Slope type breakwater breast wall structure and slope type breakwater

By designing a slope-type breast wall structure on the breakwater and using cutoff ditches and drainage channels to disperse the over-surging water, the problems of high breakwater construction costs and poor structural safety are solved, achieving safety and stability in extreme weather and a normal viewing landscape. Demand has improved the comprehensive utilization efficiency of breakwaters.

CN221877946UActive Publication Date: 2024-10-22HARBOUR ENG DESIGNING INST CO LTD CCCC FOURTH HARBOR ENG G
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420455342.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-22
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

When the existing technology increases the elevation of the breakwater top or the wave wall to enhance the shielding effect, it leads to problems such as high construction costs, difficulty in ensuring structural safety, and poor landscape effects. Especially in sea areas with poor wind and wave conditions, the wave wall cantilevers It is too large and easily damaged, making it difficult to meet the public's needs for sea viewing.

Method used

A slope-type breakwater breast wall structure is adopted, including the breast wall body, wave retaining wall, intercepting ditch and drainage channel. The breast wall body is equipped with an intercepting ditch and a drainage channel. The drainage channel connects the intercepting ditch and the outside, and a grille cover is erected on the top. The breast wall body is equipped with a protrusion at one end away from the wave-retaining wall, which intercepts the over-wave water through the intercepting ditch and disperses the water through the drainage channel to avoid the formation of secondary waves, ensure the safety and stability of the structure, and provide an ornamental landscape in normal times.

Benefits of technology

It achieves the safety and stability of the breakwater structure and the shielding effect of the harbor waters under extreme weather conditions, meets the viewing needs in normal times, reduces the construction cost and construction period, and improves the comprehensive utilization efficiency of the breakwater.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877946U_ABST
    Figure CN221877946U_ABST
Patent Text Reader

Abstract

The utility model provides a slope type breakwater breast wall structure and slope type breakway.The slope type breakwater breast wall structure comprises a breast wall body and a wave wall arranged at one end of the breast wall body, an intercepting ditch is formed in the breast wall body, a plurality of drainage channels are formed in the breast wall body, and the wave wall is arranged at the other end of the breast wall body. The drainage channel is provided with a first end and a second end which are oppositely arranged, the first end of the drainage channel communicates with the bottom of the intercepting ditch, and the second end of the drainage channel communicates with the outer side of the breast wall body. The problems that the construction cost is too high due to the fact that the elevation of the dike crest is integrally increased, a cantilever is too large due to the fact that a wave wall is singly increased, structural safety and stability are difficult to guarantee, and the landscape effect is poor are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of breakwaters, and in particular relates to a sloped breakwater breast wall structure and a sloped breakwater. Background Art

[0002] Sloping breakwater is a common breakwater structure with strong applicability and wide application. The crest elevation of the sloped breakwater is mainly determined according to the wave conditions and protection requirements. For waters with poor wind and wave conditions and high protection requirements, if the crest elevation is simply increased as a whole, the project cost will increase significantly. If the elevation of the wave-blocking wall is simply increased, the landscape effect will be poor, and it will be difficult to meet the public's demand for sea viewing, which is not conducive to the comprehensive utilization of the breakwater.

[0003] Raising the crest elevation is the most direct and common way to enhance the protective effect of breakwaters. However, because the data used in breakwater design are often data under extreme wave hydrological conditions that occur once every 50 years, in order to meet the protective effect under extreme conditions, simply raising the crest elevation will, first of all, greatly increase the construction workload and construction period, especially in deep water conditions, where the construction cost is difficult to control and the economic effect is poor; secondly, the breakwater structure has a large sea area, and when the sea area is tight, the breakwater foot retreats inward from the sea red line, causing the overall axis to shift into the port, reducing the water area in the port and making it difficult for ships to enter and leave the port; thirdly, an excessively high crest elevation will have an adverse effect on the landscape corridor of the entire port area.

[0004] Compared with raising the elevation of the entire levee crest, raising the elevation of the breakwater alone is a more economical solution, but it places higher demands on the safety and stability of the breakwater structure, especially in sea areas with poor wind and wave conditions. The breakwater cantilever is too large. In previous typhoon damage cases, the breakwater was often overturned and slid, and the breakwater structure was deformed and lost its protective effect, causing serious damage to the port. In addition, the towering breakwater protrudes too high from the levee crest, making it difficult to meet the public's demand for sea viewing and landscape effects, and is not conducive to the comprehensive utilization of the breakwater. Utility Model Content

[0005] The utility model aims to provide a sloped breakwater breast wall structure and a sloped breakwater, which solves the problem of excessively high construction costs caused by overall raising the levee top elevation, and also solves the problem of simply raising the wave-blocking wall, resulting in excessive cantilever, difficulty in ensuring structural safety and stability, and poor landscape effect.

