Desliming pool for antimony ore tailings
By designing an antimony ore tailings desliming tank and using high-pressure spray to activate the tailings and separate treatment areas, the problem of low efficiency and layered sedimentation of traditional tailings treatment methods has been solved, and more efficient and stable tailings treatment and filling performance have been achieved.
Patent Information
- Application Number
- CN202420395919.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-01
AI Technical Summary
Traditional tailings treatment methods are inefficient, have unstable treatment effects, complex equipment and processes, and high energy consumption. Moreover, the activated slurry is prone to stratification and sedimentation problems during the transportation and filling process, which affects the filling effect.
An antimony ore tailings desliming tank is designed. It adopts a cylindrical structure with an opening at the top. A bottom tank and a slurry discharge pipe are installed at the bottom. It is equipped with several internal pipes and nozzles. The high-pressure spray is formed through the mixing of water pipes and air pipes to remove tailings. Activation, internal baffles in the basin are divided into four zones to improve treatment uniformity.
It improves the efficiency and stability of tailings treatment, reduces equipment complexity and energy consumption, ensures the fluidity and filling performance of the activated slurry, avoids stratification and sedimentation problems, and meets the increasingly stringent environmental protection requirements and mining requirements. Empty area filling requirements.
Smart Images

Figure CN221868814U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of desludging equipment, in particular to an antimony ore tailings desludging pool. Background Art
[0002] In the mining process, tailings, as a solid waste, has always been an important environmental and engineering issue. Traditional tailings treatment methods usually involve the establishment of tailings ponds, which not only require a large area of land resources, but also have potential environmental risks, such as tailings dam breaches and tailings leakage, which may cause serious pollution to the surrounding environment.
[0003] In recent years, with the increasingly stringent environmental regulations and the need for sustainable mining, the harmless treatment and resource utilization of tailings have become a research hotspot. The harmless treatment of tailings aims to remove or reduce harmful substances in tailings to a safe level through physical, chemical or biological methods, while resource utilization is to convert tailings into valuable products or use them in other production processes, such as filling of mine goafs.
[0004] However, the existing tailings treatment technology still has some shortcomings in practical application. First, the traditional tailings treatment methods are often inefficient, the treatment effect is unstable, and it is difficult to meet the increasingly stringent environmental protection requirements. Secondly, the equipment and processes used in the tailings activation process are complex, energy consumption is high, and the treatment cost is increased. In addition, the slurry after tailings activation is prone to stratification and sedimentation during transportation and filling, which affects the filling effect. Utility Model Content
[0005] The purpose of the utility model is to provide an antimony ore tailings desludging pool to solve the problem that the traditional tailings treatment method proposed in the above background technology is often inefficient, the treatment effect is unstable, and it is difficult to meet the increasingly stringent environmental protection requirements. Secondly, the equipment and process used in the tailings activation process are complex, the energy consumption is high, and the treatment cost is increased. In addition, the slurry after tailings activation is prone to stratification and precipitation during transportation and filling, which affects the filling effect.
[0006] To achieve the above-mentioned purpose, the utility model provides an antimony ore tailings desludging pool, including a desludging pool, which is a cylindrical structure with an opening at the top, a bottom pool is installed at the bottom of the desludging pool, the bottom of the bottom pool is connected to a slurry discharge pipe, a conveying pipe is arranged below the bottom pool, a plurality of riser pipes are connected between the conveying pipe and the bottom pool, a plurality of inner pipes are arranged inside the bottom pool, a discharge port is arranged in the middle of the bottom pool, the outside of the discharge port is connected to the slurry discharge pipe, and a plurality of nozzles are installed on the outer wall of the inner pipe.
[0007] Preferably, columns are installed at the bottom of the desludging tank.
[0008] Preferably, inclined rods are installed on the outer side of the bottom of the desludging tank.
[0009] Preferably, the delivery pipe includes a water pipe and an air pipe, the riser includes a U-shaped pipe, the top of the U-shaped pipe is connected to a mixing pipe, the top of the mixing pipe is connected to the bottom pool, and the two ends of the bottom of the U-shaped pipe are respectively connected to the water pipe and the air pipe.
