided on both sides of the mounting plate 227. The first hinge block 11 and the second hinge block 12 are located between the support block 225 and the extrusion block 226. The auxiliary loading piece 210 transports the hinge component 10 to the loading piece 220 for processing through a conveyor belt.
[0032] One side of the extrusion block 226 is fixedly connected with a cylinder, and the extrusion block 226 is slidably mounted on the mounting plate 227 through the cylinder limit. An auxiliary feeding cylinder 224 is fixedly mounted on the machine plate 115 through a mounting frame, and the auxiliary feeding cylinder 224 is located on one side of the guide frame 221 and is arranged corresponding to the hinge component 10 between the support block 225 and the extrusion block 226. The outer ring of the machine plate 115 is driven by the transmission mechanism to rotate the machine plate 115, and the middle part of the machine plate 115 does not rotate, and the auxiliary feeding cylinder 224 is installed in a non-rotating position. The hole drilling drill 111, the slotting drill 112, the slot chamfering drill 113 and the side hole drill 114 are respectively located on one side of the machine disk 115 and correspond to a hinge component 10 on the mounting plate 227 respectively. The hole drilling drill 111 is arranged corresponding to the through hole 14 on the first hinge block 11 and the second hinge block 12, the slotting drill 112 is arranged corresponding to the hole groove 13 on the first hinge block 11 and the second hinge block 12, the slot chamfering drill 113 is arranged corresponding to the chamfer of the tail of the hole groove 13, and the side hole drill 114 is arranged corresponding to the side hole 15 on the first hinge block 11 and the second hinge block 12.
[0033] See also Figure 3 The conveying member 310 includes a material guide tube 311, one end of which is located below the machine disk 115 and corresponds to the position of the mounting plate 227. A material discharge cylinder 312 is provided on the back of the mounting plate 227. The piston rod of the material discharge cylinder 312 passes through the mounting plate 227 and corresponds to the hinge component 10 between the support block 225 and the extrusion block 226. The material discharge cylinder 312 pushes the hinge component 10 between the support block 225 and the extrusion block 226, so that the hinge component 10 falls into the material guide tube 311 and is transmitted to the groove of the limit block 321 through the transmission equipment.
[0034] See also Figure 3 and Figure 5The step processing part 320 includes a limit block 321, which is located at the other end of the guide tube 311. The limit block 321 is provided with a groove matching the hinge component 10. A first push rod 322 is provided on one side of the limit block 321 through a cylinder, and a limit baffle is provided on the opposite side of the first push rod 322. At the same time, a second push rod 323 is provided on one side of the limit baffle through a cylinder. The second push rod 323 is located on the back of the hinge component 10. The through hole step drill 121 is located directly above the through hole 14 on the first hinge block 11 and the second hinge block 12. The through hole step drill 121 opens a through hole step 16. The first push rod 322 is pushed to the limit baffle and the second push rod 323 squeezes the hinge component 10 for fixation, and the through hole step drill 121 performs processing.
[0035] A fully automatic door hinge production line, characterized in that: a ball head 324 is connected to the top of the second push rod 323 through a cylinder transmission, a support rod 326 and a limit rod 325 are provided on the side of the hinge component 10 away from the ball head 324, and a third push rod 327 is provided at one end of the limit block 321 connected to the support rod 326 through a cylinder through transmission, and the third push rod 327 is located between the support rod 326 and the limit rod 325. After processing, the ball head 324 pushes the hinge component 10 to flip, and the hinge component 10 dumps onto the support rod 326.
