Auxiliary operation trolley for vertical arch frame for tunnel excavation
By designing a tunnel excavation arch auxiliary operation trolley with autonomous walking and power assistance, the problems of high labor intensity and low efficiency of the existing neutral arch trolley are solved, and the arch pre-assembly and arch operation can be carried out simultaneously and efficiently. , improving the construction efficiency of tunnels and water diversion tunnels.
Patent Information
- Application Number
- CN202323428225.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-15
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-15
AI Technical Summary
In the construction of existing tunnels and diversion tunnels, the arch erection trolley lacks power auxiliary equipment, resulting in high labor intensity, high degree of danger, large number of construction workers, inability to synchronize arch pre-assembly and arch erection operations, and low efficiency.
A tunnel excavation arch auxiliary operation trolley is designed. It is equipped with a crawler trolley, translation support legs, hoist, lift, assembly platform transfer trolley and arch platform transfer trolley. It has the functions of autonomous walking and central position adjustment, and provides multiple functions. The multi-layer working platform and power assistance realize the automation and synchronization of arch pre-assembly and arch erection operations.
It reduces the labor intensity of construction personnel, improves the efficiency of arch pre-assembly and arch operations, solves the problems of large number of personnel and difficulty in simultaneous execution in the existing technology, and improves the construction level.
Smart Images

Figure CN221856754U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of equipment for tunnel and water diversion tunnel construction, in particular to a tunnel excavation arch frame auxiliary operation trolley. Background Art
[0002] At present, in China, excavation platforms and arch frame trolleys are used in tunnel and water diversion tunnel construction excavation and arch erection operations. The excavation platform does not have the ability to move and translate by itself, and the arch frame trolley does not have power auxiliary equipment. Therefore, the excavation platform and arch frame trolley only provide a climbing work platform for tunnel and water diversion tunnel excavation and arch erection operations. When excavating tunnels, the excavation trolley needs to be pushed into place by a loader, so the movement and centering position adjustment of the excavation trolley are very inconvenient; in addition, since the arch frame trolley does not have other power auxiliary equipment, during the pre-assembly and arch erection of the arch frame, manpower is required to move, erect and lift the arch frame through simple auxiliary tools, resulting in high labor intensity, high risk, large number of construction personnel, arch frame pre-assembly and arch erection operations cannot be carried out simultaneously, and arch erection efficiency is low. Many problems have become bottleneck processes in tunnel and water diversion tunnel construction. Therefore, it is urgent to redefine and design the functions of the existing arch frame trolley to completely solve the above problems. Utility Model Content
[0003] In order to overcome the shortcomings of the background technology, the utility model discloses a tunnel excavation arch frame auxiliary operation trolley, including a trolley frame assembly, a primary working platform, a secondary working platform, a tertiary working platform, a hoist, an elevator, an assembly platform transfer trolley, an assembly platform temporary storage frame assembly, and an arch platform transfer trolley; a crawler trolley and a translation support foot assembly are arranged at the bottom of the trolley frame assembly, and have the functions of autonomous walking and centering position adjustment; the primary working platform, the secondary working platform and the tertiary working platform provide a three-dimensional working platform for construction personnel; the hoist and the elevator are for arch frame pre- The trolley is used for arch frame assembly and arch erection operations in tunnel construction. It can provide auxiliary power for arch frame assembly; the combination of the assembly platform transfer trolley and the assembly platform temporary storage frame provides transfer power and temporary storage space for the pre-assembled arch frame; the arch erection platform transfer trolley provides transfer and lifting power for arch erection operations; since the tunnel excavation arch erection auxiliary operation trolley has redefined and designed its functions, when it is used for arch frame assembly and arch erection operations in tunnel construction, it completely solves many problems existing in the existing arch erection operations, such as high labor intensity, high degree of danger, large number of construction personnel occupied, inability to carry out arch frame pre-assembly and arch erection operations simultaneously, and low arch erection efficiency.
[0004] In order to achieve the purpose of the utility model, the utility model adopts the following technical scheme: a tunnel excavation arch frame auxiliary operation trolley, which is used for arch frame assembly and arch erection operation in tunnel construction, and the arch frame is spliced by a central arch frame, a side arch frame, and a foot arch frame; the tunnel excavation arch frame auxiliary operation trolley includes a trolley frame assembly, a first-level working platform, a second-level working platform, a third-level working platform, a hoist, an elevator, an assembly platform transfer trolley, an assembly platform temporary storage frame assembly, and an arch platform transfer trolley;
[0005] The first-level working platform and the second-level working platform are separately fixed on the front and rear sides of the trolley frame assembly, and the third-level working platform is fixed on the top of the trolley frame assembly; the above-mentioned working platforms are used to carry construction personnel to assemble the arch frame and erect the arch, and the first-level working platform and the second-level working platform also assist in tightening the arch frame against the tunnel wall during the arch erection operation;
[0006] The hoist is arranged on the front and rear sides of the right end of the three-level working platform, and the elevator is arranged on both sides of the right end of the trolley frame combination, which is located on the inner side of the hoist. The hoist and the elevator work together to provide auxiliary lifting power for the assembly of the center arch frame and the side arch frame, thereby reducing the labor intensity of the on-site construction personnel; the elevator is used to lift the center arch frame, and the hoist is used to lift the side arch frame. The elevator is also provided with a locking mechanism driven by a hydraulic cylinder. When the elevator lifts the center arch frame into place, the center arch frame is locked by the locking mechanism to prevent displacement during the assembly process; the hoist lifts the side arch frame by a wire rope or a fiber belt sling. When the side arch frame is lifted into place, the construction personnel assist in aligning the connecting flanges of the side arch frame and the center arch frame on the three-level working platform, and then use bolts and nuts to fix the side arch frame and the center arch frame together to form an assembled arch frame. When the assembly of the side arch frame and the center arch frame is completed, the locking mechanism of the center arch frame is released;
[0007] The temporary storage rack combination of the assembly platform is arranged on the front and rear sides of the middle right side of the three-level working platform for temporarily storing the assembled arch frames. Three arch frame support seats are arranged on the temporary storage rack combination of the assembly platform, and up to three assembled arch frames can be temporarily stored. The temporary storage rack combination of the assembly platform has a lifting function;
[0008] The assembly platform transfer trolley is arranged on the three-level working platform and can automatically move left and right along the track on the top of the trolley frame assembly driven by the sprocket chain drive mechanism to automatically transfer the assembled arch frame to the assembly platform temporary storage frame assembly, thereby reducing the labor intensity of the construction workers;
[0009] The arch erecting platform transfer trolley shares the same track with the assembly platform transfer trolley and is movably set on the three-level working platform. It is used to transfer the assembled arch frame temporarily stored on the temporary storage rack combination of the assembly platform to the left side of the three-level working platform. The arch erecting platform transfer trolley has a hydraulic cylinder-driven lifting function, which can automatically lift the assembled arch frame to complete the arch erecting operation, thereby reducing the labor intensity of construction workers.
