Movable positioning fixture for three walls in integrated construction of bridge floor

By designing the three-wall movable positioning fixture for the integrated construction of the bridge deck, the problem of deviation in the embedded position of the three-wall steel bars of the prefabricated box girder and low construction efficiency was solved, achieving precise control and efficient construction, and improving the quality of the project.

CN221855293UActive Publication Date: 2024-10-18THE THIRD ENG OF CHINA RAILWAY 12TH BUREAU GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420274625.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-10-18
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

In the integrated construction of the bridge deck, the embedded steel bars on the three walls of the prefabricated box girder deviated greatly, the position of the embedded steel plates on the A wall was inaccurate, and the construction efficiency was low.

Method used

A three-wall movable positioning fixture for bridge deck integrated construction is designed, including two parallel longitudinal bars, fixed cross bars, movable cross bars and linear guide bars. Through the cooperation of the locking mechanism, sliding mark lock and sliding mark lock , achieving precise control of the position and spacing of embedded steel bars.

Benefits of technology

It achieves smooth linearity and accurate positioning of embedded steel bars, improves construction efficiency, saves manpower and auxiliary steel bars, is simple and easy to carry, and improves project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855293U_ABST
    Figure CN221855293U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of prefabricated box girder steel bar installation, and particularly relates to a movable positioning clamp for three walls in bridge deck integrated construction. Comprising two parallel longitudinal rods, a fixed transverse rod perpendicular to the longitudinal rods and two movable transverse rods perpendicular to the longitudinal rods and capable of sliding along the longitudinal rods are connected between the two longitudinal rods, and locking mechanisms are arranged between the movable transverse rods and the longitudinal rods so that the movable transverse rods can be fixed at the target positions of the longitudinal rods. A longitudinal length scale line is arranged in the length direction of one longitudinal rod; a linear guide rod perpendicular to the two longitudinal rods is fixed between the ends, close to the fixed transverse rod, of the two longitudinal rods, a plug pin hole used for being fixed to the foot mold through a plug pin is formed in the linear guide rod, and transverse length scale marks are arranged in the length direction of the linear guide rod. A plurality of sliding marking locks which can slide along the linear guide rod and can be fixed at a target scale are distributed on the linear guide rod; the device is easy to carry, simple and convenient in positioning mode, light and convenient to use, capable of improving construction efficiency and engineering quality and worthy of vigorous popularization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of prefabricated box girder reinforcement installation, and specifically relates to a three-wall movable positioning fixture for bridge deck integrated construction. Background Art

[0002] With the rapid development of high-speed railway construction in my country, the quality requirements of prestressed concrete simply supported box girders are getting higher and higher, and steel bar engineering as a part of concealed engineering is also getting more and more attention. Bridge deck integrated construction is a trend that helps to improve the construction progress of the entire high-speed railway line. There are many types of three-wall steel bar pre-embedded in the bridge deck integrated construction drawings, mainly railing type and sound barrier type, with diversified widths, spacings, and positions, which increase the difficulty of construction. Usually, the three-wall construction of the beam body is done with simple positioning fixtures, which is not feasible in the bridge deck integrated construction. For this reason, the three-wall movable positioning fixture is studied, and the three-wall steel bar is installed lightly and efficiently, which lays a solid foundation for the accurate quality of beam pre-embedded, convenient installation, and convenient construction. Utility Model Content

[0003] The utility model aims to solve the problems of large deviation of embedded position of steel bars in three walls of prefabricated box beam, inaccurate position of embedded steel plate in wall A and low construction efficiency.

