Machining equipment for building decorative plate connecting piece and building decorative plate connecting piece

By designing a building decorative panel connector processing equipment that includes a placement frame, a moving block and a cutting blade, and using a rotating motor to drive the cutting blade to cut the steel pipe, the problem of low cutting efficiency in the existing technology is solved and efficient production of multiple materials is achieved. length of connecting piece blank.

CN221849381UActive Publication Date: 2024-10-18HUBEI WUPENG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323341453.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2024-10-18
Estimated Expiration
2033-12-08

AI Technical Summary

Technical Problem

The existing technology has low cutting efficiency when cutting steel pipes and cannot efficiently produce connector blanks of multiple lengths.

Method used

A processing equipment for building decorative panel connectors is designed. It uses components such as a placement frame, a moving block, a connecting rod, a cutting blade, and a rotating motor. The rotating motor drives the driving wheel and the driven wheel, and drives the cutting blade to cut the steel pipe. Cut to length.

Benefits of technology

It achieves efficient fixed-length cutting of steel pipes to be processed, can produce connecting piece blanks of multiple lengths, and improves cutting efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221849381U_ABST
    Figure CN221849381U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of decorative plate connecting piece machining equipment, and particularly relates to building decorative plate connecting piece machining equipment and a building decorative plate connecting piece. The building decorative plate connecting piece machining equipment comprises a placing frame, a first moving block and a second moving block are connected in the placing frame in a sliding mode, and a first mounting groove is formed in the side end of the first moving block; a third moving block is slidably mounted in the first mounting groove, a second mounting groove is formed in the side end of the third moving block, a rotating block is rotatably connected in the second mounting groove, an insertion hole is formed in the position, deviating from the circle center, of the side end of the rotating block, a connecting shaft is fixedly mounted at the insertion hole, and the end, away from the insertion hole, of the connecting shaft is fixedly connected with the side end of the driven wheel; the driven wheel is connected with a driving wheel through a conveying belt, the driving wheel is fixedly installed at the side end of a rotating motor, and the rotating motor is installed at the side end of the containing frame. Cutting blades are mounted at the lower end part of the first moving block and the upper end part of the second moving block; according to the device, the to-be-machined steel pipe can be cut at fixed length through the cutting assembly, and the cutting efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of decorative plate connecting piece processing equipment, in particular to a kind of architectural decorative plate connecting piece processing equipment and the architectural decorative plate connecting piece. Background Art

[0002] Connectors are a type of mechanical parts used to fasten two or more parts (or components) into a whole. The processing of connectors generally requires straight pulling, cutting, grinding, drilling and other processes. When cutting connectors, a cutting machine is usually used to cut the steel pipe to be processed according to the required length. When using a cutting machine to cut a steel pipe, if it is only cut from one point of the steel pipe, the cutting efficiency will be low. To this end, we propose a processing device for a building decorative panel connector and a building decorative panel connector. Utility Model Content

[0003] In view of the deficiencies in the prior art, the present invention aims to provide a processing device for a building decoration panel connector and a building decoration panel connector.

[0004] The purpose of this disclosure can be achieved through the following technical solutions:

[0005] A processing device for a building decorative panel connecting piece comprises: a placement frame, a first moving block and a second moving block are slidably connected in the placement frame, the upper end of the first moving block is rotatably connected to two first connecting rods, both side ends of the second moving block are rotatably connected to second connecting rods, a third connecting rod is connected between the first connecting rod and the second connecting rod on the same side, the third connecting rod is rotatably connected to the first connecting rod and the second connecting rod respectively, a first mounting groove is provided at the side end of the first moving block, a third moving block is slidably installed in the first mounting groove, the third moving block can move laterally in the first mounting groove, and a second mounting groove is provided at the side end of the third moving block A groove, a rotating block is rotatably connected in the second mounting groove, the rotating block is circular, a socket is opened at the side end of the rotating block deviating from the center of the circle, a connecting shaft is fixedly installed at the socket, and the end of the connecting shaft away from the socket is fixedly connected to the side end of the driven wheel, the driven wheel is installed on the side end of the placement frame through a mounting plate, the mounting plate is fixedly connected to the placement frame, the driven wheel is rotatably connected to the mounting plate, the driven wheel is connected to the driving wheel through a transmission belt, the driving wheel is fixedly installed on the side end of the rotating motor, and the rotating motor is installed on the side end of the placement frame; a cutting blade is installed at the lower end of the first moving block and the upper end of the second moving block.

