Completely assembled ballastless track
The design of fully prefabricated track slabs and bases solves the problems of labor shortage and high precision requirements in traditional ballastless track construction, improves construction efficiency and precision, reduces material usage and construction damage, and adapts to restricted spaces. layout requirements.
Patent Information
- Application Number
- CN202420368127.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-28
AI Technical Summary
During the construction of traditional ballastless tracks, there are problems such as shortage of labor resources, increasing requirements for engineering construction accuracy, large overall weight of a single piece and inconvenient layout in a restricted space, waste of resources, and single form.
The track plate and base are fully prefabricated. The track plate adopts a frame structure design and is equipped with a height-adjustable rail platform and point-supported groutable vibration damping pads. The base adopts a prefabricated frame structure and is equipped with an independent limiting boss. and raised support parts, which significantly reduce the dead weight through prefabricated design and improve construction efficiency and accuracy.
It achieves the improvement of on-site construction efficiency, improvement of assembly accuracy, saving of material usage, convenience of transportation and optimization of space utilization, simplifying construction operations and reducing construction damage.
Smart Images

Figure CN221855157U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of rail transportation, in particular to a fully assembled ballastless track and a construction method. Background Art
[0002] In the field of rail transit, locomotives travel on the rail system and transfer the load to the roadbed, bridges or tunnels through the rails, and the track slab base plays a vital role in this process. In the field of rail transit, the traditional fully cast-in-place ballastless track, prefabricated track slab + cast-in-place base ballastless track structure, and the new type of prefabricated base + prefabricated track slab ballastless track that has emerged in recent years each have their own characteristics and occupy a place.
[0003] For example, Chinese patent CN201990905U discloses a concrete pouring construction mold for the base of ballastless track slab, which includes a side template, a pair of adjustable triangular brackets and a pair of liftable inner running wheel devices connected to the outside of the side template, and liftable outer running wheel devices are respectively arranged on each adjustable triangular bracket, and a pair of vertically arranged adjustable support rods are installed on the side template, and a leveler running track is fixedly connected to the upper end of the two adjustable support rods. This mold is used for traditional cast-in-place base construction, and the construction method is as follows: ① Cast a concrete cushion layer on the track line foundation; ② After the maintenance is completed, tie a steel mesh cage on the concrete cushion layer; ③ The tied steel mesh cage is fixed and poured with concrete using the cast-in-place base construction mold; ④ After the concrete strength is improved, remove the mold.
[0004] Chinese patent CN216107838U discloses a prefabricated base plate for a roadbed structure, which includes a base plate body, and the base plate body is provided with bearing surfaces on the top of both sides along the longitudinal direction, and the bearing surfaces are inclined surfaces that gradually rise from the inside to the outside. The base plate adopts a frame-type base body + a raised support part to form a high-strength support member, and the frame-type base body is a plane structure, and the middle of the frame-type base body is a beam structure, which achieves the purpose of saving material usage and reducing weight, and at the same time improves the convenience of transportation and installation.
[0005] Traditional cast-in-place foundations do not require much design and can be constructed with sufficient labor; prefabricated foundations have high construction accuracy, standardized factory production, short construction time, and convenient maintenance. With the development of society, traditional cast-in-place foundations have problems such as shortage of labor resources and increased requirements for engineering construction accuracy; existing prefabricated foundations are heavy and inconvenient to arrange in a confined space, the dense reinforced concrete structure of the foundation causes waste of resources, and the form is single. Utility Model Content
[0006] In order to overcome the above-mentioned problems, the inventors have conducted intensive research and adopted a fully prefabricated structure for the track plate and the base. The track plate adopts a frame structure design, two connecting beams are provided between the two track plate longitudinal beams, and height-adjustable rail bearing platforms are provided on the longitudinal beams. Point-type support vibration-damping grouting bags are provided under the longitudinal beams, and buffering elastic grouting bags are provided on the sides of the U-shaped grooves at the ends of the track plates. The base adopts a prefabricated frame structure design, and independent limiting bosses are provided on the base and in the U-shaped grooves at the ends of the track plates, which significantly reduce the dead weight, greatly improve the on-site construction efficiency, and improve the assembly accuracy, thereby completing the utility model.
