Stone transporting device for road repairing
By designing a stone transportation device for highway repair, the impact of gas is used to make the stones flow into the bottom of the crack and clean up the impurities in the road. This solves the problem in the existing technology that stones are difficult to flow into small cracks and the impurities are not cleaned, and significantly improves the filling effect. and repair quality.
Patent Information
- Application Number
- CN202420326178.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-22
AI Technical Summary
When filling road cracks with the existing technology, it is difficult for stones to flow into smaller cracks, and impurities on the road are not cleaned in time, resulting in poor filling results.
A stone transportation device for highway repair is designed. The discharging mechanism uses gas impact force to make the stones flow into the bottom of the crack, and impurities are cleaned through blocks and nozzles to improve the filling quality.
It effectively improves the stone filling effect and the quality of road repair, ensures that the stone flows into the bottom of the crack, cleans up impurities in the road, and improves the filling efficiency and repair quality.
Smart Images

Figure CN221855239U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of highway repair, and in particular relates to a stone transport device for highway repair. Background Art
[0002] After a long period of use, the road will be affected by vehicles running and thermal expansion and contraction. After a long time, cracks will appear. If the cracks are not repaired, they will become larger and larger, accelerating the damage of the road.
[0003] Based on the existing technology, it is found that since the cracks on the road are of different sizes, the use of a unified filling method can easily lead to the difficulty of stones flowing into smaller cracks, causing the stones to stay on the road surface, or causing the stones to be stuck on the upper part of the smaller cracks and unable to flow into the bottom of the smaller cracks, thereby affecting the filling effect of the stones. In addition, since there are often vehicles passing by the road and there are usually green belts on both sides of the road, it is very easy to cause a large number of impurities such as fallen leaves and disposable plastic bags to remain in the cracks of the road. If the impurities in the cracks are not cleaned in time, that is, the cracks are filled with stones, the quality of road repair is seriously reduced.
[0004] Also, during the gravel filling process, some of the gravel will remain on the road surface and fail to flow into the cracks in the road, reducing the filling effect of the gravel. Utility Model Content
[0005] In order to overcome the disadvantage that cracks on roads vary in size, which makes it difficult for stones to flow into smaller cracks, the utility model provides a stone transport device for road repair.
[0006] Technical solution: A gravel transport device for road repair, including a movable cart, a pulley, a pushing frame, a fixed ring, a storage barrel and a discharging mechanism; a pulley is installed at each of the four corners of the rectangular lower surface of the movable cart; a pushing frame is fixedly connected to the left part of the upper surface of the movable cart; a fixed ring is fixedly connected to the middle part of the movable cart; a storage barrel is installed on the fixed ring; the storage barrel is connected to the discharging mechanism, and the discharging mechanism is used to discharge the gravel in the storage barrel; it also includes a cover, a pump, a conduit II, a nozzle and a bracket; at least two cover shells are fixedly connected to the upper part of the movable cart; at least two pumps are fixedly connected to the upper part of the movable cart, and each pump is located on the inner side of a cover shell; the air outlet of each pump is connected to a conduit II; all conduits II are fixedly connected to the movable cart; each conduit II is fixedly connected to a nozzle at one end away from the pump; at least two brackets are fixedly connected to the middle part of the inner side of the movable cart, and each bracket is movably connected to a conduit II.
[0007] More preferably, the discharging mechanism includes a conduit I, a solenoid valve and a curved pipe; the lower part of the storage barrel is connected to the conduit I; the solenoid valve is installed on the conduit I; and the lower end of the conduit I is connected to the curved pipe.
[0008] More preferably, all pulleys can be configured to be electrically driven to improve transportation efficiency.
[0009] More preferably, the nozzle is arranged in an inclined shape to blow the gas toward the right opening of the curved pipe.
[0010] More preferably, a stopper is further included; the stopper is fixedly connected to the inner side of the bent pipe, and an inclined groove is formed in the middle of the stopper.
[0011] More preferably, it further includes a fixing plate, a fixing strip and a baffle; the fixing plate is fixedly connected to the inner left part of the movable panel vehicle; at least two fixing strips are fixedly connected to the lower surface of the fixing plate; all the fixing strips are fixedly connected to the movable panel vehicle; and a baffle is fixedly connected to the lower part of each fixing strip.
