Novel quick connecting device for fracturing manifold
By designing a new fracturing manifold quick connection device, the connection structure at the fracturing site is simplified, solving the problems of complex connecting pipe fittings and high maintenance costs in the existing technology, and achieving efficient and low-cost connection and maintenance.
Patent Information
- Application Number
- CN202420558218.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-21
AI Technical Summary
The existing connecting pipe fittings at the fracturing site are thick-walled, numerous and complex in structure, which results in high assembly strength and low efficiency for workers. They also require the assistance of hydraulic and pneumatic systems, resulting in high maintenance costs.
A new fracturing manifold quick connection device is designed, including a high-pressure 90° elbow, a high-pressure elbow with a handle, an adjustable support base and a straight pipe bracket, which enables quick connection and disassembly by simplifying the structure and eliminating the need for a hydraulic system.
It reduces the work intensity of on-site personnel in connecting high-pressure manifolds, improves work efficiency, simplifies operating steps and maintenance processes, and reduces maintenance costs.
Smart Images

Figure CN221879365U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of shale gas fracturing, and in particular to a novel fracturing manifold quick connection device. Background Art
[0002] At present, the connecting pipes used in the fracturing manifold skids are all thick-walled pipes. There are a large number of them, which require the workers to assemble them on site by themselves, which is labor-intensive and inefficient. Some fracturing manifold skids equipped with quick-connect manifolds also need to be used with hydraulic and pneumatic systems. The overall structure is relatively complex, the on-site operation steps are cumbersome, the actual use is also relatively inconvenient, and the maintenance cost of the hydraulic and pneumatic systems is high in the later stage. Utility Model Content
[0003] The utility model provides a novel fracturing manifold quick connection device.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] A novel fracturing manifold quick connection device is used to connect the manifold skid plug valve outlet and the surface pipeline, including:
[0006] High-pressure 90° elbow, which is connected to the outlet of the manifold skid plug valve;
[0007] High-pressure tee, one of the ports of the high-pressure tee is connected to a high-pressure 90° elbow;
[0008] High-pressure straight pipe, the high-pressure straight pipe is arranged in the horizontal direction, the other port of the high-pressure tee is connected to the high-pressure straight pipe, and the other port of the high-pressure tee is closed;
[0009] High-pressure elbow with handle, which is connected to the high-pressure straight pipe;
[0010] Straight pipe bracket, both ends of the straight pipe bracket are respectively connected to the high-pressure 90° elbow and the high-pressure straight pipe. The straight pipe bracket is a rigid component, and the straight pipe bracket supports the high-pressure 90° elbow and the high-pressure straight pipe.
[0011] In the above-mentioned novel fracturing manifold quick connection device, the high-pressure 90° elbow includes a curved portion and a straight portion, the straight portion is arranged in the vertical direction, and the two ends of the straight pipe bracket are respectively connected to the straight portion and the high-pressure straight pipe.
[0012] In the novel fracturing manifold quick connection device, the straight pipe support comprises:
[0013] A first clamping hoop, the first clamping hoop is sleeved outside the straight portion;
[0014] A second clamping hoop, which is sleeved outside the high-pressure straight pipe;
[0015] A support rod is used to connect the first clamp and the second clamp.
[0016] In the novel fracturing manifold quick connection device, the remaining port of the high-pressure tee is closed by a plug.
[0017] In the novel fracturing manifold quick connection device, an adjustable support base is provided at the lower end of the high-pressure tee.
[0018] The novel fracturing manifold quick connection device mentioned above, wherein the adjustable support base comprises:
[0019] The lifting shaft is arranged vertically and is a threaded rod;
[0020] A lifting plate, the upper end of which is rotatably connected to the lifting shaft, and a high-pressure tee is arranged on the lifting plate;
[0021] The base is hollow, the lower part of the lifting shaft is arranged in the base, and the base is provided with a threaded hole matching the lifting shaft;
[0022] A rotating handle is fixedly connected to the lifting shaft.
[0023] The novel fracturing manifold quick connection device mentioned above, wherein the adjustable support base comprises:
[0024] The lifting shaft is arranged vertically and is a screw rod;
[0025] A lifting plate, the upper end of the lifting shaft is rotatably connected to the lifting shaft, and a high-pressure tee is arranged on the lifting plate;
[0026] A base, wherein the base is hollow and the lower part of the lifting shaft is arranged in the base;
[0027] The screw slider is arranged inside the base, the screw slider is sleeved outside the lifting shaft, the screw slider matches the screw, and the outer surface of the screw slider has turbine teeth;
[0028] Worm motor, the worm of the worm motor meshes with the turbine teeth.