[0007] The utility model aims to provide the following aspects:
[0008] 1. A fully assembled ballastless track, comprising a prefabricated track slab and a prefabricated base.
[0009] The prefabricated track slab is a frame structure. Each prefabricated track slab includes 2 track slab longitudinal beams, between which there are 2-4 connecting beams.
[0010] A height-adjustable rail support is provided on the longitudinal beam.
[0011] A point-supported grouting vibration damping pad is provided under the longitudinal beam.
[0012] A groutable buffer layer is provided on the side of the U-shaped groove formed by the end of the longitudinal beam and the cross beam at the end of the track plate.
[0013] The prefabricated base is a frame structure, and an independent limiting boss is upwardly arranged at the end of the base, and the independent limiting boss is assembled with a U-shaped groove at the end of the track plate for limiting.
[0014] 2. The fully assembled ballastless track as described in 1 above, wherein each prefabricated track slab is arranged on a prefabricated base, or on two prefabricated bases;
[0015] When a prefabricated track plate is arranged on a prefabricated base, two U-shaped grooves at both ends of the track plate are respectively assembled on two independent limiting bosses at both ends of the prefabricated base to achieve horizontal limiting;
[0016] When a prefabricated track plate is arranged on two prefabricated bases, two ends of the two prefabricated bases are provided with an independent limiting boss respectively assembled with two U-shaped grooves at the two ends of the track plate to achieve horizontal limiting.
[0017] 3. The fully assembled ballastless track as described in 1 above, wherein the height-adjustable rail support is integrally cast with the longitudinal beam and the cross beam, and the super-high slope is achieved by the height-adjustable rail support.
[0018] The height-adjustable rail support platform is obtained by adjusting the depth of the rail support platform cavity in the track plate mold during the production stage. During the production stage, the depth of the rail support platform cavity is uniformly deepened to a predetermined depth. For rail support platforms with a height lower than the predetermined depth, gaskets are placed in the rail support platform cavity during production to reduce the cavity depth so that the resulting rail support platform has a desired height.
[0019] 4. The fully assembled ballastless track as described in 1 above, wherein the grouted vibration damping pads are point-distributed and bonded to the bottom of the longitudinal beam along the longitudinal direction of the track plate.
[0020] The groutable vibration-damping pad comprises an elastic grouting bag, an elastic vibration-damping part and a grouting / exhaust port connected to the grouting bag. The elastic grouting bag is above, below or in the middle of the elastic vibration-damping part. The elastic vibration-damping part and the grouting bag can be integrally formed or separately bonded.
[0021] 5. The fully assembled ballastless track as described in 4 above, wherein the elastic grouting bag is in the middle of the elastic vibration damping part, and the elastic vibration damping part and the elastic grouting bag are integrally formed.
[0022] 6. The fully assembled ballastless track as described in 1 above, wherein the groutable buffer layer is bonded to the side of the U-shaped groove at the end of the track plate throughout its length and has the same height as the track plate.
[0023] The groutable buffer layer includes an elastic grouting bag, an elastic buffer part and a grouting / exhaust port connected to the grouting bag. The elastic grouting bag is outside, inside or in the middle of the elastic buffer part. The elastic buffer part and the elastic grouting bag are integrally formed or separately bonded.
[0024] 7. The fully assembled ballastless track as described in 6 above, wherein the elastic grouting bag is in the middle of the elastic buffer part, and the elastic buffer part and the elastic grouting bag are integrally formed and connected.
[0025] 8. The fully assembled ballastless track as described in 1 above, wherein the prefabricated base further comprises an integrally formed plate-type base body and a protruding support portion protruding outward, and each prefabricated base comprises a plurality of protruding support portions.
[0026] When the main body of the base is in the form of a flat plate, the track plate is assembled on the main body of the base through a groutable vibration reduction pad, the raised support portion is supported downward on the tunnel floor or ground foundation, and the main body of the base is provided with a weight-reducing hole that passes through the main body in a vertical direction;
[0027] When the main body of the base is in the shape of an arc plate, the track plate is assembled on the raised support part through a groutable vibration reduction pad, the arc surface of the main body of the base is supported downward on the tunnel floor, and a longitudinally penetrating weight-reducing hole is also provided on the upper part of the main body of the base.