[0004] The utility model provides the following technical scheme: a three-wall movable positioning fixture for integrated bridge deck construction, comprising two parallel longitudinal bars, a fixed cross bar perpendicular to the two longitudinal bars and two movable cross bars perpendicular to the two longitudinal bars and capable of sliding along the two longitudinal bars are connected between the two longitudinal bars, a locking mechanism is arranged between the movable cross bar and the longitudinal bars, so that the movable cross bar is fixed at a target position of the longitudinal bars, and a longitudinal length scale line is arranged on the length direction of one of the longitudinal bars; a straight line guide rod perpendicular to the two longitudinal bars is fixed between one end of the two longitudinal bars close to the fixed cross bar, a pin hole for fixing the foot mold by a pin is arranged on the straight line guide rod, a transverse length scale line is arranged on the length direction of the straight line guide rod, and a plurality of sliding mark locks which can slide along the two longitudinal bars and can be fixed at the target scale line are distributed on the straight line guide rod.

[0005] Furthermore, sliding sleeves are fixed at both ends of the movable cross bar, and the sliding sleeves can be slidably sleeved on the longitudinal rods. Set screws are passed through the wall thickness of the sliding sleeves. When the set screws are tightened, the sliding sleeves are fixed, and when the set screws are loosened, the sliding sleeves are free.

[0006] Furthermore, the linear guide rod comprises two rectangular plates connected at an angle, the top angle of the linear guide rod faces upward, and the bottom edges of the two rectangular plates are flush with the bottom surface of the longitudinal rod.

[0007] Furthermore, one of the rectangular plates is provided with a slide groove parallel to the length direction, and the sliding mark lock includes an indicator pin, a positioning rod and a nut, the positioning rod includes a boss, a positioning rod section and a screw section, the positioning rod passes through the slide groove, and the boss is stopped at the edge of the slide groove, the positioning rod section has two positioning surfaces which are respectively parallel to the long sides of the two sides of the slide groove and in sliding contact, the indicator pin is sleeved on the positioning rod section through the positioning hole, the positioning hole fits with the positioning rod section, the nut is threadedly engaged with the screw section, and the protruding top abutment part on the bottom surface of the nut contacts the indicator pin, and when the nut is tightened, the indicator pin and the boss clamp the rectangular plate, and the sliding mark lock is locked, and when the nut is loosened, the sliding mark lock is free.

[0008] Furthermore, the movable cross bar and the longitudinal bar are square tubes, and the linear guide rod is angle steel.

[0009] Furthermore, the cross section of the positioning rod segment is a square, and the screw segment is centered relative to the cross section.

[0010] Compared with the prior art, the advantages of the present invention are:

[0011] The utility model provides a three-wall movable positioning fixture for integrated bridge deck construction, which achieves the goal of accurately controlling the linear smoothness and accurate position of the embedded steel bars in use, improves construction efficiency, saves manpower and auxiliary steel bars. It can quickly detect the position and spacing of the three walls, especially effectively control the changes of the embedded steel plate of wall A. The device is easy to carry, has a simple positioning method, is easy to use, can improve construction efficiency and project quality, and is worthy of vigorous promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a structural diagram of the three-wall movable positioning fixture;

[0013] Figure 2 is a structural schematic diagram of the locking mechanism;

[0014] Figure 3 It is a schematic diagram of the connection between the sliding mark lock and the linear guide rod;

[0015] Figure 4 It is a structural schematic diagram of a sliding tag lock;

[0016] Figure 5 This is a schematic diagram of the use of the three-wall movable positioning fixture.

[0017] In the figure: 1-longitudinal rod; 2-movable cross bar; 3-locking mechanism; 4-longitudinal length scale line; 5-linear guide rod; 5.1-slide groove; 6-pin hole; 7-transverse length scale line; 8-sliding mark lock; 8.1-indicator needle; 8.2-positioning pull rod; 8.2.1-boss; 8.2.2-positioning rod section; 8.2.3-screw section; 8.3-nut; 8.3.1-top support part; 9-sliding sleeve; 10-setting screw; 11-fixed cross bar; 12-embedded steel bars for protective wall; 13-embedded steel bars for B wall; 14-embedded steel bars for A wall; 15-embedded steel plate. DETAILED DESCRIPTION

