Auxiliary installation device for joint meter
By using the ring body and the chute structure to clamp the seam meter in the seam meter installation auxiliary device, the problem of poor pre-tension stability in the existing technology is solved, and the stable fixation and precise control of the seam meter are achieved, ensuring that Accuracy of measurement results in concrete construction.
Patent Information
- Application Number
- CN202420464868.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-11
AI Technical Summary
When the existing joint measuring meter is installed in a concrete building, due to the poor stability of the bracket during the pre-tensioning process, it is easily disturbed by the pouring of concrete, affecting the observation results, and it is difficult to achieve precise control.
An auxiliary device for the installation of a joint measuring gauge is designed. By pre-embedding the first flange sleeve in the front-cast concrete block, and setting up a matching second flange sleeve, the ring body and the chute structure are used to clamp the measuring joint. The seam meter is clamped and fixed by screwing the ring cover to drive the guide column and the slider to move in the radial direction, and is reinforced with self-tapping screws to enhance stability.
This device enhances the stability of the joint meter, avoids interference during the pouring process, ensures the accuracy of the measurement results and the stability of the installation, and can effectively control the pre-tensioned length of the joint meter.
Smart Images

Figure CN221878197U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering devices, in particular to a joint meter installation auxiliary device. Background Art
[0002] The joint meter is an instrument widely used to monitor the relative displacement and the opening and closing of the contact surface between two adjacent concrete blocks (early pouring and later pouring) or between concrete and rock blocks. At present, before installing the embedded joint meter, it is usually necessary to drill holes or embed sleeves in the early concrete blocks or rock masses, and the holes or sleeves are used to fix the joint meter later. After installing the embedded joint meter into the hole or embedded sleeve, it is usually necessary to pre-tension the joint meter to ensure that the steel string inside the joint meter itself is in a taut state, improve the installation quality of the instrument, and prevent the adjacent concrete from being squeezed and thus crushing the joint meter, giving full play to the benefits of the joint meter.
[0003] Chinese patent document CN215930789U discloses a pre-tensioning device for a seam meter. The utility model discloses a pre-tensioning device for a seam meter, including an embedded sleeve assembly, a free end fixture, and a bottom bracket. The embedded sleeve assembly includes an embedded sleeve base, an embedded sleeve body, and an embedded sleeve cover; the embedded sleeve body is cylindrical, and a groove matching the protruding head of the seam meter is provided on the embedded sleeve base; the free end fixture is composed of two parts, and a bracket fixing ear is provided on the end surface around the free end fixture, and the free end fixture is used to clamp on the free end of the seam meter; the bottom bracket includes a support end, a bracket body, and a fixture connecting end, and the support end and the fixture connecting end are located at both ends of the bracket body, and the support end and the bracket body form a certain angle; the bottom bracket is used to connect to the bracket fixing ear of the free end fixture through the fixture connecting end. The seam meter is pre-tensioned after being buried, so that it can realize the tensioning and contraction monitoring of expansion joints or cracks in the later monitoring.
[0004] It is pointed out in the prior art that, during the embedding process of the joint meter in concrete buildings, the pre-tensioning of the instrument is achieved by using a bracket fixing ear, and the amount of pre-tensioning is controlled by the bracket. The bracket outside the concrete has poor stability and is easily disturbed during the concrete pouring process, which affects the observation results. The pre-tensioning of the joint meter cannot be accurately controlled. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides an auxiliary device for installing a joint meter, which provides a second flange sleeve that matches the first flange sleeve embedded in the pre-cast concrete block, and the end of the second flange sleeve is connected to a ring body, and the ring body is provided with several slide grooves around the axial direction, and a slider connected to a guide column is provided in the slide groove, and the guide column is sleeved in the guide groove on the ring cover; the guide column is displaced by screwing the ring cover, and the guide column drives the slider to move in the radial direction, and several sliders clamp and fix the outer periphery of the joint meter, and then reinforced by self-tapping screws. The clamping slider is fixedly connected to the first flange sleeve embedded in the pre-cast concrete block, which enhances the stability of the clamping and avoids interference during the concrete pouring process, which affects the observation results.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an auxiliary device for installing a joint meter, comprising a first flange sleeve pre-buried in a pre-cast concrete block, a joint meter fixedly connected inside the first flange sleeve, a first flange plate on the first flange sleeve being flush with the side surface of the pre-cast concrete block, a second flange sleeve being matched with the first flange sleeve, a ring body being connected to the end of the second flange sleeve away from the flange plate, a plurality of slide grooves being radially provided on the end surface of the ring body away from the pre-cast concrete block, sliders being installed in the slide grooves, the end surface of the slider close to the joint meter being matched with the outer periphery of the joint meter, and guide columns being provided on the sliders; a ring cover is provided on the side of the ring body away from the pre-cast concrete block, and a plurality of guide grooves are provided on the ring cover at corresponding positions of the guide columns;
[0007] As a preferred technical solution of the utility model, a threaded through hole is provided on the end of the first flange sleeve away from the first flange plate;
[0008] As a preferred technical solution of the utility model, the second flange sleeve has an internal thread at one end away from the flange, and the ring body has an external thread at one end away from the slide groove that matches the internal thread of the second flange sleeve.