[0010] Furthermore, the trolley frame assembly includes a trolley frame, a crawler trolley, a translation support foot assembly, and a rail; the trolley frame is composed of a fixed connection of steel sections to form a door frame-like channel structure; four crawler trolleys and four translation support foot assemblies are respectively provided, which are arranged at the lower end of the bottom cross beam on both sides of the door frame-like channel, and the crawler trolley is arranged on the inner side of the translation support foot assembly; the crawler trolley is driven by a hydraulic motor, and when the four crawler trolleys move synchronously, the trolley used for tunnel excavation and arch frame auxiliary operation moves in a straight line; when the front and rear crawler trolleys move asynchronously, Used for steering the tunnel excavation arch frame auxiliary operation trolley; the translation support foot combination has a hydraulically driven lifting function and a translation function. When the translation support foot is lowered, the four crawler trolleys are off the ground, and the tunnel excavation arch frame auxiliary operation trolley is supported by the translation support foot. The trolley frame is driven by the translation hydraulic system to make a lateral translation, so that the tunnel excavation arch frame auxiliary operation trolley is in the center position in the tunnel; the steel rail is fixed on the top of the trolley frame combination, which is used to support the arch platform transfer trolley and the assembly platform transfer trolley for horizontal movement.
[0011] Furthermore, the first-level working platform includes a first-level fixed working platform and a first-level telescopic working platform. The first-level telescopic working platform is movably arranged at the lower side of the first-level fixed working platform and is driven by a hydraulic cylinder to perform automatic telescopic movement. The structural design of the first-level fixed working platform and the first-level telescopic working platform has the following three purposes: First, when the first-level telescopic working platform is retracted, the overall width of the tunnel excavation arch frame auxiliary operation trolley is reduced, so that the tunnel excavation arch frame auxiliary operation trolley can avoid interference with the tunnel side wall when entering and exiting the tunnel; second, when the first-level telescopic working platform is extended, the construction personnel standing on the first-level working platform are close to the arch operation surface, which is convenient for the arch operation; third, when performing the arch operation, the first-level telescopic working platform is extended from the front and rear sides of the tunnel excavation arch frame auxiliary operation trolley, and the foot arch frame is pressed against the tunnel wall to assist the arch operation and reduce the labor intensity of the construction personnel.
[0012] Furthermore, an electric hoist is movably arranged at the lower part of the first-level fixed working platform. The electric hoist moves along the side of the tunnel excavation arch frame auxiliary work trolley through a track arranged at the lower part of the first-level fixed working platform. The movement of the electric hoist is driven by a sprocket chain to move the foot arch frame to the arch operation site, thereby reducing the labor intensity of construction workers.
[0013] Furthermore, the secondary working platform includes a secondary fixed working platform and a secondary telescopic working platform. The secondary telescopic working platform is movably arranged on the lower side of the secondary fixed working platform and is driven by a hydraulic cylinder to perform automatic telescopic movement. The telescopic structure design of the secondary working platform has the same purpose as that of the primary working platform: to prevent the tunnel excavation arch frame auxiliary operation trolley from interfering with the tunnel side wall when entering or exiting the tunnel, so that the construction personnel standing on the secondary working platform can approach the arch erection working surface and facilitate the arch erection operation. When performing the arch erection operation, the secondary telescopic working platform extends from the front and rear sides of the tunnel excavation arch frame auxiliary operation trolley, and the side arch frame is pressed against the tunnel wall to assist the arch erection operation and reduce the labor intensity of the construction personnel.
[0014] Furthermore, the three-level working platform includes an assembly platform and an arch erecting platform. The assembly platform and the arch erecting platform are composed of a frame structure formed by welding steel sections, and a steel plate is fixed on the upper part. The assembly platform and the arch erecting platform are divided into several parts and fixed on the top of the trolley frame. The assembly platform is located on the right side of the trolley frame, and the arch erecting platform is located on the left side of the trolley frame. A step is provided in the middle of the arch erecting platform for construction workers to climb up when erecting the arch.
[0015] Furthermore, the hoist includes a hoist base, a winch, and a boom; the hoist base is fixedly arranged on the upper front and rear sides of the right end of the assembly platform; the winch is fixedly arranged on the upper part of the hoist base, a steel wire rope is arranged on the winch, and the boom is fixedly arranged on the right end surface of the hoist base; a pulley is rotatably arranged at the end of the boom.
[0016] Furthermore, the elevator includes a lifting guide rail, an elevator lifting frame, and a lifting guide rail fixing seat; the lifting guide rail is an I-beam, which is fixed on the front and rear sides of the right end of the trolley frame through the lifting guide rail fixing seat, and the elevator lifting frame is movably connected to the lifting guide rail through a rotating wheel, and the elevator lifting frame is driven by a sprocket chain mechanism to move up and down; a locking mechanism driven by a hydraulic cylinder is provided on the elevator lifting frame, and when the center arch frame is set on the elevator lifting frame, its position is locked by the locking mechanism to prevent its position from changing when assembling the side arch frames.
