Double-pipe cement mixing pile with vibratory hammer mechanism

By designing a rotating bracket and slide rail system in the double-tube cement mixing pile, the power head and vibrating hammer can operate intermittently, and combined with the hydraulic guide to ensure the verticality of the core pile, it solves the problems of alternate use of equipment and poor verticality control in the existing technology. problems, improving construction efficiency and project quality.

CN221855504UActive Publication Date: 2024-10-18湖北迪工展志建设工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323066308.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2024-10-18
Estimated Expiration
2033-11-14

AI Technical Summary

Technical Problem

During the core-adding construction of the existing double-tube cement mixing piles, the alternate use of equipment results in cumbersome positioning and slow construction speed. The verticality of the core piles is poorly controlled by the vibrating hammer during the pile pressing process, which easily causes the core piles to shift and affects the quality of the cement mixing piles. Bearing capacity and engineering quality.

Method used

A double-tube cement mixing pile with a vibrating hammer mechanism is designed. By arranging a rotating bracket, a slide rail and a hydraulic guide on the pile driver, the power head and vibrating hammer work intermittently, and the power head moves downward along the main slide rail to drive the drill pipe. When the pile is formed, the vibrating hammer vibrates downward along the slide rail to add the core pile. The hydraulic guide ensures the verticality of the core pile and avoids the alternate use of equipment and complicated positioning.

Benefits of technology

It improves the construction efficiency, avoids core pile deviation, and enhances the bearing capacity and engineering quality of cement mixing piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855504U_ABST
    Figure CN221855504U_ABST
Patent Text Reader

Abstract

The double-pipe cement mixing pile with the vibratory hammer mechanism comprises a pile machine and a main pile frame, the upper portion of the pile machine is provided with a first winch connected with a power head and a second winch connected with a vibratory hammer, the upper end of the main pile frame is fixedly connected with a fixing column, and a driven gear is fixedly arranged at the top end of the fixing column. The fixed column is rotationally connected with a rotating support, the rotating support is provided with a driving gear meshed with the driven gear, the two adjacent sides of the rotating support are provided with a first auxiliary sliding rail in sliding connection with the power head and a second auxiliary sliding rail in sliding connection with the vibration hammer respectively, and the side, facing the piling direction, of the main frame is provided with a main sliding rail. The main sliding rail is connected with the first auxiliary sliding rail or the second auxiliary sliding rail, so that intermittent work of the power head and the vibratory hammer is facilitated. Two devices do not need to be used alternately, re-positioning is not needed, the construction efficiency is improved, the perpendicularity of the core pile is kept within a correct range, the core pile is prevented from deviating relative to the cement mixing pile, and the construction quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering machinery, in particular to a double-tube cement mixing pile with a vibrating hammer mechanism. Background Art

[0002] Cement mixing piles refer to an effective form of soft foundation treatment. They use cement as the main curing agent, and use a pile mixing machine to spray cement into the soil and fully mix it, so that a series of physical and chemical reactions occur between the cement and the soil, hardening the soft soil and improving the foundation strength. In actual engineering, especially in the construction of retaining walls that need to combine load bearing with anti-seepage and water-retaining functions to make it a supporting structure with both load-bearing and anti-seepage functions, in order to improve the bearing capacity and anti-seepage capacity of the pile foundation, double-tube cement mixing piles are required, and generally the cement mixing piles need to be cored. Core construction refers to the use of special equipment such as a vibrating hammer, pile driver, etc. to press core piles such as H-shaped steel, steel pipe piles or precast concrete pipe piles into the cement mixing piles before the cement mixing piles are initially set. It has the characteristics of high bearing capacity, low settlement, anti-seepage and water-retaining.

