Cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate

By using composite lightweight aggregates and waste materials in the cast-in-place foam soil filling structure, the problems of slow construction speed and uneven density of cast-in-place foam lightweight soil are solved, efficient and stable roadbed filling is achieved, and the construction speed and roadbed strength, and promotes the reuse of waste materials and environmental protection.

CN221855173UActive Publication Date: 2024-10-18FUJIAN LVSHU ENERGY SAVING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323229156.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-29
Publication Date
2024-10-18
Estimated Expiration
2033-11-29

AI Technical Summary

Technical Problem

In the construction of cast-in-place foam lightweight soil, due to the limited thickness of single-layer construction, the construction speed is slow, the efficiency is low, the density is uneven, and long-term pouring intervals are required, which affects the progress of the project.

Method used

The cast-in-place foam soil filling structure containing composite lightweight aggregate is used. The lower layer of large-grained composite lightweight aggregate-filled foam soil and the upper layer of cast-in-place composite lightweight aggregate foam are poured from bottom to top in the subgrade pit. A soil filling layer is laid, and an asphalt waterproof membrane and a rust-proof steel wire grid reinforcement layer are laid between the two layers to increase the structural strength and stability. At the same time, waste foam lightweight concrete block broken particles and solid waste ceramsite are used to form a composite Aggregate to increase the strength and density of the filling layer.

Benefits of technology

It significantly increases the construction speed, enhances the overall stability and strength of the roadbed, reduces pavement diseases caused by uneven settlement, realizes the reuse of waste materials, and has environmental protection advantages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855173U_ABST
    Figure CN221855173U_ABST
Patent Text Reader

Abstract

The utility model provides a cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate, which comprises a roadbed foundation pit filling main body, a lower foam soil filling layer filled with large-particle-size composite lightweight aggregate, an upper cast-in-place composite lightweight aggregate foam soil filling layer, an asphalt waterproof coiled material layer and an anti-rust steel wire grating reinforcing layer, the lower large-particle-size composite light aggregate filling foam soil filling layer and the upper cast-in-place composite light aggregate foam soil filling layer are sequentially poured into the roadbed foundation pit filling body from bottom to top. The asphalt waterproof coiled material layer is laid between the pit bottom of the roadbed foundation pit filling main body and the lower large-particle-size composite lightweight aggregate filling foam soil filling layer; the construction speed is high, under the condition that the density of the filled roadbed is not increased, the strength of the filled roadbed is improved, the overall stability and the quality reliability of the roadbed are enhanced, roadbed pavement diseases caused by differential settlement of the roadbed are effectively reduced, solid waste can be recycled, and environmental protection is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of cast-in-place foamed lightweight soil construction technology, and in particular to a cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate. Background Technology

[0002] Currently, during the construction of cast-in-place foamed lightweight soil, due to the large number of air bubbles inside the soil, the maximum thickness of a single layer cannot exceed 1 meter. Otherwise, the air bubbles inside the lightweight soil will rupture or accumulate to the surface under their own weight, resulting in excessively high density and uneven performance in different areas. Furthermore, to ensure that the poured lightweight soil layer hardens fully and is not damaged during subsequent construction, the interval between pouring two adjacent layers must be greater than 8 hours. This excessively long interval, coupled with the relatively limited thickness of a single layer, leads to a long construction cycle, low efficiency, and high manpower consumption for the lightweight soil filling structure, and can seriously affect the overall construction progress.

[0003] Chinese invention application CN111304987A discloses a foamed lightweight soil subgrade structure for mountainous highways. The subgrade structure includes steps, with a retaining wall extending downwards at the lowest end of each step. A concrete base is provided on the retaining wall, and a precast panel is placed on the concrete base. Foamed lightweight soil is poured between the precast panel and the step. The thickness of a single layer of foamed lightweight soil poured on-site should be controlled within the range of 0.5m to 1.0m. For adjacent pouring layers in the same section, when the temperature during construction is not lower than 15℃, the minimum pouring interval can be controlled at 8-12 hours; otherwise, the pouring interval should not be less than 2 days.

[0004] The above-mentioned technical solution uses the traditional cast-in-place foamed lightweight soil construction method for its subgrade structure, which is relatively slow. In order to solve the above technical problems, it is necessary to provide a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate with a faster construction speed. Utility Model Content

[0005] In view of this, this utility model proposes a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, which has a faster construction speed, improves the strength of the filling subgrade without increasing the density of the filling subgrade, enhances the overall stability and quality reliability of the subgrade, effectively reduces subgrade and pavement diseases caused by uneven settlement of the subgrade, and can recycle solid waste, which is beneficial to environmental protection.