[0009] As a preferred technical solution of the utility model, the end surface of the slider adjacent to the joint meter is an arc-shaped surface, and a plurality of sawtooth grooves are provided in the arc-shaped surface;
[0010] As a preferred technical solution of the utility model, a first ring gap and a second ring gap are symmetrically opened on the outer periphery of the ring body, and the first ring gap and the second ring gap are both located at an end away from the second flange sleeve;
[0011] As a preferred technical solution of the utility model, a first convex stop and a second convex stop are symmetrically provided on the end surface of the ring cover away from the slide groove;
[0012] As a preferred technical solution of the utility model, at least two locking holes are provided on the ring cover;
[0013] As a preferred technical solution of the utility model, the guide groove is an arc-shaped groove deviating from the radial direction.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] 1. A second flange sleeve is provided to match the first flange sleeve embedded in the pre-cast concrete block, the end of the second flange sleeve is connected with a ring body, and a plurality of slide grooves are provided in the ring body along the axial direction. A slider connected to a guide column is provided in the slide groove, and the guide column is sleeved in the guide groove of the ring cover; the guide column is displaced by screwing the ring cover, and the guide column drives the slider to move in the radial direction, and a plurality of sliders clamp and fix the outer periphery of the joint meter, and then reinforced by self-tapping screws to control the pre-tensioning of the joint meter.
[0016] 2. The clamping slider is fixedly connected to the first flange sleeve embedded in the pre-cast concrete block, which enhances the overall stability of the equipment and avoids interference during the concrete pouring process, which affects the observation results. The device has a simple structure and is easy to install and operate. At the same time, it can ensure the installation position and direction of the instrument. It is less affected by the concrete pouring vibration and can ensure the accuracy of the measurement results to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a three-dimensional schematic diagram of the installation structure of the joint meter of the utility model;
[0018] Figure 2 This is a three-dimensional schematic diagram of the disassembled structure of the joint meter of the utility model;
[0019] Figure 3 This is a three-dimensional schematic diagram of the cross-sectional structure of the flange sleeve of the utility model;
[0020] Figure 4 It is a top view schematic diagram of the ring cover and ring body installation structure of the utility model.
[0021] In the figure: 11, pre-cast concrete block; 12, first flange sleeve; 13, first flange plate; 14, second flange sleeve; 15, ring body; 16, ring cover; 17, joint gauge; 18, slide groove; 19, slider; 20, guide column; 21, guide groove; 22, first convex stop; 23, second convex stop; 24, first ring gap; 25, second ring gap; 26, locking hole; 27, threaded through hole; 28, second flange plate; 29, self-tapping screw. DETAILED DESCRIPTION
[0022] The following will be combined with the implementation of the utility model to clearly and completely describe the technical solutions in the implementation of the utility model. Obviously, the described implementation is only a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Figure 1-Figure 4 As shown in the figure, a joint meter installation auxiliary device is provided, including a first flange sleeve 12 embedded in a pre-cast concrete block 11, a joint meter 17 fixedly connected inside the first flange sleeve 12, a first flange plate 13 on the first flange sleeve 12 is flush with the side of the pre-cast concrete block 11, a second flange sleeve 14 is provided to match the first flange sleeve 12, a ring body 15 is connected to the end of the second flange sleeve 14 away from the flange plate, an array of slide grooves 18 are radially provided on the end surface of the ring body 15 away from the pre-cast concrete block 11, a slider 19 is installed in each of the slide grooves 18, an end surface of the slider 19 adjacent to the joint meter 17 is matched with the outer periphery of the joint meter 17, and a guide column 20 is provided on each of the sliders 19; a ring cover 16 is provided on the side of the ring body 15 away from the pre-cast concrete block 11, and an array of guide grooves 21 are provided on the ring cover 16 at the corresponding position of the guide column 20.
