Blasthole arrangement structure

By alternately arranging deep and shallow hole blasthole groups above and below the hard rock formation and filling them with explosives and other substances, the problem of equipment wear and debris throwing by hard rock is solved, and the coal excavation efficiency and equipment lifespan are improved.

CN221879385UInactive Publication Date: 2024-10-22GANSU WANSHENG MINING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420600325.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During coal excavation construction, hard rock severely wears equipment and the rock dust generated by blasting affects the working environment. The existing blasthole layout is unreasonable and causes broken slag to be thrown out of the scraper, causing difficulty in slag removal and affecting the excavation efficiency.

Method used

Deep-hole blasthole groups and shallow-hole blasthole groups are alternately arranged in the upper and lower directions of the hard rock strata. The deep-hole units are arranged at intervals along the direction of the scraper conveyor. The depth of the shallow-hole units is smaller than that of the deep-hole units. The filling cavity is filled with explosives, water cannon mud and unmanned aerial vehicle. Water cannon mud shortens the distance between the blasted debris and the scraper conveyor and reduces the probability of debris being thrown.

Benefits of technology

It effectively loosens hard rock formations, reduces the probability of debris being thrown out of the scraper conveyor after blasting, improves excavation efficiency, reduces the loss of fully mechanized excavators, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221879385U_ABST
    Figure CN221879385U_ABST
Patent Text Reader

Abstract

The utility model relates to a shot hole arrangement structure which comprises deep hole shot hole sets and shallow hole shot hole sets, the deep hole shot hole sets and the shallow hole shot hole sets are formed in the face, close to a scraper conveyor, of a hard rock stratum, and the deep hole shot hole sets and the shallow hole shot hole sets are alternately arranged in the vertical direction of the hard rock stratum. The deep hole shot hole set comprises a plurality of deep hole units which are arranged at intervals in the conveying direction of the scraper conveyor, and the shallow hole shot hole set comprises a plurality of shallow hole units which are arranged at intervals in the conveying direction of the scraper conveyor. And the depth size of the shallow hole unit is smaller than that of the deep hole unit. The blasthole arrangement structure not only can fully loosen a hard rock stratum to generate cracks, but also can reduce the probability that slag stones after blasting are thrown out of the scraper conveyor, and is beneficial to improving the tunneling efficiency and reducing the construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of coal mining, in particular to a blasthole arrangement structure. Background Art

[0002] During coal excavation, geological structures such as faults and thin coal belts are often encountered. When passing through geological structures or thin coal belts, hard rocks have a greater impact on the progress of excavation. For example, hard rocks cause serious wear and tear on equipment, and the rock dust generated when using a multi-purpose excavator to cut rock will deteriorate the working environment and affect the health of workers. In order to loosen the hard rock formations, blastholes are usually set on the hard rock for blasting. However, the blasthole arrangement structure in the related technology is unreasonable, which can easily cause the broken slag to be thrown outside the scraper, thereby causing slag removal difficulties. Utility Model Content

[0003] The utility model aims to solve one of the technical problems in the related art at least to a certain extent.

[0004] To this end, an embodiment of the utility model proposes a blasthole arrangement structure, which can not only fully loosen the hard rock layer to produce cracks, but also reduce the probability of slag and rock being thrown out of the scraper conveyor after blasting, which is beneficial to improving excavation efficiency.

[0005] The blasthole arrangement structure of the embodiment of the utility model comprises a deep hole blasthole group and a shallow hole blasthole group, wherein the deep hole blasthole group and the shallow hole blasthole group are opened on a side of the hard rock formation adjacent to the scraper conveyor, and the deep hole blasthole group and the shallow hole blasthole group are alternately arranged along the up and down directions of the hard rock formation, the deep hole blasthole group comprises a plurality of deep hole units, and the plurality of deep hole units are arranged at intervals along the conveying direction of the scraper conveyor, and the shallow hole blasthole group comprises a plurality of shallow hole units, and the plurality of shallow hole units are arranged at intervals along the conveying direction of the scraper conveyor, and the depth dimension of the shallow hole unit is smaller than the depth dimension of the deep hole unit.

[0006] According to the blasthole arrangement structure of the embodiment of the utility model, since the deep hole blasthole group and the shallow hole blasthole group are opened on the side of the hard rock formation adjacent to the scraper conveyor, it is beneficial to shorten the distance between the slag and the scraper conveyor after blasting, so that the comprehensive excavation machine can carry the crushed slag blocks to the scraper conveyor for transportation. Since the deep hole blasthole group and the shallow hole blasthole group are alternately arranged along the upper and lower directions of the hard rock formation, and multiple shallow hole units and multiple deep hole units are arranged at intervals along the conveying direction of the scraper conveyor, the hard rock formation can be fully loosened to produce cracks, and the probability of throwing slag outside the scraper conveyor after blasting can be reduced, which is beneficial to improving the excavation efficiency.