[0006] The technical solution of this utility model is implemented as follows: This utility model provides a cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate, including a roadbed foundation pit filling main body, and further including a lower layer of large-diameter composite lightweight aggregate filled foamed soil filling layer, an upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer, an asphalt waterproof membrane layer, and a rust-proof steel wire mesh reinforcement layer, wherein,

[0007] The lower layer of large-diameter composite lightweight aggregate filled foam soil and the upper layer of cast-in-place composite lightweight aggregate filled foam soil are poured sequentially from bottom to top in the main body of the roadbed pit filling.

[0008] The asphalt waterproof membrane layer is laid between the bottom of the roadbed pit and the lower layer of large-diameter composite lightweight aggregate filled foam soil.

[0009] The rust-proof steel wire mesh reinforcement layer is laid between the lower layer of large-diameter composite lightweight aggregate foamed soil filling layer and the upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer.

[0010] Based on the above technical solutions, preferably, it also includes an adhesive layer, wherein...

[0011] The bonding layer is laid on top of the upper cast-in-place composite lightweight aggregate foamed soil filling layer.

[0012] Based on the above technical solutions, a preferred option also includes a retaining wall, wherein...

[0013] The retaining wall is fixedly installed on the outer side of the road surface of the main body of the roadbed pit filling, and the top surface of the retaining wall is aligned with the top surface of the main body of the roadbed pit filling and the top surface of the upper cast-in-place composite lightweight aggregate foamed soil filling layer.

[0014] The bonding layer extends from the top of the upper cast-in-place composite lightweight aggregate foamed soil filling layer to the top of the retaining wall and the top of the main body of the roadbed pit filling.

[0015] Based on the above technical solutions, a preferred embodiment also includes steps, wherein...

[0016] The steps are fixedly installed on the side of the roadbed foundation pit filling main body near the center of the road surface;

[0017] The lower layer of large-diameter composite lightweight aggregate filled foam soil and the upper layer of cast-in-place composite lightweight aggregate filled foam soil are poured between the retaining wall and the steps.

[0018] Based on the above technical solutions, a preferred option also includes compartment partitions, wherein...

[0019] The compartment partitions are fixedly installed inside the main body of the roadbed foundation pit filling structure;

[0020] The interior of the main body of the roadbed pit filling is divided into casting compartments by partition plates.

[0021] Based on the above technical solutions, preferably, the compartment partitions are provided in several places inside the main body of the roadbed pit filling, and the compartment partitions are crisscrossed to form several casting compartments.

[0022] Based on the above technical solutions, the preferred option also includes reinforcing bars for the compartment partitions, wherein...

[0023] The protective reinforcement bars for the compartment partitions are fixedly installed on the side of the compartment partitions;

[0024] One end of the compartment partition reinforcement bar is inserted into the bottom of the roadbed foundation pit filling body, and the other end extends vertically upward to the top surface of the roadbed foundation pit filling body.

[0025] Based on the above technical solutions, preferably, the compartment partition guard ribs are provided at intervals on both sides of the compartment partition.

[0026] Based on the above technical solutions, preferably, both the lower layer of large-particle-size composite lightweight aggregate-filled foamed soil and the upper layer of cast-in-place composite lightweight aggregate-filled foamed soil include crushed waste foamed lightweight concrete block particles and recycled solid waste ceramsite.

[0027] The particle size of the waste foamed lightweight concrete block crushed particles and the recycled ceramsite in the lower layer of large-particle-size composite lightweight aggregate foamed soil filling layer is larger than that in the upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer.

[0028] Based on the above technical solutions, preferably, the waste foamed lightweight concrete block crushed particles and recycled solid waste ceramsite in the lower layer of large-particle-size composite lightweight aggregate filling foamed soil filler layer are mixed to form the lower layer of large-particle-size composite lightweight aggregate skeleton structure, wherein...

[0029] The lower layer of large-diameter composite lightweight aggregate skeleton structure is set at the bottom of the roadbed foundation pit filling main body;

[0030] The lower layer of large-particle-size composite lightweight aggregate skeleton structure is filled with foamed soil.