[0017] Furthermore, the assembly platform transfer trolley includes an assembly platform transfer trolley cross beam; a group of assembly platform transfer trolley running wheels are arranged at the lower part of the front and rear ends of the assembly platform transfer trolley cross beam, and an assembly platform transfer trolley column is fixedly arranged on the upper part, and an assembly platform transfer trolley cantilever beam is cantilevered on the top of the assembly platform transfer trolley column, and an arch frame transfer seat is fixedly arranged on the upper side of the root of the assembly platform transfer trolley cantilever beam; the assembly platform transfer trolley is movably arranged on the rails through the assembly platform transfer trolley running wheels, and is driven by a sprocket chain to move along the rails to transfer the assembled arch frame to the assembly platform temporary storage frame combination, or to adjust the position of the assembled arch frame temporarily stored on the assembly platform temporary storage frame combination; when the assembly platform transfer trolley transfers the assembled arch frame to the assembly platform temporary storage frame combination, it is done through the assembly platform transfer trolley cantilever beam, and when the assembled arch frame temporarily stored on the assembly platform temporary storage frame combination needs to be adjusted, it is done through the arch frame transfer seat.
[0018] Furthermore, the temporary storage rack assembly of the assembly platform includes a lifting guide sleeve and a temporary storage rack lifting frame; the lifting guide sleeve is fixedly arranged on the front and rear sides of the upper part of the trolley frame assembly; the temporary storage rack lifting frame includes a lifting frame guide column and a lifting frame crossbeam, the lifting frame crossbeam is fixedly arranged on the top of the lifting frame guide column, the lifting frame guide column is movably arranged in the lifting guide sleeve, and a hydraulic cylinder is arranged between the lifting frame guide column and the lifting guide sleeve, and the hydraulic cylinder drives the temporary storage rack lifting frame to move up and down; three arch frame support seats are fixedly arranged on the upper part of the lifting frame crossbeam, and three assembled arch frames can be temporarily stored at the same time;
[0019] The arch frame support seat includes a support block, a limit baffle, a positioning cylinder, and a positioning push plate. The limit baffles are fixedly arranged at both ends of the support block, the positioning cylinder is fixedly arranged on the outside of the limit baffle at one end, and the positioning push plate is arranged on the inside of the limit baffle and is fixedly connected to the end of the driving shaft of the positioning cylinder; when the assembled arch frame is placed on the arch frame support seat, the positioning cylinder drives the positioning push plate to move, and the assembled arch frame is accurately positioned under the action of the limit baffle and the positioning push plate on one side.
[0020] Furthermore, the vertical arch platform transfer trolley includes a vertical arch platform transfer trolley frame and a vertical arch platform transfer trolley lifting frame. The vertical arch platform transfer trolley frame includes a vertical arch platform transfer trolley cross beam, and a vertical arch platform transfer trolley lifting guide sleeve fixedly arranged at both ends of the vertical arch platform transfer trolley cross beam, and the vertical arch platform transfer trolley lifting guide sleeve has a vertical arch platform transfer trolley walking wheel rotatably arranged at the lower end; the vertical arch platform transfer trolley lifting frame includes a vertical arch platform transfer trolley lifting frame guide column, a vertical arch platform transfer trolley lifting frame cross beam, and a vertical arch platform transfer trolley lifting frame guide column. The cross beam of the platform transfer trolley lifting frame is fixedly set on the upper end of the guide column of the lifting frame of the arch platform transfer trolley, and an arch frame support seat is fixedly set on the upper part of the cross beam of the lifting frame of the arch platform transfer trolley; the guide column of the lifting frame of the arch platform transfer trolley is movably set in the lifting guide sleeve of the arch platform transfer trolley; the arch platform transfer trolley is movably set on the steel rail through the walking wheel of the arch platform transfer trolley, and moves along the steel rail through the sprocket chain drive to transfer the assembled arch frame temporarily stored on the temporary storage frame combination of the assembly platform to the arch platform for arch erecting operation.
[0021] Due to the adoption of the technical scheme as described above, the utility model has the following beneficial effects: the utility model discloses a tunnel excavation arch frame auxiliary operation trolley, including a trolley frame assembly, a primary working platform, a secondary working platform, a tertiary working platform, a hoist, an elevator, an assembly platform transfer trolley, an assembly platform temporary storage frame assembly, and an arch platform transfer trolley; a crawler trolley and a translation support foot assembly are arranged at the bottom of the trolley frame assembly, and the trolley frame assembly has the functions of autonomous walking and centering position adjustment; the primary working platform, the secondary working platform and the tertiary working platform provide a three-dimensional working platform for construction personnel, which is convenient for arch frame assembly and arch erection operations; the hoist and The elevator provides auxiliary power for arch frame pre-assembly; the assembly platform transfer trolley and the assembly platform temporary storage frame combination provide transfer power and temporary storage space for the pre-assembled arch frame; the arch erection platform transfer trolley provides transfer and lifting power for arch erection operations; the tunnel excavation arch erection auxiliary operation trolley redefines and designs its functions, so that when it is used for arch frame assembly and arch erection operations in tunnel construction, it completely solves the many problems existing in the existing arch erection operations, such as high labor intensity, high degree of danger, large number of construction personnel occupied, inability to carry out arch frame pre-assembly and arch erection operations simultaneously, and low arch erection efficiency, thereby greatly improving the construction level of tunnels and water diversion tunnels. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the appearance of the tunnel excavation arch frame auxiliary operation trolley;
[0023] Figure 2 Front view of the trolley for auxiliary work of erecting arch frame for tunnel excavation;
[0024] Figure 3 This is a schematic diagram of the appearance of the trolley frame assembly;
[0025] Figure 4It is a schematic diagram of the cross-sectional structure of the translation support leg assembly;
[0026] Figure 5 This is the appearance of the first-level working platform Figure 1 ;
[0027] Figure 6 This is the appearance of the first-level working platform Figure 2 ;
[0028] Figure 7 The appearance of the secondary working platform Figure 1 ;
[0029] Figure 8 The appearance of the secondary working platform Figure 2 ;
[0030] Fig. 9 This is a schematic diagram of the appearance of the three-level working platform;
[0031] Fig.10 This is a schematic diagram of the appearance of the elevator;
[0032] Fig.11 This is a schematic diagram of the appearance of the elevator;
[0033] Fig.12 This is a schematic diagram of the appearance of the assembly platform transfer vehicle;
[0034] Fig.13 This is a schematic diagram of the appearance of the assembly platform temporary storage rack combination;
[0035] Fig.14 This is a schematic diagram of the appearance of the lifting frame;
[0036] Fig.15 This is a schematic diagram of the appearance of the arch support seat;
[0037] Fig.16 This is a schematic diagram of the appearance of the arch platform transfer trolley;
[0038] Fig.17 This is a schematic diagram of the appearance of the vertical arch platform transfer trolley frame;
[0039] Fig.18 This is a schematic diagram of the appearance of the lifting frame of the arch platform transfer trolley;
[0040] Fig.19 Schematic diagram of the working status of the tunnel excavation arch frame auxiliary operation trolley.
