Cooling tower for hot galvanizing processing

By designing the filter box and related structures in the cooling tower, the clogging problem caused by the lack of filtering device at the water inlet of the cooling tower is solved, the cooling water is effectively filtered and purified, and the service life of the equipment is extended.

CN221877142UActive Publication Date: 2024-10-22TIANJIN NEW SHIWANGDA NEW MATERIAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420316848.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-22
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

The existing cooling tower device lacks a filter device at the water inlet, resulting in long-term accumulation of iron-containing impurities in the cooling water, causing blockage of the packing and sprinkling ports in the tower, and affecting the use of the cooling tower.

Method used

A cooling tower including a filter box is designed. Impurities are filtered through magnets and scrapers in the filter box. Water plugs and rubber plugs prevent water from flowing out. Water diversion plates and buffer plates reduce the impact of water flow to ensure the purity and filtration of cooling water. efficiency.

Benefits of technology

Effectively filters iron-containing impurities in cooling water to prevent clogging, ensure the normal use of the cooling tower, improve water purity and extend the service life of the filter box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877142U_ABST
    Figure CN221877142U_ABST
Patent Text Reader

Abstract

The utility model provides a cooling tower for hot galvanizing processing, which relates to the technical field of industrial galvanizing and comprises a cooling tower main body, one side of the cooling tower main body is fixedly connected with a first water inlet pipe, the top of the first water inlet pipe is fixedly connected with a filter box, and the outer surface of the filter box is fixedly connected with a second water inlet pipe; a support is arranged at the bottom of the filter box, and a water blocking plate is arranged on one side of the filter box. According to the cooling tower disclosed by the utility model, by designing the filter box, water sucked out from the cooling pond can be conveniently filtered, iron-containing impurities in the water can be filtered out, and a filler and a sprinkling pipe in the cooling tower main body are prevented from being blocked; and a magnet is embedded in the bin bottom, so that iron-containing impurities in used cooling water can be conveniently adsorbed to the bin bottom, and water entering the first water inlet pipe is purer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of industrial galvanizing, in particular to a cooling tower for hot-dip galvanizing processing. Background Art

[0002] Hot dip coating is a method of coating the metal material by immersing it in other liquid metals or alloys with lower melting points.

[0003] The basic characteristic of hot-dip galvanizing of steel materials is that an alloy layer is formed between the steel substrate and the zinc coating, and when the surface of the steel part is taken out of the molten zinc liquid, a layer of molten zinc adheres to the surface of the alloy layer, and forms a zinc coating after cooling and solidification. Since some hot-dip galvanizing workshops cannot directly access water sources to cool the parts after hot-dip galvanizing, it is necessary to use a cooling tower to circulate cooling water. The existing cooling tower device generally does not have a filtering device at the water inlet, and the cooling water will inevitably contain iron impurities when the iron parts are immersed in it for a long time. The long-term use of impurities will cause the filling and sprinkler in the tower to be blocked, affecting the use of the cooling tower. Utility Model Content

[0004] The purpose of the utility model is to solve the shortcomings existing in the prior art. The water inlet of the existing cooling tower device generally does not have a device for filtering iron-containing impurities. Long-term use of impurities will cause the filling and water sprinkling port in the tower to be blocked, affecting the use of the cooling tower. A cooling tower for hot-dip galvanizing processing is provided.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a cooling tower for hot-dip galvanizing processing, comprising a cooling tower body, a first water inlet pipe is fixedly connected to one side of the cooling tower body, a filter box is fixedly connected to the top of the first water inlet pipe, a second water inlet pipe is fixedly connected to the outer surface of the filter box, a bracket is arranged at the bottom of the filter box, a water blocking plate is arranged at one side of the filter box, a filter bin is opened on the inner wall of the filter box, a bin bottom is arranged at the bottom of the filter bin, a magnet is inlaid at the bottom of the bin bottom, a scraper is movably connected to the inner wall of the bin bottom, a water blocking plug is arranged on one side of the scraper, a water diversion plate is fixedly connected to the inner wall of the filter bin, a buffer plate is arranged on one side of the water diversion plate, and plate frames are snap-connected on both sides of the buffer plate.

[0006] As a preferred embodiment, a rotating shaft is provided at the bottom of the water blocking plate, a pressure plate is fixedly connected to the outer surface of the rotating shaft, a fixing sleeve is fixedly connected to the outer surface of the pressure plate, a fixed support is fixedly connected to one side of the filter box, and a hexagon socket bolt is fixedly connected to the top of the fixed support through a thread.