[0031] The cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate of this utility model has the following advantages over the prior art:

[0032] (1) By sequentially pouring a lower layer of large-diameter composite lightweight aggregate foamed soil filling layer and an upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer from bottom to top in the main body of the roadbed pit filling, and laying an asphalt waterproof membrane layer between the bottom of the main body of the roadbed pit filling and the lower layer of large-diameter composite lightweight aggregate foamed soil filling layer, and laying a rust-proof steel wire mesh reinforcement layer between the lower layer of large-diameter composite lightweight aggregate foamed soil filling layer and the upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer, on the one hand, the structural strength of the foamed lightweight soil filling roadbed can be improved, so that the problem of uneven settlement caused by the self-weight of the filling roadbed and the resulting roadbed pavement disease can be effectively solved. On the other hand, the self-weight of the upper layer of foamed lightweight concrete slurry can reduce the squeezing and destruction of air bubbles in the lower layer of slurry, thereby increasing the maximum construction thickness of a single layer and greatly accelerating the construction speed.

[0033] (2) By setting both the lower layer of large-particle-size composite lightweight aggregate foamed soil filling layer and the upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer to include waste foamed lightweight concrete block crushed particles and solid waste recycled ceramsite, the strength of the roadbed structure after pouring is high, which can realize the reuse of waste foamed lightweight concrete blocks and the recycling of solid waste, which is beneficial to environmental protection. Attached Figure Description

[0034] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0035] Figure 1 This is a cross-sectional schematic diagram of a cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate according to the present invention.

[0036] Figure 2 This is a top view schematic diagram of a cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate according to the present invention;

[0037] In the diagram: 1. Main body of roadbed pit filling; 2. Lower layer of large-diameter composite lightweight aggregate filled foam soil filling layer; 3. Upper layer of cast-in-place composite lightweight aggregate foam soil filling layer; 4. Asphalt waterproof membrane layer; 5. Rust-proof steel wire mesh reinforcement layer; 6. Adhesive layer; 7. Retaining wall; 8. Steps; 9. Compartment partition; 10. Compartment partition reinforcement; 11. Road surface layer; 21. Lower layer of large-diameter composite lightweight aggregate skeleton structure; 22. Foam soil; 101. Cast-in-place compartment. Detailed Implementation

[0038] The technical solutions of this utility model will be clearly and completely described below with reference to specific embodiments. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.

[0039] Example 1:

[0040] like Figure 1-2 As shown, this utility model discloses a cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate, including a roadbed pit filling body 1, a lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2, an upper layer of cast-in-place composite lightweight aggregate-filled foamed soil filling layer 3, an asphalt waterproof membrane layer 4, and a rust-proof steel wire mesh reinforcement layer 5. The lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2 and the upper layer of cast-in-place composite lightweight aggregate-filled foamed soil filling layer 3 are sequentially poured from bottom to top within the roadbed pit filling body 1. The asphalt waterproof membrane layer 4 is laid between the bottom of the roadbed pit filling body 1 and the lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2. The rust-proof steel wire mesh reinforcement layer 5 is laid between the lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2 and the upper layer of cast-in-place composite lightweight aggregate-filled foamed soil filling layer 3.

[0041] Specifically, the excavation depth of the main body 1 of the roadbed pit filling is 4.5m, and at least one layer of asphalt waterproof membrane 4 is laid at the bottom of the pit. The thickness of the asphalt waterproof membrane 4 is 3mm. The main body 1 of the roadbed pit filling is constructed in two major layers, and at least one layer of anti-rust steel wire mesh reinforcement layer 5 is laid between the layers. The anti-rust steel wire mesh reinforcement layer 5 is an anti-rust steel wire mesh with a mesh size of 30mm and a wire diameter of 2mm.

[0042] In the above structure, the upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer 3 is a composite aggregate consisting of crushed foamed lightweight concrete blocks and ceramsite added to pure cast-in-place foamed lightweight soil. The lower layer of large-diameter composite lightweight aggregate foamed soil filling layer 2 is formed by injecting foamed lightweight soil slurry into the voids of the skeleton structure formed by the composite aggregate of large-diameter crushed foamed lightweight concrete blocks and ceramsite, thus forming a composite structure. Since the density of the crushed foamed lightweight concrete blocks is comparable to that of ordinary cast-in-place foamed lightweight soil due to the rigid foamed plastic aggregate, and the density of ceramsite is lower than that of ordinary cast-in-place foamed lightweight soil, the density of the filling layer of the above composite structure is lower than that of ordinary cast-in-place foamed lightweight soil. On the other hand, the strength of the crushed foamed lightweight concrete blocks is greater than that of ordinary cast-in-place foamed lightweight soil, while the strength of ceramsite is comparable to that of ordinary cast-in-place foamed lightweight soil. Therefore, the strength of the filling layer of the above composite structure is higher than that of ordinary cast-in-place foamed lightweight soil. Because of this, the composite structure filling layer has a lower density and higher strength than ordinary cast-in-place foamed lightweight soil, effectively solving the problem of uneven settlement caused by the self-weight of the filling roadbed and resulting in roadbed and pavement diseases, thus ensuring the structural stability and long-term durability of the filling roadbed. At the same time, composite lightweight aggregates of different particle sizes play different skeleton filling roles. On the one hand, they can ensure the structural strength of the foamed lightweight soil filling roadbed, and on the other hand, they can reduce the compression and destruction of air bubbles in the lower layer of slurry by the self-weight of the upper layer of foamed lightweight concrete slurry. As a result, the maximum construction thickness of the upper and lower layers can be increased from the original 1m to 2m and 3m respectively, greatly accelerating the construction speed and reducing management and time costs.