[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] like Figure 1 , Figure 5 As shown: a three-wall movable positioning fixture for integrated bridge deck construction, comprising two parallel longitudinal bars 1, a fixed cross bar 11 perpendicular to the two longitudinal bars 1 and two movable cross bars 2 perpendicular to the two longitudinal bars 1 and capable of sliding along the two longitudinal bars 1, a locking mechanism 3 is arranged between the movable cross bar 2 and the longitudinal bars 1, so that the movable cross bar 2 is fixed at the target position of the longitudinal bars 1, and a longitudinal length scale line 4 is arranged in the length direction of one of the longitudinal bars 1; a linear guide rod 5 perpendicular to the two longitudinal bars 1 is fixed between one end close to the fixed cross bar 11, a pin hole 6 for fixing the foot mold by a pin is arranged on the linear guide rod 5, a transverse length scale line 7 is arranged in the length direction of the linear guide rod 5, and a plurality of sliding mark locks 8 that can slide along the two longitudinal bars 5 and can be fixed at the target scale are distributed on the linear guide rod 5. The position of the embedded steel bars 14 of the A wall is controlled by the fixed cross bar 11, the positions of the embedded steel bars 13 of the B wall and the embedded steel bars 12 of the protective wall are controlled by the two movable cross bars 2 respectively, and the position of the embedded steel plate 15 is controlled by the sliding mark lock.

[0020] When in use, place the prepared three-wall movable positioning fixture on the foot mold of the prefabricated box beam, and the linear guide rod 5 corresponds to the foot mold, and the installation pin is fixed. After fixing the three-wall movable positioning fixture, adjust the first movable cross bar 2 to the width position of the A wall embedded steel bar 14, lock the locking mechanism 3, and arrange the A wall embedded steel bar 14. Adjust the second movable cross bar 2 to the installation position of the B wall embedded steel bar 13, lock the locking mechanism 3, and arrange the B wall embedded steel bar 13 and the protective wall embedded steel bar 12.

[0021] Before arranging the pre-embedded steel bars 14 of wall A, adjust the sliding mark lock 8 on the linear guide rod 5 to the middle of the installation position of the pre-embedded steel plate 15, and arrange the pre-embedded steel bars 14 of wall A based on the middle of the installation position of the pre-embedded steel plate 15 (the layout of the pre-embedded steel bars 14 of wall A varies with the beam type, and the corresponding pre-embedded steel bars 14 of wall A have different embedded models, widths, and heights with or without sound barriers). The sliding mark lock 8 solves the problem of inaccurate positioning of the pre-embedded steel plate 15.

[0022] like Figure 2 As shown: sliding sleeves 9 are fixed at both ends of the movable cross bar 2, and the sliding sleeve 9 can be slidably sleeved on the longitudinal bar 1. A locking screw 10 is passed through the sliding sleeve 9 along the wall thickness. When the locking screw 10 is tightened, the sliding sleeve 9 is fixed, and when the locking screw 10 is loosened, the sliding sleeve 9 is free.

[0023] The linear guide rod 5 includes two rectangular plates connected at an angle, the top angle of the linear guide rod 5 is upward, and the bottom edges of the two rectangular plates are flush with the bottom surface of the longitudinal rod 1.

[0024] like Figure 3 , Figure 4 As shown: one of the rectangular plates is provided with a slide groove 5.1 parallel to the length direction, the sliding mark lock 8 comprises an indicator pin 8.1, a positioning rod 8.2 and a nut 8.3, the positioning rod 8.2 comprises a boss 8.2.1, a positioning rod section 8.2.2 and a screw section 8.2.3, the positioning rod 8.2 passes through the slide groove 5.1, the boss 8.2.1 is stopped at the edge of the slide groove 5.1, the positioning rod section 8.2.2 has two positioning surfaces which are parallel to the long sides of the two sides of the slide groove 5.1 and are in sliding contact, and the positioning rod section 8.2.2 is matched with the slide groove 5.1 The nut 8.3 is screwed with the screw segment 8.2.3, and the protruding top portion 8.3.1 on the bottom surface of the nut 8.3 contacts with the indicator needle 8.1. When the nut 8.3 is tightened, the indicator needle 8.1 and the boss 8.2.1 clamp the rectangular plate, and the sliding mark lock 8 is locked. When the nut 8.3 is loosened, the sliding mark lock 8 is free.