[0006] Preferably, a first conveyor belt is installed at the left end of the placement rack, and a second conveyor belt is installed at the right end of the placement rack, and the height of the first conveyor belt is higher than the height of the second conveyor belt.

[0007] Preferably, a limiting plate is fixedly installed on the inner side of the placement rack between the first moving block and the second moving block, a limiting hole is opened at the center position of the side end of the limiting plate, and the aperture of the limiting hole is larger than the diameter of the steel pipe to be processed.

[0008] Preferably, a protective plate is installed on the peripheral side of the upper end portion of the second conveyor belt, and a connecting plate is installed between the placement rack and the second conveyor belt.

[0009] Preferably, a building decoration panel connector is processed by the processing equipment.

[0010] Preferably, the connecting piece is in a cylindrical structure, and a threaded hole is provided in the center of the connecting piece.

[0011] The nouns, conjunctions or adjectives involved in the above technical solution are explained as follows:

[0012] Fixed connection: refers to a connection in which parts or components are fixed without any relative movement. There are two types: detachable connection and non-detachable connection.

[0013] (1) Removable connection: A removable connection is a connection that uses screws, splines, wedge pins, etc. to fasten parts together. This type of connection can be disassembled for maintenance without damaging the parts. However, the specifications of the connectors used must be correct (such as the length of the bolts, keys, and wedge pins) and they must be properly tightened.

[0014] (2) Non-detachable connection: Non-detachable connection mainly refers to welding, riveting and tenoning. Since forging, sawing or oxygen cutting are required for disassembly during maintenance or replacement, spare parts generally cannot be reused. At the same time, attention should be paid to process quality, technical inspection and remedial measures (such as calibration, polishing, etc.) during connection.

[0015] The beneficial effects of the present disclosure are as follows: the device can realize fixed-length cutting of the steel pipe to be processed through the cutting assembly, so as to obtain connector blanks of multiple lengths, and when cutting, it can drive the driving wheel to rotate by rotating the motor, thereby driving the driven wheel to rotate, thereby driving the cutting blade at the lower end of the first moving block and the cutting blade at the upper end of the second moving block to cut the steel pipe to be processed at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0017] Figure 1 This is a schematic diagram of the overall structure of the embodiment of the utility model. Figure 1 ;

[0018] Figure 2 This is a schematic diagram of the overall structure of the embodiment of the utility model. Figure 2 ;

[0019] Figure 3 This is a schematic diagram of the overall structure of the embodiment of the utility model. Figure 3 ;

[0020] Figure 4 It is a right side view of the placement rack of the utility model embodiment;

[0021] Figure 5 It is a structural schematic diagram of the first moving block of an embodiment of the utility model;

[0022] Figure 6 This is a schematic structural diagram of a driven wheel and a connecting shaft in an embodiment of the utility model;

[0023] Figure 7 It is a structural schematic diagram of a connecting piece of an embodiment of the utility model;

[0024] Figure 8 It is a structural schematic diagram of the connecting piece of the embodiment of the utility model when connecting the decorative plate.