[0043] As a preferred embodiment of a cast-in-place foamed soil fill roadbed structure containing composite lightweight aggregate, it also includes a bonding layer 6, wherein the bonding layer 6 is laid on top of the upper cast-in-place composite lightweight aggregate foamed soil fill layer 3.

[0044] Specifically, the tack coat 6 includes a tack coat and a prime coat, which are SBS modified emulsified asphalt and liquid asphalt. The amount of SBS modified emulsified asphalt is 0.6L / m2 and the amount of liquid asphalt is 1.1L / m2. After the tack coat and prime coat are laid, the pavement layer 11 is laid.

[0045] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it further includes a retaining wall 7, wherein the retaining wall 7 is fixedly installed on the outer side of the subgrade pit filling body 1 near the road surface, and the top surface of the retaining wall 7 is aligned with the top surface of the subgrade pit filling body 1 and the top surface of the upper cast-in-place composite lightweight aggregate foamed soil filling layer 3; the bonding layer 6 extends from the top of the upper cast-in-place composite lightweight aggregate foamed soil filling layer 3 to the top of the retaining wall 7 and the top of the subgrade pit filling body 1.

[0046] Specifically, the retaining wall 7 is a 20cm thick cement concrete block wall set on the outer side of the road surface of the main body 1 of the roadbed pit filling. It can also be a cast-in-place concrete wall. The retaining wall 7 is used to restrain the grout in the main body 1 of the roadbed pit filling.

[0047] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it also includes a step 8, wherein the step 8 is fixedly set on the side of the subgrade pit filling body 1 near the center of the road surface; the lower layer of large-diameter composite lightweight aggregate filled foamed soil filling layer 2 and the upper layer of cast-in-place composite lightweight aggregate filled foamed soil filling layer 3 are poured between the retaining wall 7 and the step 8.

[0048] Specifically, step 8 is a stepped excavation layer set on the center side of the road surface of the main body 1 of the roadbed pit filling. The slope of the step is 1:1, the height of each step is 1m, and the width of the step platform is 1m.

[0049] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it also includes a compartment partition 9, wherein the compartment partition 9 is fixedly installed inside the subgrade pit filling body 1; the interior of the subgrade pit filling body 1 is formed by the compartment partition 9 to form a casting compartment 101.

[0050] Specifically, there are several compartment partitions 9 inside the main body 1 of the roadbed pit filling. Several compartment partitions 9 are crisscrossed to form several pouring compartments 101. Several pouring compartments 101 are used for skip pouring. Each compartment partition 9 is an EPS geotextile lightweight foam board with a thickness of 15mm.

[0051] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it also includes a compartment partition reinforcement 10, wherein the compartment partition reinforcement 10 is fixedly installed on the side of the compartment partition 9; one end of the compartment partition reinforcement 10 is inserted into the bottom of the subgrade foundation pit filling body 1, and the other end extends vertically upward to the top surface of the subgrade foundation pit filling body 1.

[0052] Specifically, several compartment partition guard bars 10 are spaced apart on both sides of the compartment partition 9. Each compartment partition guard bar 10 is a ribbed steel bar, with the lower end of the steel bar embedded into the roadbed to a depth of 200mm, and the spacing between each guard bar is 1.5m.

[0053] As a preferred embodiment of a cast-in-place foamed soil fill roadbed structure containing composite lightweight aggregate, both the lower layer of large-diameter composite lightweight aggregate filled foamed soil fill layer 2 and the upper layer of cast-in-place composite lightweight aggregate filled foamed soil fill layer 3 include crushed particles of waste foamed lightweight concrete blocks and recycled ceramsite. The particle size of the crushed particles of waste foamed lightweight concrete blocks and recycled ceramsite in the lower layer of large-diameter composite lightweight aggregate filled foamed soil fill layer 2 is larger than that in the upper layer of cast-in-place composite lightweight aggregate filled foamed soil fill layer 3.