[0003] When constructing a core with existing double-tube cement mixing piles, a pile mixer is generally used first. Pre-formed H-shaped steel, steel pipe piles, or precast concrete pipe piles are then driven into the pile using a pile driver, pile hammer, vibratory hammer, or other equipment. However, during this construction process, the two types of equipment are used alternately. After the cement mixing pile is completed, the vibratory hammer or pile driver needs to be precisely positioned above the cement mixing pile for construction. This positioning process is cumbersome and results in a slow construction speed. Furthermore, during the pile driving process, the core pile comes into contact with the cement inside the cement mixing pile, resulting in poor vertical control of the core pile. This can easily cause the core pile to shift relative to the cement mixing pile, reducing the bearing capacity of the cement mixing pile and affecting the quality of the project. Utility Model Content

[0004] In order to solve the technical problems in the prior art that the alternating positioning of the two devices is cumbersome, resulting in slow construction speed, and the verticality control of the core pile is poor during the pile driving process of the vibratory hammer, which easily causes the core pile to shift relative to the cement mixing pile, resulting in a reduction in the bearing capacity of the cement mixing pile and affecting the quality of the project, the present utility model provides the following technical solutions.

[0005] The utility model discloses a double-tube cement mixing pile containing a vibratory hammer mechanism, comprising a pile driver and a main pile frame located on the upper part of the pile driver, wherein the pile driver is provided with a first winch connected to a power head and a second winch connected to the vibratory hammer, the upper end of the main pile frame is fixedly connected to a fixed column with a top end fixedly provided with a driven gear, the fixed column is rotatably connected to a rotating bracket, the rotating bracket is provided with a driving gear meshing with the driven gear, adjacent two sides of the rotating bracket are respectively provided with a first secondary slide rail slidably connected to the power head and a second secondary slide rail slidably connected to the vibratory hammer, the main pile frame is provided with a main slide rail on the side facing the piling direction, and under the rotation of the rotating bracket, the main slide rail is connected to the first secondary slide rail or the second secondary slide rail to facilitate intermittent operation of the power head and the vibratory hammer.

[0006] As a further technical solution, a limit plate is fixed on the upper part of the rotating bracket, and a drive motor is fixed on one side of the limit plate. The output end of the drive motor is connected to the driving gear, and the driving gear is meshed with the driven gear to enable the rotating bracket to rotate under the action of the drive motor.

[0007] As a further technical solution, a support plate is provided on the top of the rotating bracket, and an anti-winding plate is provided on the support plate toward the first hoist and the second hoist.

[0008] As a further technical solution, the main slide rail has the same cross-section as the first and second auxiliary slide rails, and the upper end of the main slide rail abuts against the lower end of the first or second auxiliary slide rail.

[0009] As a further technical solution, fixed plates are provided on both sides of the main pile frame, the fixed plates are connected to hydraulic rods, and the hydraulic rods are connected to detachable guides through connecting blocks.

[0010] As a further technical solution, there are two guides, which can guide the drill rod and the core pile respectively.

[0011] The beneficial effects of the present invention are as follows: the present invention divides the pile frame on the pile driver into a main pile frame and a rotating bracket for a load power head and a vibratory hammer rotatably connected to the main pile frame, and the power head and the vibratory hammer are hoisted by the first winch and the second winch respectively. Under the action of the driving motor, the rotating bracket rotates, so that the power head and the vibratory hammer intermittently move on the main pile frame, so that the power head moves downward along the main slide rail to drive the drill rod to spirally form a pile or the vibratory hammer moves downward along the main slide rail and vibrates to add core piles. There is no need to use the two devices alternately, and there is no need to re-position, thereby improving construction efficiency; the detachable guide connected by a hydraulic rod at the lower part of the main pile frame can guide the movement of the drill rod and the core pile respectively, so that the verticality of the core pile is kept within the correct range, preventing the core pile from deviating relative to the cement mixing pile, thereby improving the bearing capacity of the pile body and improving the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a schematic diagram of the three-dimensional structure of a double-tube cement mixing pile with a vibrating hammer mechanism according to the present invention;

[0013] Figure 2 This is a schematic diagram of a rotating bracket for a double-tube cement mixing pile with a vibrating hammer mechanism according to the present invention;

[0014] Figure 3 This is an exploded view of the rotating bracket of the double-tube cement mixing pile with a vibrating hammer mechanism of the utility model;

[0015] In the figure: 1-pile driver; 101-first winch; 102-second winch; 2-main pile frame; 201-main slide rail; 202-fixed plate; 3-power head; 4-vibratory hammer; 5-rotating bracket; 501-first secondary slide rail; 502-second secondary slide rail; 503-limiting plate; 504-support plate; 6-anti-winding plate; 7-drive motor; 701-driving gear; 8-fixed column; 801-driven gear; 9-hydraulic rod; 10-connecting block; 11-guide; 12-drill rod. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely for the purpose of explaining the present invention and are not intended to limit the present invention. It should be noted that the embodiments and features of the embodiments of the present invention may be combined with each other unless there is a conflict.

