Efficient dust falling device for green building engineering garbage treatment
By introducing dust collectors and spray parts into the construction waste treatment device, the problem of dust pollution during the crushing process is solved, effective dust absorption and waste wetting treatment are achieved, protecting the health of workers and reducing the risk of dust .
Patent Information
- Application Number
- CN202323521678.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-22
AI Technical Summary
Existing construction waste treatment equipment generates a large amount of dust during crushing and unloading, causing air pollution and health risks to workers.
An efficient dust reduction device including a dust collector and a sprayer is designed. The dust collector is used to absorb dust during crushing. The sprayer wets the crushed waste through an atomizing nozzle to reduce dust during transportation.
It effectively reduces the emission of dust during the crushing process, protects the health of workers, and avoids the generation of dust again during the handling process.
Smart Images

Figure CN221869683U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering waste treatment, in particular to a high-efficiency dust reduction device for green construction engineering waste treatment. Background Art
[0002] Construction waste is solid waste generated during the construction, reconstruction, expansion or demolition of buildings. According to the different sources of construction waste, it can be divided into construction waste and demolition waste. Construction waste treatment is a way to reuse solid waste as renewable resources. The Chinese patent announcement number is: CN 217164742 U, a construction waste treatment device for construction projects, and its beneficial effects are: the utility model uses the structural design of the crushing and screening mechanism to make the device convenient for volume screening of crushed construction waste, speed up work efficiency, and improve the flexibility of the device. However, when the device crushes and discharges construction waste, a large amount of dust will be generated, which will not only pollute the air, but also be inhaled by the staff, which will also affect the health of the staff. Utility Model Content
[0003] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and utility model name of this application to avoid blurring the purpose of this section, specification abstract and utility model name, and such simplifications or omissions cannot be used to limit the scope of the utility model.
[0004] In view of the above-mentioned and / or existing problems in the existing high-efficiency dust reduction devices for waste treatment in green building projects, the present utility model is proposed.
[0005] Therefore, the problem to be solved by the utility model is that when the device crushes and discharges construction waste, a large amount of dust will be generated, which will not only pollute the air, but also the dust will be inhaled into the body of the workers, which will also affect the health of the workers.
[0006] In order to solve the above technical problems, the utility model provides the following technical solutions: a high-efficiency dust reduction device for green building engineering waste treatment, comprising a main body assembly, including a box, a support column, a feeding port, a crushing device, a discharge port and a moving part, wherein the support column is fixed to the bottom of the box, the feeding port is arranged at the top of the box, the crushing device is arranged on the box, the discharge port is arranged on one side of the box, and the moving part is rotatably connected to the bottom of the support column; and
[0007] The dust reduction component is arranged on the main body component, and comprises a dust suction component and a spray component. The dust suction component is arranged on the box body, and the spray component is arranged on one side of the box body.
[0008] As a preferred solution of the high-efficiency dust reduction device for green construction project waste treatment described in the utility model, the movable part includes a rotating column, a positioning frame and a wheel, the rotating column is rotatably connected to the bottom of the support column, the positioning frame is fixed to one end of the rotating column, and the wheel is rotatably connected to the positioning frame.
[0009] As a preferred solution of the high-efficiency dust reduction device for green building project waste treatment described in the utility model, the dust suction component includes a collection box, a dust suction device, a dust suction hood and a first duct, the collection box is fixed to the top of the crushing device, the dust suction device is fixed to the top of the collection box, the dust suction hood is fixed to the top of the box body, and the two ends of the first duct are respectively connected to the dust suction device and the dust suction hood.
[0010] As a preferred solution of the high-efficiency dust reduction device for green building engineering waste treatment described in the utility model, the dust collecting component also includes a fixed frame and a protective net, the fixed frame is fixed on the box body, and the protective net is fixed on the fixed frame.
[0011] As a preferred solution of the high-efficiency dust reduction device for green building project waste treatment described in the utility model, the spraying part includes a fixed plate, a second conduit, a connecting pipe, an atomizing nozzle and a sealing ring, the fixed plate is fixed to one side of the box body, the second conduit is fixed to the fixed plate, the connecting pipe is fixed to one side of the second conduit, the atomizing nozzle is threadedly connected to the connecting pipe, and the sealing ring is arranged on the connecting pipe.
[0012] As a preferred solution of the high-efficiency dust reduction device for green building project waste treatment described in the utility model, wherein: the spraying part also includes a support plate, a water tank, a booster pump and a third conduit, the support plate is fixed to one side of the box body, the water tank is fixed to the top of the support plate, the booster pump is fixed to the top of the support plate, the booster pump is connected to the water tank, and the two ends of the third conduit are respectively connected to the second conduit and the booster pump.