[0054] Specifically, the upper cast-in-place composite lightweight aggregate foamed soil filling layer 3 is formed by mixing crushed foamed lightweight concrete blocks and expanded clay aggregate at a volume ratio of 1:2, and then mixing and pouring it with foamed lightweight soil slurry at a volume ratio of 1.5:1. The crushed foamed lightweight concrete blocks are obtained by crushing and screening recycled waste foamed lightweight concrete blocks from construction sites, with 92% of the particles having a diameter between 2.36 and 13.2 mm. The expanded clay aggregate is waste expanded clay, with 96% of the particles having a diameter between 2.36 and 13.2 mm. The filling layer is 1.7 m thick.

[0055] Specifically, the lower layer of large-particle-size composite lightweight aggregate filled with foamed soil 2 consists of a mixture of crushed waste foamed lightweight concrete blocks and recycled ceramsite, forming a lower layer of large-particle-size composite lightweight aggregate skeleton structure 21. This lower layer of large-particle-size composite lightweight aggregate skeleton structure 21 is located at the bottom of the roadbed foundation pit filling body 1. The lower layer of large-particle-size composite lightweight aggregate skeleton structure 21 is filled with foamed soil 22. In other words, the lower layer of large-particle-size composite lightweight aggregate filled with foamed soil 2 is composed of crushed foamed lightweight concrete blocks and ceramsite. The aggregate is mixed at a ratio of 3:1 and laid in the main body 1 of the roadbed pit filling to form a lower layer of large-diameter composite lightweight aggregate skeleton structure 21. Then, foamed lightweight soil slurry is injected into the voids of this skeleton to form a composite filling layer. The foamed lightweight concrete block crushed material is obtained by crushing and screening recycled waste foamed lightweight concrete blocks from construction sites, with 97% of the particles having a diameter between 26.5 and 75 mm. The expanded clay type is riverbed mud expanded clay, with 94% of the particles having a diameter between 13.2 and 26.5 mm. The thickness of this filling layer is 2.8 m.

[0056] Example 2:

[0057] like Figure 1-2As shown, this utility model discloses a cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate, including a roadbed pit filling body 1, a lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2, an upper layer of cast-in-place composite lightweight aggregate-filled foamed soil filling layer 3, an asphalt waterproof membrane layer 4, and a rust-proof steel wire mesh reinforcement layer 5. The lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2 and the upper layer of cast-in-place composite lightweight aggregate-filled foamed soil filling layer 3 are sequentially poured from bottom to top within the roadbed pit filling body 1. The asphalt waterproof membrane layer 4 is laid between the bottom of the roadbed pit filling body 1 and the lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2. The rust-proof steel wire mesh reinforcement layer 5 is laid between the lower layer of large-diameter composite lightweight aggregate-filled foamed soil filling layer 2 and the upper layer of cast-in-place composite lightweight aggregate-filled foamed soil filling layer 3.

[0058] Specifically, the excavation depth of the main body 1 of the roadbed pit filling is 8.4m, and at least one layer of asphalt waterproof membrane 4 is laid at the bottom of the pit. The thickness of the asphalt waterproof membrane 4 is 5mm. The main body 1 of the roadbed pit filling is constructed in two major layers, and at least one layer of anti-rust steel wire mesh reinforcement layer 5 is laid between the layers. The anti-rust steel wire mesh reinforcement layer 5 is an anti-rust steel wire mesh with a mesh size of 30mm and a wire diameter of 3mm.