[0041] In the figure: 1. Trolley frame assembly; 1.1. Trolley frame; 1.1.1. Trolley column; 1.2. Crawler trolley; 1.3. Translation support foot assembly; 1.3.1. Support foot; 1.3.2. Translation cylinder; 1.3.3. Translation seat; 1.3.4. Lifting leg; 1.4. Lifting cylinder; 2. First-level working platform; 2.1. First-level fixed working platform; 2.2. First-level telescopic working platform; 2.3. Electric hoist; 3. Second-level working platform; 3. 1. Secondary fixed working platform; 3.2. Secondary telescopic working platform; 4. Third-level working platform; 4.1. Assembly platform; 4.2. Arch platform; 5. Rails; 6. Hoist; 6.1. Hoist base; 6.2. Winch; 6.3. Boom; 7. Lift; 7.1. Lifting rail; 7.2. Lifting frame; 7.3. Lifting rail fixing seat; 7.4. Locking block; 8. Assembly platform transfer trolley; 8.1. Assembly platform transfer trolley crossbeam; 8.2, assembly platform transfer trolley walking wheel; 8.3, assembly platform transfer trolley column; 8.4, assembly platform transfer trolley cantilever beam; 8.5, arch frame transfer seat; 9, assembly platform temporary storage rack combination; 9.1, lifting guide sleeve; 9.2, temporary storage rack lifting rack; 9.2.1, lifting rack guide column; 9.2.2, lifting rack crossbeam; 9.3, arch frame support seat; 9.3.1, support block; 9.3.2, limit baffle; 9.3.3, positioning cylinder; 9.3 .4. Positioning push plate; 10. Vertical arch platform transfer trolley; 10.1. Vertical arch platform transfer trolley frame; 10.1.1. Vertical arch platform transfer trolley crossbeam; 10.1.2. Vertical arch platform transfer trolley lifting guide sleeve; 10.1.3. Vertical arch platform transfer trolley walking wheel; 10.2. Vertical arch platform transfer trolley lifting frame; 10.2.1. Vertical arch platform transfer trolley lifting frame guide column; 10.2.2. Vertical arch platform transfer trolley lifting frame crossbeam; 11. Arch frame. DETAILED DESCRIPTION
[0042] The present invention can be explained in detail through the following embodiments. The purpose of disclosing the present invention is to protect all technical improvements within the scope of the present invention.
[0043] A tunnel excavation arch frame auxiliary operation trolley is used for assembling and erecting an arch frame 11 in tunnel construction. The arch frame 11 is composed of a central arch frame, a side arch frame, and a foot arch frame. Figure 1 , 2 :The tunnel excavation arch frame auxiliary operation trolley includes a trolley frame assembly 1, a primary working platform 2, a secondary working platform 3, a tertiary working platform 4, rails 5, a hoist 6, a lift 7, an assembly platform transfer trolley 8, an assembly platform temporary storage frame assembly 9, and an arch platform transfer trolley 10;
[0044] See the instruction manual Figure 3:The trolley frame assembly 1 includes a trolley frame 1.1, a crawler trolley 1.2, a translation support leg assembly 1.3, and a rail 5; the trolley frame 1.1 is composed of I-beams and square steels connected by flanges with bolts and nuts to form a door frame-like channel structure; the crossbeams at the bottom of both sides of the door frame-like channel are I-beams, and the trolley columns 1.1.1 at the left and right ends of the door frame-like channel are hollow square steels; the crawler trolley 1.2 is fixedly arranged at the lower end of the crossbeams at the bottom of both sides of the door frame-like channel, and the crawler trolley 1.2 is driven by a motor to move; the translation support leg assembly 1.3 is movably arranged at the lower end of the trolley column 1.1.1, see the attached manual Figure 4 : The translation support foot assembly 1.3 includes a support foot 1.3.1, a translation cylinder 1.3.2, a translation seat 1.3.3, and a lifting leg 1.3.4. The translation seat 1.3.3 is movably arranged on the upper part of the support foot 1.3.1. The support foot 1.3.1 and the translation seat 1.3.3 are connected by the translation cylinder 1.3.2. The two ends of the translation cylinder 1.3.2 are respectively hingedly connected to the support foot 1.3.1 and the translation seat 1.3.3; the lifting leg 1.3.4 is hingedly arranged on the upper part of the translation seat 1.3.3 , inserted into the inner hole of the trolley column 1.1.1, the lifting leg 1.3.4 is connected to the translation seat 1.3.3 through the lifting cylinder 1.4, and the two ends of the lifting cylinder 1.4 are respectively hingedly connected to the lifting leg 1.3.4 and the translation seat 1.3.3; the crawler trolley 1.2 is used for the straight walking and steering of the tunnel excavation arch frame auxiliary operation trolley, and the translation support leg assembly 1.3 is used for the lateral translation of the tunnel excavation arch frame auxiliary operation trolley; the rail 5 is fixedly arranged on the top of the trolley frame assembly 1;
[0045] See the instruction manual Figure 5 , 6 : The first-level working platform 2 includes a first-level fixed working platform 2.1 and a first-level telescopic working platform 2.2. A slideway is fixedly arranged at the lower part of the first-level fixed working platform 2.1. The first-level telescopic working platform 2.2 is arranged at the lower side of the first-level fixed working platform 2.1 through the slideway, and is driven by a hydraulic cylinder to telescope along the slideway; a slide rail is fixedly arranged near the inner side of the lower part of the first-level fixed working platform 2.1, and the slide rail is parallel to the side of the tunnel excavation arch frame auxiliary operation trolley. An electric hoist 2.3 is arranged through the slide rail, and the electric hoist 2.3 moves along the slide rail;
[0046] See the instruction manual Figure 7 , 8 : The secondary working platform 3 includes a secondary fixed working platform 3.1 and a secondary telescopic working platform 3.2. A slideway is fixedly arranged at the lower part of the secondary fixed working platform 3.1. The secondary telescopic working platform 3.2 is arranged at the lower side of the secondary fixed working platform 3.1 through the slideway and is driven by a hydraulic cylinder to telescopically move along the slideway;