[0006] The utility model is realized by the following technical solutions:

[0007] A sloped breakwater breast wall structure comprises a breast wall body and a wave-blocking wall arranged at one end of the breast wall body, the breast wall body is provided with a drainage ditch, the breast wall body is provided with a plurality of drainage channels inside, the drainage channels have a first end and a second end arranged oppositely, the first end of the drainage channel is communicated with the bottom of the drainage ditch, and the second end of the drainage channel is communicated with the outer side of the breast wall body.

[0008] Furthermore, a grille cover is provided at the top of the intercepting ditch.

[0009] Furthermore, a protrusion is provided at the bottom of one end of the breast wall body away from the wave-breaking wall, and the protrusion includes an upper slope and a lower slope, the slope of the upper slope is the same as the slope of the inner slope protective layer of the breakwater, and the width of the lower slope is the same as the thickness of the inner slope protective layer of the breakwater.

[0010] Furthermore, the drainage channel is a drainage pipe.

[0011] Furthermore, the width of the breast wall body is greater than or equal to 6m.

[0012] Furthermore, the width of the intercepting ditch is not less than 1.5m, and the depth is not less than 1m.

[0013] Furthermore, the top elevation of the wave-breaking wall is 1.0 to 1.2 m higher than the top elevation of the breast wall body.

[0014] The utility model also comprises a sloped breakwater, comprising the sloped breakwater breast wall structure as described above.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows: it can give full play to the maximum function of the breast wall structure. In extreme weather, the intercepting ditch on the breast wall body can be used to intercept the overtopping water, and the water can be dispersed through a number of drainage channels to avoid the high energy of the overtopping water directly impacting the port and causing secondary waves, thereby playing a role in wave dissipation and energy dissipation, ensuring the safety and stability of the breakwater structure and the shielding effect on the water area in the port. In normal weather, the breast wall body can provide leisure tourism, sea view and other landscape needs, which not only solves the problem of excessively high construction costs caused by the overall increase in the elevation of the levee top, but also solves the problem of simply raising the wave-blocking wall, resulting in excessive cantilever, difficult to ensure structural safety and stability, and poor landscape effect, thereby realizing the multifunctional comprehensive utilization of the breakwater, and having high economic and social benefits; the sloped breakwater skill using the sloped breakwater breast wall structure can meet the structural force, improve the stability of the water area in the port, and save engineering cost and construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the sloped breakwater breast wall structure of the utility model;

[0017] Figure 2It is a structural schematic diagram of the slope type wave-breaking device of the utility model.

[0018] In the figure, 1- breast wall body, 2- wave retaining wall, 3- intercepting ditch, 4- drainage channel, 5- grille cover, 6- upper slope, 7- lower slope, 8- core stone of embankment, 9- crushed stone cushion layer, 10- inner slope protective layer, 11- first bottom protection block stone, 12- block stone cushion layer, 13- outer slope protective layer, 14- second bottom protection block stone. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0020] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of the present utility model, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0023] In the description of the present utility model, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present utility model.

[0024] See also Figure 1 , Figure 1 The schematic diagram of the structure of the sloped breakwater breast wall structure of the utility model is shown in FIG. A sloped breakwater breast wall structure comprises a breast wall body 1 and a wave-blocking wall 2 arranged at one end of the breast wall body 1, the breast wall body 1 is provided with a water intercepting ditch 3, and the breast wall body 1 is provided with a plurality of drainage channels 4 inside, the drainage channels 4 having a first end and a second end arranged oppositely, the first end of the drainage channels 4 being connected to the bottom of the water intercepting ditch 3, and the second end of the drainage channels 4 being connected to the outer side of the breast wall body 1.

[0025] The utility model sloped breakwater breast wall structure is provided with a wave-blocking wall 2 and a water intercepting ditch 3 on the breast wall body 1, and has both wave-blocking and drainage functions. Under normal circumstances, the wave-blocking wall on the breast wall body 1 can be used to block the wave. In extreme weather, when the wave passes over the wave-blocking wall, the water intercepting ditch 3 on the breast wall body 1 can be used to intercept the over-wave water, and the water in the water intercepting ditch 3 can be dispersed and discharged through the drainage channel 4 connected to the water intercepting ditch 3, so as to avoid the high energy of the over-wave water directly impacting the harbor and causing secondary waves, thereby playing the role of dissipating waves and dissipating energy, ensuring the safety and stability of the breakwater structure and the protection effect on the water area in the harbor. In addition, in normal weather, the breast wall body 1 can provide leisure tourism, sea view and other landscape needs. It not only solves the problem of excessively high construction costs caused by the overall increase in the elevation of the embankment top, but also solves the problem of simply raising the wave-blocking wall, resulting in an excessively large cantilever, difficulty in ensuring the safety and stability of the structure, and poor landscape effect, thus realizing the multifunctional comprehensive utilization of the breakwater, with high economic and social benefits.