[0012] More preferably, it further comprises bristles; a plurality of bristles are fixedly connected to the lower part of each fixing strip and located on the left side of the baffle, and all the bristles on the same fixing strip form a group.
[0013] Compared with the prior art, the utility model has the following advantages: The advantages and positive effects of the utility model are:
[0014] (1) The gas is blown into the curved pipe through two nozzles, thereby increasing the gas pressure in the curved pipe, and the gas is blown toward the stones, so that the stones have a greater impact force through the gas, and the stones flow into smaller cracks under the action of the impact force, thereby avoiding staying on the road surface, and the impact force causes the stones to flow to the bottom of the cracks, thereby avoiding the stones being stuck in the upper part of the smaller cracks, thereby effectively improving the filling effect of the stones;
[0015] (2) By setting the block, the stone flows out through the inclined groove in the middle of the block, further increasing the air pressure in the elbow and improving the impact force of the stone;
[0016] (3) By setting the block, part of the gas can flow out through the inclined groove in the middle of the block and flow into the crack to be filled in front, so that the impurities such as fallen leaves and disposable plastic bags remaining in the road cracks can be cleaned in advance by the gas, and the impurities in the road cracks can be blown to the road surface, so that the impurities in the cracks can be cleaned before the stones are filled, effectively improving the filling quality of the stones and the repair quality of the road;
[0017] (4) The two covers, two pumps, two conduits II, two nozzles and two brackets are arranged symmetrically with respect to the center of the mobile cart, so that the center of gravity of the mobile cart is more stable, and the problem of the center of gravity of the mobile cart shifting during movement and tipping over is avoided. The two covers are used to protect one pump each, so that the pump is not damaged during use;
[0018] (5) The two baffles are used to move the stones on the road surface and limit the stones on the road surface. As the two baffles move, the stones that are limited by the two baffles will be limited again by the two groups of brushes, so that the stones on the road surface flow to the gaps in the road, thereby preventing the stones on the road surface from affecting the movement of the movable cart, and effectively utilizing the stones on the road surface, thereby further improving the filling effect of the stones. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional structural schematic diagram of the stone transport device for road repair of the utility model;
[0020] Figure 2 It is a partial cross-sectional view of the bent pipe of the gravel transport device for road repair of the utility model;
[0021] Figure 3 This is a schematic diagram of the installation position of the pump machine of the gravel transport device for road repair of the utility model;
[0022] Figure 4 This is a schematic diagram of the installation position of the nozzle of the gravel transport device for road repair of the utility model;
[0023] Figure 5 The utility model is a schematic diagram of the installation position of the baffle and the brush of the gravel transport device for road repair.
[0024] Among them, the above-mentioned drawings include the following figure marks: 1-movable cart, 11-pulley, 2-pushing frame, 3-fixing ring, 4-storage barrel, 41-conduit I, 42-solenoid valve, 43-elevated pipe, 201-block, 202-cover, 203-pump, 204-conduit II, 2041-spray head, 205-bracket, 301-fixing plate, 302-fixing bar, 303-baffle, 304-brush. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Example
[0027] A stone transport device for road repair, according to Figure 1-5As shown, it includes a movable cart 1, a pulley 11, a push frame 2, a fixed ring 3, a storage barrel 4 and a discharging mechanism; a pulley 11 is installed at each of the four corners of the rectangular lower surface of the movable cart 1; the push frame 2 is fixedly connected to the left part of the upper surface of the movable cart 1; the fixed ring 3 is fixedly connected to the middle part of the movable cart 1; the storage barrel 4 is installed on the fixed ring 3; the storage barrel 4 is connected to the discharging mechanism, and the discharging mechanism is used to discharge the stones in the storage barrel 4;
[0028] It also includes a cover 202, a pump 203, a conduit II 204, a nozzle 2041 and a bracket 205; two cover shells 202 are fixedly connected to the upper part of the movable pallet 1; two pumps 203 are fixedly connected to the upper part of the movable pallet 1, and each pump 203 is located on the inner side of a cover shell 202; the air outlet of each pump 203 is fixedly connected to and connected to a conduit II 204; all conduits II 204 are fixedly connected to the movable pallet 1; one end of each conduit II 204 away from the pump 203 is fixedly connected to a nozzle 2041; two brackets 205 are fixedly connected to the middle part of the inner side of the movable pallet 1, and each bracket 205 is movably connected to a conduit II 204.