[0047] See the instruction manual Fig. 9: The three-level working platform 4 includes an assembly platform 4.1 and an arch platform 4.2;
[0048] The first-level working platform 2 and the second-level working platform 3 are fixedly arranged on the front and rear sides of the trolley frame assembly 1 separately, and the first-level working platform 2 and the second-level working platform 3 are connected up and down by an iron ladder; the third-level working platform 4 is fixedly arranged on the top of the trolley frame assembly 1, the assembly platform 4.1 is located on the right side of the trolley frame 1.1, the arch platform 4.2 is located on the left side of the trolley frame 1.1, and a step is provided in the middle of the arch platform 4.2;
[0049] See the instruction manual Fig.10 :The hoist 6 includes a hoist base 6.1, a winch 6.2, and a boom 6.3; the hoist base 6.1 is fixedly arranged on the upper front and rear sides of the right end of the assembly platform 4.1; the winch 6.2 is fixedly arranged on the upper part of the hoist base 6.1, the boom 6.3 is fixedly arranged on the right end surface of the hoist base 6.1, and a pulley is rotatably arranged at the end of the boom 6.3; the hoist 6 is arranged on the upper front and rear sides of the right side of the three-level working platform 4;
[0050] See the instruction manual Fig.11 :The elevator 7 includes a lifting rail 7.1, an elevator lifting frame 7.2, and a lifting rail fixing seat 7.3; the lifting rail 7.1 is an I-beam, which is fixedly arranged on the front and rear sides of the right end of the trolley frame 1.1 through the lifting rail fixing seat 7.3; the elevator lifting frame 7.2 is movably connected with the lifting rail 7.1 through a rotating wheel, and is driven by a sprocket chain to move up and down along the lifting rail 7.1; a locking block 7.4 driven by a hydraulic cylinder is also arranged on the elevator lifting frame 7.2; the elevator 7 is arranged on both sides of the right end of the trolley frame assembly 1, and is located on the inner side of the hoist 6; the elevator 7 is used to lift the central arch frame, and the hoist 6 is used to lift the side arch frame. The construction personnel complete the assembly of the central arch frame and the side arch frame at the right end of the three-level working platform 4;
[0051] See the instruction manual Fig.12 :The assembly platform transfer trolley 8 includes an assembly platform transfer trolley cross beam 8.1; a group of assembly platform transfer trolley running wheels 8.2 are arranged at the lower part of the front and rear ends of the assembly platform transfer trolley cross beam 8.1, and an assembly platform transfer trolley column 8.3 is fixedly arranged at the upper part of the front and rear ends of the fixed assembly platform transfer trolley cross beam 8.1, and an assembly platform transfer trolley cantilever beam 8.4 is cantilevered at the top of the assembly platform transfer trolley column 8.3, and an arch frame transfer seat 8.5 is fixedly arranged on the upper side of the root of the assembly platform transfer trolley cantilever beam 8.4; the assembly platform transfer trolley 8 is movably arranged on the rail 5 through the assembly platform transfer trolley running wheels 8.2, and is driven by a sprocket chain to move horizontally along the rail 5;
[0052] See the instruction manual Fig.13 , 1415: The temporary storage rack assembly 9 of the assembly platform includes a lifting guide sleeve 9.1 and a temporary storage rack lifting frame 9.2; the lifting guide sleeve 9.1 is fixedly arranged on the front and rear sides of the upper part of the trolley frame assembly 1; the temporary storage rack lifting frame 9.2 includes a lifting frame guide column 9.2.1 and a lifting frame cross beam 9.2.2; the lifting frame cross beam 9.2.2 is fixedly arranged on the top of the lifting frame guide column 9.2.1; the lifting frame guide column 9.2.1 is movably arranged in the lifting guide sleeve 9.1 and driven by a hydraulic cylinder to perform lifting movement; three arch frame support seats 9.3 are fixedly arranged on the upper part of the lifting frame cross beam 9.2.2; the arch frame The support seat 9.3 includes a support block 9.3.1, a limit baffle 9.3.2, a positioning cylinder 9.3.3, and a positioning push plate 9.3.4. The limit baffle 9.3.2 is fixedly arranged at both ends of the support block 9.3.1, the positioning cylinder 9.3.3 is fixedly arranged on the outer side of the limit baffle 9.3.2 at one end, and the positioning push plate 9.3.4 is arranged on the inner side of the limit baffle 9.3.2 and fixedly connected to the end of the driving shaft of the positioning cylinder 9.3.3; the assembly platform temporary storage rack combination 9 is fixedly arranged on the front and rear sides of the middle of the right side of the three-level working platform 4, and is used for temporarily storing the assembled arch frame;
[0053] See the instruction manual Fig.16 , 17 18: The arch platform transfer trolley 10 includes an arch platform transfer trolley frame 10.1 and an arch platform transfer trolley lifting frame 10.2. The arch platform transfer trolley frame 10.1 includes an arch platform transfer trolley cross beam 10.1.1 and an arch platform transfer trolley lifting guide sleeve 10.1.2 fixedly arranged at both ends of the arch platform transfer trolley cross beam 10.1.1. The lower end of the arch platform transfer trolley lifting guide sleeve 10.1.2 is rotatably provided with an arch platform transfer trolley running wheel 10.1.3; the arch platform transfer trolley lifting frame 10.2 includes an arch platform transfer trolley lifting frame guide column 10.2.1 and an arch platform transfer trolley lifting frame cross beam 10.2. 2. The cross beam 10.2.2 of the lifting frame of the arch platform transfer trolley is fixedly arranged on the upper end of the guide column 10.2.1 of the lifting frame of the arch platform transfer trolley, and the upper part of the cross beam 10.2.2 of the lifting frame of the arch platform transfer trolley is fixedly arranged with an arch frame support seat 9.3; the guide column 10.2.1 of the lifting frame of the arch platform transfer trolley is movably arranged in the lifting guide sleeve 10.1.2 of the arch platform transfer trolley, and is driven by a hydraulic cylinder to perform lifting movement; the arch platform transfer trolley 10 is movably arranged on the steel rail 5 through the walking wheel 10.1.3 of the arch platform transfer trolley, and is driven by a sprocket chain to perform horizontal movement along the steel rail 5; the arch platform transfer trolley 10 and the assembly platform transfer trolley 8 are arranged on the same track.