[0059] In the above structure, the upper layer of cast-in-place composite lightweight aggregate foamed soil filling layer 3 is a composite aggregate consisting of crushed foamed lightweight concrete blocks and ceramsite added to pure cast-in-place foamed lightweight soil. The lower layer of large-diameter composite lightweight aggregate foamed soil filling layer 2 is formed by injecting foamed lightweight soil slurry into the voids of the skeleton structure formed by the composite aggregate of large-diameter crushed foamed lightweight concrete blocks and ceramsite, thus forming a composite structure. Since the density of the crushed foamed lightweight concrete blocks is comparable to that of ordinary cast-in-place foamed lightweight soil due to the rigid foamed plastic aggregate, and the density of ceramsite is lower than that of ordinary cast-in-place foamed lightweight soil, the density of the filling layer of the above composite structure is lower than that of ordinary cast-in-place foamed lightweight soil. On the other hand, the strength of the crushed foamed lightweight concrete blocks is greater than that of ordinary cast-in-place foamed lightweight soil, while the strength of ceramsite is comparable to that of ordinary cast-in-place foamed lightweight soil. Therefore, the strength of the filling layer of the above composite structure is higher than that of ordinary cast-in-place foamed lightweight soil. Because of this, the composite structure filling layer has a lower density and higher strength than ordinary cast-in-place foamed lightweight soil, effectively solving the problem of uneven settlement caused by the self-weight of the filling roadbed and resulting in roadbed and pavement diseases, thus ensuring the structural stability and long-term durability of the filling roadbed. At the same time, composite lightweight aggregates of different particle sizes play different skeleton filling roles. On the one hand, they can ensure the structural strength of the foamed lightweight soil filling roadbed, and on the other hand, they can reduce the compression and destruction of air bubbles in the lower layer of slurry by the self-weight of the upper layer of foamed lightweight concrete slurry. As a result, the maximum construction thickness of the upper and lower layers can be increased from the original 1m to 2m and 3m respectively, greatly accelerating the construction speed and reducing management and time costs.

[0060] As a preferred embodiment of a cast-in-place foamed soil fill roadbed structure containing composite lightweight aggregate, it also includes a bonding layer 6, wherein the bonding layer 6 is laid on top of the upper cast-in-place composite lightweight aggregate foamed soil fill layer 3.

[0061] Specifically, the tack coat 6 includes a tack coat and a prime coat, which are SBS modified emulsified asphalt and liquid asphalt. The amount of SBS modified emulsified asphalt is 0.5L / m2 and the amount of liquid asphalt is 1.2L / m2. After the tack coat and prime coat are laid, the pavement layer 11 is laid.

[0062] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it further includes a retaining wall 7, wherein the retaining wall 7 is fixedly installed on the outer side of the subgrade pit filling body 1 near the road surface, and the top surface of the retaining wall 7 is aligned with the top surface of the subgrade pit filling body 1 and the top surface of the upper cast-in-place composite lightweight aggregate foamed soil filling layer 3; the bonding layer 6 extends from the top of the upper cast-in-place composite lightweight aggregate foamed soil filling layer 3 to the top of the retaining wall 7 and the top of the subgrade pit filling body 1.

[0063] Specifically, the retaining wall 7 is a 30cm thick cement concrete block wall set on the outer side of the road surface of the main body 1 of the roadbed pit filling. It can also be a cast-in-place concrete wall. The retaining wall 7 is used to confine the grout inside the main body 1 of the roadbed pit filling.

[0064] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it also includes a step 8, wherein the step 8 is fixedly set on the side of the subgrade pit filling body 1 near the center of the road surface; the lower layer of large-diameter composite lightweight aggregate filled foamed soil filling layer 2 and the upper layer of cast-in-place composite lightweight aggregate filled foamed soil filling layer 3 are poured between the retaining wall 7 and the step 8.

[0065] Specifically, step 8 is a stepped excavation layer set on the center side of the road surface of the main body 1 of the roadbed pit filling. The slope of the step is 0.9:1, the height of each step is 0.9m, and the width of the step platform is 1.5m.

[0066] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it also includes a compartment partition 9, wherein the compartment partition 9 is fixedly installed inside the subgrade pit filling body 1; the interior of the subgrade pit filling body 1 is formed by the compartment partition 9 to form a casting compartment 101.

[0067] Specifically, there are several compartment partitions 9 inside the main body 1 of the roadbed pit filling. Several compartment partitions 9 are crisscrossed to form several pouring compartments 101. Several pouring compartments 101 are used for skip pouring. Each compartment partition 9 is an EPS geotextile lightweight foam board with a thickness of 20mm.

[0068] As a preferred embodiment of a cast-in-place foamed soil filling subgrade structure containing composite lightweight aggregate, it also includes a compartment partition reinforcement 10, wherein the compartment partition reinforcement 10 is fixedly installed on the side of the compartment partition 9; one end of the compartment partition reinforcement 10 is inserted into the bottom of the subgrade foundation pit filling body 1, and the other end extends vertically upward to the top surface of the subgrade foundation pit filling body 1.

[0069] Specifically, several compartment partition guard bars 10 are spaced apart on both sides of the compartment partition 9. Each compartment partition guard bar 10 is a ribbed steel bar, with the lower end of the steel bar embedded into the roadbed to a depth of 250mm, and the spacing between each guard bar is 1.3m.

