Pre-grouting construction structure for highway construction

By using injection boxes and control mechanisms in highway construction, real-time monitoring and control of the pressure and flow of the grouting fluid solves the problem of stratigraphic structure damage caused by excessive pressure applied by the grouting fluid in the existing technology, and realizes grouting The effect is improved and the purity of the slurry is maintained.

CN221855211UActive Publication Date: 2024-10-18中交建筑集团西南建设有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420398976.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-18
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

The pre-grouting construction structure in existing highway construction cannot effectively control the applied pressure of the grouting fluid, which may cause the stratigraphic structure to be damaged or the grout to be lost in an unintended path, reducing the grouting effect.

Method used

A pre-grouting construction structure including an injection box and a control mechanism is designed. The PLC controller, pressure sensor, flow sensor, grouting pump and other components are used to monitor and control the pressure and flow of the grouting liquid in real time to ensure that the Grouting is performed at pressures exceeding a predetermined threshold, and the injection box is cleaned by stirring and cleaning components to maintain slurry purity.

Benefits of technology

It achieves precise pressure control of the grouting fluid applied to the formation, avoids damage to the formation structure, and ensures the cleanliness of the inner wall of the injection box through the cleaning component, improving the grouting effect and slurry purity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855211U_ABST
    Figure CN221855211U_ABST
Patent Text Reader

Abstract

The utility model provides a pre-grouting construction structure for expressway construction, and relates to the technical field of expressway construction, the pre-grouting construction structure comprises a material injection box and a control mechanism, the top end of the material injection box is provided with a sealing cover, one side of the material injection box is provided with the control mechanism, through the arrangement of the control mechanism, a worker can carry out programming through a PLC controller, and the pre-grouting construction structure can carry out pre-grouting construction through the PLC controller. Specific pressure and flow numerical values are stored in the read-only memory card through the central processing unit, in the working process, the grouting pump pressurizes grout through the characteristics of the grouting pump and then injects the grout into soil and rock, in the process, the pressure sensor and the flow sensor monitor the pressure value and the flow of the grout, and when the pressure value of the grout exceeds a preset threshold value, the pressure sensor and the flow sensor monitor the pressure value and the flow of the grout. Data are transmitted to the controller, and the controller compares the data with the data through the read-only memory card so as to master the size of the current pressure value, so that the working speed of the grouting pump is accurately controlled, the pressure of grout applied to a stratum is reduced, and the stratum structure is prevented from being damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway construction, in particular to a pre-grouting construction structure for highway construction. Background Art

[0002] The pre-grouting construction structure in highway construction usually refers to the grouting work carried out in advance to strengthen and improve the ground conditions before specific foundation treatment or construction of structures such as tunnels and bridges. This technology is mainly aimed at adverse geological conditions, such as loose sand layers, quicksand, broken zones, karst development areas, and foundation areas that may produce large or uneven settlements.

[0003] After searching, the patent number "CN220150020U" mentioned in the text that "the utility model discloses a pre-grouting construction structure for highway construction, including an injection barrel and a motor, the motor is located above the injection barrel, the injection barrel includes a barrel tube and a barrel cover, the barrel cover is clamped on the top of the barrel tube, the motor is fixedly installed on the barrel cover, the barrel cover is provided with a feed inlet and an air outlet, the barrel cover is installed with a stirring assembly, the stirring assembly is used to stir concrete; the stirring assembly includes a threaded rod, a connecting pipe and a spiral plate, the threaded rod is fixedly rotated on the side of the barrel cover opposite to the motor, the threaded rod is fixedly connected to the output end of the motor, the inner wall of the connecting pipe is threadedly connected to the threaded rod, and the spiral plate is fixedly installed on the connecting pipe. On the outer wall. The utility model discharges the gas in the concrete and improves the hardness of the concrete after molding. When in use, concrete is injected into the barrel through the feed port, the starting motor drives the threaded rod to rotate, and the threaded rod drives the spiral plate to rotate. The spiral plate can squeeze the bubbles generated in the concrete during the rotation process, which helps to speed up the gas circulation inside the concrete and discharge the gas in the concrete from the air outlet. Discharging the gas in the concrete helps to improve the hardness of the concrete after molding. However, the grouting structure can only control the feeding speed of the concrete, but has relatively weak control over the pressure actually applied by the slurry to the formation. If the grouting pressure is too large, the formation structure will be damaged, and even the slurry will be lost in an unpredictable path under high pressure, thereby reducing the grouting effect.

