By designing a movable pouring bucket and tapered structure, the problem of difficult control of the amount of manual concrete pouring is solved, and the efficiency and quality of road construction are improved.

CN221877610UActive Publication Date: 2024-10-22JINAN YELLOW RIVER CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420418594.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-10-22
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

In road construction, when pouring concrete manually, due to the narrow distance between side forms, the amount of concrete poured is difficult to control, which affects the pouring quality.

Method used

A tool is designed that includes a side form extending longitudinally along the road and a movable pouring bucket. The pouring bucket is equipped with wheels and limiting rings, and has conical parts and holes inside to evenly distribute concrete and connect it through the connection. Rod and hinged structure increase stability.

Benefits of technology

It realizes the movement of the pouring bucket and the even falling of the concrete, expands the distance between the side forms, and improves the construction efficiency and pouring quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877610U_ABST
    Figure CN221877610U_ABST
Patent Text Reader

Abstract

The construction road side formwork pouring tool comprises a side formwork, a pouring hopper with the wide upper portion and the narrow lower portion is arranged above the side formwork, and the pouring hopper is provided with a walking wheel set and can move on the upper edge of the side formwork; the width of the rotating wheel is larger than the thickness of the side mold, and limiting circular rings are arranged on the inner side and the outer side of the rotating wheel; a conical part is arranged in the pouring hopper, and holes are distributed in the surface of the conical part. The problems that in the prior art, the concrete pouring amount of the road side formwork is not easy to control, and the pouring quality is low are solved, the construction efficiency can be improved, and concrete is evenly distributed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of engineering construction technology, and specifically relates to a road construction side form casting tool. Background Art

[0002] During the construction of municipal engineering roads, side forms need to be set up to control the width of the road structure layer. The space formed by the side forms is relatively narrow and long. The commonly used method of pouring concrete is for workers to pour it into the formwork with a shovel. During manual pouring, due to the narrow spacing between the side forms, workers can only tilt the shovel to rely on the fluidity of the concrete to complete the pouring in the side form. Especially when pouring to the top of the side form, the amount of poured concrete is difficult to control, which can easily affect the pouring quality. Summary of the invention

[0003] The invention provides a construction road side form pouring tool, which solves the problem in the prior art that the amount of concrete poured in the road side form is difficult to control and the pouring quality is low.

[0004] The technical solution of the present invention is as follows:

[0005] A road construction side form casting tool, comprising a side form extending longitudinally along the road, a casting bucket which is wide at the top and narrow at the bottom is provided above the side form, and a walking wheel group which can be used for the casting bucket to move on the upper edge of the side form is provided on the side of the casting bucket; the walking wheel group also includes a rotating wheel and a connecting rod connected between the rotating wheel and the casting bucket, the width of the rotating wheel is greater than the thickness of the side form, and the inner side and the outer side of the rotating wheel are both provided with a limiting ring with a diameter greater than the rotating wheel;

[0006] A conical part protruding upward from the bottom surface of the pouring bucket is arranged inside the pouring bucket, and holes are distributed on the surface of the conical part.

[0007] Furthermore, the side of the casting bucket is provided with reinforcing ribs.

[0008] Furthermore, the diameter of the limiting circular ring on the inner side of the rotating wheel is smaller than the diameter of the limiting circular ring on the outer side of the rotating wheel.

[0009] Furthermore, a rubber sleeve is provided on the outer periphery of the rotating wheel.

[0010] Furthermore, the connecting rod is hingedly connected to the pouring bucket, and the connecting rod is provided with a horizontal support rod, one end of the support rod is fixedly connected to the connecting rod, and the other end is slidably connected to the pouring bucket.

[0011] Due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0012] 1. In this application, the casting bucket can be moved on the side mold by the rotating wheel, and the limiting rings inside and outside the rotating wheel can also prevent the casting bucket from tilting.

[0013] 2. The conical parts of the present application can be evenly scattered between the side molds by relying on the fluidity of the concrete. After the concrete falls on the conical surface, it will be scattered around the conical parts due to the action of gravity, and then fall into the side molds through the holes to complete the pouring.

[0014] 3. This application can indirectly expand the space between the side forms, increase the convenience of construction, and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application.

[0016] Figure 1 A schematic diagram of the overall structure of a road construction side formwork casting tool provided in this application;

[0017] Figure 2 A schematic diagram of the internal structure of a road construction side formwork casting tool provided in this application;

[0018] In the attached picture:

[0019] 1. Side form; 2. Casting bucket; 3. Travel wheel set; 4. Connecting rod; 5. Rotating wheel; 6. Limiting ring; 7. Reinforcing ribs; 8. Support rod; 9. Conical part; 10. Hole. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the content of the present invention, the present invention is further described in conjunction with the accompanying drawings and specific implementation methods.

