Professional clamp for hoisting guide rail of building machine
By designing a split professional clamp to clamp the building machine guide rail and connect the steel wire rope, the problem of slippage during traditional hoisting is solved, construction safety and adaptability are improved, and it is suitable for the installation of guide rails of different widths.
Patent Information
- Application Number
- CN202420327238.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-22
AI Technical Summary
During the traditional construction process, the wire rope winding method used for hoisting the guide rails of building construction machines can easily lead to slippage, causing safety hazards, and it is difficult to adapt to the installation of guide rails of different widths.
A split-type professional clamp is designed, including a bending plate, a vertical plate, a reinforced steel plate and a bolt hole structure. It clamps the square columns of the building machine guide rail to prevent sliding, and connects the wire ropes through snap rings and screws to ensure stable lifting. .
It effectively prevents the guide rail from sliding, improves the safety and adaptability of the installation process, is suitable for guide rails of different widths, and improves the level of construction safety.
Smart Images

Figure CN221853962U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building engineering construction, in particular to a professional clamp for hoisting guide rails of a building construction machine. Background Art
[0002] During the installation of the building construction machine, the guide rail needs to be vertically hoisted into the reserved hole of the guide rail and connected to the hanging shoe of the building construction machine to form the support mechanism of the building construction machine. However, in the traditional construction process, the guide rail is hoisted by winding a wire rope, which is prone to slippage, causing the guide rail to fall during the hoisting process, posing a huge safety hazard to the installation of the building construction machine. Therefore, it is necessary to develop a hoisting fixture that can keep the guide rail column of the building construction machine vertical and facilitate disassembly, so as to safely hoist the building construction machine and solve the pain points in the installation of the guide rail of the building construction machine. Utility Model Content
[0003] The technical problem to be solved by the utility model is to provide a professional clamp for hoisting the guide rail of a building construction machine. The utility model adopts a split design, can adapt to the guide rail square columns of the building construction machine with different widths, and prevent the wire rope from slipping off.
[0004] In order to solve the above problems, a professional clamp for hoisting the guide rail of the building construction machine is adopted, which includes:
[0005] The first body comprises a first bent plate, a concave portion in the middle of the first bent plate, the concave portion can accommodate one side of the guide rail square column of the building machine, and both ends of the first bent plate are vertical plates; a first triangular reinforcing steel plate is welded at the corner of the vertical plate, a first bolt hole is arranged on the vertical plate, a first L-shaped plate is welded on the back of the concave portion, and a third bolt hole is arranged on the horizontal section of the first L-shaped plate;
[0006] The second body has a second bent plate, a concave portion in the second bent plate, which can accommodate the other side of the square column of the guide rail of the building construction machine and is opposite to the first bent plate. The two ends of the second bent plate are vertical plates, and a second triangular reinforcing steel plate is welded at the corner of the vertical plate. A second bolt hole is arranged on the vertical plate, and the second bolt hole is opposite to the first bolt hole; a second L-shaped plate is welded on the back of the concave portion, and a fourth bolt hole is arranged in the horizontal section of the second L-shaped plate;
[0007] Bolts are inserted into the first bolt hole and the second bolt hole and tightened with nuts so that the first body and the second body clamp the guide rail square column of the building construction machine;
[0008] The clamping ring is U-shaped, and a screw is arranged at the U-shaped end for closure. The screw is connected to the third bolt hole and the fourth bolt hole. The clamping ring is used for hanging the steel wire rope.
[0009] With such a structure, the left and right sides can be clamped on the square columns of the building machine guide rails, and the square columns of the building machine guide rails can be clamped by bolts to prevent them from sliding during the lifting process. After the first L-shaped plate and the second L-shaped plate are punched, they can be used as lifting ears to connect the clamps and wire ropes to start formal lifting.
[0010] As a further improvement of the present invention, a U-shaped plate is welded to the vertical plate of the first body to form a closed rectangle, and the bolts also pass through the U-shaped plate.
[0011] By adopting such a structure, the rigidity can be improved and the bolts can be prevented from being squeezed and deformed.
[0012] As a further improvement of the present invention, steel plates are welded between the first L-shaped plates and the second L-shaped plates to form a closed rectangle.
[0013] As a further improvement of the utility model, a third triangular reinforcing steel plate is welded between the back side of the U-shaped plate and the horizontal plate of the first bent plate.
[0014] The utility model can solve the problem that the steel wire rope is easy to slip during the installation of the guide rail of the building construction machine, and improve the safety operation level of the building construction machine installation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of an embodiment.
[0016] Figure 2 It is a schematic diagram from another angle of the embodiment.