[0004] Therefore, we provide a pre-grouting construction structure for highway construction to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to provide a pre-grouting construction structure for highway construction, so as to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above object, the utility model provides the following technical solution: a pre-grouting construction structure for highway construction, comprising a grouting box and a control mechanism, a sealing cover is installed on the top of the grouting box, and a control mechanism is arranged on one side of the grouting box;

[0007] The control mechanism includes a control component, a drive component, a monitoring component, a data storage component and a data processing component. The control component is installed on the outside of the injection box, the drive component is installed on the top of the sealing cover, the monitoring component is installed inside the injection box, the data storage component is installed inside the control component, and a data processing component is arranged on one side of the data storage component.

[0008] Preferably, the control component includes a control panel, a PLC controller and operating buttons. The control panel is installed on the outside of the injection box, the PLC controller is installed on the surface of the control panel, and the operating buttons are arranged on one side of the PLC controller.

[0009] Preferably, the driving assembly includes a motor, a grouting pump and a controller, the motor is installed on the top of the sealing cover, the grouting pump is installed on the surface of the sealing cover, and the controller is arranged on the outside of the grouting pump.

[0010] Preferably, the monitoring component includes a pressure sensor and a flow sensor, the pressure sensor is installed on the top of the inner wall of the injection box, and the flow sensor is installed inside the injection box.

[0011] Preferably, the data storage component includes a random access memory card and a read-only memory card, the random access memory card is installed inside the PLC controller, and a read-only memory card is arranged on one side of the random access memory card.

[0012] Preferably, the data processing component includes a central processing unit, an input-output module and a communication module. The central processing unit is installed on the inner side of the PLC controller, the input-output module is arranged below the central processing unit, and the communication module is arranged on the outer side of the input-output module.

[0013] Preferably, a stirring and cleaning assembly is installed at the bottom end of the sealing cover, and the stirring and cleaning assembly includes a connecting piece, a stirring rod and a scraper. The bottom end of the sealing cover is installed with a connecting piece, the inner side of the connecting piece is threadedly connected to the stirring rod, and the outer side of the stirring rod is provided with a scraper.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. Through the setting of the control mechanism, before work, the staff can program through the PLC controller, and store the specific pressure and flow values ​​into the read-only memory card through the central processor. During work, the grouting pump pressurizes the slurry and injects it into the soil and rock through its own characteristics. In this process, the pressure sensor and flow sensor monitor the pressure value and flow rate of the slurry. When the pressure value of the slurry exceeds the predetermined threshold, the data is transmitted to the controller. The controller compares the data with the read-only memory card to grasp the current pressure value, so as to accurately control the working rate of the grouting pump, thereby reducing the pressure applied by the slurry to the formation and avoiding damage to the formation structure.

[0016] 2. Through the setting of the stirring and cleaning component, when the grouting structure is used up, the stirring rod is unscrewed from the connecting piece through the thread, and then the scraper is installed into the connecting rod, and then the scraper is controlled by the motor to clean the inside of the injection box to prevent the dirt on the inner wall from affecting the purity of the slurry. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the overall appearance structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the internal structure of the injection box of the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the stirring cleaning component of the utility model;

[0020] Figure 4 It is a schematic diagram of the internal structure of the PLC control of the utility model.