[0025] In the figure: 1. placement rack; 2. first moving block; 3. second moving block; 4. first connecting rod; 5. second connecting rod; 6. third connecting rod; 7. first mounting groove; 8. third moving block; 9. second mounting groove; 10. rotating block; 11. jack; 12. connecting shaft; 13. driven wheel; 14. mounting plate; 15. driving wheel; 16. transmission belt; 17. rotating motor; 18. cutting blade; 19. first conveyor belt; 20. second conveyor belt; 21. limit plate; 22. limit hole; 23. steel pipe to be processed; 24. protective plate; 25. connecting plate; 26. connecting piece; 27. threaded hole. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, rather than all the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0027] A processing device for building decorative panel connectors, such as Figure 1-Figure 6As shown, it includes: a placement frame 1, in which a first moving block 2 and a second moving block 3 are slidably connected, the upper end of the first moving block 2 is rotatably connected to two first connecting rods 4, and the two side ends of the second moving block 3 are rotatably connected to second connecting rods 5, and a third connecting rod 6 is connected between the first connecting rod 4 and the second connecting rod 5 located on the same side, and the third connecting rod 6 is rotatably connected to the first connecting rod 4 and the second connecting rod 5 respectively, and a first mounting groove 7 is provided at the side end of the first moving block 2, and a third moving block 8 is slidably installed in the first mounting groove 7, and the third moving block 8 can move laterally in the first mounting groove 7, and a second mounting groove 9 is provided at the side end of the third moving block 8, and a rotating block 10, the rotating block 10 is circular, and a socket 11 is provided at the side end of the rotating block 10 away from the center of the circle, and a connecting shaft 12 is fixedly installed at the socket 11, and the end of the connecting shaft 12 away from the socket 11 is fixedly connected to the side end of the driven wheel 13, and the driven wheel 13 is installed on the side end of the placement rack 1 through a mounting plate 14, and the mounting plate 14 is fixedly connected to the placement rack 1, and the driven wheel 13 is rotatably connected to the mounting plate 14, and the driven wheel 13 is connected to the driving wheel 15 through a transmission belt 16, and the driving wheel 15 is fixedly installed on the side end of the rotating motor 17, and the rotating motor 17 is installed on the side end of the placement rack 1; the lower end of the first moving block 2 and the upper end of the second moving block 3 are both installed with a cutting blade 18.

[0028] In the device, the operating steps of the cutting component are: first start the rotating motor 17. After the rotating motor 17 is started, it will drive the driving wheel 15 to rotate. The rotation of the driving wheel 15 will drive the driven wheel 13 to rotate, thereby driving the connecting shaft 12 connected to the driven wheel 13 to rotate, thereby driving the rotating block 10 to rotate, thereby driving the first moving block 2 to move downward, and also driving the second moving block 3 to move upward, so that the cutting blade 18 at the lower end of the first moving block 2 and the cutting blade 18 at the upper end of the second moving block 3 can cut the steel pipe 23 to be processed.

[0029] As a technical optimization solution of the utility model, a first conveyor belt 19 is installed at the left end of the placement rack 1, and a second conveyor belt 20 is installed at the right end of the placement rack 1. The height of the first conveyor belt 19 is higher than that of the second conveyor belt. When the steel pipe 23 to be processed is processed into a connector 26, it is first placed on the first conveyor belt 19. The steel pipe 23 to be processed is transported to the placement rack 1 via the first conveyor belt 19. The connector 26 blank obtained after being cut by the cutting blade 18 will directly fall on the second conveyor belt 20 and be transported to the next place for processing via the second conveyor belt 20.

[0030] As a technical optimization scheme of the utility model, a limiting plate 21 is fixedly installed on the inner side of the placement rack 1 between the first moving block 2 and the second moving block 3, and a limiting hole 22 is opened at the center position of the side end of the limiting plate 21, and the aperture of the limiting hole 22 is larger than the diameter of the steel pipe 23 to be processed; in the device, the setting of the limiting plate 21 and the limiting hole 22 is mainly used for limiting and fixing the steel pipe to be processed.

[0031] As a technical optimization solution of the utility model, a protective plate 24 is installed on the surrounding side of the upper end of the second conveyor belt 20, and a connecting plate 25 is installed between the placement rack 1 and the second conveyor belt 20; the protective plate 24 is mainly provided to protect the connecting piece 26 during the conveying process to prevent the connecting piece 26 from falling from the second conveyor belt 20 when the second conveyor belt 20 is conveying, and the connecting plate 25 is mainly to facilitate the cutting of the connecting piece 26 to fall directly on the connecting plate 25, and then slide from the connecting plate 25 to the second conveyor belt 20 for transmission.

[0032] A building decorative panel connector is processed by the processing equipment; the processing equipment only cuts the steel pipe 23 to be processed into connector blanks.

[0033] It should be noted that the connecting member 26 is cylindrical in structure, and a threaded hole 27 is provided at the center of the connecting member 26; when the connecting member 26 is used to connect the decorative panel, the connection method is as follows: Figure 8 The outer frame 28, the insulation board 29 and the insulation board 30 are fixed together by passing the connecting member 26 through the outer frame 28, the insulation board 29 and the insulation board 30 in sequence, and then passing the screws through the threaded holes 27 at the side ends of the outer frame 28 and the connecting member 26 transversely.

