Dredging mechanism of ore crushing equipment
By designing a guiding mechanism in the ore crushing equipment and using a lifting mechanism and a motor-driven rotating plate, the clogging problem caused by the difference in material diameter is solved and the efficient operation and crushing effect of the equipment are ensured.
Patent Information
- Application Number
- CN202420379208.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
After the initial crushing of existing ore crushing equipment, the discharge port is blocked due to the difference in material diameter, which affects the efficiency of the equipment. When the material is insufficient, the direct outflow may also cause blockage and affect the crushing effect.
A guiding mechanism for ore crushing equipment is designed, which includes a fixed frame, a lifting mechanism and a motor-driven rotating plate. The screw and tooth block engagement mechanism ensures that the rotating plate moves smoothly and avoids material blockage.
It effectively prevents the discharge port from being blocked, ensures the normal operation and efficiency of the crushing equipment, ensures the smooth flow of materials, and improves the crushing effect.
Smart Images

Figure CN221868772U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of dredging, in particular to a dredging mechanism for ore crushing equipment. Background Art
[0002] Ore crushing equipment is widely used in many departments such as ore, building materials, roads and railways. Its function is to use impact and collision to break materials into small diameter fragments in a relatively short time. There are many types of crushing equipment, including jaw crusher, impact crusher, hammer crusher, impact crusher, compound crusher and other crushers. Impact crusher is currently the most effective, practical and reliable stone crushing machine. It uses the continuous collision between materials and materials and materials and impact plates to achieve crushing. Usually, this type of equipment achieves the effect of complete crushing of materials after two crushings. However, after the crushed stone hits the impact plate to achieve the initial crushing, fragments of different diameters may block the outlet leading to the secondary crushing. The dredging mechanism is used for adjustment to avoid the possibility of such a situation.
[0003] The existing technology only solves many problems such as poor crushing effect of materials in the working process of the crushing equipment. However, when the material is crushed for the first time, there may be a large difference in the diameter of the crushed material, which may cause blockage when passing through the discharge port, thereby affecting the working efficiency of the equipment. At the same time, when the material is small, it will cause blockage when flowing out directly through the discharge port without being crushed, and the crushing effect of the equipment will also be affected to a certain extent. Utility Model Content
[0004] The purpose of the utility model is to provide a dredging mechanism for ore crushing equipment to solve the above-mentioned deficiencies in the prior art.
[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a dredging mechanism for ore crushing equipment, comprising a fixed frame, a slanted panel is installed on the top of the fixed frame by bolts;
[0006] A fixing plate, wherein a fixing plate is installed at the middle of the rear side of the fixed frame by bolts, a partition plate is installed at the top and bottom of the fixing plate by bolts, and a connecting plate is installed between the two partition plates by bolts;
[0007] A lifting mechanism, the lifting mechanism comprising a vertical plate and a rotating rod, the fixed plate is provided with two vertical plates by bolts on one side close to the connecting plate, and a rotating rod is provided between the two vertical plates by a bearing;
[0008] A movable plate is installed on a side of the connecting plate away from the fixed plate through bolts.
[0009] Furthermore, the lifting mechanism also includes a worm, a worm wheel and a motor, two worms are installed on the outside of the rotating rod by bolts, and a worm wheel is provided at the front end of the two worms, a connecting rod is installed at the bottom end of the worm wheel through a bearing, and the end of the connecting rod away from the worm wheel is installed on the side of the fixed plate close to the connecting plate by bolts, a mounting frame is installed on the side of the fixed plate close to the connecting plate by bolts, and a motor is installed on the side of the mounting frame away from the fixed plate by bolts.
[0010] Furthermore, the lifting mechanism also includes a first rotating roller, a second rotating roller and a screw rod, a shaft rod is installed at the middle part of the motor by bolts, and the first rotating roller is installed at the end of the shaft rod away from the motor by bolts, and the second rotating roller is installed at the end of the connecting rod close to the first rotating roller by bolts, a belt is movably installed between the first rotating roller and the second rotating roller, and screw rods are installed at the top ends of the two worm gears by bolts.
[0011] Furthermore, the lifting mechanism also includes a movable block and a rotating plate. The two screw rods are both connected to the movable blocks on the outside by threads. Two limit frames are installed on the side of the connecting plate away from the fixed plate by bolts. The movable block is arranged in the middle of the limit frame. A rotating shaft is installed between the two movable blocks by bolts, and a rotating plate is installed on the outside of the rotating shaft by bearings.
[0012] Furthermore, the movable plate is mounted on the top of the limiting frame by bolts, and the limiting frame is arranged in the middle of the fixed frame, and a metal disc is mounted on one side of the rotating plate close to the movable plate by bolts.