[0017] In the description of this utility model, it should be understood that the terms "upper" and "lower" are based on the orientation or positional relationship shown in the accompanying drawings and are merely for the purpose of facilitating the description of this utility model and simplifying the description. They do not indicate or imply that the devices or components referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limiting the present utility model. In the description of this utility model, unless otherwise specified, "plurality" means two or more.

[0018] like Figure 1 、 Figure 2 and Figure 3As shown, the present invention discloses a double-tube cement mixing pile with a vibratory hammer mechanism, comprising a pile driver 1 and a main pile frame 2 located above the pile driver 1. The telescopic legs, adjustment rods, high-pressure grouting pump, high-pressure air pump, and control structure on the pile driver 1 platform all utilize existing technologies and are not further described or illustrated herein. A first hoist 101 and a second hoist 102 are provided on the pile driver 1. The first hoist 101 and the second hoist 102 are connected to a power head 3 and a vibratory hammer 4, respectively, to stably support the power head 3 and the vibratory hammer 4. A fixed column 8 is fixedly connected to the upper end of the main pile frame 2. A driven gear 801 is fixedly mounted on the top of the fixed column 8. A rotating bracket 5 is rotatably connected to the fixed column 8. The rotating bracket 5 is provided with a driving gear 701 that meshes with the driven gear 801. When the driving gear 701 rotates, since the driven gear 801 is fixed, the driving gear 701 drives the rotating bracket 5 to rotate relative to the fixed column 8, i.e., the rotating bracket 5 rotates relative to the main pile frame 2.

[0019] like Figure 2 and Figure 3 As shown, the main pile frame 2 is provided with a main slide rail 201 on the side facing the piling direction, and the adjacent two sides of the rotating bracket 5 are respectively provided with a first auxiliary slide rail 501 slidingly connected to the power head 3 and a second auxiliary slide rail 502 slidingly connected to the vibratory hammer 4, and the first auxiliary slide rail 501 and the second auxiliary slide rail 502 have the same structure. The main slide rail 201 has the same cross-section as the first and second secondary slide rails 501 and 502, and the upper end of the main slide rail 201 abuts against the lower end of the first or second secondary slide rail 501 and 502. When the first or second secondary slide rail 501 abuts against the main slide rail 201, the power head 3 can slide along the first or second secondary slide rail 501 to the main slide rail 201, and move downward along the main slide rail 201 to drive the drill rod 12 to spiral downward into a pile; when the rotating bracket 5 rotates 90 degrees, the second or second secondary slide rail 502 abuts against the main slide rail 201, and the vibrating hammer 4 can slide along the second or second secondary slide rail 502 to the main slide rail 201, and move downward along the main slide rail 201 to vibrate the core pile into the cement mixing pile. Thus, under the rotation of the rotating bracket 5, the main slide rail 201 is connected to the first or second secondary slide rail 501 and 502, so that the power head 3 and the vibrating hammer 4 can work intermittently.

[0020] like Figure 2As shown, a limit plate 503 is fixedly provided on the upper portion of the rotating bracket 5, and a drive motor 7 is fixedly provided on one side of the limit plate 503. The output end of the drive motor 7 is connected to a driving gear 701, and the driving gear 701 is meshed and connected with the driven gear 801 to rotate the rotating bracket 5 under the action of the drive motor 7. A support plate 504 is provided on the top of the rotating bracket 5. The support plate 504 is provided with an anti-winding plate 6 facing the direction of the first hoist 101 and the second hoist 102. The anti-winding plate 6 can prevent the cables of the first hoist 101 and the second hoist 102 from affecting each other.