[0026] In one embodiment, a grille cover 5 is provided at the top of the intercepting ditch 3. The grille cover 5 can prevent garbage or debris from falling into the intercepting ditch 3, thereby preventing the garbage or debris from blocking the drainage channel 4. At the same time, it can prevent pedestrians from accidentally falling into the intercepting ditch 3 and getting injured. In one embodiment, the grille cover 5 is a steel grille cover.

[0027] In one embodiment, a protrusion is provided at the bottom of the end of the breast wall body 1 away from the wave-breaking wall, and the protrusion includes an upper slope 6 and a lower slope 7. The slope of the upper slope 6 is the same as the slope of the inner slope armour layer of the breakwater, and the width of the lower slope 7 is the same as the thickness of the inner slope armour layer of the breakwater. The bottom of the end of the breast wall body 1 away from the wave-breaking wall is designed as a protrusion structure, and the breast wall body 1 is connected to the inner slope armour layer of the breakwater through the protrusion, so as to protect the structural weak parts at the corners of the breast wall body 1 and the inner slope armour layer of the breakwater, and realize a smoother connection between the breast wall body 1 and the inner slope armour layer of the breakwater.

[0028] In one embodiment, the drainage channel 4 is a drainage pipe, which can be pre-arranged at a corresponding position of the casting template of the breast wall body 1 and connected to the breast wall body 1 for casting together, so that the breast wall body 1 and the drainage channel 4 are integrally formed, which is convenient for setting the drainage channel 4 on the breast wall body 1.

[0029] In one embodiment, the width of the breast wall body 1 is greater than or equal to 6 m. In one embodiment, the width of the intercepting ditch 3 is not less than 1.5 m, and the depth is not less than 1 m. In one embodiment, the top elevation of the wave-blocking wall 2 is 1.0 to 1.2 m higher than the top elevation of the breast wall body 1.

[0030] The utility model also includes a sloped breakwater, including the sloped breakwater breast wall structure as described above. The sloped breakwater includes the sloped breakwater breast wall structure as described above, and has all the technical effects of the sloped breakwater breast wall structure as described above, which will not be described again.

[0031] In one embodiment, the sloped breakwater also includes a core stone 8, a gravel cushion layer 9 is provided on the top of the core stone 8, the number of the sloped breakwater breast wall structures is set to multiple, and the multiple sloped breakwater breast wall structures are arranged in parallel on the gravel cushion layer 9 along the coastline, and an elastic layer is provided between two adjacent sloped breakwater breast wall structures, an inner slope protective layer 10 and a first bottom protection block 11 are provided on the side of the core stone 8 facing the harbor, and the inner slope protective layer 10 is respectively connected to the sloped breakwater breast wall structure and the first bottom protection block 11, a block stone cushion layer 12 is provided on the side of the core stone 8 facing the outside of the harbor, an outer slope protective layer 13 is provided on the block stone cushion layer 12, and the block stone cushion layer 12 and the outer slope protective layer 13 are both connected to the wave-breaking wall 2, and a second bottom protection block 14 is provided on the side of the block stone cushion layer 12 facing the outside of the harbor, and the second bottom protection block 14 is respectively connected to the block stone cushion layer 12 and the outer slope protective layer 13.

[0032] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A sloped breakwater breast wall structure, It is characterized in that The invention comprises a breast wall body and a wave-blocking wall arranged at one end of the breast wall body, wherein the breast wall body is provided with a drainage ditch, and the interior of the breast wall body is provided with a plurality of drainage channels, wherein the drainage channels have a first end and a second end arranged opposite to each other, wherein the first end of the drainage channel is communicated with the bottom of the drainage ditch, and the second end of the drainage channel is communicated with the outer side of the breast wall body.

2. The sloped breakwater breast wall structure according to claim 1, It is characterized in that A grille cover is arranged on the top of the intercepting ditch.

3. The sloped breakwater breast wall structure according to claim 1, It is characterized in that A protrusion is provided at the bottom of one end of the breast wall body away from the wave-breaking wall, and the protrusion includes an upper slope and a lower slope. The slope of the upper slope is the same as the slope of the inner slope protective layer of the breakwater, and the width of the lower slope is the same as the thickness of the inner slope protective layer of the breakwater.

4. The sloped breakwater breast wall structure according to claim 1, It is characterized in that The drainage channel is a drainage pipe.

5. The sloped breakwater breast wall structure according to claim 1, It is characterized in that The width of the breast wall body is greater than or equal to 6m.

6. The sloped breakwater breast wall structure according to claim 1, It is characterized in that The width of the intercepting ditch is not less than 1.5m and the depth is not less than 1m.

7. The sloped breakwater breast wall structure according to claim 1, It is characterized in that The top elevation of the wave-blocking wall is 1.0 to 1.2 m higher than the top elevation of the breast wall body.

8. A sloped breakwater, It is characterized in that It comprises the sloped breakwater breast wall structure as described in any one of claims 1 to 7.