[0021] Numbers in the figure: 1. injection box; 2. sealing cover; 3. control mechanism; 31. control component; 311. control panel; 312. PLC controller; 313. operation button; 32. drive component; 321. motor; 322. grouting pump; 323. controller; 33. monitoring component; 331. pressure sensor; 332. flow sensor; 34. data storage component; 341. random access memory card; 342. read-only memory card; 35. data processing component; 351. central processing unit; 352. input and output module; 353. communication module; 4. stirring and cleaning component; 41. connecting part; 42. stirring rod; 43. scraper. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Embodiment 1

[0024] See also Figure 1-4 As shown, the utility model provides a technical solution: a pre-grouting construction structure for highway construction, comprising a material injection box 1 and a control mechanism 3, a sealing cover 2 is installed on the top of the material injection box 1, and a control mechanism 3 is arranged on one side of the material injection box 1;

[0025] The control mechanism 3 includes a control component 31, a drive component 32, a monitoring component 33, a data storage component 34 and a data processing component 35. The control component 31 is installed on the outside of the injection box 1, the drive component 32 is installed on the top of the sealing cover 2, the monitoring component 33 is installed inside the injection box 1, the data storage component 34 is installed inside the control component 31, and the data processing component 35 is arranged on one side of the data storage component 34.

[0026] Furthermore, the control component 31 includes a control panel 311, a PLC controller 312 and a control button 313. The control panel 311 is installed on the outside of the filling box 1, the PLC controller 312 is installed on the surface of the control panel 311, and a control button 313 is set on one side of the PLC controller 312. The device is controlled and programmed through the PLC controller 312 and the control button 313 to improve the automation of the device.

[0027] Furthermore, the driving assembly 32 includes a motor 321, a grouting pump 322 and a controller 323. The motor 321 is installed on the top of the sealing cover 2, the grouting pump 322 is installed on the surface of the sealing cover 2, and the controller 323 is arranged on the outside of the grouting pump 322. The grouting pump 322 pressurizes the slurry and injects it into the gaps and holes of the soil, rock, buildings or other structures to achieve the purposes of consolidation, support, waterproofing, water blocking, etc.

[0028] Furthermore, the monitoring component 33 includes a pressure sensor 331 and a flow sensor 332. The pressure sensor 331 is installed on the top of the inner wall of the injection box 1, and the flow sensor 332 is installed inside the injection box 1. The pressure sensor 331 monitors the pressure value of the slurry in real time to prevent it from being too large to cause damage to other structures.

[0029] Furthermore, the data storage component 34 includes a random access memory card 341 and a read-only memory card 342. The random access memory card 341 is installed inside the PLC controller 312, and a read-only memory card 342 is set on one side of the random access memory card 341. The random access memory card 341 temporarily stores programs and data, and the read-only memory card 342 solidifies the storage system programs and user programs.

[0030] Furthermore, the data processing component 35 includes a central processing unit 351, an input-output module 352 and a communication module 353. The central processing unit 351 is installed on the inner side of the PLC controller 312, the input-output module 352 is arranged below the central processing unit 351, and the communication module 353 is arranged on the outer side of the input-output module 352. The central processing unit 351 is responsible for running the control program written by the user, processing input or output signals and performing logical operations, the input-output module 352 receives or outputs various instructions, and the communication module 353 is responsible for communication between network devices.

[0031] Embodiment 2

[0032] See also Figure 2 and Figure 3 As shown, in contrast to Example 1, as another implementation of the utility model, a stirring and cleaning assembly 4 is installed at the bottom end of the sealing cover 2, and the stirring and cleaning assembly 4 includes a connecting piece 41, a stirring rod 42 and a scraper 43. A connecting piece 41 is installed at the bottom end of the sealing cover 2, and the inner side of the connecting piece 41 is threadedly connected to the stirring rod 42, and the outer side of the stirring rod 42 is provided with a scraper 43. When stirring is required, the stirring rod 42 is screwed to the lower end of the connecting piece 41 through a thread. When the interior of the injection box 1 needs to be cleaned, the stirring rod 42 is removed from the connecting piece 41, and then the scraper 43 is screwed to the lower end of the connecting piece 41 to clean the interior of the injection box 1.