[0028] The independent limiting boss is cast on the end of the main body of the prefabricated base, the outer end surface of the independent limiting boss is flush with the outer end surface of the track plate, and the upper end surface of the independent limiting boss is flush with the upper end surface of the track plate.
[0029] 9. The fully assembled ballastless track as described in 1 above, wherein an eccentric bolt sleeve is used in the ballastless track, and the eccentric bolt sleeve includes a centrally symmetrical embedded portion and an eccentric fixing portion.
[0030] 10. The fully assembled ballastless track as described in 1 above further comprises a cast-in-place layer between the bottom of the base and the surrounding area and the tunnel floor or ground foundation, which is cast on-site by fine stone concrete, self-compacting concrete or self-leveling mortar.
[0031] The bottom of the prefabricated base is provided with embedded reinforcement, which is connected to the cast-in-place layer as a whole.
[0032] The fully assembled ballastless track provided by the utility model has the following beneficial effects:
[0033] (1) All tracks are prefabricated, which improves on-site construction efficiency and achieves higher laying accuracy;
[0034] (2) Minimize the weight of the track slab to save materials and facilitate transportation and laying;
[0035] (3) The middle of the track plate is hollowed out to facilitate the installation of resonance blocks and sound-absorbing panels;
[0036] (4) The groutable vibration damping pads with point support can be easily installed on the track plate in a dispersed manner in the factory. Through on-site grouting, an adaptive and stable foundation vibration damping layer can be accurately and easily formed, providing 6-8dB foundation vibration damping. It is convenient to raise the foundation after a large settlement occurs, and it is easy to reset the line;
[0037] (5) The height of the rail support platform of the track plate is adjustable by adjusting the depth of the rail support platform mold during the production stage. That is, the super-high slope adjustment can be achieved through the rail support platform itself, without the need to adjust the height by installing a pad at the construction site, which greatly improves the construction accuracy and ease;
[0038] (6) A frame-type prefabricated base with a raised support portion is used to minimize material usage, eliminate the need for on-site casting, improve on-site construction efficiency, and achieve high construction and assembly accuracy;
[0039] (7) An independent limiting boss is used, which is set at a position on the base corresponding to the U-shaped groove at the end of the track plate. The assembly accuracy with the U-shaped groove at the end of the track plate is high. The base and the track plate are adjusted synchronously according to the construction situation, which does not affect the assembly with the limiting boss. In addition, the independent limiting boss does not occupy the horizontal space of the track, thereby improving space utilization;
[0040] (8) A groutable buffer layer is provided on the side of the U-shaped groove at the end of the track plate. On-site grouting can accurately and easily form an adaptive and stable buffer layer to prevent "hard collision" between the U-shaped groove at the end of the track plate and the limiting boss, providing good buffering;
[0041] (9) On-site assembly and construction is fast and efficient, which greatly simplifies on-site construction operations, achieves high laying accuracy, and causes little or no construction damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A schematic diagram showing the structure of a prefabricated track plate according to a preferred embodiment of the utility model is shown;
[0043] Figure 2 A schematic diagram of a prefabricated base structure of a preferred embodiment of the utility model is shown;
[0044] Figure 3 A schematic diagram showing a fully assembled ballastless track structure according to a preferred embodiment of the utility model;
[0045] Figure 4 A schematic diagram of a prefabricated base structure of a preferred embodiment of the utility model is shown;
[0046] Figure 5 A schematic diagram showing a fully assembled ballastless track structure according to a preferred embodiment of the utility model;
[0047] Figure 6 A schematic diagram showing the structure of a prefabricated track plate according to a preferred embodiment of the utility model is shown;
[0048] Figure 7 A schematic diagram showing the structure of a prefabricated track plate according to a preferred embodiment of the utility model is shown;
[0049] Figure 8 A schematic diagram showing the structure of a prefabricated track plate according to a preferred embodiment of the utility model is shown;