[0029] In the novel fracturing manifold quick connection device, the high-pressure 90° elbow, the high-pressure tee, the high-pressure straight pipe, and the high-pressure elbow with handle are all connected through a union.
[0030] In the novel fracturing manifold quick-connect device, the high-pressure elbow with a handle comprises at least three elbow parts connected in sequence, and a rotating movable joint is provided between the three elbow parts.
[0031] In the novel fracturing manifold quick-connect device, the high-pressure elbow with handle further comprises: a handle, which is arranged on the last elbow among the plurality of elbows.
[0032] In the novel fracturing manifold quick connection device, the handle is in a ring-shaped structure, the handle is arranged in an arc shape, and the handle fits the arc surface on the outer side of the elbow.
[0033] Due to the adoption of the above technology, the utility model has the following positive effects compared with the prior art:
[0034] (1) The utility model adopts the above solution, which reduces the work intensity of on-site personnel in connecting the high-pressure manifold and improves work efficiency.
[0035] (2) The entire manifold quick connection device of the utility model has a simple structure and does not require the assistance of a hydraulic system or a pneumatic system, thereby simplifying the on-site operation steps. The utility model is also simpler to maintain later, requiring only the manifold to be disassembled and maintained, and the maintenance cost is also lower. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of a novel fracturing manifold quick connection device of the utility model;
[0037] Figure 2 It is a partial enlarged view of the novel fracturing manifold quick connection device of the utility model.
[0038] The symbols in the drawings of the specification include:
[0039] A. Manifold pry-on plug valve outlet; 1. High-pressure 90° elbow; 11. Bending part; 12. Straight part; 2. High-pressure tee; 3. High-pressure straight pipe; 4. High-pressure elbow with handle; 41. Bending part; 42. Handle; 5. Straight pipe bracket; 51. First clamp; 52. Second clamp; 53. Support rod; 6. Adjustable support base; 61. Lifting shaft; 62. Rotating handle; 63. Base; 64. Lifting plate. DETAILED DESCRIPTION
[0040] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0041] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as “upper”, “lower”, “left”, “right”, “inside”, “outside”, “front”, “back”, “lateral” and “vertical” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention. They do not indicate or imply that the device or component referred to must have a specific direction and therefore should not be understood as a limitation on the present invention.
[0042] It should be specially explained that the terms “horizontal” and “vertical” in the present invention are used to illustrate a rough positional relationship, rather than a strict “horizontal plane” or “vertical plane”.
[0043] See also Figure 1 to Figure 2 As shown, a novel fracturing manifold quick connection device of a preferred embodiment is shown, which is used to connect the outlet A of the manifold pry plug valve and the ground pipeline, including: a high-pressure 90° elbow 1, a high-pressure tee 2, a high-pressure straight pipe 3, a high-pressure elbow 4 with a handle, and a straight pipe support 5; wherein, the high-pressure 90° elbow 1 is connected to the outlet A of the manifold pry plug valve; one of the ports of the high-pressure tee 2 is connected to the high-pressure 90° elbow 1; the high-pressure straight pipe 3 is arranged in a horizontal direction, the other port of the high-pressure tee 2 is connected to the high-pressure straight pipe 3, and the remaining port of the high-pressure tee 2 is closed; the high-pressure elbow 4 with a handle is connected to the high-pressure straight pipe 3; the two ends of the straight pipe support 5 are respectively connected to the high-pressure 90° elbow 1 and the high-pressure straight pipe 3, the straight pipe support 5 is a rigid component, and the straight pipe support 5 supports the high-pressure 90° elbow 1 and the high-pressure straight pipe 3.
[0044] Further, as a preferred embodiment, the high-pressure 90° elbow 1 includes a curved portion 11 and a straight portion 12, the straight portion 12 is arranged along the vertical direction, and the two ends of the straight pipe support 5 are respectively connected to the straight portion 12 and the high-pressure straight pipe 3.
[0045] Further, as a preferred embodiment, the straight pipe support 5 includes: a first clamp 51, a second clamp 52, and a support rod 53; wherein the first clamp 51 is sleeved on the outside of the straight portion 12; the second clamp 52 is sleeved on the outside of the high-pressure straight pipe 3; and the support rod 53 connects the first clamp 51 and the second clamp 52.
[0046] Further, as a preferred embodiment, the remaining one port of the high-pressure tee 2 is closed by a plug.
