Vegetation water and soil slope protection blocking net fixing structure

By designing multiple sets of frames and connection systems, combined with insertion rods, steel pipes and cement slurry reinforcement, the problem of stability and slow replacement speed of the existing slope protection net was solved, and a fixed structure of vegetation, water and soil slope protection nets with convenient replacement and high stability was achieved. .

CN221855565UActive Publication Date: 2024-10-18WUHAN SHANSHUI LINCAOHU ECOLOGICAL RESTORATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420407272.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-18
Estimated Expiration
2034-03-04

AI Technical Summary

Technical Problem

After long-term use, the existing slope protection net is prone to small-scale rupture, leading to large-scale damage and weakening stability. The disassembly and assembly process is cumbersome and easy to loosen, especially when it is pulled with high intensity, it is more likely to fall off, resulting in slow replacement speed and high labor intensity.

Method used

A fixed structure for soil and water slope protection with vegetation is designed, including multiple sets of frames, connecting blocks, adjusting bolts, sliders, clamping blocks and insertion rods of the same size. The insertion rods and steel pipes are driven into the ground and poured with cement slurry for reinforcement. Barbs and grouting holes ensure stable installation of the frame, and the adjustment bolts and slots facilitate replacement and maintenance.

Benefits of technology

It improves the convenience and stability of the replacement and maintenance of the slope protection net, enhances the firmness of the device, reduces the labor intensity of disassembly and assembly, and facilitates the disassembly and replacement of a single frame when necessary.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855565U_ABST
    Figure CN221855565U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of slope protection blocking nets, and discloses a vegetation water and soil slope protection blocking net fixing structure which comprises a frame, a blocking net is fixedly installed on the inner wall of the frame, a connecting block is installed at the side end of the frame, an adjusting bolt is rotatably installed in the connecting block, a sliding block is arranged on the outer wall of the adjusting bolt in a sleeved mode, and clamping blocks are symmetrically and fixedly installed at the side end of the sliding block. Connecting grooves are formed in the side ends of the frame, clamping grooves are symmetrically formed in the side ends of the connecting grooves, inserting rods are fixedly installed around the bottom end of the frame, steel pipes are fixedly installed at the bottom end of the frame, and through holes are formed in the outer walls of the steel pipes in a penetrating mode. According to the vegetation water and soil slope protection blocking net fixing structure, by arranging the inserting rods and the steel pipes, the frames can be firmly installed on the ground conveniently, the slope protection net is prevented from loosening, the stability of the slope protection net is improved, by arranging the connecting blocks and the connecting grooves which are matched with each other, the multiple sets of frames can be assembled together conveniently, and the slope protection net can be replaced subsequently conveniently; and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slope protection and blocking nets, in particular to a vegetation and water soil slope protection and blocking net fixing structure. Background Art

[0002] The slope protection net mainly prevents falling rocks from sliding or controls them within a certain range through the action of the system. It is suitable for high mountains and steep hills with buffer zones next to building facilities. It can intercept rockfalls, flying rocks, avalanches, and mudslides outside building facilities to avoid damage to building facilities caused by disasters.

[0003] Due to long-term use, small-scale ruptures of the existing slope protection nets will lead to large-scale damage, which will weaken the stability of the slope protection nets during use. The speed of replacing the slope protection nets is relatively slow, which increases the labor intensity of operators when disassembling and assembling the slope protection nets. In addition, the existing slope protection nets are prone to falling off after long-term use. When encountering high-intensity pulling, the slope protection nets will become loose, so it is necessary to improve the existing devices to meet actual needs. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the utility model provides a vegetation and soil slope protection net fixing structure, which has the advantages of easy replacement and maintenance and good stability, and solves the above-mentioned technical problems.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a vegetation and soil slope protection net fixing structure, comprising a frame, a protection net is fixedly installed on the inner wall of the frame, a connecting block is installed on the side end of the frame, an adjusting bolt is rotatably installed inside the connecting block, a sliding block is sleeved on the outer wall of the adjusting bolt, a clamping block is symmetrically fixedly installed on the side end of the sliding block, a connecting groove is provided on the side end of the frame, and clamping grooves are symmetrically provided on the side end of the connecting groove, plug rods are fixedly installed around the bottom end of the frame, a steel pipe is fixedly installed on the bottom end of the frame, and a through hole is opened through the outer wall of the steel pipe.

