Installation structure of invar ruler
By using prefabricated steel bars and magnetic connections with separate sleeve structures at subway monitoring points, the problem of large diameter of traditional boreholes is solved, efficient and stable surface settlement monitoring is achieved, the borehole size is reduced, and work efficiency and monitoring are improved. Accuracy.
Patent Information
- Application Number
- CN202420593957.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-26
AI Technical Summary
In subway projects, the diameter of drilling holes at traditional surface subsidence monitoring points is relatively large, resulting in long construction periods, high costs, a lot of backfill materials, fragile protective covers, great impact on the original roadbed, increased workload of ice cutting in winter, and difficulties in road surface restoration. Moreover, the base of the indium steel ruler needs to rotate freely within the drill hole, resulting in a larger hole diameter, which affects construction efficiency.
It adopts the structure of prefabricated steel bars and separate sleeves, and the indium steel ruler is fixed in the prefabricated sleeve through magnetic connection components, replacing the traditional direct burial method, reducing the drilling diameter, and using the matching structure of prefabricated steel bars and sleeves to achieve stable installation and angle Adjustment.
It greatly improves work efficiency, reduces the amount of drilling and backfilling, reduces costs, reduces the impact on the environment, and improves the stability and monitoring accuracy of the indium steel ruler.
Smart Images

Figure CN221858102U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of subway monitoring, in particular to an installation structure of an indium steel ruler. Background Art
[0002] In the subway project, a considerable number of surface settlement monitoring points should be laid along the line. Conventional surface settlement monitoring points need to be buried in the ground. The depth of a single hole is about 1.8 meters and the diameter is about 160mm. The disadvantages of a larger drilling diameter are: ① It is labor-intensive and time-consuming, and the work efficiency is low; ② There is a lot of backfill material, which consumes raw materials and has a large extrusion force on the measuring rod; ③ After the protective cover is lost, the exposed pit diameter is large, which brings pedestrian safety hazards; ④ The water content of the original roadbed is increased, affecting the service life; ⑤ Winter monitoring requires large-scale ice chiseling, which increases unnecessary workload; ⑥ The workload of road restoration is large; Because the diameter of the conventional surface settlement monitoring point drilling hole is mainly considered to be able to rotate freely in the protective cover (the base is rectangular, 52*97mm and the bevel is 110mm), it is necessary to drill a relatively large-diameter hole. For urban subway construction, the number of surface settlement monitoring points per kilometer ranges from hundreds to thousands, and reducing the size of the drilling hole is of great significance. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model provides an installation structure of an indium steel ruler to solve the technical problem of the larger diameter of the drill hole in the traditional surface settlement monitoring point in the related technology.
[0004] The utility model provides an installation structure of an indium steel ruler, wherein the indium steel ruler has a first installation end and a second installation end that are arranged opposite to each other, and is characterized in that the installation structure comprises:
[0005] Prefabricated steel bars are arranged in the up-down direction;
[0006] A prefabricated sleeve, detachably arranged on the prefabricated steel bar;
[0007] The connecting assembly includes a first connecting base arranged on the prefabricated sleeve and a second connecting base arranged on the first mounting end. The first connecting base and the second connecting base are magnetically attracted to each other so that the indium steel ruler can be detachably installed on the prefabricated sleeve.
[0008] Furthermore, the first connecting base is configured as an open structure with a closed top and an open bottom, and is used for being sleeved on the prefabricated sleeve.
[0009] Furthermore, the first connecting base and the prefabricated sleeve are both provided with a plurality of positioning holes, and any group of the positioning holes is used for the jacking screw to pass through.
[0010] Furthermore, the first connecting base is provided with a plurality of positioning grooves, and the prefabricated sleeve is formed with a plurality of protrusions, and each of the positioning grooves cooperates with each of the protrusions so that when the first connecting base is installed on the prefabricated sleeve, each of the protrusions extends into each of the positioning grooves and limits the relative rotation of the first connecting base and the prefabricated sleeve.