[0047] Furthermore, as a preferred embodiment, an adjustable supporting base 6 is provided at the lower end of the high-pressure tee 2 .
[0048] Further, as a first preferred embodiment, the adjustable support base 6 includes: a lifting shaft 61, the lifting shaft 61 is vertically arranged, and the lifting shaft 61 is a threaded rod.
[0049] Further, as a first preferred embodiment, the adjustable support base 6 includes: a lifting plate 64 , the upper end of the lifting plate 64 is rotatably connected to the lifting shaft 61 , and the high-pressure tee 2 is arranged on the lifting plate 64 .
[0050] Further, as a first preferred embodiment, the adjustable support base 6 includes: a base 63, the base 63 is hollow, the lower part of the lifting shaft 61 is arranged in the base 63, and the base 63 has a threaded hole matching the lifting shaft 61.
[0051] Further, as a first preferred embodiment, the adjustable support base 6 includes: a rotating handle 62 , and the rotating handle 62 is fixedly connected to the lifting shaft 61 .
[0052] Specifically, in the second preferred embodiment, the rotating handle 62 is rotated to drive the lifting shaft 61 to rotate, and the lifting shaft drives the upper lifting plate 64 to rise or fall through the cooperation between the thread of the lifting shaft 61 and the threaded hole of the base 63.
[0053] Further, as a second preferred embodiment, the adjustable support base 6 includes: a lifting shaft 61, the lifting shaft 61 is vertically arranged, and the lifting shaft 61 is a screw rod.
[0054] Further, as a second preferred embodiment, the adjustable support base 6 includes: a lifting plate 64 , the upper end of the lifting shaft 61 is rotatably connected to the lifting plate 64 , and the high-pressure tee 2 is arranged on the lifting plate 64 .
[0055] Further, as a second preferred embodiment, the adjustable support base 6 includes: a base 63 , the base 63 is hollow, and the lower part of the lifting shaft 61 is arranged in the base 63 .
[0056] Further, as a second preferred embodiment, the adjustable support base 6 includes: a screw slider, the screw slider is arranged inside the base 63, the screw slider is sleeved outside the lifting shaft 61, the screw slider matches the lifting shaft 61, that is, the screw, and the outer surface of the screw slider has turbine teeth.
[0057] Specifically, the screw slider rotates to drive the lifting shaft 61 to rise or fall.
[0058] Further, as a second preferred embodiment, the adjustable support base 6 includes: a worm motor, and the worm of the worm motor is meshed with the turbine teeth.
[0059] Specifically, the worm rotates to drive the turbine teeth to rotate, thereby driving the lead screw slider to rotate.
[0060] Specifically, the lifting shaft 61 is arranged to be movable in the vertical direction but not to be rotatable.
[0061] Specifically, in some embodiments, the rotation of the lifting shaft 61 can be limited by a spline. For example, a vertical guide rod with a rectangular cross-section is fixedly arranged inside the base 63, and a rectangular guide groove is correspondingly provided in the axial direction of the lifting shaft 61 to ensure that the lifting shaft 61 can slide up and down along the guide rod but cannot rotate relative to the guide rod.
[0062] Specifically, in some other embodiments, since the lifting plate 64 and the lifting shaft 61 are fixedly arranged, the rotation of the lifting shaft 61 can be further restricted by restricting the rotation of the lifting plate 64 .
[0063] Furthermore, as another preferred embodiment, the adjustable support base 6 may adopt a lifting mechanism such as a scissor lift mechanism in addition to the structure of the above-mentioned turbine screw lift.
[0064] Further, as a preferred embodiment, the high-pressure 90° elbow 1, the high-pressure tee 2, the high-pressure straight pipe 3, and the high-pressure elbow with handle 4 are all connected through unions.
[0065] Further, as a preferred embodiment, the high-pressure elbow 4 with a handle includes: at least three elbow parts 41 connected in sequence, and the three elbow parts 41 are provided with rotating movable joints.
[0066] Specifically, the union of this embodiment usually includes a first joint, a second joint, and a nut connecting the first joint and the second joint. A sealing ring is usually provided at the mating position of the first joint and the second joint.
[0067] As a possible embodiment, the union may adopt the union structure disclosed in CN201120116252.2 and CN201320710173.3.
[0068] Further, as a preferred embodiment, the high-pressure elbow 4 with a handle further includes: a handle 42 , and the handle 42 is disposed on the last elbow portion 41 among the plurality of elbow portions 41 .
[0069] Specifically, one end of the handle 42 is welded to the curved tube portion 41 , and the middle portion of the handle 42 is fixedly connected to the curved tube portion 41 via a structure such as a clamp.