[0029] The discharging mechanism includes a conduit Ⅰ41, a solenoid valve 42 and a bend 43; the lower part of the storage barrel 4 is fixedly connected to and communicated with the conduit Ⅰ41; the solenoid valve 42 is installed on the conduit Ⅰ41; the lower end of the conduit Ⅰ41 is fixedly connected to and communicated with the bend 43.
[0030] All pulleys 11 can be configured to be electrically driven to improve transportation efficiency.
[0031] The nozzle 2041 is arranged in an inclined shape to blow the gas toward the right opening of the curved pipe 43 .
[0032] The baffle 201 is also included; the baffle 201 is fixedly connected to the inner side of the curved pipe 43, and an inclined groove is formed in the middle of the baffle 201.
[0033] It also includes a fixing plate 301, a fixing strip 302 and a baffle 303; the fixing plate 301 is fixedly connected to the inner left part of the movable panel vehicle 1; two fixing strips 302 are fixedly connected to the lower surface of the fixing plate 301; all the fixing strips 302 are fixedly connected to the movable panel vehicle 1; and a baffle 303 is fixedly connected to the lower part of each fixing strip 302.
[0034] Bristles 304 are also included; a plurality of bristles 304 are fixedly connected in an equidistant array at the lower part of each fixing strip 302 and located to the left of the baffle 303, and all the bristles 304 on the same fixing strip 302 are grouped together.
[0035] When transporting and filling stones: pour the stones into the storage barrel 4 in advance, and then manually push the push frame 2 to move the movable cart 1, or move the movable cart 1 through the electric drive of the four pulleys 11, until the movable cart 1 is moved to the crack of the road, and then control the solenoid valve 42 to open, so that the stones in the storage barrel 4 flow through the conduit I 41, the solenoid valve 42 and the curved pipe 43 in sequence, and finally flow into the crack of the road to fill the crack of the road;
[0036] Since the cracks on the road vary in size, the use of a unified filling method can easily make it difficult for the stones to flow into smaller cracks, causing the stones to remain on the road surface, or cause the stones to be stuck on the upper part of the smaller cracks and fail to flow into the bottom of the smaller cracks, thereby affecting the filling effect of the stones. In addition, since the road is often passed by vehicles and there are usually green belts on both sides of the road, it is easy to cause a large number of impurities such as fallen leaves and disposable plastic bags to remain in the cracks of the road. Failure to clean the impurities in the cracks in time, that is, not filling the cracks with stones, seriously reduces the quality of road repair. To solve the above problem, when the curved pipe 43 is unloading, the two pumps 203 are controlled to operate and input gas into each conduit II 204, so that the gas is blown into the curved pipe 43 through the two nozzles 2041, thereby increasing the air pressure in the curved pipe 43, and the gas will blow toward the stone, so that the stone will generate a greater impact force through the gas, and then the stone will flow into the smaller crack under the action of the impact force, so as to avoid staying on the road surface, and the stone will flow into the bottom of the crack through the impact force, so as to avoid the stone being stuck in the upper part of the smaller crack, thereby effectively improving the filling effect of the stone;
[0037] Furthermore, by setting the block 201, the stones flow out through the inclined groove in the middle of the block 201, further increasing the air pressure in the curved pipe 43 and enhancing the impact force of the stones. In addition, due to the gaps between the stones flowing through the block 201, part of the gas can flow out through the inclined groove in the middle of the block 201 and flow into the crack to be filled in front, thereby cleaning the impurities such as fallen leaves and disposable plastic bags remaining in the cracks of the road in advance through the gas, and blowing the impurities in the cracks of the road to the road surface, thereby cleaning the impurities in the cracks before the stones are filled, effectively improving the filling quality of the stones and the repair quality of the road;
[0038] The two covers 202, the two pumps 203, the two conduits II 204, the two nozzles 2041 and the two brackets 205 are arranged symmetrically with respect to the center of the movable pallet 1, so that the center of gravity of the movable pallet 1 is more stable, and the problem of the center of gravity shifting and tipping of the movable pallet 1 during the movement is avoided. The two covers 202 are used to protect each pump 203, so that the pump 203 is prevented from being damaged during use.