[0010] Preferably, the interior of the bottom pool is divided into four areas by partitions.
[0011] Preferably, the inner pipe is a fan-shaped structure, and a plurality of the inner pipes are distributed in a ring structure.
[0012] Preferably, a plurality of support blocks are installed at the bottom of the delivery pipe.
[0013] Preferably, the inner pipes in each area are in three groups and are arranged at equal intervals.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] In the antimony mine tailings desludging pool, the desludging pool adopts a cylindrical structure with an open top, so that the tailings can smoothly enter the pool for treatment. The setting of the bottom pool and the slurry discharge pipe connected to it ensure that the treated tailings can be discharged in an orderly manner, which is convenient for subsequent filling or other applications. The tailings are activated by installing a number of nozzles on the outer wall of the inner pipe and passing compressed air. This activation method not only improves the treatment efficiency of the tailings, but also makes the treatment effect more stable and reliable. At the same time, the activated tailings slurry has better fluidity and filling performance, which meets the filling requirements of the mine goaf. The desludging pool also realizes the separation and mixing of water pipes and air pipes through a number of risers between the conveying pipe and the bottom pool. This design simplifies the equipment structure, reduces energy consumption, and also reduces the complexity and cost of the treatment process. The bottom pool is divided into four areas by a partition inside, and three groups of inner pipes arranged at equal intervals are arranged in each area, which further improves the treatment effect and uniformity of the tailings. This layout ensures that the tailings can be fully activated and mixed in the pool, avoiding problems such as stratification and sedimentation. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the structure of the bottom pool in the utility model;
[0018] Figure 3 It is a structural schematic diagram of the delivery pipe in the utility model;
[0019] Figure 4 It is a structural schematic diagram of the inner pipeline in the utility model.
[0020] The meaning of each number in the figure is:
[0021] 1. Desludging tank; 11. Inclined rod; 12. Vertical column; 2. Bottom tank; 21. Inner pipe; 211. Nozzle; 22. Discharge port; 23. Partition; 3. Discharge pipe; 4. Delivery pipe; 41. Water pipe; 42. Air pipe; 43. Support block; 5. Riser; 51. U-shaped pipe; 52. Mixing pipe. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] The utility model provides an antimony ore tailings desludging pool, such as Figure 1-Figure 4 As shown, it includes a desludging tank 1, which is a cylindrical structure with an opening at the top, a bottom tank 2 is installed at the bottom of the desludging tank 1, a slurry discharge pipe 3 is connected to the bottom of the bottom tank 2, a conveying pipe 4 is arranged below the bottom tank 2, a plurality of riser pipes 5 are connected between the conveying pipe 4 and the bottom tank 2, a plurality of inner pipes 21 are arranged inside the bottom tank 2, a discharge port 22 is arranged in the middle of the bottom tank 2, the outside of the discharge port 22 is connected to the slurry discharge pipe 3, and a plurality of nozzles 211 are installed on the outer wall of the inner pipe 21.
[0024] In this embodiment, a column 12 is installed at the bottom of the desludging tank 1 to facilitate the support of the desludging tank 1 .
[0025] Specifically, an inclined rod 11 is installed on the outer side of the bottom of the desludging tank 1 to facilitate the bottom support of the desludging tank 1 .
[0026] Furthermore, the delivery pipe 4 includes a water pipe 41 and an air pipe 42. The water pipe 41 is externally connected to a water supply pipe, and the air pipe 42 is externally connected to an air supply pipe. The riser 5 includes a U-shaped pipe 51. The top of the U-shaped pipe 51 is connected to a mixing pipe 52. The top of the mixing pipe 52 is connected to the bottom pool 2. The two ends of the bottom of the U-shaped pipe 51 are respectively connected to the water pipe 41 and the air pipe 42, so as to mix the gas and water, thereby generating a high-pressure spray for spraying.
[0027] Furthermore, the interior of the bottom pool 2 is divided into four areas by a partition 23, so as to facilitate desludging operations in each area.
[0028] Furthermore, the inner pipe 21 is a fan-shaped structure, and a plurality of inner pipes 21 are distributed in a ring structure, so that the high-pressure spray can be sprayed out evenly.