[0013] Furthermore, a plurality of first tooth blocks are installed on the outside of the metal disc by bolts, and a plurality of second tooth blocks are installed on the side of the movable plate close to the metal disc by bolts, and the first tooth blocks and the second tooth blocks are meshed with each other.
[0014] Compared with the prior art, the utility model provides a dredging mechanism for ore crushing equipment. By installing a lifting mechanism, the motor is started, and the first rotating roller rotates to drive the second rotating roller to rotate, so that the screw rotates, ensuring that the rotating plate can move smoothly. Since the first tooth block outside the metal disc and the second tooth block outside the movable plate are engaged with each other, the rotating plate rotates. As the rotating plate continues to reciprocate and rotate, the material can pass through the discharge port smoothly, ensuring that the crushing equipment is not easily blocked, thereby playing a dredging role. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0016] Figure 1 The overall structural diagram provided for the embodiment of the utility model;
[0017] Figure 2 A schematic diagram of a lifting mechanism provided in an embodiment of the utility model;
[0018] Figure 3 A schematic diagram of the internal structure provided for an embodiment of the utility model;
[0019] Figure 4 A partial schematic diagram of the mechanism provided in an embodiment of the utility model.
[0020] Description of reference numerals:
[0021] 1. Fixed frame; 2. Inclined panel; 3. Fixed plate; 4. Partition plate; 5. Connecting plate; 6. Lifting mechanism; 61. Vertical plate; 62. Rotating rod; 63. Worm; 64. Worm gear; 65. Motor; 66. First rotating roller; 67. Second rotating roller; 68. Screw; 69. Movable block; 610. Rotating plate; 7. Moving plate; 8. Metal disc. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0023] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0024] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0025] See also Figure 1-4 , a dredging mechanism for ore crushing equipment, comprising a fixed frame 1, a top of which is provided with an inclined panel 2 by bolts;
[0026] A fixing plate 3 is installed at the middle of the rear side of the fixed frame 1 by bolts, a partition plate 4 is installed at the top and bottom of the fixing plate 3 by bolts, and a connecting plate 5 is installed between the two partition plates 4 by bolts;
[0027] The lifting mechanism 6 includes a vertical plate 61 and a rotating rod 62. The fixed plate 3 is provided with two vertical plates 61 by bolts on one side close to the connecting plate 5. The rotating rod 62 is provided between the two vertical plates 61 by bearings.
[0028] The movable plate 7 is installed on the side of the connecting plate 5 away from the fixed plate 3 by bolts.
[0029] The lifting mechanism 6 also includes a worm 63, a worm wheel 64 and a motor 65. Two worms 63 are installed on the outside of the rotating rod 62 by bolts. The front ends of the two worms 63 are provided with worm wheels 64. The bottom ends of the worm wheels 64 are installed with connecting rods through bearings, and the end of the connecting rod away from the worm wheel 64 is installed on the side of the fixed plate 3 close to the connecting plate 5 by bolts. The side of the fixed plate 3 close to the connecting plate 5 is installed with a mounting frame by bolts, and the side of the mounting frame away from the fixed plate 3 is installed with a motor 65 by bolts, so that the motor 65 can remain stable when it is started;
[0030] The lifting mechanism 6 also includes a first rotating roller 66, a second rotating roller 67 and a screw 68. A shaft is installed in the middle of the motor 65 by bolts, and the first rotating roller 66 is installed at the end of the shaft away from the motor 65 by bolts, and the second rotating roller 67 is installed at the end of the connecting rod close to the first rotating roller 66 by bolts. A belt is movably installed between the first rotating roller 66 and the second rotating roller 67. The top ends of the two worm gears 64 are both installed with screws 68 by bolts to ensure that the rotation of the worm gears 64 drives the screws 68 to rotate;
[0031] The lifting mechanism 6 also includes a movable block 69 and a rotating plate 610. The two screw rods 68 are both connected to the movable block 69 through threads on the outside. Two limit frames are installed on the side of the connecting plate 5 away from the fixed plate 3 through bolts. The movable block 69 is arranged in the middle of the limit frame. A rotating shaft is installed between the two movable blocks 69 through bolts, and the rotating plate 610 is installed on the outside of the rotating shaft through a bearing, so that the rotating plate 610 can rotate outside the rotating shaft.
[0032] The movable plate 7 is installed on the top of the limit frame by bolts, and the limit frame is set in the middle of the fixed frame 1. The rotating plate 610 is installed with a metal disc 8 by bolts on the side close to the movable plate 7, so that the rotating plate 610 can rotate when the metal disc 8 rotates;
[0033] A plurality of first tooth blocks are installed on the outside of the metal disc 8 by bolts, and a plurality of second tooth blocks are installed on the side of the movable plate 7 close to the metal disc 8 by bolts, and the first tooth blocks and the second tooth blocks are meshed with each other, so that the rotating plate 610 starts to rotate.
