Rapid grouting hole packer for double-coal-seam mine gas extraction

By designing a rapid grouting hole sealer and utilizing the grouting pipe and valve structure, efficient hole sealing for double-layer coal seam gas drainage is achieved, which solves the problems of high drilling cost and long construction period in the traditional process, and improves gas drainage. efficiency and sealing effect.

CN221879352UActive Publication Date: 2024-10-22ANHUI YINGKU HEAVY IND TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323617069.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-22
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The traditional double seam gas drainage technology requires drilling double holes and grouting and sealing the holes one by one, which increases the drilling cost and construction period and is inefficient.

Method used

Design a rapid grouting hole sealer, including a grouting pipe, a bag belt, a one-way valve and a blasting valve. By drilling a grouting hole, gas extraction from double-layer coal seams can be completed. The one-way valve and blasting valve can be used to achieve rapid Grout sealing.

Benefits of technology

It reduces the number of drilling holes, improves work efficiency, saves drilling costs, and achieves fast and effective hole sealing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221879352U_ABST
    Figure CN221879352U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick grouting hole packer for double coal seam mine gas extraction, which comprises a grouting pipe, the left end and the right end of the grouting pipe are respectively provided with a group of bag belts, each group of bag belts comprises an upper bag belt positioned on the left side and a lower bag belt positioned on the right side, and a plurality of one-way valves are arranged on the grouting pipe wrapped by the upper bag belts and the lower bag belts at intervals; a plurality of first explosion valves are arranged on the grouting pipe between every two sets of bag belts at intervals, the explosion ends of the first explosion valves are connected with slurry discharging pipes with one ends plugged, and second explosion valves are installed at the other ends of the slurry discharging pipes. The rapid grouting hole packer is simple in structure and reasonable in design, gas extraction of the double-layer coal seam mine can be completed only by drilling one grouting hole when gas extraction is conducted on the double-layer coal seam mine through the rapid grouting hole packer, the number of drilled holes is reduced, working efficiency is improved, drilling cost is saved, and the rapid grouting hole packer is high in hole sealing speed and good in hole sealing effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of coal mine gas extraction, in particular to a rapid grouting hole sealer for double coal seam mine gas extraction. Background Art

[0002] Gas is the general term for gaseous fuels by the general public. It can be divided into three categories: liquefied petroleum gas, natural gas and coal gas. Gas exists in the coal body or surrounding rock in a free state or in an adsorbed state. Moreover, when the gas content in the air is 5% to 16%, it will cause an explosion when it encounters a fire, resulting in an accident. In the process of coal mining, it is generally necessary to extract the gas in the coal seam first to prevent gas accidents. For gas extraction, it is generally necessary to seal the hole between the hole mouth and the extraction pipe after drilling the gas extraction hole. The sealing treatment is generally to use expansion grouting fluid for grouting and sealing. For double coal seams (such as Figure 1 The traditional extraction process is to drill two holes, one hole drilled to the upper coal seam and the other hole drilled to the lower coal seam, and grouting and sealing the holes one by one. This method not only increases the drilling cost, but also takes a long time. For this reason, a double coal seam mine gas extraction using a fast grouting hole sealer is designed to meet the use needs, and it meets the requirements of the utility model after retrieval. Utility Model Content

[0003] The utility model aims at the deficiencies in the prior art and provides a rapid grouting hole sealer for gas extraction in double coal seams.

[0004] A double-coal-seam mine gas extraction adopts a rapid grouting hole sealer, comprising a grouting pipe, wherein a group of bag belts are arranged at both ends of the left and right ends of the grouting pipe, each group of bag belts comprises an upper bag belt located on the left and a lower bag belt located on the right, and a plurality of one-way valves are arranged at intervals on the grouting pipe wrapped by the upper bag belt and the lower bag belt; a plurality of bursting valves 1 are arranged at intervals on the grouting pipe between each group of bag belts, a bursting end of the bursting valve 1 is connected to a slurry discharge pipe with one end blocked, and a bursting valve 2 is installed at the other end of the slurry discharge pipe.

[0005] Furthermore, an extraction pipe is tied to the bag belt on one side of the grouting pipe, a plurality of extraction holes 1 are spaced apart on the extraction pipe between the two groups of bag belts, and a plurality of extraction holes 2 are spaced apart on the extraction pipe on the right side of the bag belt at the right end.

[0006] Furthermore, the left end of the grouting pipe is connected with a quick connector, and the right end is connected with a plug.

[0007] Furthermore, the length of the upper bag belt is 5-10m, and the length of the lower bag belt is 3-5m.

[0008] Furthermore, the bursting pressure of the bursting valve 1 is 1 MPa.

[0009] Furthermore, the bursting pressure of the second bursting valve is 1.5 MPa.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: the utility model has a simple structure and a reasonable design. Through the setting of the rapid grouting hole sealer, when extracting gas from a double-layer coal seam mine, only one grouting hole needs to be drilled to complete the gas extraction from the double-layer coal seam mine, thereby reducing the number of holes drilled, improving work efficiency, and saving drilling costs. Moreover, the grouting hole sealer has a fast sealing speed and a good sealing effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the prior art;

[0012] Figure 2 It is a structural schematic diagram of the utility model.