[0054] When the tunnel excavation arch erection frame auxiliary operation trolley is used for arch erection operation, the operation process includes two processes of tunnel excavation and tunnel arch erection in alternating cycles; the tunnel arch erection includes two processes of arch frame pre-assembly and arch erection carried out simultaneously; see the attached manual for details. Fig.19:
[0055] The tunnel excavation process is as follows:
[0056] S11, trolley in place: The integrated trolley for tunnel excavation and arch support is located in the center of the tunnel, close to the blasting operation surface;
[0057] S12, manual drilling: construction workers work on the primary working platform 2, the secondary working platform 3, the tertiary working platform 4, and in the passage below the trolley frame assembly 1 to perform manual drilling;
[0058] S13, charging: construction workers work on the primary working platform 2, the secondary working platform 3, the tertiary working platform 4, and in the passage below the trolley frame assembly 1, and load explosives into the blasting holes drilled by manual drilling operations;
[0059] S14, trolley withdrawal: The tunnel excavation arch frame integrated trolley drives out of the blasting operation surface through the crawler trolley 1.2, and is at least 30 meters away from the blasting operation surface;
[0060] S15, Blasting: After the tunnel excavation arch frame integrated trolley exits the blasting operation surface, blasting operation is carried out;
[0061] S16, troubleshooting and slag removal: After the blasting operation is completed, the construction personnel enter the blasting operation surface to complete the knocking and top-checking, and slag removal operations; during the slag removal operation, the slag removal vehicle enters and exits the blasting operation surface through the passage at the bottom of the trolley frame assembly 1;
[0062] Arch frame pre-assembly and arch erection are carried out simultaneously; arch frame pre-assembly is completed on assembly platform 4.1 and primary working platform 2; arch erection is completed on arch erection platform 4.2, primary working platform 2 and secondary working platform 3;
[0063] The arch pre-assembly process is as follows:
[0064] S21, the trolley is in place again: when the blasting operation surface completes the on-site knocking and top-asking and slag-discharging operations, the tunnel excavation arch frame integrated trolley drives into the arch operation surface through the crawler trolley 1.2, the translation support foot assembly 1.3 falls, so that the crawler trolley 1.2 leaves the ground, and the translation cylinder drives the trolley frame assembly 1 to translate as a whole, and adjusts the central position of the tunnel excavation arch frame integrated trolley in the tunnel; then, by adjusting the falling height of the four translation support foot assemblies 1.3, the overall height of the tunnel excavation arch frame integrated trolley is adjusted; and then, by fine-tuning the falling height of the four translation support foot assemblies 1.3 respectively, the overall horizontality of the tunnel excavation arch frame integrated trolley is adjusted;
[0065] S22, assembling the arch frame: the central arch frame is supported by the lifting frame 7.2 of the lift 7, lifted to the set height and locked to keep it stationary, the side arch frame is lifted to the set height by the lift 6 through the sling, the connecting flanges of the central arch frame and the side arch frame are aligned and fixedly connected by bolts;
[0066] S23, transporting the assembled arch frame one by one to the assembly platform for temporary storage: the transport trolley 8 moves horizontally to the bottom of the assembled arch frame 11, and the central arch frame lock is released; the hoist of the hoist 6 and the lifting frame 7.2 of the elevator 7 fall at the same time, and the assembled arch frame 11 falls on the transport trolley beam 8.4 of the transport trolley 8; the transport trolley 8 moves horizontally to transport the assembled arch frame 11 to the top of one of the arch frame support seats 9.3 of the lifting assembly rack 9; the temporary storage rack lifting frame 9.2 rises to make the assembled arch frame 11 The arch frame 11 is transferred from the transfer trolley beam 8.4 of the transfer trolley 8 to the arch frame support seat 9.3 of the lifting assembly frame 9, the transfer trolley 8 is translated back to its original position, the arch frame support seat 9.3 of the lifting assembly frame 9 is lowered, the assembled arch frame 11 is temporarily stored on the arch frame support seat 9.3 of the lifting assembly frame 9, and the positioning cylinder 9.3.3 of the arch frame support seat 9.3 drives the positioning push plate 9.3.4 to move, so that the assembled arch frame 11 is positioned on the arch frame support seat 9.3;
[0067] S24, welding of steel mesh of multiple assembled arch frames: after three assembled arch frames are positioned on the lifting assembly frame 9, steel mesh is welded between the three assembled arch frames;
[0068] S25, transfer to the arch trolley: after the three assembled arch frames are welded with the steel mesh, the lifting assembly frame 9 lifts the three arch frames to the set height through the temporary storage frame lifting frame 9.2, the arch trolley 10 moves horizontally to the bottom of the three arch frames, the temporary storage frame lifting frame 9.2 falls, and the three arch frames fall on the arch frame support seat 9.3 of the arch trolley 10, and are positioned by the positioning push plate 9.3.4 of the arch frame support seat 9.3; the arch trolley 10 moves horizontally to transfer the three arch frames to the arch platform 4.2; when the previous three arch frames are transferred to the arch platform 4.2, the assembly platform 4.1 continues to pre-assemble the next arch frame;