[0033] Working principle: First, a pre-grouting construction structure for highway construction is moved to the working position. When in use, the first step is for the staff to program through the PLC controller 312, the central processing unit 351 is responsible for running the control program written by the user, and the read-only memory card 342 stores these programs. The second step is that during work, the grouting pump 322 pressurizes the slurry through its own characteristics and injects it into the soil and rock. In this process, the pressure sensor 331 and the flow sensor 332 monitor the pressure value and flow rate of the slurry. When the pressure value of the slurry exceeds the predetermined threshold, the data is transmitted to the controller 323. The controller 323 compares these data through the read-only memory card 342 to grasp the current pressure value, thereby accurately controlling the working speed of the grouting pump 322, thereby reducing the pressure applied by the slurry to the formation and avoiding damage to the formation structure. In this way, the use process of a pre-grouting construction structure for highway construction is completed.

[0034] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pre-grouting construction structure for highway construction, comprising a grouting box (1) and a control mechanism (3), characterized in that: A sealing cover (2) is installed at the top of the injection box (1), and a control mechanism (3) is provided on one side of the injection box (1); The control mechanism (3) comprises a control component (31), a drive component (32), a monitoring component (33), a data storage component (34) and a data processing component (35); the control component (31) is installed on the outside of the injection box (1); the drive component (32) is installed on the top of the sealing cover (2); the monitoring component (33) is installed inside the injection box (1); the data storage component (34) is installed inside the control component (31); and the data processing component (35) is arranged on one side of the data storage component (34).

2. A pre-grouting construction structure for highway construction according to claim 1, characterized in that: The control component (31) comprises a control panel (311), a PLC controller (312) and an operating button (313); the control panel (311) is installed on the outside of the injection box (1); the PLC controller (312) is installed on the surface of the control panel (311); and the operating button (313) is arranged on one side of the PLC controller (312).

3. A pre-grouting construction structure for highway construction according to claim 1, characterized in that: The driving assembly (32) comprises a motor (321), a grouting pump (322) and a controller (323); the motor (321) is installed on the top of the sealing cover (2); the grouting pump (322) is installed on the surface of the sealing cover (2); and the controller (323) is arranged on the outside of the grouting pump (322).

4. A pre-grouting construction structure for highway construction according to claim 1, characterized in that: The monitoring component (33) comprises a pressure sensor (331) and a flow sensor (332). The pressure sensor (331) is installed at the top of the inner wall of the injection box (1), and the flow sensor (332) is installed inside the injection box (1).

5. A pre-grouting construction structure for highway construction according to claim 2, characterized in that: The data storage component (34) comprises a random access memory card (341) and a read-only memory card (342); the random access memory card (341) is installed inside the PLC controller (312); and a read-only memory card (342) is arranged on one side of the random access memory card (341).

6. A pre-grouting construction structure for highway construction according to claim 2, characterized in that: The data processing component (35) comprises a central processing unit (351), an input / output module (352) and a communication module (353); the central processing unit (351) is installed inside the PLC controller (312); the input / output module (352) is arranged below the central processing unit (351); and the communication module (353) is arranged outside the input / output module (352).

7. A pre-grouting construction structure for highway construction according to claim 1, characterized in that: The bottom end of the sealing cover (2) is provided with a stirring cleaning assembly (4), the stirring cleaning assembly (4) comprising a connecting piece (41), a stirring rod (42) and a scraper (43); the bottom end of the sealing cover (2) is provided with a connecting piece (41), the inner side of the connecting piece (41) is threadedly connected with the stirring rod (42), and the outer side of the stirring rod (42) is provided with a scraper (43).