[0025] The movable cross bar 2 and the longitudinal bar 1 are square tubes, and the linear guide rod 5 is an angle steel.

[0026] The cross section of the positioning rod segment 8.2.2 is square, and the screw segment 8.2.3 is centered relative to the cross section.

[0027] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A three-wall movable positioning fixture for bridge deck integrated construction, characterized by: The invention comprises two parallel longitudinal bars (1), a fixed cross bar (11) and two movable cross bars (2) which are perpendicular to the longitudinal bars (1) and can slide along the fixed cross bars (1), a locking mechanism (3) is arranged between the movable cross bars (2) and the longitudinal bars (1), so that the movable cross bars (2) are fixed at the target position of the longitudinal bars (1), and a longitudinal length scale line (4) is arranged in the length direction of one of the longitudinal bars (1); a linear guide rod (5) and perpendicular to the fixed cross bar (11) is fixed between the ends of the two longitudinal bars (1) close to the fixed cross bar (11), a pin hole (6) is arranged on the linear guide rod (5) for fixing with a foot mold by a pin, a transverse length scale line (7) is arranged in the length direction of the linear guide rod (5), and a plurality of sliding mark locks (8) which can slide along the linear guide rod and can be fixed at the target scale are arranged on the linear guide rod (5).

2. The three-wall movable positioning fixture for bridge deck integrated construction according to claim 1 is characterized by: Sliding sleeves (9) are fixed at both ends of the movable cross bar (2). The sliding sleeves (9) are slidably sleeved on the longitudinal bar (1). A set screw (10) is passed through the sliding sleeve (9) along the wall thickness. When the set screw (10) is tightened, the sliding sleeve (9) is fixed, and when the set screw (10) is loosened, the sliding sleeve (9) is free.

3. The three-wall movable positioning fixture for bridge deck integrated construction according to claim 2 is characterized by: The linear guide rod (5) comprises two rectangular plates connected at an angle, the top angle of the linear guide rod (5) faces upward, and the bottom edges of the two rectangular plates are flush with the bottom surface of the longitudinal rod (1).

4. The three-wall movable positioning fixture for bridge deck integrated construction according to claim 3 is characterized by: One of the rectangular plates is provided with a slide groove (5.1) parallel to the length direction. The sliding mark lock (8) includes an indicator needle (8.1), a positioning rod (8.2) and a nut (8.3). The positioning rod (8.2) includes a boss (8.2.1), a positioning rod section (8.2.2) and a screw section (8.2.3). The positioning rod (8.2) passes through the slide groove (5.1). The boss (8.2.1) is stopped at the edge of the slide groove (5.1). The positioning rod section (8.2.2) has two long sides that are respectively aligned with the two sides of the slide groove (5.1). The positioning surfaces are parallel and in sliding contact, the indicating needle (8.1) is sleeved on the positioning rod section (8.2.2) through the positioning hole, the positioning hole is matched with the positioning rod section (8.2.2), the nut (8.3) is screwed with the screw section (8.2.3), the top abutting part (8.3.1) protruding from the bottom surface of the nut (8.3) contacts the indicating needle (8.1), when the nut (8.3) is tightened, the indicating needle (8.1) and the boss (8.2.1) clamp the rectangular plate, the sliding mark lock (8) is locked, and when the nut (8.3) is loosened, the sliding mark lock (8) is free.

5. The three-wall movable positioning fixture for bridge deck integrated construction according to claim 3 is characterized by: The movable cross bar (2) and the longitudinal bar (1) are square tubes, and the linear guide rod (5) is angle steel.

6. The three-wall movable positioning fixture for bridge deck integration construction according to claim 4 is characterized by: The cross section of the positioning rod section (8.2.2) is a square, and the screw section (8.2.3) is centered relative to the cross section.