[0069] The arch erection process is as follows:
[0070] S26, arch erection trolley raises the arch: the arch erection trolley lifting frame 10.2 rises, lifts the three arch frames to a height close to the arch erection height, and adjusts the arch erection trolley 10 forward and backward to make the three arch frames complete the arch erection alignment; the arch erection trolley lifting frame 10.2 continues to rise, so that the central arch frame of the three arch frames is pressed tightly against the top of the tunnel wall;
[0071] S27, hoisting the foot arch frame with electric hoist: the electric hoist 2.3 moves along the side of the tunnel excavation arch frame integrated trolley to move the foot arch frame to the arch operation site;
[0072] S28, connecting the foot arch frame and the three-arch frame: the foot arch frame is arranged at the lower end of the side arch frame of the three-arch frame, the connecting flanges of the side arch frame and the foot arch frame are aligned, and fixedly connected by bolts;
[0073] S29, steel mesh welding: weld the steel mesh between the three foot arch frames;
[0074] S210, drilling anchor holes: construction personnel drill anchor holes on the first-level working platform 2, the second-level working platform 3, and the third-level working platform 4;
[0075] S211, installing anchor rods: installing resin anchoring agent and anchor rods; extending the first-level telescopic working platform 2.2 and the second-level telescopic working platform 3.2 on the front and rear sides of the integrated trolley for tunnel excavation and arch erection, and pressing the side arch frame and the foot arch frame with welded steel mesh against the tunnel side wall; then installing the anchor rod tray on the anchor rod, and tightening the anchor rod tray with nuts to fix the foot arch frame on the tunnel wall, completing the arch erection operation of an arch frame 11; retracting the first-level telescopic working platform 2.2 and the second-level telescopic working platform 3.2;
[0076] The above process is repeated until all the arch erection and arch erection operations required after one blasting operation are completed, and then the shotcrete operation is carried out; after the shotcrete operation is completed, the next tunnel excavation operation is carried out.
[0077] The parts not described in detail in this utility model are prior art.
Claims
1. A tunnel excavation arch frame erection auxiliary operation trolley, used for assembling and erecting an arch frame (11) in tunnel construction, wherein the arch frame (11) is composed of a central arch frame, a side arch frame, and a foot arch frame. The central arch frame and the side arch frame are first assembled into an assembled arch frame, and the foot arch frame is assembled during the arch erection process; Its characteristics are: The invention comprises a trolley frame assembly (1), wherein the trolley frame assembly (1) comprises a trolley frame (1.1), a crawler trolley (1.2), and a translation support foot assembly (1.3); the trolley frame (1.1) is formed by fixedly connecting steel sections to form a door frame-shaped channel structure; the crawler trolley (1.2) and the translation support foot assembly (1.3) are arranged at the lower ends of the cross beams at the bottom of both sides of the door frame-shaped channel, and the crawler trolley (1.2) is arranged on the inner side of the translation support foot assembly (1.3); wherein the crawler trolley (1.2) is driven to move by a hydraulic motor and is used for the straight-line movement of the tunnel excavation arch frame auxiliary operation trolley, wherein the translation support foot assembly (1.3) is provided with a lifting cylinder and a translation cylinder and is used for the lateral translation of the tunnel excavation arch frame auxiliary operation trolley.
2. The tunnel excavation arch frame auxiliary operation trolley according to claim 1, Its characteristics are: A steel rail (5) is fixedly arranged on the top of the trolley frame assembly (1).
3. The tunnel excavation arch frame auxiliary operation trolley according to claim 2, Its characteristics are: Also includes A first-level working platform (2); the first-level working platform (2) comprises a first-level fixed working platform (2.1) and a first-level telescopic working platform (2.2), wherein the first-level telescopic working platform (2.2) is movably arranged at the lower side of the first-level fixed working platform (2.1); when performing arch erection operation, the first-level telescopic working platform (2.2) is extended from the front and rear sides of the tunnel excavation arch erection frame auxiliary operation trolley, and the foot arch frame is placed against the tunnel wall to assist the arch erection operation; An electric hoist (2.3) is movably arranged at the lower part of the first-level fixed working platform (2.1). The electric hoist (2.3) moves along the side of the tunnel excavation arch frame auxiliary operation trolley and is used to move the arch frame to the arch operation position.
4. The tunnel excavation arch frame auxiliary operation trolley according to claim 2, Its characteristics are: It also includes a secondary working platform (3); the secondary working platform (3) includes a secondary fixed working platform (3.1) and a secondary telescopic working platform (3.2); the secondary telescopic working platform (3.2) is movably arranged on the lower side of the secondary fixed working platform (3.1); when performing arch erection operation, the secondary telescopic working platform (3.2) extends from the front and rear sides of the tunnel excavation arch erection frame auxiliary operation trolley, and the side arch frame is pressed against the tunnel wall to assist the arch erection operation.