[0034] The working principle and use process of this utility model:

[0035] When the device is used to process the connector 26, the steel pipe 23 to be processed is first placed on the first conveyor belt 19, and the steel pipe 23 to be processed is transported to the placement rack 1 via the first conveyor belt 19 and cut by the cutting assembly. The connector 26 blank obtained after cutting will directly fall onto the second conveyor belt 20 and be transported to the next location for processing via the second conveyor belt 20. When the cutting assembly is used to cut the steel pipe 23 to be processed, the cutting steps are as follows: first start the rotating motor 17, and after the rotating motor 17 is started, it will drive the driving wheel 15 to rotate, and the rotation of the driving wheel 15 will drive the driven wheel 13 to rotate, thereby driving the connecting shaft 12 connected to the driven wheel 13 to rotate, thereby driving the rotating block 10 to rotate, thereby driving the first moving block 2 to move downward, and also driving the second moving block 3 to move upward, so that the cutting blade 18 at the lower end of the first moving block 2 and the cutting blade 18 at the upper end of the second moving block 3 can cut the steel pipe 23 to be processed.

[0036] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0037] The above shows and describes the basic principles, main features and advantages of the present disclosure. Those skilled in the art should understand that the present disclosure is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present disclosure. Without departing from the spirit and scope of the present disclosure, the present disclosure may have various changes and improvements, and these changes and improvements fall within the scope of the present disclosure to be protected.

Claims

1. A processing device for a building decorative panel connector, characterized in that: include: A placement rack (1), wherein a first moving block (2) and a second moving block (3) are slidably connected in the placement rack (1), the upper end of the first moving block (2) is rotatably connected to two first connecting rods (4), both side ends of the second moving block (3) are rotatably connected to second connecting rods (5), a third connecting rod (6) is connected between the first connecting rod (4) and the second connecting rod (5) located on the same side, and the third connecting rod (6) is rotatably connected to the first connecting rod (4) and the second connecting rod (5) respectively, a first mounting groove (7) is provided at the side end of the first moving block (2), a third moving block (8) is slidably installed in the first mounting groove (7), the third moving block (8) can move laterally in the first mounting groove (7), a second mounting groove (9) is provided at the side end of the third moving block (8), a rotating block (10) is rotatably connected in the second mounting groove (9), The rotating block (10) is circular, and a socket (11) is provided at a side end of the rotating block (10) deviating from the center of the circle. A connecting shaft (12) is fixedly installed at the socket (11). The end of the connecting shaft (12) away from the socket (11) is fixedly connected to the side end of a driven wheel (13). The driven wheel (13) is installed on the side end of the placement frame (1) through a mounting plate (14). The mounting plate (14) is fixedly connected to the placement frame (1). The driven wheel (13) and the mounting plate (14) are rotatably connected. The driven wheel (13) is connected to a driving wheel (15) through a transmission belt (16). The driving wheel (15) is fixedly installed on the side end of a rotating motor (17). The rotating motor (17) is installed on the side end of the placement frame (1); a cutting blade (18) is installed at the lower end of the first moving block (2) and the upper end of the second moving block (3).

2. The processing equipment of the building decoration board connector according to claim 1 is characterized in that: A first conveyor belt (19) is installed at the left end of the placement rack (1), and a second conveyor belt (20) is installed at the right end of the placement rack (1), and the height of the first conveyor belt (19) is higher than the height of the second conveyor belt.

3. The processing equipment of the building decoration board connector according to claim 1, characterized in that: A limiting plate (21) is fixedly installed on the inner side of the placement rack (1) between the first moving block (2) and the second moving block (3), and a limiting hole (22) is provided at the center position of the side end of the limiting plate (21), and the diameter of the limiting hole (22) is larger than the diameter of the steel pipe (23) to be processed.

4. The processing equipment of the building decoration board connector according to claim 2 is characterized in that: A protective plate (24) is installed on the peripheral side of the upper end of the second conveyor belt (20), and a connecting plate (25) is installed between the placement rack (1) and the second conveyor belt (20).

5. A building decoration panel connector, characterized in that: The building decoration panel connector is processed by a building decoration panel connector processing device as described in any one of claims 1-4.

6. A building decoration panel connector according to claim 5, characterized in that: The connecting piece (26) is in a cylindrical structure, and a threaded hole (27) is provided at the center of the connecting piece (26).