[0034] Working principle: By starting the motor 65, since a shaft is installed in the middle of the motor 65, a first rotating roller 66 is installed at the end of the shaft away from the motor 65, the shaft rotates to drive the first rotating roller 66 to rotate, and a belt is installed between the first rotating roller 66 and the second rotating roller 67. When the first rotating roller 66 rotates, the second rotating roller 67 also rotates accordingly, so that the rotating rod 62 installed between the two vertical plates 61 starts to rotate. Since two worms 63 are installed outside the rotating rod 62, a worm wheel 64 is provided at the front end of the worm 63. The rotation of the worm 63 drives the worm wheel 64 to rotate, so that the worm wheel 64 installed at the top of the worm wheel 64 The screw 68 rotates, and a movable block 69 is installed on the outside of the screw 68. The movable block 69 moves, so that the rotating plate 610 moves away from the connecting plate 5. At the same time, the first tooth block installed on the outside of the metal disc 8 and the second tooth block installed on the outside of the movable plate 7 engage with each other, so that the rotating plate 610 starts to rotate. After moving to a suitable position, the motor 65 starts to rotate in the opposite direction, so that the rotating plate 610 moves toward the side close to the connecting plate 5, and starts to rotate in the opposite direction. When the material passes through the middle of the fixed frame 1, as the rotating plate 610 continues to rotate and move, it is ensured that the material can flow out smoothly.
[0035] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A dredging mechanism for ore crushing equipment, comprising a fixed frame (1), a top of which is mounted with an inclined panel (2) by bolts, characterized in that: A fixing plate (3), the fixing plate (3) being installed at the middle of the rear side of the fixing frame (1) by means of bolts, a partition plate (4) being installed at the top and bottom ends of the fixing plate (3) by means of bolts, and a connecting plate (5) being installed between the two partition plates (4) by means of bolts; A lifting mechanism (6), the lifting mechanism (6) comprising a vertical plate (61) and a rotating rod (62), the fixed plate (3) being mounted with two vertical plates (61) on one side close to the connecting plate (5) by means of bolts, and the rotating rod (62) being mounted between the two vertical plates (61) by means of a bearing; A movable plate (7), wherein the movable plate (7) is mounted on a side of the connecting plate (5) away from the fixed plate (3) via bolts.
2. The dredging mechanism of ore crushing equipment according to claim 1, characterized in that: The lifting mechanism (6) further comprises a worm (63), a worm wheel (64) and a motor (65); two worms (63) are mounted on the outside of the rotating rod (62) by means of bolts; a worm wheel (64) is disposed at the front end of each of the two worms (63); a connecting rod is mounted at the bottom end of the worm wheel (64) by means of a bearing; and an end of the connecting rod away from the worm wheel (64) is mounted on a side of the fixing plate (3) close to the connecting plate (5) by means of bolts; a mounting frame is mounted on a side of the fixing plate (3) close to the connecting plate (5) by means of bolts; and a motor (65) is mounted on a side of the mounting frame away from the fixing plate (3) by means of bolts.
3. The dredging mechanism of ore crushing equipment according to claim 2, characterized in that: The lifting mechanism (6) further comprises a first rotating roller (66), a second rotating roller (67) and a screw rod (68); a shaft rod is installed in the middle of the motor (65) by means of bolts, and the first rotating roller (66) is installed at one end of the shaft rod away from the motor (65) by means of bolts; the second rotating roller (67) is installed at one end of the connecting rod close to the first rotating roller (66) by means of bolts; a belt is movably installed between the first rotating roller (66) and the second rotating roller (67); and screw rods (68) are installed at the top ends of the two worm gears (64) by means of bolts.
4. The dredging mechanism of ore crushing equipment according to claim 3 is characterized in that: The lifting mechanism (6) further comprises a movable block (69) and a rotating plate (610), the two screw rods (68) are externally connected to the movable block (69) via threads, two limit frames are installed via bolts on the side of the connecting plate (5) away from the fixed plate (3), the movable block (69) is arranged in the middle of the limit frame, a rotating shaft is installed between the two movable blocks (69) via bolts, and the rotating plate (610) is installed on the outside of the rotating shaft via a bearing.
5. The dredging mechanism of ore crushing equipment according to claim 4, characterized in that: The movable plate (7) is mounted on the top of the limiting frame by means of bolts, and the limiting frame is arranged in the middle of the fixed frame (1). A metal disc (8) is mounted on the side of the rotating plate (610) close to the movable plate (7) by means of bolts.
6. The dredging mechanism of ore crushing equipment according to claim 5, characterized in that: A plurality of first tooth blocks are installed on the outside of the metal disc (8) by means of bolts, and a plurality of second tooth blocks are installed on the side of the movable plate (7) close to the metal disc (8) by means of bolts, and the first tooth blocks and the second tooth blocks are meshed with each other.