[0024] Among them, a first flange plate 13 is provided at one end of the first flange sleeve 12, and the other end is closed, and a threaded through hole 27 is opened in the center of the closed end; the first flange sleeve 12 is integrally formed, and the first flange sleeve 12 is completely pre-embedded in the pre-cast concrete block 11. The first flange plate 13 on the first flange sleeve 12 is flush with the side of the pre-cast concrete block 11. During installation, one end of the joint meter 17 is threadedly connected to the threaded through hole 27, and the end of the joint meter 17 can pass through the threaded through hole 27 and be connected to the pre-cast concrete block to enhance the stability of the equipment.
[0025] The second flange sleeve 14 is integrally formed, and the second flange 28 on the second flange sleeve 14 is fixedly connected to the first flange 13 by bolts. An internal thread is provided at one end of the second flange sleeve 14 away from the flange, and an external thread matching the internal thread of the second flange sleeve 14 is provided at the outer periphery of one end of the ring body 15. An array of slide grooves 18 are radially provided at one side of the ring body 15 away from the pre-cast concrete block 11. The slide grooves 18 are provided in the radial direction, and sliders 19 are installed in the slide grooves 18. The end surface of the slider 19 adjacent to the joint meter 17 matches the outer periphery of the joint meter 17, and a guide column 20 is provided on the slider 19.
[0026] The first ring gap 24 and the second ring gap 25 are symmetrically formed on the outer circumference of the ring body 15, and the first ring gap 24 and the second ring gap 25 are both located at one end away from the second flange sleeve 14. When the ring body 15 is threadedly connected to the second flange sleeve 14, the first ring gap 24 and the second ring gap 25 are clamped by a wrench and rotated and tightened.
[0027] The first flange sleeve 12 , the second flange sleeve 14 and the ring body 15 are made of aluminum alloy.
[0028] The joint meter 17 is cylindrical in shape, and the slider 19 is arranged to be an arc-shaped surface close to the end surface of the joint meter 17, and a plurality of sawtooth grooves are arranged on the arc-shaped surface, and the sawtooth grooves can also be crisscrossed.
[0029] The seam meter 17 is in the shape of a rectangular parallelepiped, and the slider 19 is arranged to be a plane close to the end face of the seam meter 17, and a plurality of sawtooth grooves are provided on the plane, and the sawtooth grooves can also be crisscrossed.
[0030] When in use, the joint meter 17 is clamped and fixed by the curved surface or plane on the slider 19 that matches the outer periphery of the joint meter 17. The slide grooves 18 are provided in at least 4 groups and are evenly distributed to ensure the stability of the clamping.
[0031] The first flange sleeve 12, the second flange sleeve 14, the ring body 15 and the ring cover 16 are all sleeved outside the joint meter.
[0032] The guide groove 21 on the ring cover 16 is sleeved on the guide column 20, and the bottom end of the ring cover 16 is slidably matched with the top end of the ring body 15. When the ring cover 16 is rotated, the guide groove 21 drives the guide column 20 to move, and the guide column 20 drives the slider 19 to slide in the slide groove 18.
[0033] The first convex stop 22 and the second convex stop 23 are symmetrically arranged on the end surface of the ring cover 16 away from the slide groove 18, and are fixedly connected by welding or integral molding. When it is necessary to apply external force to the ring cover 16 for rotation, the first convex stop 22 and the second convex stop 23 are clamped by the jaws of a wrench and screwed. At least two locking holes 26 are spaced apart on the ring cover 16. When the external force applied to the ring cover 16 for rotation is stable, a self-tapping screw 29 is used to pass through the locking holes 26 and then connected to the ring body 15 for fixing.