[0021] like Figure 1 As shown, to achieve verticality control of the cement mixing pile and the core pile, fixed plates 202 are provided on both sides of the main pile frame 2. The fixed plates 202 are connected to hydraulic rods 9, which are connected to detachable guides 11 via connecting blocks 10. There are two guides 11, both detachably connected to the connecting blocks 10. One guide guides the drill rod 12, and the other guides the core pile, ensuring that the verticality of the core pile relative to the drill rod 12 remains consistent and the core pile verticality remains within the correct range.

[0022] When the present invention is in use, the power head 3 first moves upward along the first secondary slide rail 501 and the main slide rail 201, and at the same time drives the drill rod 12 to pass through the guide 11 and spiral downward to form a pile, and then the drill rod 12 is pulled back and high-pressure air and cement slurry are injected; after the grouting is completed, the power head 3 is retracted to the first secondary slide rail 501, and the guide 11 is replaced, and then the driving motor 7 drives the rotating bracket 5 to rotate 90 degrees, so that the second secondary slide rail 502 abuts against the main slide rail 201, and the vibrating hammer 4 clamps the core pile and passes through the guide 11, and then the vibrating hammer 4 is transported downward along the second secondary slide rail 502 and the main slide rail 201 and vibrates to drive the core pile into the cement mixing pile. After completion, the vibrating hammer 4 retracts the second secondary slide rail 502, and the rotating bracket 5 rotates 90 degrees to proceed to the next process.

[0023] The preferred specific implementation methods and embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the above implementation methods and embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes or equivalent substitutions can be made without departing from the concept of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments that fall within the scope of the claims of this application belong to the scope of protection of the present invention.

Claims

1. A double-tube cement mixing pile with a vibrating hammer mechanism, comprising a pile driver (1) and a main pile frame (2) located above the pile driver (1), characterized in that: The pile driver (1) is provided with a first winch (101) connected to a power head (3) and a second winch (102) connected to a vibrating hammer (4) at the upper part, the main pile frame (2) is fixedly connected to a fixed column (8) with a driven gear (801) fixed at the top end, the fixed column (8) is rotatably connected to a rotating bracket (5), the rotating bracket (5) is provided with a driving gear (701) meshing with the driven gear (801), and two adjacent rotating brackets (5) are connected to each other. A first auxiliary slide rail (501) slidably connected to the power head (3) and a second auxiliary slide rail (502) slidably connected to the vibrating hammer (4) are respectively provided on the sides; a main slide rail (201) is provided on the side of the main pile frame (2) facing the piling direction; under the rotation of the rotating bracket (5), the main slide rail (201) is connected to the first auxiliary slide rail (501) or the second auxiliary slide rail (502), so as to facilitate the intermittent operation of the power head (3) and the vibrating hammer (4).

2. The double-tube cement mixing pile with a vibrating hammer mechanism according to claim 1 is characterized in that: A limit plate (503) is fixedly provided on the upper part of the rotating bracket (5), a driving motor (7) is fixedly provided on one side of the limit plate (503), an output end of the driving motor (7) is connected to a driving gear (701), and the driving gear (701) is meshedly connected with the driven gear (801) so that the rotating bracket (5) rotates under the action of the driving motor (7).

3. The double-tube cement mixing pile with a vibrating hammer mechanism according to claim 1, characterized in that: A support plate (504) is provided at the top end of the rotating bracket (5), and an anti-winding plate (6) is provided on the support plate (504) in the direction of the first hoist (101) and the second hoist (102).

4. The double-tube cement mixing pile with a vibrating hammer mechanism according to claim 1, characterized in that: The main slide rail (201) has the same cross-section as the first auxiliary slide rail (501) and the second auxiliary slide rail (502), and the upper end of the main slide rail (201) abuts against the lower end of the first auxiliary slide rail (501) or the second auxiliary slide rail (502).

5. The double-tube cement mixing pile with a vibrating hammer mechanism according to claim 1, characterized in that: Fixed plates (202) are provided on both sides of the main pile frame (2), the fixed plates (202) are connected to hydraulic rods (9), and the hydraulic rods (9) are connected to detachable guides (11) via connecting blocks (10).

6. The double-tube cement mixing pile with a vibrating hammer mechanism according to claim 5, characterized in that: There are two guides (11), which can guide the drill rod (12) and the core pile respectively.