5. The tunnel excavation arch frame auxiliary operation trolley according to claim 2, Its characteristics are: It also includes a three-level working platform (4); the three-level working platform (4) includes an assembly platform (4.1) and an arch platform (4.2); the assembly platform (4.1) and the arch platform (4.2) are adjacently arranged on the top of the trolley frame (1.1); the assembly platform (4.1) is located on the right side of the trolley frame (1.1), and the arch platform (4.2) is located on the left side of the trolley frame (1.1); A step is provided in the middle of the arch erecting platform (4.2) for construction workers to climb up to work when erecting the arch.
6. The tunnel excavation arch frame auxiliary operation trolley according to claim 5, Its characteristics are: It also includes a hoist (6); the hoist (6) includes a hoist base (6.1), a winch (6.2), and a boom (6.3); the hoist base (6.1) is fixedly arranged on the upper parts of the front and rear sides of the right end of the assembly platform (4.1); the winch (6.2) is fixedly arranged on the upper part of the hoist base (6.1); the boom (6.3) is fixedly arranged on the right end surface of the hoist base (6.1); and a pulley is rotatably arranged at the end of the boom (6.3).
7. The tunnel excavation arch frame auxiliary operation trolley according to claim 2, Its characteristics are: It also includes a lift (7); the lift (7) includes a lift rail (7.1), a lift frame (7.2), and a lift rail fixing seat (7.3); the lift rail (7.1) is fixedly arranged on the front and rear sides of the right end of the trolley frame (1.1) through the lift rail fixing seat (7.3), and the lift frame (7.2) is movably connected to the lift rail (7.1) via a rotating wheel.
8. The tunnel excavation arch frame auxiliary operation trolley according to claim 2, Its characteristics are: It also includes an assembly platform transfer trolley (8); the assembly platform transfer trolley (8) includes an assembly platform transfer trolley cross beam (8.1); a group of assembly platform transfer trolley running wheels (8.2) are arranged at the lower part of the front and rear ends of the assembly platform transfer trolley cross beam (8.1), an assembly platform transfer trolley column (8.3) is fixedly arranged at the upper part, an assembly platform transfer trolley cantilever beam (8.4) is cantilevered at the top of the assembly platform transfer trolley column (8.3), and an arch frame transfer seat (8.5) is fixedly arranged at the upper side of the root of the assembly platform transfer trolley cantilever beam (8.4); the assembly platform transfer trolley (8) is movably arranged on the rail (5) through the assembly platform transfer trolley running wheels (8.2).
9. The tunnel excavation arch frame auxiliary operation trolley according to claim 2, Its characteristics are: It also includes an assembly platform temporary storage rack assembly (9); the assembly platform temporary storage rack assembly (9) includes a lifting guide sleeve (9.1) and a temporary storage rack lifting frame (9.2); the lifting guide sleeve (9.1) is fixedly arranged on the front and rear sides of the upper part of the trolley frame assembly (1); the temporary storage rack lifting frame (9.2) includes a lifting frame guide column (9.2.1) and a lifting frame cross beam (9.2.2); the lifting frame cross beam (9.2.2) is fixedly arranged on the top of the lifting frame guide column (9.2.1), and the lifting frame guide column (9.2.1) is movably arranged in the lifting guide sleeve (9.1); a plurality of arch frame support seats (9.3) are fixedly arranged on the upper part of the lifting frame cross beam (9.2.2); The arch support seat (9.3) comprises a support block (9.3.1), a limit baffle (9.3.2), a positioning cylinder (9.3.3), and a positioning push plate (9.3.4). The limit baffle (9.3.2) is fixedly arranged at both ends of the support block (9.3.1), the positioning cylinder (9.3.3) is fixedly arranged on the outside of the limit baffle (9.3.2) at one end, and the positioning push plate (9.3.4) is arranged on the inside of the limit baffle (9.3.2) and fixedly connected to the end of the driving shaft of the positioning cylinder (9.3.3).
10. The tunnel excavation arch frame auxiliary operation trolley according to claim 9, Its characteristics are: The invention also includes a vertical arch platform transfer trolley (10); the vertical arch platform transfer trolley (10) includes a vertical arch platform transfer trolley frame (10.1) and a vertical arch platform transfer trolley lifting frame (10.2); the vertical arch platform transfer trolley frame (10.1) includes a vertical arch platform transfer trolley cross beam (10.1.1) and a vertical arch platform transfer trolley lifting guide sleeve (10.1.2) fixedly arranged at both ends of the vertical arch platform transfer trolley cross beam (10.1.1); the vertical arch platform transfer trolley lifting guide sleeve (10.1.2) is rotatably provided with a vertical arch platform transfer trolley walking wheel (10.1.3) at the lower end; the vertical arch platform transfer trolley lifting frame (10.2) includes a vertical arch platform transfer trolley frame (10.1.1) and a vertical arch platform transfer trolley lifting guide sleeve (10.1.2) fixedly arranged at both ends of the vertical arch platform transfer trolley cross beam (10.1.1); the vertical arch platform transfer trolley lifting guide sleeve (10.1.2) is rotatably provided with a vertical arch platform transfer trolley walking wheel (10.1.3); the vertical arch platform transfer trolley lifting frame (10.2) includes a vertical arch platform transfer trolley frame (10.1.1) and a vertical arch platform transfer trolley lifting guide sleeve (10.1.2). The transport trolley lifting frame guide column (10.2.1) and the arch platform transfer trolley lifting frame cross beam (10.2.2) are fixedly arranged on the upper end of the arch platform transfer trolley lifting frame guide column (10.2.1), and the upper part of the arch platform transfer trolley lifting frame cross beam (10.2.2) is fixedly arranged with an arch frame support seat (9.3); the arch platform transfer trolley lifting frame guide column (10.2.1) is movably arranged in the arch platform transfer trolley lifting guide sleeve (10.1.2); the arch platform transfer trolley (10) is movably arranged on the rail (5) through the arch platform transfer trolley walking wheel (10.1.3).