[0050] Fig. 9 A schematic diagram showing the structure of an eccentric bolt sleeve according to a preferred embodiment of the utility model is shown;
[0051] Fig.10 A schematic diagram showing a fully assembled ballastless track structure according to a preferred embodiment of the utility model;
[0052] Fig.11 A schematic diagram showing a fully assembled ballastless track structure according to a preferred embodiment of the utility model;
[0053] Fig.12 A schematic diagram showing a fully assembled ballastless track structure according to a preferred embodiment of the utility model;
[0054] Fig.13 A schematic diagram showing a fully assembled ballastless track structure according to a preferred embodiment of the utility model;
[0055] Fig.14 A schematic diagram of a groutable buffer layer structure according to a preferred embodiment of the utility model is shown;
[0056] Description of Figure Numbers:
[0057] 1- Prefabricated track slab
[0058] 11- Stringer
[0059] 12-Connecting beams
[0060] 13- Height-adjustable rail support
[0061] 14- Groutable vibration damping pads
[0062] 141-Elastic grouting bag
[0063] 142-Elastic vibration damping part
[0064] 143- Grouting port / exhaust port
[0065] 15- Groutable buffer layer
[0066] 151- Grouting port / exhaust port
[0067] 16-Eccentric bolt sleeve
[0068] 161-Embedded part
[0069] 162-Fixed part
[0070] 2- Prefabricated base
[0071] 21- Base body
[0072] 22- Raised support part
[0073] 23-Weight reduction hole
[0074] 24-Drainage hole
[0075] 25-Independent limit boss
[0076] 3- Cast-in-place layer DETAILED DESCRIPTION
[0077] The present invention is further described in detail below through the accompanying drawings and embodiments. Through these descriptions, the features and advantages of the present invention will become clearer and more distinct.
[0078] Therein, while various aspects of the embodiments are shown in the drawings, the drawings are not necessarily drawn to scale unless specifically noted.
[0079] The fully assembled ballastless track provided by the utility model, the prefabricated track plate and the prefabricated base all adopt a frame structure to minimize the material consumption, lighten the weight, save the concrete masonry volume, reduce the deadweight, not only save costs but also facilitate transportation and on-site construction.
[0080] In a preferred embodiment, the prefabricated track plate 1 used in the utility model is a standard, symmetrical frame structure, including two track plate longitudinal beams 11, with 2-4 connecting cross beams 12 arranged therebetween, and a U-shaped groove is formed at the end of the track plate by the end of the longitudinal beam and the cross beam.
[0081] In the most preferred embodiment, the prefabricated track slab has two connecting beams, such as Figure 1 shown.
[0082] The structural design of the frame-type prefabricated track slab not only reduces its own weight to the greatest extent, but also leaves sufficient space for the installation of other devices such as resonance blocks and sound-absorbing panels.
[0083] In a preferred embodiment, a height-adjustable rail support 13 is provided on the longitudinal beam. The height-adjustable rail support is obtained by adjusting the depth of the rail support cavity in the track plate mold during the production stage. During the production stage, the depth of the rail support cavity is uniformly deepened to a predetermined depth. For rail supports with a height lower than the predetermined depth, a gasket is placed in the rail support cavity during production to reduce the cavity depth so that the obtained rail support has a desired height.
[0084] By means of the height-adjustable rail support platform 13 formed integrally with the track plate, different super-elevation slopes can be easily achieved without the need for an additional height-adjusting pad, which not only greatly simplifies on-site construction but also significantly improves the super-elevation slope accuracy.
[0085] In a preferred embodiment, a point-supported groutable vibration-damping pad 14 is provided under the longitudinal beam of the track plate. The groutable vibration-damping pad 14 is point-distributedly bonded to the bottom of the longitudinal beam along the longitudinal direction of the track plate, and includes an elastic grouting bag 141, an elastic vibration-damping portion 142, and a grouting port / exhaust port 143 connected to the grouting bag. The vibration-damping pad body and the grouting bag can be integrally formed or separately bonded, and are pre-installed at the bottom of the prefabricated frame plate track plate in the factory.
[0086] The elastic grouting bag 141 can be arranged above, below or in the elastic vibration damping part 142, preferably integrated therein, such as Figure 7 As shown, the vibration damping pad has more stable vibration damping performance, longer service life, and is easy to produce.