[0011] Furthermore, a middle partition is provided at one end of the prefabricated sleeve close to the prefabricated steel bar for abutting against the prefabricated steel bar.
[0012] Furthermore, the prefabricated sleeve has a coaxially arranged hollow cavity, and the hollow cavity is gap-matched with the prefabricated steel bar.
[0013] Furthermore, a plurality of cleaning tanks are arranged around the hollow cavity.
[0014] Furthermore, the prefabricated steel bar jacket is provided with a centering rubber ring.
[0015] Compared with the prior art, the utility model has the following beneficial effects: a borehole is drilled on the ground to monitor surface settlement, and prefabricated steel bars are arranged in the borehole. During monitoring, an indium steel ruler is fixed to one end of a prefabricated sleeve, and the other end of the prefabricated sleeve is used to abut against the prefabricated steel bars, which replaces the traditional monitoring method of burying the indium steel ruler together with the indium steel ruler base directly in the ground borehole. Only a borehole with a diameter larger than the prefabricated steel cylinder needs to be drilled and abutted against the prefabricated steel bars for monitoring. The amount of soil taken from the borehole is one-fourth of the original amount, and the amount of consolidated concrete and backfill material is also one-fourth of the original amount, which greatly improves work efficiency and reduces investment costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic structural diagram of the installation structure of the indium steel ruler in one embodiment of the utility model;
[0017] Figure 2 It is a top view of the structure of the installation structure of the indium steel ruler in one embodiment of the utility model.
[0018] Description of Figure Numbers:
[0019] 1. Prefabricated steel bars; 2. Prefabricated sleeves; 3. First connecting base; 4. Second connecting base; 5. Positioning holes; 6. Jacking screws; 7. Positioning grooves; 8. Bumps; 9. Middle partitions; 10. Hollow cavities; 11. Cleaning tanks; 12. Centering rubber rings.
[0020] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and beneficial effects of the utility model more clear, the technical solution of the utility model is further described below in conjunction with the drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0022] See also Figure 1 to Figure 2 The utility model provides an installation structure of an indium steel ruler, wherein the indium steel ruler has a first installation end and a second installation end that are arranged opposite to each other, and is characterized in that the installation structure comprises:
[0023] Prefabricated steel bars 1 are arranged in an up-down direction;
[0024] A prefabricated sleeve 2, detachably arranged on the prefabricated steel bar 1;
[0025] The connecting assembly includes a first connecting base 3 arranged on the prefabricated sleeve 2, and a second connecting base 4 arranged on the first mounting end. The first connecting base 3 and the second connecting base 4 are magnetically attracted to each other so that the indium steel ruler can be detachably installed on the prefabricated sleeve 2.