[0021] Based on the background technology, in order to overcome the many problems caused by the manual casting of the side form 1, the present application provides a road construction side form 1 casting tool, including a side form 1 extending longitudinally along the road, a casting bucket 2 that is wide at the top and narrow at the bottom is provided above the side form 1, and a walking wheel group 3 is provided on the side of the casting bucket 2 for the casting bucket 2 to move on the upper edge of the side form 1; the walking wheel group 3 also includes a rotating wheel 5 and a connecting rod 4 connected between the rotating wheel 5 and the casting bucket 2, the width of the rotating wheel 5 is greater than the thickness of the side form 1, and the inner and outer sides of the rotating wheel 5 are provided with limiting rings 6 with a diameter greater than the rotating wheel 5; the inside of the casting bucket 2 is provided with a conical part protruding upward from the bottom surface of the casting bucket 2, and the surface of the conical part is distributed with holes.

[0022] As attached Figure 1 and attached Figure 2As shown, the side formwork 1 used in road construction can be a steel formwork, a wooden formwork or a formwork made of other materials. The two formworks are spaced at a certain distance. Supports are set on the outside of the formwork to improve the lateral strength. Steel bars are set between the two formworks to ensure that the formwork is vertical and maintains force. The formwork has a certain thickness, and the thickness of the formwork is close to the width of the runner 5 to ensure that the runner 5 can move forward or backward on the formwork. The casting bucket 2 in this application is wide at the top and narrow at the bottom, and is connected in the middle. The upper part can be square or rectangular, and gradually narrows from the upper part to the lower part to adapt to the distance between the two side forms 1. In this application, the inner and outer sides of the runner 5 are provided with a limiting ring 6. The diameter of the limiting ring 6 is larger than the diameter of the runner 5, which can prevent the runner 5 from moving in the lateral direction of the side formwork 1, so that the runner 5 can move better along the extension direction of the side formwork 1 to correct the offset route. The casting bucket 2 of the present application is provided with a conical part inside. The conical part is in the shape of a pyramid and has no bottom surface. There are holes distributed on the side of the conical part. After the construction workers pour the concrete into the casting bucket 2, the concrete flows evenly to various positions depending on its fluidity and then falls between the two templates to complete the casting.

[0023] As a preferred embodiment of the present application, the side of the pouring bucket 2 is provided with a reinforcing rib 7. Due to the high density of the filled concrete, in order to enhance the impact resistance of the side of the pouring bucket 2 during the pouring process, a reinforcing rib 7 is provided on the side of the pouring bucket 2.

[0024] As a preferred embodiment of the present application, the diameter of the limiting ring 6 inside the runner 5 is smaller than the diameter of the limiting ring 6 outside the runner 5. Since the inside of the casting will be frequently impacted by concrete, increasing the diameter of the outer limiting ring 6 can effectively prevent the outer limiting ring from slipping off the template and prevent the casting bucket 2 from tipping over.

[0025] As a preferred embodiment of the present application, a rubber sleeve is provided on the outer periphery of the rotating wheel 5 , and the rubber sleeve helps to reduce friction and increase the service life of the rotating wheel 5 .

[0026] As a preferred embodiment of the present application, the connecting rod 4 is hingedly connected to the pouring bucket 2, and the connecting rod 4 is provided with a horizontal support rod 8, one end of the support rod 8 is fixedly connected to the connecting rod 4, and the other end is slidably connected to the pouring bucket 2. The horizontal rod can adjust the direction of the connecting rod 4, and can provide sufficient redundant space for the swing of the pulley to obtain a buffer.

[0027] The above description is only the basic principle and preferred embodiments of the present invention. Improvements and substitutions made by those skilled in the art based on the present invention belong to the protection scope of the present invention.

Claims

1. A road construction side formwork casting tool, comprising a side formwork extending longitudinally along a road, It is characterized in that A casting bucket which is wide at the top and narrow at the bottom is provided above the side mold, and a walking wheel group is provided on the side of the casting bucket so that the casting bucket can move on the upper edge of the side mold; the walking wheel group also includes a rotating wheel and a connecting rod connected between the rotating wheel and the casting bucket, the width of the rotating wheel is greater than the thickness of the side mold, and the inner and outer sides of the rotating wheel are both provided with a limiting ring with a diameter greater than the rotating wheel; A conical part protruding upward from the bottom surface of the pouring bucket is arranged inside the pouring bucket, and holes are distributed on the surface of the conical part.

2. A road construction side form casting tool according to claim 1, It is characterized in that The side of the pouring bucket is provided with reinforcing ribs.

3. A road construction side form casting tool according to claim 1, It is characterized in that The diameter of the limiting circular ring on the inner side of the rotating wheel is smaller than the diameter of the limiting circular ring on the outer side of the rotating wheel.

4. A road construction side form casting tool according to claim 1, It is characterized in that A rubber sleeve is arranged on the outer periphery of the rotating wheel.

5. A road construction side form casting tool according to claim 1, It is characterized in that The connecting rod is hingedly connected to the pouring bucket, and the connecting rod is provided with a horizontal support rod, one end of the support rod is fixedly connected to the connecting rod, and the other end of the support rod is slidably connected to the pouring bucket.