[0007] In some embodiments, in a projection plane orthogonal to the up-down direction of the hard rock formation, the deep hole units and the shallow hole units are arranged at intervals along the conveying direction of the scraper conveyor.

[0008] In some embodiments, the depth dimension of the shallow hole is L1, and the depth dimension of the deep hole is L2, wherein 0.5≤L1 / L2≤0.7.

[0009] In some embodiments, L1 = 1500 mm, L2 = 2500 mm.

[0010] In some embodiments, in the upper and lower directions of the hard rock formation, the spacing between adjacent deep hole units is equal, and the spacing between adjacent shallow hole units is equal; and / or, in the conveying direction of the scraper conveyor, the spacing between adjacent deep hole units is equal, and the spacing between adjacent shallow hole units is equal.

[0011] In some embodiments, in the up and down directions of the hard rock formation, the spacing between adjacent deep hole units and the spacing between adjacent shallow hole units are both L3, and L3=900mm; in the conveying direction of the scraper conveyor, the spacing between adjacent deep hole units and the spacing between adjacent shallow hole units are both L4, and L4=800mm.

[0012] In some embodiments, both the deep hole unit and the shallow hole unit have a filling cavity, and the filling cavity is filled with explosives, water taphole mud and anhydrous taphole mud in sequence from the inside to the outside.

[0013] In some embodiments, the deep hole units of the uppermost deep hole blasthole layer gradually tilt downward from inside to outside, and the deep hole units of the lowermost deep hole blasthole layer gradually tilt upward from inside to outside. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the arrangement of the blasthole arrangement structure and the excavation equipment according to an embodiment of the utility model.

[0015] Figure 2 It is a front view of the blasthole arrangement structure of an embodiment of the utility model.

[0016] Figure 3 It is a side view of the blasthole arrangement structure of an embodiment of the utility model.

[0017] Figure 4 It is a top view of the blasthole arrangement structure of an embodiment of the utility model.

[0018] Figure 5 It is a schematic diagram of filling the filling cavity of the blasthole arrangement structure of the embodiment of the utility model.

[0019] Reference numerals:

[0020] 1. Deep hole blasthole group; 11. Deep hole unit;

[0021] 2. Shallow hole group; 21. Shallow hole unit;

[0022] 3. Filling cavity; 31. Explosive; 32. Water cannon mud; 33. Anhydrous cannon mud; 34. Detonator leg wire;

[0023] 4. Hard rock formation;

[0024] 5. Scraper conveyor;

[0025] 6. Multi-purpose excavator. DETAILED DESCRIPTION

[0026] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but cannot be understood as limiting the present invention.

[0027] Please refer to the following Figures 1 to 5 The blasthole arrangement structure according to the embodiment of the utility model is described.

[0028] like Figures 1 to 5 As shown, the blasthole arrangement structure of the embodiment of the utility model includes: a deep hole blasthole group 1 and a shallow hole blasthole group 2, the deep hole blasthole group 1 and the shallow hole blasthole group 2 are opened on a side of the hard rock layer 4 adjacent to the scraper conveyor 5, the deep hole blasthole group 1 and the shallow hole blasthole group 2 are alternately arranged along the up and down directions of the hard rock layer 4, the deep hole blasthole group 1 includes a plurality of deep hole units 11, and the plurality of deep hole units 11 are arranged at intervals along the conveying direction of the scraper conveyor 5, the shallow hole blasthole group 2 includes a plurality of shallow hole units 21, and the plurality of shallow hole units 21 are arranged at intervals along the conveying direction of the scraper conveyor 5, and the depth dimension of the shallow hole unit 21 is smaller than the depth dimension of the deep hole unit 11.

[0029] It is understandable that if Figure 1 As shown, the deep hole unit 11 and the shallow hole blastholes extend along the width direction of the scraper conveyor 5. After the blasting of the hard rock layer 4 is completed, the loosened slag can be pushed onto the scraper conveyor 5 by the cutting part of the multi-purpose excavator 6 to transport the slag out.