[0087] More preferably, the width of the vibration-damping pad is the same as the width of the longitudinal beam of the frame track plate. The vibration-damping pad, including the elastic grouting bag 141 and the elastic vibration-damping part 142, can be made of an elastic material such as rubber or polyurethane. In a preferred embodiment, the thickness of the vibration-damping layer ranges from 10 to 40 mm. Preferably, the wall thickness of the grouting bag chamber is 1 to 5 mm, and the clearance thickness in the grouting bag chamber ranges from about 10 to 100 mm.
[0088] By grouting the elastic grouting bag 141 through the grouting port / exhaust port 143 on site, an adaptive and stable foundation vibration reduction layer can be accurately and easily formed, providing at least 6-8dB of foundation vibration reduction with high reliability. After a large settlement of the foundation occurs, it can be conveniently raised to facilitate line reset adjustment.
[0089] The surface where the vibration damping pad is bonded to the track plate is a rough surface or a rough surface, so as to facilitate bonding to the track plate in the factory to form a prefabricated track plate.
[0090] In a preferred embodiment, a groutable buffer layer 15 is provided on the side of the U-shaped groove formed by the end of the longitudinal beam and the cross beam at the end of the track plate, and the height is the same as the track plate. Figure 8 shown.
[0091] Similar to the groutable buffer layer type, the groutable buffer layer includes an elastic grouting bag, an elastic buffer part and a grouting port / exhaust port 151 connected to the elastic grouting bag. The elastic grouting bag is outside, inside or in the middle of the elastic buffer part. The elastic buffer part and the grouting bag can be integrally formed or separately bonded.
[0092] Similar to the preferred embodiment of the groutable buffer layer, the elastic grouting bag and the elastic buffer portion can be made of an integral piece of elastic material such as rubber or polyurethane. The elastic grouting bag is in the middle of the elastic buffer portion, and the grouting port / exhaust port 151 is connected to the elastic grouting bag. By grouting the elastic grouting bag through the grouting port / exhaust port 151 on site, an adaptive and stable buffer layer can be accurately and easily formed. At this time, the groutable buffer layer has more stable buffering performance, longer service life, and is easy to produce.
[0093] In a preferred embodiment, the thickness of the buffer layer ranges from 10 to 40 mm, the wall thickness of the grouting bag chamber ranges from 1 to 5 mm, and the clearance thickness in the grouting bag chamber ranges from about 10 to 50 mm.
[0094] The surface where the buffer pad is bonded to the track plate is a rough surface or a rough surface, so as to facilitate bonding to the track plate in the factory to form a prefabricated track plate.
[0095] In a preferred embodiment, an eccentric bolt sleeve 16 is used in the ballastless track, and the eccentric bolt sleeve includes a centrally symmetrical embedded portion 161 and an eccentric fixing portion 162. Figure 8 shown.
[0096] The traditional bolt sleeve bolt hole centered structure is changed to an eccentric structure, so that the distance from the center of the bolt hole to the edge of the sleeve is changed from a fixed spacing to a variable spacing, thereby realizing track gauge adjustment.
[0097] In practice, the track gauge can be adjusted on the ballast or sleeper without increasing the model of long sleepers or ballast plate molds. The track gauge adjustment amount of a single rail is -3 to +4 mm, and the track gauge adjustment amount between two rails reaches -6 to +8 mm. The adjustment amount and adjustment range can be adjusted according to actual needs, thereby easily realizing curve section adjustment without the need for complicated fastener adjustment at the construction site.
[0098] In a preferred embodiment, the prefabricated base 2 used in the present invention is a special-shaped frame structure, such as Figure 2 and Figure 3 As shown, it includes a base body portion 21 and a raised support portion 22, on which a weight-reducing hole 23 is opened.
[0099] In a preferred embodiment of the prefabricated base, Figure 2 , Figure 3 As shown, the base body 21 is flat, the track plate 1 is assembled on the base body, the raised support part 22 is supported downward on the tunnel floor or the ground foundation, and the base body is provided with a weight-reducing hole 23 that passes through the body in a vertical direction.