[0017] Figure numerals: 1. first body; 101. first bent plate; 102. first triangular reinforcing steel plate; 103. first bolt hole; 104. first L-shaped plate; 105. third bolt hole; 2. second body; 201. second bent plate; 202. second triangular reinforcing steel plate; 203. second bolt hole; 204. second L-shaped plate; 205. fourth bolt hole; 3. building machine guide rail square column; 4. bolt; 5. retaining ring; 6. screw; 7. U-shaped plate; 8. steel plate; 9. third triangular reinforcing steel plate. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0020] Example 1
[0021] like Figure 1-Figure 2 As shown, a professional clamp for hoisting the guide rail of a building construction machine includes:
[0022] The first body 1 has a first bent plate 101, the middle of the first bent plate 101 is a concave portion, the concave portion can accommodate one side of the guide rail square column 3 of the building construction machine, and the two ends of the first bent plate 101 are vertical plates; and a first triangular reinforcing steel plate 102 is welded at the corner of the vertical plate, a first bolt hole 103 is set on the vertical plate, and a first L-shaped plate 104 is welded on the back of the concave portion. The horizontal section of the first L-shaped plate 104 is provided with a third bolt hole 105;
[0023] The second body 2 has a second bent plate 201, in which there is a concave portion, which can accommodate the other side of the guide rail square column 3 of the building construction machine and is opposite to the first bent plate 101. Both ends of the second bent plate 201 are vertical plates, and a second triangular reinforcing steel plate 202 is welded at the corner of the vertical plate. A second bolt hole 203 is arranged on the vertical plate, and the second bolt hole 203 is opposite to the first bolt hole 103; a second L-shaped plate 204 is welded on the back of the concave portion, and a fourth bolt hole 205 is arranged in the horizontal section of the second L-shaped plate 204;
[0024] Bolts 4 are inserted into the first bolt holes 103 and the second bolt holes 203 and tightened with nuts so that the first body 1 and the second body 2 clamp the guide rail square column 3 of the building construction machine;
[0025] The clamping ring 5 is U-shaped, and a screw rod 6 is provided at the U-shaped end to close it. The screw rod 6 is connected to the third bolt hole 105 and the fourth bolt hole 205. The clamping ring 5 is used to suspend the steel wire rope.
[0026] With such a structure, the left and right sides can be clamped on the building machine guide rail square column 3, and the building machine guide rail square column 3 can be clamped by bolts 4 to prevent the building machine guide rail square column from sliding during lifting. After the first L-shaped plate 104 and the second L-shaped plate 204 are punched, they can be used as lifting ears, connected with the clamp 5 and the wire rope, and formal lifting can begin.
[0027] In this embodiment, a U-shaped plate 7 is welded to the vertical plate of the first body 1 to form a closed rectangle, and the bolt 4 also passes through the U-shaped plate 7 .
[0028] By adopting such a structure, the rigidity can be improved and the bolt 4 can be prevented from being squeezed and deformed.
[0029] In this embodiment, the steel plate 8 is welded between the opposite first L-shaped plate 104 and the opposite second L-shaped plate 204 to form a closed rectangle.
[0030] In this embodiment, a third triangular reinforcing steel plate 9 is welded between the back side of the U-shaped plate 7 and the horizontal plate of the first bent plate 101 .
[0031] The utility model is divided into two parts, a left and a right part, each part is provided with a lifting lug for connecting a steel wire rope, and the two parts are connected by bolts to hold the square column of the building machine rail. The clamp is made of 5mm steel plate bent, and the internal size is consistent with the size of the square column of the building machine rail. Vertical wing plates for bolt connection are arranged on both sides, and reinforcing steel plates are welded at the wing plates to prevent deformation of the wing plates. Bolt holes are reserved in the center of the wing plates for connection, and a lifting lug is reserved at the tail of the clamp. The lifting lug is welded to the tail of the clamp with a steel plate, and bolt holes are reserved on both sides for connecting clamp rings.
[0032] The above contents are further detailed descriptions of the present invention in combination with specific preferred implementations, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For technicians in the technical field to which the present invention belongs, several equivalent substitutions or obvious variations can be made without departing from the concept of the present invention, and the performance or use is the same, which should be regarded as belonging to the protection scope of the present invention.
Claims
1. A professional clamp for hoisting the guide rail of a building construction machine, characterized in that include: The first body (1) comprises a first bent plate (101), the middle of the first bent plate (101) is a concave portion, the concave portion can accommodate one side of the guide rail square column (3) of the building construction machine, and the two ends of the first bent plate (101) are vertical plates; a first triangular reinforcing steel plate (102) is welded at the corner of the vertical plate, a first bolt hole (103) is arranged on the vertical plate, a first L-shaped plate (104) is welded to the back of the concave portion, and a third bolt hole (105) is arranged on the horizontal section of the first L-shaped plate (104); The second body (2) comprises a second bent plate (201), wherein the second bent plate (201) has a concave portion, the concave portion can accommodate the other side of the guide rail square column (3) of the building construction machine, and is opposite to the first bent plate (101); both ends of the second bent plate (201) are vertical plates, and a second triangular reinforcing steel plate (202) is welded at the corner of the vertical plate, a second bolt hole (203) is arranged on the vertical plate, and the second bolt hole (203) is opposite to the first bolt hole (103); a second L-shaped plate (204) is welded on the back of the concave portion, and a fourth bolt hole (205) is arranged on the horizontal section of the second L-shaped plate (204); Bolts (4) are inserted into the first bolt hole (103) and the second bolt hole (203) and are tightened with nuts so that the first body (1) and the second body (2) clamp the guide rail square column (3) of the building construction machine; The clamping ring (5) is U-shaped, and a screw rod (6) is arranged at the U-shaped end to close it. The screw rod (6) is connected to the third bolt hole (105) and the fourth bolt hole (205). The clamping ring (5) is used to suspend the steel wire rope.
2. According to claim 1, the professional clamp for hoisting the guide rail of the building construction machine is characterized in that A U-shaped plate (7) is welded to the vertical plate of the first body (1) to form a closed rectangle, and the bolt (4) also passes through the U-shaped plate (7).
3. According to claim 1, the professional clamp for hoisting the guide rail of the building construction machine is characterized in that The steel plates (8) are welded between the opposite first L-shaped plates (104) and the opposite second L-shaped plates (204) to form a closed rectangle.
4. According to claim 2, the professional clamp for hoisting the guide rail of the building construction machine is characterized in that A third triangular reinforcing steel plate (9) is welded between the back side of the U-shaped plate (7) and the horizontal plate of the first bent plate (101).