[0030] According to the blasthole arrangement structure of the embodiment of the utility model, since the deep hole blasthole group 1 and the shallow hole blasthole group 2 are opened on a side of the hard rock layer 4 adjacent to the scraper conveyor 5, it is beneficial to shorten the distance between the slag after blasting and the scraper conveyor 5, so that the comprehensive excavation machine 6 can carry the crushed slag blocks to the scraper conveyor 5 for transportation. Since the deep hole blasthole group 1 and the shallow hole blasthole group 2 are alternately arranged along the upper and lower directions of the hard rock layer 4, and the multiple shallow hole units 21 and the multiple deep hole units 11 are arranged at intervals along the conveying direction of the scraper conveyor 5, the hard rock layer 4 can be fully loosened to produce cracks, and the probability of the slag after blasting being thrown out of the scraper conveyor 5 can be reduced, which is beneficial to improving the excavation efficiency, and can reduce the loss of the cutting teeth of the comprehensive excavation machine 6, thereby reducing the construction cost.

[0031] In order to ensure that the hard rock layer 4 can be fully loosened to generate cracks and the probability of the slag being thrown out after blasting is low, the deep hole unit 11 and the shallow hole unit 21 can be arranged at intervals along the conveying direction of the scraper conveyor 5 in the projection plane orthogonal to the up and down direction of the hard rock layer 4. In this way, the blasting effect of the hard rock layer 4 can be better, and the cutting efficiency of the multi-purpose excavator 6 can be greatly improved.

[0032] Alternatively, if Figure 3 As shown, the depth dimension of the shallow hole is L1, and the depth dimension of the deep hole is L2, wherein 0.5≤L1 / L2≤0.7. It is understandable that the depth difference between the shallow hole unit and the deep hole unit cannot be too large or too small. The blasthole arrangement structure of the embodiment of the utility model can ensure that the hard rock layer 4 can be fully loosened to produce cracks, and the probability of slag being thrown out after blasting is low by limiting the ratio of L1 / L2 to the above range. For example, L1=1500mm, L2=2500mm.

[0033] In some embodiments, in the vertical direction of the hard rock layer 4, the spacing between adjacent deep hole units 11 is equal, and the spacing between adjacent shallow hole units 21 is equal. In the conveying direction of the scraper conveyor 5, the spacing between adjacent deep hole units 11 is equal, and the spacing between adjacent shallow hole units 21 is equal. This can make the hard rock layer 4 more evenly broken, avoid the generation of larger stones, and help improve the excavation efficiency of the tunneling machine 6.

[0034] Alternatively, if Figure 2As shown, in the vertical direction of the hard rock layer 4, the spacing between adjacent deep hole units 11 and the spacing between adjacent shallow hole units 21 are both L3, and L3 = 900 mm. In the conveying direction of the scraper conveyor 5, the spacing between adjacent deep hole units 11 and the spacing between adjacent shallow hole units 21 are both L4, and L4 = 800 mm. The inventor of the present application found through experimental research that when L3 and L4 use the above parameters, it can ensure that the hard rock layer 4 can be fully loosened to produce cracks, and the probability of slag being thrown out after blasting is low.

[0035] In a specific example, the depth of the deep hole unit 11 is 2.5m, with a total of 28, the depth of the shallow hole unit 21 is 1.5m, with a total of 18, the eye distance between the shallow hole unit 21 and the deep hole unit 11 is 0.8m, the eye distance from the roof to the bottom plate is 0.9m, the distance between the blastholes near the roof and bottom plates of the roadway is 0.3m, the blastholes vertically expand the coal wall, and the eye openings face the non-mining side. Each hole of the deep hole unit 11 is filled with 1 roll of medicine (0.3kg), and each hole of the shallow hole unit 21 is filled with half a roll of medicine (0.15kg), and the blastholes are sealed with water cannon mud 32+yellow mud.

[0036] The sealing length of the 2.5m deep hole unit 11 is not less than 1.0m, and the sealing length of the 1.5m shallow hole unit 21 is not less than 0.5m. The quality of blasthole drilling, blasthole spacing, charging and sealing are the key to the success of loosening blasting. Strictly follow the plan to ensure the effect of loosening blasting. Explosive 31 uses φ35mm×300g / piece of third-level coal mine permitted latex explosive 31, and the detonator uses millisecond delay electric detonator, adopts forward charging structure, series connection, and uses MFH-200-B coal mine permitted digital electronic detonator detonation controller for detonation.

[0037] In one example, if Figure 5 As shown, both the deep hole unit 11 and the shallow hole unit 21 have a filling cavity 3, and the filling cavity 3 is sequentially filled with explosives 31, water cannon mud 32 and anhydrous cannon mud 3332 from the inside to the outside. It can be understood that the explosives 31 are blocked by the water cannon mud 32 and the anhydrous cannon mud 3332, and the explosives 31 are led out of the filling cavity 3 through the detonator leg wire 34, which can effectively reduce dust during blasting, and has a good comprehensive effect in cooling and eliminating harmful gases in the blasthole.