[0036] The tapping workpiece 330 includes a dividing block 331, which is slidingly set at the other end of the support rod 326 through a cylinder limit, and dividing cylinders 335 are transmission-set on both sides of the support rod 326. Fixed blocks 332 are fixedly installed below the two dividing cylinders 335, and the other sides of the fixed blocks 332 are connected to displacement blocks 333 through cylinder transmission. The displacement block 333 is slidingly installed on the fixed seat 334. There is a hollow setting just below the displacement block 333, and a lower hopper 124 is set below the hollow. Two grooves matching the hinge component 10 are provided on the dividing block 331. The third push rod 327 pushes the hinge component 10 to be displaced onto the dividing block 331, and is transmitted to the first tapping drill 122 or the second tapping drill 123 through the cylinder for processing. During processing, the dividing cylinder 335 will push the hinge component 10 to be close to the fixed seat 334, and the hinge component 10 is located just above the displacement block 333.
[0037] Working principle: When the device processes the hinge component 10, it is necessary to process the first hinge block 11 and the second hinge block 12 separately, and the first hinge block 11 and the second hinge block 12 are opened with a hole groove 13, a through hole 14, a side hole 15 and a through hole step 16. The first hinge block 11 and the second hinge block 12 need to be processed separately. When the first hinge block 11 (the second hinge block 12) is processed, the first hinge block 11 (the second hinge block 12) is transported to the feeding member 220 through the auxiliary feeding member 210, falls onto the guide frame 221, and slides to the feeding trough block 221 through the guidance of the guide frame 221. 22, the feeding trough block 222 is pushed into between the support block 225 and the extrusion block 226 through the transmission of the feeding cylinder 223 (at this time, the cylinder pulls the extrusion block 226 away from the support block 225), and at the same time, the auxiliary feeding cylinder 224 will push the first hinge block 11 (the second hinge block 12) to make it close to the mounting plate 227. After placement, the cylinder will push the extrusion block 226 to clamp the first hinge block 11 (the second hinge block 12), and they will be moved to the bottom of the hole drill 111, the slot drill 112, the slot chamfering drill 113 and the side hole drill 114 through the transmission of the machine plate 115 for processing. After processing, the unloading cylinder 224 will push the first hinge block 11 (the second hinge block 12) to make it close to the mounting plate 227. The cylinder 312 pushes the first hinge block 11 (the second hinge block 12) to be transmitted to the groove of the limit block 321 through the guide tube 311, and controls the first push rod 322 to push the first hinge block 11 (the second hinge block 12) close to the side wall. At the same time, the second push rod 323 pushes the first hinge block 11 (the second hinge block 12) to fix the through hole step drill 121 for processing. After the processing is completed, the ball head 324 pushes the top corner of the first hinge block 11 (the second hinge block 12) to make it fall on the support rod 326. At this time, the third push rod 327 is driven by the cylinder to push the third push rod 327 between the limit rod 325 and the support rod 326. The support rods 326 are displaced to the dividing block 331 at the bottom. At this time, depending on whether the first hinge block 11 or the second hinge block 12 is being processed, the dividing block 331 enters the bottom of the first tapping drill 122 or the second tapping drill 123, and is pushed by the cylinder to move to the bottom of the first tapping drill 122 or the second tapping drill 123. The dividing cylinder 335 pushes it to the displacement block 333 directly below for processing. After the processing is completed, the cylinder pulls the displacement block 333 back into the fixed seat 334. At this time, the bottom of the first hinge block 11 (the second hinge block 12) has no support and falls into the lower hopper 124 to complete the processing.
[0038] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A fully automatic door hinge production line, comprising an equipment body and a hinge component, wherein the hinge component comprises a first hinge block and a second hinge block, characterized in that: Also includes Processing equipment, the processing equipment includes a hole-opening part and a further processing part, the hole-opening part includes a hole-opening drill, a slotting drill, a slot chamfering drill, a side hole drill and a machine plate, the further processing part includes a through-hole step drill, a first tapping drill, a second tapping drill and a lower hopper; Preliminary auxiliary equipment, the preliminary auxiliary equipment comprising an auxiliary loading piece and a loading piece, the loading piece is installed and arranged correspondingly to the opening piece and the auxiliary loading piece; The material dividing auxiliary equipment includes a conveying part, a step processing part and a tapping processing part. The conveying part is connected correspondingly to the loading part. The other end of the conveying part is arranged correspondingly to the step processing part and the further processing part. A tapping processing part is arranged on one side of the step processing part, and the tapping processing part is located directly below the further processing part.