[0070] As a preferred embodiment of a cast-in-place foamed soil fill roadbed structure containing composite lightweight aggregate, both the lower layer of large-diameter composite lightweight aggregate filled foamed soil fill layer 2 and the upper layer of cast-in-place composite lightweight aggregate filled foamed soil fill layer 3 include crushed particles of waste foamed lightweight concrete blocks and recycled ceramsite. The particle size of the crushed particles of waste foamed lightweight concrete blocks and recycled ceramsite in the lower layer of large-diameter composite lightweight aggregate filled foamed soil fill layer 2 is larger than that in the upper layer of cast-in-place composite lightweight aggregate filled foamed soil fill layer 3.

[0071] Specifically, the upper cast-in-place composite lightweight aggregate foamed soil filling layer 3 is formed by mixing crushed foamed lightweight concrete blocks and expanded clay aggregate at a volume ratio of 1:1, and then mixing them with foamed lightweight soil slurry at a volume ratio of 2:1 before pouring. The crushed foamed lightweight concrete blocks are obtained by crushing and screening recycled waste foamed lightweight concrete blocks from construction sites; 94% of the particles have a diameter between 2.36 and 13.2 mm. The expanded clay aggregate is biological sludge expanded clay, with 95% of the particles having a diameter between 2.36 and 13.2 mm. This filling layer is 3.6 m thick and is poured in two layers, each 1.8 m thick.

[0072] Specifically, the lower layer of large-particle-size composite lightweight aggregate filled with foamed soil 2 consists of a mixture of crushed waste foamed lightweight concrete blocks and recycled ceramsite, forming a lower layer of large-particle-size composite lightweight aggregate skeleton structure 21. This lower layer of large-particle-size composite lightweight aggregate skeleton structure 21 is located at the bottom of the roadbed foundation pit filling body 1. The lower layer of large-particle-size composite lightweight aggregate skeleton structure 21 is filled with foamed soil 22. In other words, the lower layer of large-particle-size composite lightweight aggregate filled with foamed soil 2 is composed of crushed foamed lightweight concrete blocks and ceramsite. The aggregate is mixed in a 2:1 ratio and laid in the main body 1 of the roadbed pit filling to form a lower layer of large-diameter composite lightweight aggregate skeleton structure 21. Then, foamed lightweight soil slurry is injected into the voids of this skeleton to form a composite filling layer. The foamed lightweight concrete block crushed material is obtained by crushing and screening recycled waste foamed lightweight concrete blocks from construction sites, with 98% of the particles having a diameter between 26.5 and 75 mm. The expanded clay type is riverbed mud expanded clay, with 96% of the particles having a diameter between 13.2 and 26.5 mm. The filling layer is 4.8 m thick and is poured in two layers, each 2.4 m thick.

[0073] The method of using the cast-in-place foamed soil filling roadbed structure containing composite lightweight aggregate according to this utility model is as follows:

[0074] Example 1:

[0075] During construction, a skip-pour, layer-by-layer construction method was adopted, with both the upper and lower layers of cast-in-place foamed soil fill containing composite lightweight aggregate being poured in one go.

[0076] According to current specifications, the construction method for ordinary cast-in-place foamed lightweight soil subgrade requires at least five layers of pouring. However, the aforementioned cast-in-place foamed soil subgrade structure containing composite lightweight aggregate can be completed in two layers. After curing, the wet density of ordinary cast-in-place foamed lightweight soil is 810 kg / m³, and the strength of the filling layer is 1.46 MPa. The wet density of the upper and lower layers of cast-in-place foamed soil containing composite lightweight aggregate are 640 kg / m³ and 610 kg / m³, respectively, with strengths of 1.91 MPa and 2.23 MPa. Compared to ordinary cast-in-place foamed lightweight soil, the wet density is reduced by approximately 20%, while the strengths of the upper and lower subgrade layers are increased by approximately 30% and 50%, respectively. Therefore, using the above-mentioned cast-in-place foamed soil with composite lightweight aggregate to fill the roadbed structure not only greatly improves the construction speed and significantly enhances the strength and overall stability of the roadbed structure, but also reuses waste foamed lightweight concrete blocks and ceramsite produced from garbage and riverbed mud, which is conducive to the promotion and application of environmentally friendly materials.

[0077] Example 2:

[0078] During construction, a skip-pour, layer-by-layer construction method was adopted. The upper and lower layers of cast-in-place foamed soil filling containing composite lightweight aggregate were each poured in two layers.