[0013] In the figure: grouting pipe 1, one-way valve 11, bursting valve 1 12, quick connector 13, plug 14, bag belt 2, upper bag belt 21, lower bag belt 22, slurry discharge pipe 3, bursting valve 2 31, extraction pipe 4, extraction hole 1 41, extraction hole 2 42. DETAILED DESCRIPTION

[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0015] Reference Figure 1 —2, a double coal seam mine gas extraction using fast grouting hole sealing device, including a grouting pipe 1, the left end of the grouting pipe 1 is connected to a quick connector 13, and the right end is connected to a plug 14. A group of bag belts 2 are arranged at both ends of the grouting pipe 1, and each group of bag belts 2 includes an upper bag belt 21 located on the left side and a lower bag belt 22 located on the right side. The length of the upper bag belt 21 is 5-10m, and the length of the lower bag belt 22 is 3-5m.

[0016] The grouting pipe 1 wrapped by the upper bag belt 21 and the lower bag belt 22 is provided with multiple one-way valves 11 at intervals. The grouting pipe 1 between each group of bag belts 2 is provided with multiple bursting valves 12 at intervals, and the bursting pressure of the bursting valve 12 is 1Mpa. The bursting end of the bursting valve 12 is connected to a slurry discharge pipe 3 with one end blocked, and the other end of the slurry discharge pipe 3 is installed with a bursting valve 2 31, and the bursting pressure of the bursting valve 2 31 is 1.5Mpa.

[0017] A suction pipe 4 is tied to the bag belt 2 on one side of the grouting pipe 1, and a plurality of suction holes 1 41 are arranged at intervals on the suction pipe 4 between the two groups of bag belts 2, and a plurality of suction holes 2 42 are arranged at intervals on the suction pipe 4 on the right side of the bag belt 2 at the right end. The left end of the suction pipe 4 is connected to a joint connected to a suction pump.

[0018] When sealing the hole, the grouting hole sealer is placed in the borehole so that a group of bag bands 2 on the left are located in the upper rock layer, a group of bag bands 2 on the right are located in the lower rock layer, the extraction hole 1 41 is located in the upper coal mine, and the extraction hole 2 42 is located in the lower coal mine. It is connected to the discharge pipe of the grouting pump through the quick connector 13, the grouting pump is started, and the slurry is injected into the grouting pipe 1. Due to the effect of the one-way valve 11, the slurry is quickly injected into the upper bag band 21 and the lower bag band 22 through multiple one-way valves 11. When the upper bag band 21 and the lower bag band 22 are grouted and expanded, the outer walls of the upper bag band 21 and the lower bag band 22 are fastened to the borehole wall to achieve plugging in the hole. As the pressure in the grouting pipe 1 increases, when the slurry pressure in the grouting pipe 1 is greater than 1MPa, each bursting valve 12 bursts one by one. The slurry breaks and enters the discharge pipe 3. As the pressure in the grouting pipe 1 increases, when the slurry pressure in the grouting pipe 1 is greater than 1.5MPa, a bursting valve 2 31 bursts, and the slurry is quickly injected into the borehole of a group of bag belts 2 through each bursting valve 12, the discharge pipe 3, and the bursting valve 2 31. After the borehole is filled with slurry, as the pressure in the grouting pipe 1 increases, when the slurry pressure in the grouting pipe 1 is greater than 1.5MPa, another bursting valve 2 31 bursts, and the slurry is quickly injected into the borehole of another group of bag belts 2 through each bursting valve 12, the discharge pipe 3, and the bursting valve 2 31. When the grouting is filled to the designed final pressure value, the grouting pump is turned off. After the slurry is solidified, the extraction pipe 4 is connected to the extraction pump through the joint on the extraction pipe 4, and the extraction pump is turned on to extract gas. The utility model discloses the utility model has a simple structure and a reasonable design. Through the setting of the rapid grouting hole sealer, when extracting gas from a double-layer coal seam mine, only one grouting hole needs to be drilled to complete the gas extraction from the double-layer coal seam mine, thereby reducing the number of holes drilled, improving work efficiency, and saving drilling costs. In addition, the grouting hole sealer has a fast sealing speed and a good sealing effect.

Claims

1. A double coal seam mine gas extraction using a rapid grouting hole sealer, characterized in that: The invention comprises a grouting pipe (1), wherein a group of bag belts (2) are arranged at both left and right ends of the grouting pipe (1), each group of bag belts (2) comprises an upper bag belt (21) located on the left side and a lower bag belt (22) located on the right side, and a plurality of one-way valves (11) are arranged at intervals on the grouting pipe (1) wrapped by the upper bag belt (21) and the lower bag belt (22); a plurality of bursting valves (12) are arranged at intervals on the grouting pipe (1) between each group of bag belts (2), and a bursting end of the bursting valve (12) is connected to a grouting pipe (3) with one end blocked, and a bursting valve (31) is installed at the other end of the grouting pipe (3).

2. A double coal seam mine gas extraction using a rapid grouting sealer according to claim 1, characterized in that: A suction pipe (4) is tied to the bag belt (2) on one side of the grouting pipe (1); a plurality of suction holes (41) are arranged at intervals on the suction pipe (4) between the two groups of bag belts (2); and a plurality of suction holes (42) are arranged at intervals on the suction pipe (4) on the right side of the bag belt (2) at the right end.

3. A double coal seam mine gas extraction using a rapid grouting sealer according to claim 1, characterized in that: The left end of the grouting pipe (1) is connected to a quick connector (13), and the right end is connected to a plug (14).

4. A double coal seam mine gas extraction using a rapid grouting sealer according to claim 1, characterized in that: The length of the upper bag belt (21) is 5-10m, and the length of the lower bag belt (22) is 3-5m.

5. A double coal seam mine gas extraction using a rapid grouting sealer according to claim 1, characterized in that: The bursting pressure of the bursting valve 1 (12) is 1Mpa.