[0039] And when the stones are in the process of filling, some of the stones will remain on the road surface and fail to flow into the cracks of the road. The movement of the movable flatbed truck 1 drives the fixed plate 301 to move, and the movement of the fixed plate 301 drives the two fixed bars 302 to move, thereby making the baffle plate 303 and the bristles 304 move synchronously. At this time, the stones remaining on the road surface are moved by the two baffle plates 303 and the stones remaining on the road surface are limited. As the two baffle plates 303 move, the stones limited by the two baffle plates 303 will be limited again by the two groups of bristles 304, thereby making the stones remaining on the road surface flow to the gaps of the road, thereby avoiding the stones remaining on the road surface from affecting the movement of the movable flatbed truck 1, and effectively utilizing the stones remaining on the road surface, thereby further improving the filling effect of the stones.
[0040] The above is a detailed introduction to the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea. At the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A stone transport device for road repair, comprising a movable panel truck (1), a pulley (11), a push frame (2), a fixing ring (3), a storage barrel (4) and a discharging mechanism; a pulley (11) is installed at each of the four rectangular corners of the lower surface of the movable panel truck (1); the push frame (2) is fixedly connected to the left portion of the upper surface of the movable panel truck (1); A fixing ring (3) is fixedly connected to the middle of the movable panel vehicle (1); a storage barrel (4) is installed on the fixing ring (3); the storage barrel (4) is connected to a discharge mechanism, and the discharge mechanism is used to discharge the stones in the storage barrel (4); the characteristics are: The invention also comprises a cover (202), a pump (203), a conduit II (204), a nozzle (2041) and a bracket (205); at least two cover shells (202) are fixedly connected to the upper part of the movable cart (1); at least two pumps (203) are fixedly connected to the upper part of the movable cart (1), and each pump (203) is located on the inner side of a cover shell (202); the air outlet of each pump (203) is connected to a conduit II (204); all conduits II (204) are fixedly connected to the movable cart (1); one end of each conduit II (204) away from the pump (203) is fixedly connected to a nozzle (2041); at least two brackets (205) are fixedly connected to the middle part of the inner side of the movable cart (1), and each bracket (205) is movably connected to a conduit II (204).
2. The gravel transport device for road repair according to claim 1 is characterized in that: The discharging mechanism comprises a conduit I (41), an electromagnetic valve (42) and a curved pipe (43); the lower part of the storage barrel (4) is connected to the conduit I (41); the electromagnetic valve (42) is installed on the conduit I (41); and the lower end of the conduit I (41) is connected to the curved pipe (43).
3. The gravel transport device for road repair according to claim 1 is characterized in that: All pulleys (11) can be configured to be electrically driven to improve transportation efficiency.
4. The gravel transport device for road repair according to claim 1 is characterized in that: The nozzle (2041) is arranged in an inclined shape to blow the gas toward the right opening of the curved pipe (43).
5. A gravel transport device for road repair according to any one of claims 1 to 4, characterized in that: It also includes a stopper (201); the stopper (201) is fixedly connected to the inner side of the curved pipe (43), and an inclined groove is formed in the middle of the stopper (201).
6. The gravel transport device for road repair according to claim 5 is characterized in that: It also includes a fixing plate (301), a fixing strip (302) and a baffle (303); the fixing plate (301) is fixedly connected to the inner left part of the movable panel vehicle (1); at least two fixing strips (302) are fixedly connected to the lower surface of the fixing plate (301); all the fixing strips (302) are fixedly connected to the movable panel vehicle (1); and a baffle (303) is fixedly connected to the lower part of each fixing strip (302).
7. The gravel transport device for road repair according to claim 6 is characterized in that: It also includes bristles (304); a plurality of bristles (304) are fixedly connected to the lower part of each fixing strip (302) and located on the left side of the baffle (303), and all the bristles (304) on the same fixing strip (302) form a group.