[0038] Alternatively, if Figure 3 As shown, the deep hole units 11 of the uppermost deep hole blasthole layer gradually tilt downward from the inside to the outside, and the deep hole units 11 of the lowermost deep hole blasthole layer gradually tilt upward from the inside to the outside. The inventors of the present application have found through experimental research that by setting the deep hole units 11 to the above structure, the pre-blasting surface of the hard rock layer 4 can be fully separated from the intact rock layer, which is conducive to improving the blasting effect of the hard rock layer 4.

[0039] In a specific example, the depth of the deep hole unit 11 is 2.5m, with a total of 28, the depth of the shallow hole unit 21 is 1.5m, with a total of 18, the eye distance between the shallow hole unit 21 and the deep hole unit 11 is 0.8m, the eye distance from the roof to the bottom plate is 0.9m, the distance between the blastholes near the roof and bottom plates of the roadway is 0.3m, the blastholes vertically expand the coal wall, and the eye openings face the non-mining side. Each hole of the deep hole unit 11 is filled with 1 roll of medicine (0.3kg), and each hole of the shallow hole unit 21 is filled with half a roll of medicine (0.15kg), and the blastholes are sealed with water cannon mud 32+yellow mud.

[0040] The sealing length of the 2.5m deep hole unit 11 is not less than 1.0m, and the sealing length of the 1.5m shallow hole unit 21 is not less than 0.5m. The quality of blasthole drilling, blasthole spacing, charging and sealing are the key to the success of loosening blasting. Strictly follow the plan to ensure the effect of loosening blasting. Explosive 31 uses φ35mm×300g / piece of third-level coal mine permitted latex explosive 31, and the detonator uses millisecond delay electric detonator, adopts forward charging structure, series connection, and uses MFH-200-B coal mine permitted digital electronic detonator detonation controller for detonation.

[0041] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0043] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0045] In the present utility model, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0046] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are illustrative and cannot be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A blasthole arrangement structure, characterized in that: include: A deep hole blasthole group and a shallow hole blasthole group, wherein the deep hole blasthole group and the shallow hole blasthole group are opened on a side of a hard rock formation adjacent to a scraper conveyor, and the deep hole blasthole group and the shallow hole blasthole group are alternately arranged in the up and down directions of the hard rock formation, the deep hole blasthole group comprises a plurality of deep hole units, and the plurality of deep hole units are arranged at intervals along the conveying direction of the scraper conveyor, and the shallow hole blasthole group comprises a plurality of shallow hole units, and the plurality of shallow hole units are arranged at intervals along the conveying direction of the scraper conveyor, and the depth dimension of the shallow hole unit is smaller than the depth dimension of the deep hole unit.

2. The blasthole arrangement structure according to claim 1, characterized in that: In a projection plane perpendicular to the up-down direction of the hard rock formation, the deep hole units and the shallow hole units are arranged at intervals along the conveying direction of the scraper conveyor.

3. The blasthole arrangement structure according to claim 1, characterized in that: The depth dimension of the shallow hole is L1, and the depth dimension of the deep hole is L2, wherein 0.5≤L1 / L2≤0.

7.

4. The blasthole arrangement structure according to claim 3, characterized in that: L1=1500mm, L2=2500mm.

5. The blasthole arrangement structure according to claim 2, characterized in that: In the up and down directions of the hard rock formation, the spacings between adjacent deep hole units are equal, and the spacings between adjacent shallow hole units are equal; And / or, in the conveying direction of the scraper conveyor, the spacings between adjacent deep hole units are equal, and the spacings between adjacent shallow hole units are equal.

6. The blasthole arrangement structure according to claim 5, characterized in that: In the up and down directions of the hard rock formation, the spacing between adjacent deep hole units and the spacing between adjacent shallow hole units are both L3, and L3=900 mm; In the conveying direction of the scraper conveyor, the spacing between adjacent deep hole units and the spacing between adjacent shallow hole units are both L4, and L4=800 mm.

7. The blasthole arrangement structure according to claim 5, characterized in that: The deep hole unit and the shallow hole unit both have a filling cavity therein, and the filling cavity is sequentially filled with explosives, water taphole mud and anhydrous taphole mud from the inside to the outside.

8. The blasthole arrangement structure according to claim 1, characterized in that: The deep hole units of the uppermost deep hole blasthole layer gradually tilt downward from the inside to the outside, and the deep hole units of the lowermost deep hole blasthole layer gradually tilt upward from the inside to the outside.