[0007] As a preferred implementation, the top of the hexagon socket bolt is arranged on the inner side of the fixing sleeve, and the outer surface of the hexagon socket bolt is movably connected to the inner wall of the fixing sleeve.

[0008] As a preferred embodiment, a scraper is fixedly connected to the top of the scraper strip, and the outer surface of the scraper is movably connected to the inner wall of the filter bin.

[0009] As a preferred embodiment, one side of the plate frame is fixedly connected to the inner wall of the filter bin, and both sides of the buffer plate are fixedly connected to the inner wall of the filter bin through the plate frame.

[0010] As a preferred embodiment, a rubber plug is provided on the outer surface of the water blocking plug, one side of the rubber plug is fixedly connected to the outer surface of the water blocking plate, a cleaning slot is provided on one side of the filter box, and the outer surfaces of the water blocking plug and the scraper strip are both engaged and connected with the inner wall of the cleaning slot.

[0011] As a preferred implementation, one side of the water blocking plug is fixedly connected to one side of the water blocking plate, and the top of the scraper strip is fixedly connected to the outer surface of the water blocking plate.

[0012] Compared with the prior art, the advantages and positive effects of the utility model are:

[0013] The utility model is convenient for filtering water sucked out from the cooling pool by designing a filter box, filtering out iron-containing impurities in the water, and preventing clogging of fillers and sprinkler pipes in the cooling tower body; by arranging a first water inlet pipe, the filtered cooling water enters the cooling tower body from the first water inlet pipe; by embedding magnets inside the bottom of the bin, the iron-containing impurities in the cooling water after use are conveniently adsorbed at the bottom of the bin, so that the water quality entering the first water inlet pipe is purer; by arranging scrapers and scrapers on the sides of the bin bottom, the adsorbed impurities are conveniently pulled toward the cleaning notch; by designing a water plug and a rubber plug, the cleaning notch is conveniently blocked to prevent cooling water from flowing out; by designing a water guide plate, unfiltered cooling water is prevented from directly flowing into the first water inlet pipe, and the cooling water is guided to the bottom of the bin for adsorption and filtration; by designing a buffer plate, water is prevented from flowing into the filter bin to generate impact force, and long-term use causes damage to the filter box. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 The utility model provides a schematic structural diagram of a cooling tower for hot-dip galvanizing processing.

[0015] Figure 2 The utility model provides a side sectional stereoscopic view of a filter box of a cooling tower for hot-dip galvanizing processing.

[0016] Figure 3 The utility model provides a schematic structural diagram of a scraper portion of a cooling tower for hot-dip galvanizing processing.

[0017] Figure 4 The utility model provides a front cross-sectional stereoscopic view of a filter box of a cooling tower for hot-dip galvanizing processing.

[0018] Legend:

[0019] 1. Cooling tower body; 2. First water inlet pipe; 3. Filter box; 4. Second water inlet pipe; 5. Bracket; 6. Water blocking plate; 7. Rotating shaft; 8. Pressing plate; 9. Fixed sleeve; 10. Filter bin; 11. Bin bottom; 12. Magnet; 13. Scraper strip; 14. Water blocking plug; 15. Water guide plate; 16. Buffer plate; 17. Plate frame; 18. Rubber plug; 19. Scraper; 20. Fixed support; 21. Hexagon socket bolt. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] Example 1