[0026] In this embodiment, in order to reduce the size of the borehole at the surface settlement monitoring point, a borehole is drilled in the ground, and a prefabricated steel bar 1 arranged in the up-down direction is buried in the borehole. A detachable prefabricated sleeve 2 is arranged on the prefabricated steel bar 1, and one end of the prefabricated sleeve 2 is used to be sleeved on the prefabricated steel bar 1, and the other end is used to fix an indium steel ruler (not shown). The indium steel ruler has a first mounting end and a second mounting end arranged back to back, and the first mounting end is used to connect with the prefabricated sleeve 2, and the second mounting end is used to adjust the angle of the indium steel ruler (according to the level bubble on the indium steel ruler) so that it is perpendicular to the prefabricated sleeve 2 during monitoring; on the other hand, the prefabricated sleeve 2 is provided with a first connecting base 3, and the first mounting end of the indium steel ruler is provided with a second connecting base 4. The first connecting base 3 and the second connecting base 4 are made of alloy permanent magnetic materials such as bonded neodymium iron boron, which have the advantages of high precision, good magnetism, good corrosion resistance, and good temperature stability, so as to facilitate the first connecting base 3 and the second connecting base 4. The bases 4 are magnetically attracted to each other and fit tightly under the action of strong magnetism, so that the indium steel ruler can be firmly connected to the prefabricated sleeve 2 to improve the stability of the indium steel ruler itself during monitoring; by burying the prefabricated steel bar 1 in the ground, sleeved with the prefabricated sleeve 2, the indium steel ruler and the prefabricated sleeve 2 are magnetically attracted to each other through the first connecting base 3 and the second connecting base 4 that are magnetically attracted to each other, so that the indium steel ruler can be set up on the ground for stable monitoring, replacing the traditional monitoring method of directly burying the indium steel ruler and the indium steel ruler base directly in the ground monitoring borehole, while ensuring the observation accuracy. The bottom size of the indium steel ruler is reduced (from the bottom size of the indium steel ruler 110mm to the size of the prefabricated sleeve 2 with a diameter of 40mm, and the borehole diameter is only 80mm), thereby reducing the size of the borehole when burying the measuring point, thereby greatly improving the work efficiency of the burying process, saving more costs, and reducing the adverse effects of the burying point on the surrounding environment.
[0027] The first connecting base 3 is configured as an open structure with a closed top and an open bottom, and is used for being sleeved on the prefabricated sleeve 2 .
[0028] In this embodiment, an open structure with a closed top and an open bottom is provided on the first connecting base 3, and the lower end of the prefabricated sleeve 2 is used to abut against the upper part of the prefabricated steel bar 1, and the upper end of the prefabricated sleeve 2 is used to extend into the opening of the first connecting base 3, so that the prefabricated sleeve 2 can be connected to the prefabricated steel bar 1 and the first connecting base 3 respectively, so that the indium steel ruler can be set up on the ground for monitoring, replacing the traditional method of burying the indium steel ruler as a whole in the ground for monitoring, without considering the diameter of the borehole at the surface settlement monitoring point and how the base of the indium steel ruler rotates freely in the borehole, making the adjustment and monitoring of the indium steel ruler more convenient.
[0029] The first connecting base 3 and the prefabricated sleeve 2 are both provided with a plurality of positioning holes 5 , and any group of the positioning holes 5 is used for the jacking screw 6 to pass through.
[0030] In this embodiment, a plurality of positioning holes 5 are provided on the circumferential surfaces of the first connecting base 3 and the prefabricated sleeve 2. Any group of interconnected positioning holes 5 is used for allowing the jacking screw 6 to pass through, so as to lock the prefabricated sleeve 2 and the first connecting base 3 (having a certain upward jacking force when locking), thereby ensuring their stability and observation accuracy.
[0031] The first connecting base 3 is provided with a plurality of positioning grooves 7, and the prefabricated sleeve 2 is formed with a plurality of protrusions 8, and each of the positioning grooves 7 cooperates with each of the protrusions 8 so that when the first connecting base 3 is installed on the prefabricated sleeve 2, each of the protrusions 8 extends into each of the positioning grooves 7 and limits the relative rotation of the first connecting base 3 and the prefabricated sleeve 2.
[0032] In this embodiment, a plurality of positioning grooves 7 are provided on the first connecting base 3, and a plurality of protrusions 8 are formed on the prefabricated sleeve 2. When the prefabricated sleeve 2 is inserted into the opening of the first connecting base 3 from bottom to top, the protrusions 8 can limit the relative rotation of the first connecting base 3 and the prefabricated sleeve 2 through the mutual positioning cooperation of the positioning grooves 7, so that the positioning holes 5 of the first connecting base 3 and the prefabricated sleeve 2 can overlap and allow the jacking screw 6 to pass through.
[0033] The prefabricated sleeve 2 is provided with a middle partition plate 9 at one end close to the prefabricated steel bar 1 for abutting against the prefabricated steel bar 1 .