[0034] The slider 19 and the guide column 20 are integrally formed or fixedly connected by welding. The guide column 20 is located inside the guide groove 21, which is an arc-shaped groove deviating from the radial direction. The ring cover 16 is rotated by clamping the first convex stop 22 and the second convex stop 23 on the ring cover 16 with the jaws of a wrench. The guide column 20 is displaced under the drive of the guide groove 21. The guide column 20 drives the slider 19 to displace in the radial direction in the slide groove 18, so that each slider 19 is close to the joint meter 17. After setting the pre-tension length of the joint meter 17, an external force is applied to the rotation of the ring cover 16, so that multiple sliders 19 clamp the joint meter 17. When it is stable, a self-tapping screw 29 is used to pass through the locking hole 26 and then connected to the ring body 15 for fixing.
[0035] Working principle:
[0036] The second flange sleeve 14 is fixedly connected to the flange end of the first flange sleeve 12 (the first flange sleeve 12 is a fixing part pre-buried in the pre-cast concrete block 11), the external thread end of the ring body 15 is matched and connected to the internal thread of the second flange sleeve 14, the first ring gap 24 and the second ring gap 25 are clamped by the jaws of a wrench and tightened, and the ring cover 16 is installed on the upper end of the ring body 15, so that the guide groove 21 on the ring cover 16 is sleeved on the guide column 20;
[0037] The ring cover 16 is rotated by clamping the first cam 22 and the second cam 23 on the ring cover 16 with the jaws of a wrench. The guide column 20 is displaced under the drive of the guide groove 21. The guide column 20 drives the slider 19 to displace in the radial direction in the slide groove 18, so that each slider 19 is close to the joint meter 17. After setting the pre-tension length for the joint meter 17, an external force is applied to the rotation of the ring cover 16 to clamp the multiple sliders 19 to clamp the joint meter 17. When it is stable, use a self-tapping screw 29 to pass through the locking hole 26 and then connect it to the ring body 15 for reinforcement.
[0038] The utility model uses the above embodiments to illustrate the technical concept of the utility model, but the utility model is not limited to the above embodiments, that is, it does not mean that the utility model must rely on the above embodiments to be implemented. Those skilled in the art should understand that the relevant improvements to the utility model fall within the protection scope and disclosure scope of the utility model.
Claims
1. A joint meter installation auxiliary device, comprising a first flange sleeve (12) pre-buried in a pre-cast concrete block (11), and a joint meter (17) fixedly connected inside the first flange sleeve (12). It is characterized in that The first flange plate (13) on the first flange sleeve (12) is flush with the side surface of the precast concrete block (11), and a second flange sleeve (14) is provided to match the first flange sleeve (12). The end of the second flange sleeve (14) away from the flange plate is connected to a ring body (15). An array of slide grooves (18) are radially provided on the end surface of the ring body (15) away from the precast concrete block (11). Slide blocks (19) are installed in the slide grooves (18). The end surface of the slide block (19) is close to the joint meter (17) and matches the outer periphery of the joint meter (17). Guide columns (20) are provided on the slide blocks (19); a ring cover (16) is provided on the side of the ring body (15) away from the precast concrete block (11), and an array of guide grooves (21) are provided on the ring cover (16) at the corresponding positions of the guide columns (20).
2. The joint meter installation auxiliary device according to claim 1, It is characterized in that A threaded through hole (27) is provided on the end of the first flange sleeve (12) away from the first flange plate (13).
3. The joint meter installation auxiliary device according to claim 1, It is characterized in that An internal thread is formed at one end of the second flange sleeve (14) away from the flange plate, and an external thread matching the internal thread of the second flange sleeve (14) is formed at one end of the outer periphery of the ring body (15) away from the slide groove (18).
4. The joint meter installation auxiliary device according to claim 1, It is characterized in that The end surface of the slider (19) adjacent to the joint meter (17) is an arc-shaped surface, and a plurality of sawtooth grooves are provided in the arc-shaped surface.
5. The joint meter installation auxiliary device according to claim 1, It is characterized in that A first ring gap (24) and a second ring gap (25) are symmetrically formed on the outer circumference of the ring body (15), and the first ring gap (24) and the second ring gap (25) are both located at an end away from the second flange sleeve (14).
6. The joint meter installation auxiliary device according to claim 1, It is characterized in that A first convex stop (22) and a second convex stop (23) are symmetrically provided on the end surface of the ring cover (16) away from the slide groove (18).
7. The joint meter installation auxiliary device according to claim 1, It is characterized in that The ring cover (16) is provided with at least two locking holes (26).
8. The joint meter installation auxiliary device according to claim 1, It is characterized in that The guide groove (21) is an arc-shaped groove deviating from the radial direction.