[0100] There are multiple raised support parts 22, which are evenly distributed in 4 rows along the longitudinal direction at the bottom of both sides of the frame of the base body 21 to adapt to rectangular tunnels and circular tunnels. The height of the raised support part is adapted according to the rectangular tunnel or circular tunnel below it. For rectangular tracks, the height of the raised support part is the same, such as Fig.10 As shown, for a circular tunnel, the height of the raised support portion decreases from the inside to the outside, as shown in Fig.11 As shown, to match the circular tunnel. Since the raised support portion 22 is arranged downward, it not only plays a supporting role, but also because a plurality of raised support portions are arranged separately, the space formed therein can drain water and play the role of a drainage ditch.
[0101] In another preferred embodiment of the prefabricated base, Figure 4 , Figure 5 As shown, the base body 21 is in the shape of an arc plate, the track plate 1 is assembled on the raised support portion 22, the base body 21 is supported downward on the tunnel floor by an arc surface, and a weight reduction hole 23 and a drainage hole 24 are provided in the middle of the base body that penetrate the body in the longitudinal direction, as shown in FIG. Figure 5 shown.
[0102] There are multiple raised support parts 22, which are evenly distributed in two rows along the longitudinal direction at the bottom of both sides of the frame of the base body 21, and the raised support parts 22 have the same height to better provide support for the prefabricated track plate 1. The weight-reducing holes 23 not only save materials and reduce deadweight, but also collect and drain water, and water is discharged from the track base through the drainage holes 24.
[0103] Further preferably, the prefabricated base 2 further comprises an independent limiting boss 25 arranged at the end, which is formed at the end of the prefabricated base by casting and is assembled with the U-shaped groove at the end of the track plate for limiting.
[0104] More preferably, the independent limiting boss 25 is cast on the end of the prefabricated base main body, the outer end face of the independent limiting boss 25 is flush with the outer end face of the track plate 1, and the upper end face of the independent limiting boss 25 is flush with the upper end face of the prefabricated track plate 1, thereby improving the construction accuracy while ensuring the limiting effect and avoiding on-site construction damage.
[0105] In a preferred embodiment, each prefabricated track plate is arranged on a prefabricated base. In this case, two U-shaped grooves at both ends of the track plate are respectively assembled on two independent limiting bosses at both ends of the prefabricated base to achieve horizontal limiting. Figure 3 and Fig.12 shown.
[0106] In another preferred embodiment, each prefabricated track plate is arranged on two prefabricated bases. At this time, an independent limiting boss is provided at the two ends of the two prefabricated bases, which are respectively assembled with the two U-shaped grooves at the two ends of the track plate to achieve horizontal limiting. Figure 5 shown.
[0107] Since an independent limiting boss is used on the prefabricated base, the prefabricated track plate 1 and the prefabricated base 2 can be accurately installed on site, and the construction is simple and easy.
[0108] In a preferred embodiment, the fully assembled ballastless track further comprises a cast-in-place layer 3 between the bottom and surrounding of the base and the tunnel floor or ground foundation, such as Fig.13 shown.
[0109] The cast-in-place layer can be cast on site by fine stone concrete, self-compacting concrete or self-leveling mortar. The bottom of the prefabricated base is provided with embedded reinforcement, which is connected to the cast-in-place layer as a whole. The cast-in-place layer provides precise positioning for the prefabricated base, as well as stable and reliable fixation.
[0110] The present invention has been described above in conjunction with preferred embodiments, but these embodiments are only exemplary and serve only as an illustration. On this basis, the present invention may be subjected to a variety of substitutions and improvements, all of which fall within the scope of protection of the present invention.
Claims
1. Fully assembled ballastless track, characterized by: The fully assembled ballastless track comprises a prefabricated track slab and a prefabricated base. The prefabricated track slab is a frame structure. Each prefabricated track slab includes 2 track slab longitudinal beams, between which there are 2-4 connecting beams. A height-adjustable rail support is provided on the longitudinal beam. A point-supported grouting vibration damping pad is provided under the longitudinal beam. A groutable buffer layer is provided on the side of the U-shaped groove formed by the end of the longitudinal beam and the cross beam at the end of the track plate. The prefabricated base is a frame structure, and an independent limiting boss is upwardly arranged at the end of the base, and the independent limiting boss is assembled with a U-shaped groove at the end of the track plate for limiting.