[0034] In this embodiment, a middle partition 9 is provided on the prefabricated sleeve 2. The middle partition 9 is arranged close to the prefabricated steel bar 1. The middle partition 9 cooperates with the prefabricated steel bar 1. The middle partition 9 is extended into the drilled hole and abuts against the prefabricated steel bar 1, so that the prefabricated sleeve 2 can be erected on the ground.
[0035] The prefabricated sleeve 2 has a coaxially arranged hollow cavity 10 , and the hollow cavity 10 is clearance-matched with the prefabricated steel bar 1 .
[0036] In this embodiment, the prefabricated sleeve 2 has a coaxially arranged hollow cavity 10, which is used to be sleeved on the prefabricated steel bar 1. The diameter of the hollow cavity 10 should be larger than the diameter of the prefabricated steel bar 1 so that there can be a clearance fit between the hollow cavity 10 and the prefabricated steel bar 1, thereby facilitating fine-tuning the monitoring angle of the indium steel ruler.
[0037] The hollow cavity 10 is surrounded by a plurality of cleaning tanks 11 .
[0038] In this embodiment, a plurality of cleaning grooves 11 are provided at the lower end of the prefabricated sleeve 2. The cleaning grooves 11 are arranged around the hollow cavity 10 to facilitate cleaning of foreign matter in the hollow cavity 10 and ensure direct contact between the partition plate 9 and the prefabricated steel bar 1 during monitoring operation.
[0039] The prefabricated steel bar 1 is provided with a centering rubber ring 12 on its outer shell.
[0040] In this embodiment, a centering rubber ring 12 is provided outside the prefabricated steel bar 1 to ensure that the prefabricated steel bar 1 is centered in the drilled hole.
[0041] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.
Claims
1. An indium steel ruler installation structure, the indium steel ruler having a first installation end and a second installation end disposed opposite to each other, It is characterized in that The mounting structure comprises: Prefabricated steel bars are arranged in the up-down direction; A prefabricated sleeve, detachably arranged on the prefabricated steel bar; The connecting assembly includes a first connecting base arranged on the prefabricated sleeve and a second connecting base arranged on the first mounting end. The first connecting base and the second connecting base are magnetically attracted to each other so that the indium steel ruler can be detachably installed on the prefabricated sleeve.
2. The installation structure of an indium steel ruler as claimed in claim 1, It is characterized in that The first connecting base is configured as an open structure with a closed top and an open bottom, and is used for being sleeved on the prefabricated sleeve.
3. The installation structure of an indium steel ruler as claimed in claim 2, It is characterized in that The first connecting base and the prefabricated sleeve are both provided with a plurality of positioning holes, and any group of the positioning holes is used for the jacking screw to pass through.
4. The installation structure of an indium steel ruler according to any one of claims 1 to 3, It is characterized in that The first connecting base is provided with a plurality of positioning grooves, and the prefabricated sleeve is formed with a plurality of protrusions, and each of the positioning grooves cooperates with each of the protrusions so that when the first connecting base is installed on the prefabricated sleeve, each of the protrusions extends into each of the positioning grooves and limits the relative rotation of the first connecting base and the prefabricated sleeve.
5. The installation structure of an indium steel ruler as claimed in claim 1, It is characterized in that The prefabricated sleeve is provided with a middle partition plate at one end close to the prefabricated steel bar, which is used to abut against the prefabricated steel bar.
6. The installation structure of an indium steel ruler as claimed in claim 5, It is characterized in that The prefabricated sleeve has a coaxially arranged hollow cavity, and the hollow cavity is gap-matched with the prefabricated steel bar.
7. The installation structure of an indium steel ruler as claimed in claim 6, It is characterized in that A plurality of cleaning tanks are arranged around the hollow cavity.
8. The installation structure of an indium steel ruler as claimed in claim 1, It is characterized in that The prefabricated steel bar outer shell is provided with a centering rubber ring.