[0022] like Figure 1-Figure 4 As shown, the utility model provides a technical solution: a cooling tower for hot-dip galvanizing processing, comprising a cooling tower body 1, a first water inlet pipe 2 is fixedly connected to one side of the cooling tower body 1, a filter box 3 is fixedly connected to the top of the first water inlet pipe 2, a cleaning slot is provided on one side of the filter box 3, the outer surfaces of a water plug 14 and a scraper 13 are both engaged with the inner wall of the cleaning slot, a second water inlet pipe 4 is fixedly connected to the outer surface of the filter box 3, a bracket 5 is arranged at the bottom of the filter box 3, a water plugging plate 6 is arranged on one side of the filter box 3, a filter bin 10 is provided on the inner wall of the filter box 3, a bin bottom 11 is arranged at the bottom of the filter bin 10, a magnet 12 is inlaid at the bottom of the bin bottom 11, a scraper 13 is movably connected to the inner wall of the bin bottom 11, and the scraper 1 3 is fixedly connected to the outer surface of the water blocking plate 6, the top of the scraper strip 13 is fixedly connected with a scraper plate 19, the outer surface of the scraper plate 19 is movably connected to the inner wall of the filter bin 10, a water blocking plug 14 is provided on one side of the scraper strip 13, one side of the water blocking plug 14 is fixedly connected to one side of the water blocking plate 6, a rubber plug 18 is provided on the outer surface of the water blocking plug 14, one side of the rubber plug 18 is fixedly connected to the outer surface of the water blocking plate 6, a water guide plate 15 is fixedly connected to the inner wall of the filter bin 10, a buffer plate 16 is provided on one side of the water guide plate 15, both sides of the buffer plate 16 are snap-connected with a plate frame 17, one side of the plate frame 17 is fixedly connected to the inner wall of the filter bin 10, and both sides of the buffer plate 16 are fixedly connected to the inner wall of the filter bin 10 through the plate frame 17.

[0023] In this embodiment, by fixing the filter box 3 on one side of the second water inlet pipe 4, it is convenient to filter the water sucked out from the cooling pool, filter out the iron-containing impurities in the water, and prevent the fillers and sprinkler pipes in the cooling tower body 1 from being blocked. By setting the first water inlet pipe 2 at the bottom of the rear side of the filter box 3, the filtered cooling water enters the cooling tower body 1 from the first water inlet pipe 2. By designing the bracket 5, it is convenient to support the filter box 3 on one side of the cooling tower body 1. By embedding the magnet 12 inside the bin bottom 11, it is convenient to adsorb the iron-containing impurities in the used cooling water at the bin bottom 11, so that the water quality entering the first water inlet pipe 2 is purer. By setting the scraper strip 13 on the side of the bin bottom 11, and one end of the scraper strip 13 is fixedly connected to the scraper 19, it is convenient to pull the scraper Strip 13 enables the scraper 19 to pull the adsorbed impurities toward the cleaning slot. The water plug 14 is designed to engage with the cleaning slot, and a rubber plug 18 is provided at the connection between the water plug 14 and the water plug plate 6, so that the edge of the cleaning slot is pressed by the rubber plug 18, which is convenient for blocking the cleaning slot to prevent the cooling water from flowing out. The water guide plate 15 is fixedly connected to the inner wall of the filter bin 10 to prevent the unfiltered cooling water from directly flowing into the first water inlet pipe 2, and the cooling water is guided to the bin bottom 11 for adsorption filtration. The buffer plate 16 is designed to prevent water from flowing into the filter bin 10 to generate impact force, which may cause damage to the filter box 3 due to long-term use. The outer surface of the filter bin 10 is provided with a plurality of inclined plates, which can make the impurities in the water undergo a simple sedimentation process and further reduce the impact force of the water flow.

[0024] Example 2

[0025] like Figure 4 As shown, a rotating shaft 7 is provided at the bottom of the water blocking plate 6, a pressure plate 8 is fixedly connected to the outer surface of the rotating shaft 7, a fixing sleeve 9 is fixedly connected to the outer surface of the pressure plate 8, a fixing support 20 is fixedly connected to one side of the filter box 3, a hexagon socket bolt 21 is fixedly connected to the top of the fixing support 20 by a thread, the top of the hexagon socket bolt 21 is provided on the inner side of the fixing sleeve 9, and the outer surface of the hexagon socket bolt 21 is movably connected to the inner wall of the fixing sleeve 9.

[0026] In this embodiment, by designing the rotating shaft 7 and the pressure plate 8 at its upper end, it is convenient for the bottom of the pressure plate 8 to rotate with the rotating shaft 7 as the central fulcrum. By designing the fixing sleeve 9, it is convenient to confine the hexagon socket bolt 21 in the internal space of the fixing sleeve 9. The inner wall of the fixing sleeve 9 is engaged with the top surface of the hexagon socket bolt 21. The opening of the fixing sleeve 9 is smaller than the outer ring diameter of the hexagon socket bolt 21 and larger than the lateral distance of the top angle of the hexagon socket, so that the hexagon socket bolt 21 can be connected to the fixed support 20 in the space of the fixing sleeve 9 to prevent the bolt from being unscrewed and lost after being placed arbitrarily when the cleaning slot is opened. The pressure plate 8 is gradually tightened between the hexagon socket bolt 21 and the fixed support 20 to close the water blocking plate 6 to the edge of the cleaning slot. Two pressure plates 8 structures are provided to prevent the water blocking plate 6 from being easily loosened.