[0070] Furthermore, as a preferred embodiment, the handle 42 is annular and arranged in an arc shape. Specifically, the curved tube portion 41 has an inner side with a shorter arc length and an outer side with a longer arc length, and the handle 42 fits the curved surface of the outer side of the curved tube portion 41 .
[0071] When using on site, first release the fixing device on the manifold skid, unlock the adjustable support base 6 and lower the height of the lifting plate 64, rotate the entire quick connection device horizontally outside the skid through the handle 42 of the high-pressure elbow 4 with a handle, and after adjusting to the required angle, connect and fix the handle high-pressure elbow 4 to the pipeline to be connected, adjust the adjustable support base 6 to make it fully and firmly support the bottom of the high-pressure tee 2 and then lock it.
[0072] When fracturing is completed and needs to be dismantled, disconnect the high-pressure elbow 4 with handle from the pipeline, unlock the adjustable support base 6 and lower the height of the lifting plate 64, then move the entire quick connection device back to the pry through the handle 42 of the high-pressure elbow 4 with handle and fix it, and finally adjust the adjustable support base 6 to fully and firmly support the bottom of the high-pressure tee 2 and then lock it.
[0073] The above are only embodiments of the present invention, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution are not described in detail here. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the technical solution of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A new type of fracturing manifold quick connection device, used to connect the manifold skid plug valve outlet and the ground pipeline, characterized in that: include: A high-pressure 90° elbow, the high-pressure 90° elbow is connected to the outlet of the manifold pry cock; A high-pressure tee, one of the ports of which is connected to the high-pressure 90° elbow; A high-pressure straight pipe, the high-pressure straight pipe is arranged in a horizontal direction, another port of the high-pressure tee is connected to the high-pressure straight pipe, and the remaining port of the high-pressure tee is closed; A high-pressure elbow with a handle, wherein the high-pressure elbow with a handle is connected to the high-pressure straight pipe; A straight pipe bracket, both ends of which are respectively connected to the high-pressure 90° elbow and the high-pressure straight pipe, and the straight pipe bracket is a rigid component, and the straight pipe bracket supports the high-pressure 90° elbow and the high-pressure straight pipe.
2. The novel fracturing manifold quick connection device according to claim 1 is characterized in that: The high-pressure 90° elbow comprises a curved portion and a straight portion, the straight portion is arranged in a vertical direction, and both ends of the straight pipe support are respectively connected to the straight portion and the high-pressure straight pipe.
3. The novel fracturing manifold quick connection device according to claim 2 is characterized in that: The straight tube support comprises: A first clamp, wherein the first clamp is sleeved outside the straight portion; A second clamp, the second clamp is sleeved outside the high-pressure straight pipe; A support rod, wherein the support rod connects the first clamp and the second clamp.
4. The novel fracturing manifold quick connection device according to claim 1 is characterized in that: The remaining port of the high-pressure tee is closed by a plug.
5. The novel fracturing manifold quick connection device according to claim 1 is characterized in that: An adjustable supporting base is provided at the lower end of the high pressure tee.
6. The novel fracturing manifold quick connection device according to claim 5 is characterized in that: The adjustable support base comprises: A lifting shaft, which is arranged vertically and is a threaded rod; A lifting plate, the upper end of which is rotatably connected to the lifting shaft, and the high-pressure tee is arranged on the lifting plate; A base, wherein the base is hollow, the lower part of the lifting shaft is arranged in the base, and the base is provided with a threaded hole matching the lifting shaft; A rotating handle is fixedly connected to the lifting shaft.
7. The novel fracturing manifold quick connection device according to claim 1 is characterized in that: The high-pressure 90° elbow, the high-pressure tee, the high-pressure straight pipe, and the high-pressure elbow with handle are all connected through a union.
8. The novel fracturing manifold quick connection device according to claim 1 is characterized in that: The high-pressure elbow with a handle comprises: at least three elbow parts connected in sequence, and rotating movable joints are provided between the three elbow parts.
9. The novel fracturing manifold quick connection device according to claim 8, characterized in that: The high-pressure elbow with a handle further comprises a handle, wherein the handle is arranged on the last elbow portion among the plurality of elbow portions.
10. The novel fracturing manifold quick connection device according to claim 9, characterized in that: The handle is an annular structure, the handle is arranged in an arc shape, and the handle is fitted to the arc surface of the outer side of the curved pipe part.
Citation Information
Cited By
Multi-channel high-pressure fracturing manifold
CN121229054A