[0013] The beneficial effects of the utility model are as follows: through the provision of the dust suction part, it is used to absorb a large amount of dust generated when the crushing device crushes construction waste; through the provision of the spraying part, it is used to reduce the smoke and dust generated by the waste discharged after the crushing is completed; at the same time, the crushed waste can be wetted, thereby avoiding the generation of dust during transportation. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the following briefly introduces the drawings required for the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0015] Figure 1 This is the overall structure diagram of the high-efficiency dust reduction device for waste treatment in green construction projects.
[0016] Figure 2 This is a cross-sectional structural diagram of the dust collection component of a high-efficiency dust reduction device for waste treatment in green building projects.
[0017] Figure 3 This is a cross-sectional structural diagram of the spraying components of a high-efficiency dust suppression device for waste treatment in green building projects.
[0018] In the figure: 101, box body; 102, support column; 103, feeding port; 104, crushing device; 105, discharge port; 106a, rotating column; 106b, positioning frame; 106c, wheel; 201a, collecting box; 201b, dust collection device; 201c, dust collection hood; 201d, first duct; 201e, fixing frame; 201f, protection net; 202a, fixing plate; 202b, second duct; 202c, connecting pipe; 202d, atomizing nozzle; 202e, sealing ring; 202f, support plate; 202g, water tank; 202h, booster pump; 202i, third duct. DETAILED DESCRIPTION
[0019] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0020] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0021] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments. Example
[0022] Reference Figure 1~Figure 3, which is the first embodiment of the utility model, and this embodiment provides a high-efficiency dust reduction device for green building engineering waste treatment. The high-efficiency dust reduction device for green building engineering waste treatment includes a main body component 100 and a dust reduction component 200. Through the cooperation of the two, dust reduction can be carried out quickly.
[0023] The main component 100 includes a box body 101, a support column 102, a feeding port 103, a crushing device 104, a discharge port 105 and a moving part 106. The support column 102 is fixed to the bottom of the box body 101, the feeding port 103 is arranged on the top of the box body 101, the crushing device 104 is arranged on the box body 101, the discharge port 105 is arranged on one side of the box body 101, and the moving part 106 is rotatably connected to the bottom of the support column 102.
[0024] The support column 102 is used to support and fix the box body 101. The feeding port 103 is used to facilitate the addition of construction waste into the box body 101. The crushing device 104 is used to crush the construction waste. The discharge port 105 is used to discharge the crushed construction waste. The movable part 106 is used to facilitate the transportation of the device.
[0025] The dust reduction component 200 is arranged on the main component 100 , and includes a dust suction component 201 and a spray component 202 . The dust suction component 201 is arranged on the box body 101 , and the spray component 202 is arranged on one side of the box body 101 .
[0026] The dust collecting part 201 is used to absorb a large amount of dust generated when the crushing device 104 crushes construction waste. The spraying part 202 is used to reduce the smoke and dust generated by the waste discharged after the crushing is completed. At the same time, the crushed waste can be wetted to avoid dust during transportation. Example
[0027] Reference Figure 1~Figure 3 , which is the second embodiment of the utility model, and this embodiment is based on the previous embodiment.
[0028] Specifically, the moving member 106 includes a rotating column 106a, a positioning frame 106b and a wheel 106c. The rotating column 106a is rotatably connected to the bottom of the support column 102, the positioning frame 106b is fixed to one end of the rotating column 106a, and the wheel 106c is rotatably connected to the positioning frame 106b.
[0029] The rotating column 106a is provided to drive the positioning frame 106b to rotate, thereby driving the wheels 106c to turn in different directions, thereby facilitating the movement of the device.
[0030] Specifically, the dust collecting part 201 includes a collecting box 201a, a dust collecting device 201b, a dust collecting hood 201c and a first duct 201d. The collecting box 201a is fixed to the top of the crushing device 104, the dust collecting device 201b is fixed to the top of the collecting box 201a, the dust collecting hood 201c is fixed to the top of the box body 101, and both ends of the first duct 201d are respectively connected to the dust collecting device 201b and the dust collecting hood 201c.
[0031] The collecting box 201a is provided to collect dust, and the dust collecting device 201b is provided to generate suction force, which is then transmitted to the dust collecting hood 201c through the first conduit 201d, thereby absorbing dust generated when crushing construction waste.
[0032] Specifically, the dust collecting member 201 further includes a fixing frame 201e and a protection net 201f. The fixing frame 201e is fixed on the box body 101, and the protection net 201f is fixed on the fixing frame 201e.
[0033] The fixing frame 201e is used to fix the protective net 201f. The protective net 201f is used to prevent larger construction waste from being splashed into the first conduit 201d, thereby clogging the first conduit 201d or damaging the dust collecting device 201b. Example
[0034] Reference Figure 1~Figure 3 , which is the third embodiment of the utility model, and this embodiment is based on the first two embodiments.
[0035] Specifically, the spraying member 202 includes a fixing plate 202a, a second conduit 202b, a connecting pipe 202c, an atomizing nozzle 202d and a sealing ring 202e. The fixing plate 202a is fixed to one side of the box body 101, the second conduit 202b is fixed to the fixing plate 202a, the connecting pipe 202c is fixed to one side of the second conduit 202b, the atomizing nozzle 202d is threadedly connected to the connecting pipe 202c, and the sealing ring 202e is arranged on the connecting pipe 202c.