[0027] Working principle:

[0028] like Figure 1-Figure 4 As shown, when in use, cooling water enters the filter bin 10 of the filter box 3 from the second water inlet pipe 4, flows directly to the buffer plate 16 to reduce the impact force of the water flow, and then flows to the water guide plate 15. The cooling water is led to the bin bottom 11, and the iron-containing impurities are adsorbed and filtered through the magnet 12, and finally enters the tower from the first water inlet pipe 2. When cleaning the bin bottom 11, the hexagonal bolt 21 is screwed with a hexagonal wrench, and the hexagonal bolt 21 and the fixed support 20 are gradually loosened. After the hexagonal bolt 21 is separated from the fixed support 20, the pressure plate 8 is flipped away from the water blocking plate 6, and the water blocking plate 6 is pulled out of the cleaning slot, and the scraper strip 13 and the scraper 19 are driven to move at the same time. The scraper 19 pulls the adsorbed impurities to the cleaning slot, and is re-inserted into the cleaning slot after being pulled out of the cleaning slot. Finally, the pressure plate 8 is flipped on the surface of the water blocking plate 6 and the hexagonal bolt 21 is tightened on the fixed support 20, and the edge of the cleaning slot is tightly fitted with the rubber plug 18 through pressure.

[0029] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A cooling tower for hot dip galvanizing, comprising a cooling tower body (1), characterized in that: A first water inlet pipe (2) is fixedly connected to one side of the cooling tower body (1), a filter box (3) is fixedly connected to the top of the first water inlet pipe (2), a second water inlet pipe (4) is fixedly connected to the outer surface of the filter box (3), a bracket (5) is arranged at the bottom of the filter box (3), a water blocking plate (6) is arranged at one side of the filter box (3), a filter bin (10) is provided on the inner wall of the filter box (3), a bin bottom (11) is arranged at the bottom of the filter bin (10), a magnet (12) is embedded at the bottom of the bin bottom (11), a scraper (13) is movably connected to the inner wall of the bin bottom (11), a water blocking plug (14) is arranged at one side of the scraper (13), a water guide plate (15) is fixedly connected to the inner wall of the filter bin (10), a buffer plate (16) is arranged at one side of the water guide plate (15), and plate frames (17) are snap-connected to both sides of the buffer plate (16).

2. A cooling tower for hot dip galvanizing according to claim 1, characterized in that: A rotating shaft (7) is provided at the bottom of the water blocking plate (6), a pressure plate (8) is fixedly connected to the outer surface of the rotating shaft (7), a fixing sleeve (9) is fixedly connected to the outer surface of the pressure plate (8), a fixing support (20) is fixedly connected to one side of the filter box (3), and a hexagon socket bolt (21) is fixedly connected to the top of the fixing support (20) via a thread.

3. A cooling tower for hot dip galvanizing according to claim 2, characterized in that: The top of the hexagon socket bolt (21) is arranged on the inner side of the fixing sleeve (9), and the outer surface of the hexagon socket bolt (21) is movably connected to the inner wall of the fixing sleeve (9).

4. A cooling tower for hot dip galvanizing according to claim 1, characterized in that: A scraper (19) is fixedly connected to the top of the scraper strip (13), and the outer surface of the scraper (19) is movably connected to the inner wall of the filter bin (10).

5. A cooling tower for hot dip galvanizing according to claim 1, characterized in that: One side of the plate frame (17) is fixedly connected to the inner wall of the filter bin (10), and both sides of the buffer plate (16) are fixedly connected to the inner wall of the filter bin (10) through the plate frame (17).

6. A cooling tower for hot dip galvanizing according to claim 1, characterized in that: The outer surface of the water plug (14) is provided with a rubber plug (18), one side of the rubber plug (18) is fixedly connected to the outer surface of the water plug plate (6), one side of the filter box (3) is provided with a cleaning slot, and the outer surfaces of the water plug (14) and the scraper (13) are both snap-fitted and connected to the inner wall of the cleaning slot.

7. A cooling tower for hot dip galvanizing according to claim 1, characterized in that: One side of the water blocking plug (14) is fixedly connected to one side of the water blocking plate (6), and the top of the scraper strip (13) is fixedly connected to the outer surface of the water blocking plate (6).