2. The fully assembled ballastless track according to claim 1, characterized in that: Each prefabricated track slab is arranged on a prefabricated base, or on two prefabricated bases; When a prefabricated track plate is arranged on a prefabricated base, two U-shaped grooves at both ends of the track plate are respectively assembled on two independent limiting bosses at both ends of the prefabricated base to achieve horizontal limiting; When a prefabricated track plate is arranged on two prefabricated bases, two ends of the two prefabricated bases are provided with an independent limiting boss respectively assembled with two U-shaped grooves at the two ends of the track plate to achieve horizontal limiting.
3. The fully assembled ballastless track according to claim 1, characterized in that: The height-adjustable rail support is integrally cast with the longitudinal beam and the cross beam. The height-adjustable rail support platform is obtained by adjusting the depth of the rail support platform cavity in the track plate mold during the production stage. During the production stage, the depth of the rail support platform cavity is uniformly deepened to a predetermined depth. For rail support platforms with a height lower than the predetermined depth, gaskets are placed in the rail support platform cavity during production to reduce the cavity depth so that the resulting rail support platform has a desired height.
4. The fully assembled ballastless track according to claim 1, characterized in that: The grouting vibration damping pads can be dispersed and bonded to the bottom of the longitudinal beam along the longitudinal direction of the track plate. The groutable vibration-damping pad comprises an elastic grouting bag, an elastic vibration-damping part and a grouting port / exhaust port connected to the grouting bag. The elastic grouting bag is above, below or in the middle of the elastic vibration-damping part. The elastic vibration-damping part and the elastic grouting bag are integrally formed or separately bonded.
5. The fully assembled ballastless track according to claim 4, characterized in that: The elastic grouting bag is in the middle of the elastic vibration damping part, and the elastic vibration damping part and the elastic grouting bag are integrally formed.
6. The fully assembled ballastless track according to claim 1, characterized in that: The grouting buffer layer can be bonded to the side of the U-shaped groove at the end of the track plate, and the height is the same as the track plate. The groutable buffer layer includes an elastic grouting bag, an elastic buffer part and a grouting port / exhaust port connected to the grouting bag. The elastic grouting bag is outside, inside or in the middle of the elastic buffer part. The elastic buffer part and the elastic grouting bag are integrally formed or separately bonded.
7. The fully assembled ballastless track according to claim 6, characterized in that: The elastic grouting bag is in the middle of the elastic buffer part, and the elastic buffer part and the elastic grouting bag are integrally formed and connected.
8. The fully assembled ballastless track according to claim 1, characterized in that: The prefabricated base also includes an integrally formed plate-type base main body and a protruding support portion protruding outward, and each prefabricated base includes a plurality of protruding support portions. When the main body of the base is in the form of a flat plate, the track plate is assembled on the main body of the base through a groutable vibration reduction pad, the raised support portion is supported downward on the tunnel floor or ground foundation, and the main body of the base is provided with a weight-reducing hole that passes through the main body in a vertical direction; When the main body of the base is in the shape of an arc plate, the track plate is assembled on the raised support part through a groutable vibration reduction pad, the arc surface of the main body of the base is supported downward on the tunnel floor, and a longitudinally penetrating weight-reducing hole is also provided on the upper part of the main body of the base. The independent limiting boss is cast on the end of the main body of the prefabricated base, the outer end surface of the independent limiting boss is flush with the outer end surface of the track plate, and the upper end surface of the independent limiting boss is flush with the upper end surface of the track plate.
9. The fully assembled ballastless track according to claim 1, characterized in that: An eccentric bolt sleeve is used in a ballastless track, and the eccentric bolt sleeve comprises a centrally symmetrical embedded portion and an eccentric fixing portion.
10. The fully assembled ballastless track according to claim 1, characterized in that: The fully assembled ballastless track also includes a cast-in-place layer between the bottom and surrounding of the base and the tunnel floor or ground foundation, which is cast on-site by fine stone concrete, self-compacting concrete or self-leveling mortar. The bottom of the prefabricated base is provided with embedded reinforcement, which is connected to the cast-in-place layer as a whole.
Citation Information
Cited By
Precast plate type vibration reduction rail structure for rail transit
CN120486179A
Completely-fabricated ballastless track and construction method thereof
CN120556318A