[0036] The fixing plate 202a is used to fix the second conduit 202b, and the second conduit 202b is used to transport water. The connecting pipe 202c is used to connect the atomizing nozzle 202d, and the atomizing nozzle 202d is used to atomize and spray water, thereby absorbing dust generated during discharge. The sealing ring 202e is used to increase the sealing between the connecting pipe 202c and the atomizing nozzle 202d.
[0037] Specifically, the spraying member 202 also includes a support plate 202f, a water tank 202g, a booster pump 202h and a third conduit 202i. The support plate 202f is fixed to one side of the box body 101, the water tank 202g is fixed to the top of the support plate 202f, the booster pump 202h is fixed to the top of the support plate 202f, the booster pump 202h is connected to the water tank 202g, and both ends of the third conduit 202i are respectively connected to the second conduit 202b and the booster pump 202h.
[0038] The support plate 202f is used to support and fix the water tank 202g and the booster pump 202h. The water tank 202g is used to store water. The booster pump 202h is used to extract the water in the water tank 202g and boost the pressure. The third conduit 202i is used to transport the pressurized water flow to the second conduit 202b.
[0039] During use, when it is necessary to reduce the dust generated when the construction waste is crushed, first turn on the dust suction device 201b to generate suction, and then transmit the suction force to the dust hood 201c through the first duct 201d, and increase the dust suction area through the dust hood 201c, so as to absorb a large amount of dust generated when the construction waste is crushed, and transport it to the collection box 201a for collection. When unloading, turn on the booster pump 202h at the same time to extract the water flow in the water tank 202g and increase the pressure, and then transport it to the second duct 202b through the third duct 202i, and then transport it to the atomizing nozzle 202d for atomization spraying, so as to absorb the dust generated during unloading, and then reduce the dust. At the same time, the atomized water flow can also wet the surface of the crushed construction waste, so as to avoid the generation of dust again during transportation.
[0040] It should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.
Claims
1. A high-efficiency dust suppression device for green construction engineering waste treatment, characterized by: include, A main body component (100) comprises a box (101), a support column (102), a feeding port (103), a crushing device (104), a discharge port (105) and a moving part (106), wherein the support column (102) is fixed to the bottom of the box (101), the feeding port (103) is arranged at the top of the box (101), the crushing device (104) is arranged on the box (101), the discharge port (105) is arranged on one side of the box (101), and the moving part (106) is rotatably connected to the bottom of the support column (102); and, The dust reduction component (200) is arranged on the main body component (100), and comprises a dust suction component (201) and a spray component (202); the dust suction component (201) is arranged on the box body (101); the spray component (202) is arranged on one side of the box body (101); the moving component (106) comprises a rotating column (106a), a positioning frame (106b) and a wheel (106c); the rotating column (106a) is rotatably connected to the bottom of the supporting column (102); the positioning frame (106b) is arranged on the side of the supporting column (102); 06b) is fixed to one end of the rotating column (106a), the wheel (106c) is rotatably connected to the positioning frame (106b), the dust collecting member (201) comprises a collection box (201a), a dust collecting device (201b), a dust collecting hood (201c) and a first conduit (201d), the collection box (201a) is fixed to the top of the crushing device (104), the dust collecting device (201b) is fixed to the top of the collection box (201a), and the dust collecting hood (201c) is fixed to the top of the crushing device (104). At the top of the box (101), two ends of the first conduit (201d) are respectively connected to the dust collecting device (201b) and the dust collecting cover (201c); the dust collecting member (201) further comprises a fixing frame (201e) and a protective net (201f); the fixing frame (201e) is fixed on the box (101); the protective net (201f) is fixed on the fixing frame (201e); the spraying member (202) comprises a fixing plate (202a), a second conduit (202b), and a second conduit (202c). ), a connecting pipe (202c), an atomizing nozzle (202d) and a sealing ring (202e), the fixing plate (202a) being fixed to one side of the box body (101), the second conduit (202b) being fixed to the fixing plate (202a), the connecting pipe (202c) being fixed to one side of the second conduit (202b), the atomizing nozzle (202d) being threadedly connected to the connecting pipe (202c), and the sealing ring (202e) being arranged on the connecting pipe (202c).
2. The high-efficiency dust suppression device for green construction engineering waste treatment as claimed in claim 1, characterized in that: The spraying member (202) further comprises a support plate (202f), a water tank (202g), a booster pump (202h) and a third conduit (202i); the support plate (202f) is fixed to one side of the box body (101); the water tank (202g) is fixed to the top of the support plate (202f); the booster pump (202h) is fixed to the top of the support plate (202f); the booster pump (202h) is connected to the water tank (202g); and two ends of the third conduit (202i) are respectively connected to the second conduit (202b) and the booster pump (202h).