[0008] Preferably, the frames are provided in multiple groups, and the size of each group of frames is the same.

[0009] Through the above technical solution, by setting up multiple groups of frames, it is convenient to separate the entire slope protection net and to replace the slope protection net.

[0010] Preferably, a support plate is installed at the center of the frame, and the support plate is fixedly connected to the frame via a connecting plate.

[0011] Through the above technical solution, a handle is fixedly installed on the top of the support plate, and the single set of frames can be disassembled by pulling the handle.

[0012] Preferably, the connection blocks are provided in four groups, and every two groups are installed at the side ends of the frame, and the connection grooves are provided in four groups, and every two groups are opened at the side ends of the frame.

[0013] Through the above technical solution, the sizes of the connecting blocks and the connecting grooves match, so that multiple groups of frames can be assembled together through the connecting blocks and the connecting grooves.

[0014] Preferably, the outer wall array of the insertion rod is fixedly mounted with barbs.

[0015] Through the above technical solution, by providing the barbs, when the rod is inserted into the ground, the barbs can increase the firmness between the rod and the ground.

[0016] Preferably, the steel pipe and the frame are connected in a through-connection manner, and a grouting hole is reserved at the top of the frame.

[0017] Through the above technical solution, cement slurry is poured into the grouting holes, and the cement slurry penetrates into the ground through the through holes, thereby further increasing the firmness of the device body.

[0018] Compared with the prior art, the utility model provides a vegetation and soil slope protection net fixing structure, which has the following beneficial effects:

[0019] 1. The utility model places a frame on the ground, inserts the rods and steel pipes into the ground, drives the rods and steel pipes firmly into the ground by external force, and then pours cement slurry into the grouting holes, the cement slurry penetrates into the ground through the through holes, and cooperates with the barbs to firmly install the frame on the ground.

[0020] 2. The utility model connects the connecting block at the side end of one group of frames with the connecting groove at the side end of the other group of frames. At this time, the clamping block inside the connecting block corresponds to the clamping groove at the bottom end of the connecting groove. Then, the adjusting bolt is rotated by external force. The adjusting bolt rotates, driving the slider to move upward. The upward movement of the slider drives the clamping block to move upward until the clamping block moves to the top of the clamping groove, thereby connecting the two groups of frames together through the clamping block and the clamping groove. When maintenance and replacement are needed later, the adjusting bolt is rotated to remove the clamping block from the clamping groove, and then the handle is pulled to disassemble the single group of frames. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the fixed structure of the slope protection net of the utility model;

[0022] Figure 2 This is a front view cutaway schematic diagram of the fixed structure of the slope protection net of the utility model;

[0023] Figure 3 It is a side view cutaway schematic diagram of the fixed structure of the slope protection net of the utility model;

[0024] Figure 4 The utility model structure Figure 1 A is a partial enlarged schematic diagram of the middle part.

[0025] Among them: 1. Frame; 2. Guardrail; 3. Connecting block; 4. Adjusting bolt; 5. Slider; 6. Clamping block; 7. Connecting groove; 8. Clamping groove; 9. Insert rod; 10. Steel pipe; 11. Through hole; 12. Support plate; 13. Barb; 14. Grouting hole. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] See also Figure 1-4 A fixed structure of a vegetation and soil slope protection net comprises a frame 1, a protection net 2 is fixedly installed on the inner wall of the frame 1, a connecting block 3 is installed on the side end of the frame 1, an adjusting bolt 4 is rotatably installed inside the connecting block 3, a slider 5 is sleeved on the outer wall of the adjusting bolt 4, a clamping block 6 is symmetrically fixedly installed on the side end of the slider 5, a connecting groove 7 is opened on the side end of the frame 1, and a clamping groove 8 is symmetrically opened on the side end of the connecting groove 7, an insertion rod 9 is fixedly installed around the bottom end of the frame 1, a steel pipe 10 is fixedly installed on the bottom end of the frame 1, and a through hole 11 is opened through the outer wall of the steel pipe 10.

[0028] Specifically, multiple groups of frames 1 are provided, and each group of frames 1 has the same size. The advantage is that by providing multiple groups of frames 1, the entire slope protection net can be easily separated and replaced.