[0029] Furthermore, a plurality of support blocks 43 are installed at the bottom of the delivery pipe 4 to prevent wear between the delivery pipe 4 and the ground.
[0030] Furthermore, the inner pipes 21 in each area are arranged in three groups at equal intervals to ensure uniform spraying of the spray.
[0031] When the antimony ore tailings desludging tank of the utility model is used, when the tailings enter the cylindrical structure tank through the top opening of the desludging tank 1, they first contact the inner pipes 21 in the bottom tank 2. These inner pipes 21 are fan-shaped and distributed in a ring manner to ensure that the tailings can be treated evenly. The inner pipes 21 in each area are divided into three groups and arranged at equal intervals, which further enhances the uniformity of treatment.
[0032] A plurality of nozzles 211 are mounted on the outer wall of the inner pipe 21, and these nozzles are responsible for generating high-pressure spray. The spray is formed by the water pipe 41 and the air pipe 42 in the delivery pipe 4. The water pipe 41 provides water, and the air pipe 42 provides compressed air. The two are mixed in the U-shaped pipe 51 of the riser 5 to form an air-water mixture, which then enters the bottom pool 2 through the mixing pipe 52 and is sprayed out from the nozzle 211 in the form of high-pressure spray.
[0033] The function of high-pressure spray is to activate the tailings into slurry and remove the muddy components. The activated tailings have better fluidity and filling performance, and are suitable for filling operations in mine goafs.
[0034] The interior of the bottom pool 2 is divided into four areas by a partition 23. This design allows the tailings to be desludified in different areas, thereby improving the processing efficiency. The treated tailings slurry enters the slurry discharge pipe 3 through the discharge port 22 in the middle of the bottom pool 2, and is finally discharged from the desludging tank for subsequent use.
[0035] During the whole process, the bottom of the desludging tank 1 is supported by the columns 12 and the inclined rods 11 to ensure the stability and safety of the structure. At the same time, a support block 43 is installed at the bottom of the delivery pipe 4 to prevent the pipe from directly contacting the ground and causing wear.
[0036] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. An antimony ore tailings desludging tank, comprising a desludging tank (1), characterized in that: The desludging tank (1) is a cylindrical structure with an opening at the top. A bottom tank (2) is installed at the bottom of the desludging tank (1). The bottom of the bottom tank (2) is connected to a slurry discharge pipe (3). A conveying pipe (4) is arranged below the bottom tank (2). A plurality of rising pipes (5) are connected between the conveying pipe (4) and the bottom tank (2). A plurality of inner pipes (21) are arranged inside the bottom tank (2). A discharge port (22) is arranged in the middle of the bottom tank (2). The outside of the discharge port (22) is connected to the slurry discharge pipe (3). A plurality of nozzles (211) are installed on the outer wall of the inner pipe (21).
2. The antimony ore tailings desludging pond according to claim 1, characterized in that: A column (12) is installed at the bottom of the desludging tank (1).
3. The antimony ore tailings desludging pond according to claim 1, characterized in that: An inclined rod (11) is installed on the outer side of the bottom of the desludging tank (1).
4. The antimony ore tailings desludging pond according to claim 1, characterized in that: The delivery pipe (4) comprises a water pipe (41) and an air pipe (42), the riser (5) comprises a U-shaped pipe (51), the top of the U-shaped pipe (51) is connected to a mixing pipe (52), the top of the mixing pipe (52) is connected to the bottom pool (2), and the two ends of the bottom of the U-shaped pipe (51) are respectively connected to the water pipe (41) and the air pipe (42).
5. The antimony ore tailings desludging pond according to claim 1, characterized in that: The interior of the bottom tank (2) is divided into four areas by partitions (23).
6. The antimony ore tailings desludging pond according to claim 1, characterized in that: The inner pipe (21) is a fan-shaped structure, and a plurality of the inner pipes (21) are distributed in a ring structure.
7. The antimony ore tailings desludging pond according to claim 1, characterized in that: A plurality of support blocks (43) are installed at the bottom of the delivery pipe (4).
8. The antimony ore tailings desludging pond according to claim 5, characterized in that: The inner pipes (21) in each area are in three groups and are arranged at equal intervals.