[0079] According to current specifications, the construction method for ordinary cast-in-place foamed lightweight soil subgrade requires at least five layers of layering. However, the aforementioned cast-in-place foamed soil subgrade structure containing composite lightweight aggregate can be completed in two layers. After curing, the wet density of ordinary cast-in-place foamed lightweight soil is 810 kg / m³, and the strength of the filling layer is 1.46 MPa. In contrast, the wet density of the upper and lower layers of cast-in-place foamed soil containing composite lightweight aggregate are 650 kg / m³ and 600 kg / m³, respectively, with filling layer strengths of 2.13 MPa and 2.26 MPa. Compared to ordinary cast-in-place foamed lightweight soil, the wet density of the upper and lower layers of cast-in-place foamed soil containing composite lightweight aggregate decreases by approximately 20% and 25%, respectively, while the strength of the upper and lower subgrade layers increases by approximately 45% and 55%, respectively. Therefore, using the above-mentioned cast-in-place foamed soil with composite lightweight aggregate to fill the roadbed structure not only greatly improves the construction speed and significantly enhances the strength and overall stability of the roadbed structure, but also reuses waste foamed lightweight concrete blocks and ceramsite produced from garbage and riverbed mud, which is conducive to the promotion and application of environmentally friendly materials.

[0080] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A cast-in-place foam soil roadbed structure containing composite lightweight aggregate, comprising a roadbed foundation pit filling body (1), characterized in that: It also includes a lower layer of large-size composite lightweight aggregate-filled foam soil filling layer (2), an upper layer of cast-in-place composite lightweight aggregate foam soil filling layer (3), an asphalt waterproofing coiled material layer (4) and an anti-rust steel wire grid reinforcement layer (5), wherein: A lower layer of large-size composite lightweight aggregate-filled foam soil filling layer (2) and an upper layer of cast-in-place composite lightweight aggregate foam soil filling layer (3) are cast in sequence from bottom to top in the roadbed foundation pit filling body (1); The asphalt waterproofing roll material layer (4) is laid between the bottom of the roadbed foundation pit filling body (1) and the lower large-size composite lightweight aggregate filled foam soil filling layer (2); The rust-proof steel wire grid reinforcement layer (5) is laid between the lower large-diameter composite lightweight aggregate-filled foam soil filling layer (2) and the upper cast-in-place composite lightweight aggregate foam soil filling layer (3).

2. The cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate according to claim 1, characterized in that: It also includes a sticky layer (6), wherein: The adhesive layer (6) is laid on top of the upper cast-in-place composite lightweight aggregate foam soil filling layer (3).

3. A cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate as claimed in claim 2, characterized in that: Also included is a retaining wall (7), wherein: The retaining wall (7) is fixedly arranged on the outer side of the roadbed foundation pit filling body (1) close to the road surface, and the top surface of the retaining wall (7) is aligned with the top surface of the roadbed foundation pit filling body (1) and the top surface of the upper cast-in-place composite lightweight aggregate foam soil filling layer (3); The viscous layer (6) extends from the top of the upper cast-in-place composite lightweight aggregate foam soil filling layer (3) to the top of the retaining wall (7) and the top of the roadbed foundation pit filling body (1).

4. A cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate as claimed in claim 3, characterized in that: Also included is a step (8), wherein: The step (8) is fixedly arranged on the side of the roadbed foundation pit filling body (1) close to the center of the road surface; A lower layer of large-size composite lightweight aggregate-filled foam soil filling layer (2) and an upper layer of cast-in-place composite lightweight aggregate foam soil filling layer (3) are cast between the retaining wall (7) and the step (8).

5. A cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate as claimed in claim 1 or 4, characterized in that: It also includes a compartment partition (9), wherein: The compartment partition plate (9) is fixedly arranged inside the roadbed foundation pit filling body (1); A pouring compartment (101) is formed inside the roadbed foundation pit filling body (1) through a compartment partition (9).

6. A cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate as claimed in claim 5, characterized in that: The compartment partitions (9) are arranged at a plurality of locations inside the roadbed foundation pit filling body (1), and a plurality of the compartment partitions (9) are crisscrossed to form a plurality of casting compartments (101).

7. The cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate according to claim 5, characterized in that: It also includes compartment partition plate reinforcement (10), wherein: The compartment partition plate protective ribs (10) are fixedly arranged on the side of the compartment partition plate (9); One end of the compartment partition reinforcement bar (10) is implanted in the bottom of the roadbed foundation pit filling body (1), and the other end extends vertically upward to the top surface of the roadbed foundation pit filling body (1).

8. The cast-in-place foam soil filling roadbed structure containing composite lightweight aggregate according to claim 7, characterized in that: A plurality of compartment partition plate protective ribs (10) are arranged at intervals on both sides of the compartment partition plate (9).