[0029] Specifically, a support plate 12 is installed at the center of the frame 1, and the support plate 12 is fixedly connected to the frame 1 through a connecting plate. The advantage is that a handle is fixedly installed on the top of the support plate 12, and the single group of frames 1 can be disassembled by pulling the handle.

[0030] Specifically, four groups of connecting blocks 3 are provided, and every two groups are installed at the side ends of the frame 1. Four groups of connecting grooves 7 are provided, and every two groups are opened at the side ends of the frame 1. The advantage is that the sizes of the connecting blocks 3 and the connecting grooves 7 match, so that multiple groups of frames 1 can be assembled together through the connecting blocks 3 and the connecting grooves 7.

[0031] Specifically, the outer wall array of the insertion rod 9 is fixedly installed with barbs 13. The advantage is that by providing the barbs 13, the firmness of the insertion rod 9 to the ground can be increased by the barbs 13 when the insertion rod 9 is inserted into the ground.

[0032] Specifically, the steel pipe 10 and the frame 1 are connected in a through connection, and a grouting hole 14 is reserved at the top of the frame 1. The advantage is that by pouring cement slurry into the grouting hole 14, the cement slurry penetrates into the ground through the through hole 11, further increasing the firmness of the device body.

[0033] When in use, the frame 1 is placed on the ground, and the insertion rod 9 and the steel pipe 10 are inserted into the ground, and the insertion rod 9 and the steel pipe 10 are firmly driven into the ground by external force, and then cement slurry is poured into the grouting hole 14, and the cement slurry penetrates into the ground through the through hole 11, and the frame 1 is firmly installed on the ground with the barb 13, and the connecting block 3 at the side end of one group of frames 1 is docked with the connecting groove 7 at the side end of the other group of frames 1. At this time, the block 6 inside the connecting block 3 corresponds to the groove 8 at the bottom of the connecting groove 7, and then the adjusting bolt 4 is rotated by external force, and the adjusting bolt 4 rotates to drive the slider 5 to move upward, and the slider 5 moves upward to drive the block 6 to move upward until the block 6 moves to the top of the groove 8, so that the two groups of frames 1 are connected together by the block 6 and the groove 8. When maintenance and replacement are needed later, the adjusting bolt 4 is rotated to remove the block 6 from the groove 8, and then the handle is pulled to disassemble the single group of frames 1.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A vegetation and soil slope protection net fixing structure, comprising a frame (1), characterized in that: A guardrail net (2) is fixedly installed on the inner wall of the frame (1), a connecting block (3) is installed on the side end of the frame (1), an adjusting bolt (4) is rotatably installed inside the connecting block (3), a sliding block (5) is sleeved on the outer wall of the adjusting bolt (4), a clamping block (6) is symmetrically fixedly installed on the side end of the sliding block (5), a connecting groove (7) is provided on the side end of the frame (1), and a clamping groove (8) is symmetrically provided on the side end of the connecting groove (7), an insertion rod (9) is fixedly installed around the bottom end of the frame (1), a steel pipe (10) is fixedly installed on the bottom end of the frame (1), and a through hole (11) is provided through the outer wall of the steel pipe (10).

2. The vegetation and soil slope protection net fixing structure according to claim 1 is characterized by: The frames (1) are arranged in multiple groups, and the frames (1) in each group have the same size.

3. The vegetation and soil slope protection net fixing structure according to claim 1 is characterized by: A support plate (12) is installed at the center of the frame (1), and the support plate (12) is fixedly connected to the frame (1) via a connecting plate.

4. The vegetation and soil slope protection net fixing structure according to claim 1 is characterized by: The connection blocks (3) are provided in four groups, and every two groups are installed on the side ends of the frame (1); the connection grooves (7) are provided in four groups, and every two groups are opened on the side ends of the frame (1).

5. The vegetation and soil slope protection net fixing structure according to claim 1 is characterized by: The outer wall array of the insertion rod (9) is fixedly mounted with barbs (13).

6. The vegetation and soil slope protection net fixing structure according to claim 1 is characterized by: The steel pipe (10) and the frame (1) are connected in a through manner, and a grouting hole (14) is reserved at the top of the frame (1).