2. A fully automatic door hinge production line as claimed in claim 1, characterized in that: The first hinge block and the second hinge block are both provided with a hole groove, a through hole, a side hole and a through hole step.
3. A fully automatic door hinge production line as claimed in claim 2, characterized in that: The feeding part includes a material guide frame, one side of the material guide frame is limitedly and slidably connected with a feeding trough block, the material guide frame and the feeding trough block are both provided with grooves matching the first hinge block and the second hinge block, the tail of the feeding trough block is connected to a feeding cylinder, a plurality of mounting plates are equally spacedly installed on the machine disk, support blocks and extrusion blocks are respectively arranged on both sides of the mounting plates, and the first hinge block and the second hinge block are located between the support block and the extrusion block.
4. A fully automatic door hinge production line as claimed in claim 3, characterized in that: One side of the extrusion block is fixedly connected with a cylinder, and the extrusion block is slidably mounted on the mounting plate through the cylinder limit.
5. The fully automatic door hinge production line according to claim 3, characterized in that: An auxiliary feeding cylinder is fixedly mounted on the machine disc via a mounting frame. The auxiliary feeding cylinder is located on one side of the material guide frame and is arranged corresponding to a hinge component between the support block and the extrusion block.
6. The fully automatic door hinge production line according to claim 3, characterized in that: The hole drill, slot drill, slot chamfer drill and side hole drill are respectively located on one side of the machine disk and correspond to a hinge component on a mounting plate respectively. The hole drill is arranged corresponding to the through holes on the first hinge block and the second hinge block, the slot drill is arranged corresponding to the hole slots on the first hinge block and the second hinge block, the slot chamfer drill is arranged corresponding to the chamfer of the tail of the hole slot, and the side hole drill is arranged corresponding to the side holes on the first hinge block and the second hinge block.
7. The fully automatic door hinge production line according to claim 1, characterized in that: The conveying part includes a material guide pipe, one end of which is located below the machine disc and corresponds to the position of the mounting plate. A material discharge cylinder is arranged on the back of the mounting plate, and a piston rod of the material discharge cylinder passes through the mounting plate and is arranged corresponding to the hinge part between the support block and the extrusion block.
8. A fully automatic door hinge production line as claimed in claim 7, characterized in that: The step processing part includes a limit block, which is located at the other end of the material guide tube. A groove matching the hinge component is opened on the limit block. A first push rod is arranged on one side of the limit block through a cylinder, and a limit baffle is arranged on the opposite side of the first push rod. At the same time, a second push rod is arranged on one side of the limit baffle through a cylinder, and the second push rod is located on the back of the hinge component. The through hole step drill is located directly above the through holes on the first hinge block and the second hinge block, and the through hole step drill opens a through hole step.
9. A fully automatic door hinge production line as claimed in claim 8, characterized in that: A ball head is connected to the top of the second push rod through a cylinder transmission, a support rod and a limit rod are provided on the side of the hinge component away from the ball head, and a third push rod is provided on one end of the limit block connected to the support rod through a cylinder transmission, and the third push rod is located between the support rod and the limit rod.
10. A fully automatic door hinge production line as claimed in claim 9, characterized in that: The tapping workpiece includes a dividing block, which is slidably arranged at the other end of the support rod through a cylinder limit, and dividing cylinders are provided on both sides of the support rod for transmission. Fixed blocks are fixedly installed below the two dividing cylinders, and the other sides of the fixed blocks are connected to displacement blocks through cylinder transmission. The displacement blocks are slidably arranged on a fixed seat, and there is a hollow setting directly below the displacement block, and a lower hopper is provided below the hollow.