Water pump leakproof device for cooling tower

By designing the pump body, sealing, early warning and emergency cut-off devices in the cooling tower, the leakage problem caused by the loose connection between the water pump and the conduit is solved, the prevention of leakage and safe automatic cut-off are realized, and the quality and safety of the cooling tower are improved.

CN221879790UActive Publication Date: 2024-10-22DALIAN XIXINGJIULONG MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420623966.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-10-22
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

The flange connection method between the water pump and the conduit in the cooling tower causes vibration during operation, causing the connection position to loosen, causing leakage and affecting the quality of the cooling tower.

Method used

A water pump anti-leakage device is designed that includes a pump body, a closing device, a warning device and an emergency cut-off device. It is sealed and isolated through the connection between the pump body and the external conduit, and reminds maintenance and automatically closes the pump body in case of leakage to prevent leakage. expand.

Benefits of technology

It effectively avoids water leakage, reminds timely maintenance, improves the quality and safety performance of the water pump, and facilitates the use of the staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221879790U_ABST
    Figure CN221879790U_ABST
Patent Text Reader

Abstract

The utility model discloses a water pump leakproof device for a cooling tower, which comprises a pump body, two support frames are attached to the lower part of the pump body, two placing tables are arranged below the pump body, the water pump leakproof device for the cooling tower further comprises a sealing device, a sealing cover, a sealing cover and a sealing cover, the early warning device is arranged in the sealing device; the emergency cut-off device is arranged above the early warning device; the sealing device can seal and isolate the joint of the pump body and an external guide pipe. The utility model relates to the technical field of cooling towers, in particular to a water pump leakproof device for a cooling tower, which can isolate the connection position of a pump body and an external guide pipe through the matching of the pump body, a sealing device and an early warning device, further can prevent a conveyed water source from leaking to the surrounding environment, and can prevent the water source from leaking to the outside when leakage occurs. And a worker is reminded to carry out timely maintenance treatment, and further expansion of the leakage phenomenon is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cooling towers, in particular to a leakage prevention device for a water pump of a cooling tower. Background Art

[0002] A cooling tower is a device that uses water as a circulating coolant to absorb heat from a system and discharge it into the atmosphere to lower the water temperature. It uses the heat exchange between water and air to produce steam. The steam evaporates and takes away the heat to achieve evaporative heat dissipation, convection heat transfer, and radiation heat transfer. It is an evaporative heat dissipation device that dissipates the waste heat generated in industry or refrigeration and air conditioning to lower the water temperature to ensure the normal operation of the system. The device is generally barrel-shaped, hence the name cooling tower;

[0003] The current cooling tower requires the use of a water pump to circulate the cooling water. However, since the connection between the water pump and the conduit is mostly flange docking, and then installed by bolting, the water pump will vibrate when working. This will cause the connection between the water pump and the conduit to loosen after long-term operation, resulting in leakage, which will affect the overall use quality of the cooling tower and bring inconvenience to the staff. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a cooling tower water pump anti-leakage device, which solves the problem that the current cooling tower needs to use a water pump to circulate and drive cooling water. Since the connection between the water pump and the conduit is mostly flange docking, and then installed by bolt fixing, and the water pump will vibrate when working, the connection between the water pump and the conduit will become loose after long-term operation, thereby causing leakage, which will affect the overall use quality of the cooling tower and bring inconvenience to the staff.

[0005] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a leakage prevention device for a cooling tower water pump, including a pump body, two support frames are attached to the bottom of the pump body, and two placement platforms are arranged under the pump body. The leakage prevention device for a cooling tower water pump also includes: a closing device, installed under the pump body; an early warning device, arranged inside the closing device; an emergency shut-off device, arranged above the early warning device; wherein, the closing device can seal and isolate the connection between the pump body and the external conduit, the early warning device can give an early warning when the pump body leaks, and the emergency shut-off device can urgently shut down the pump body when the pump body leaks on a large scale.

[0006] Preferably, the closing device comprises: two boxes, which are respectively sleeved on the bottom of the pump body and respectively fixed to the tops of the two placement tables; two rubber pads, which are respectively installed in the grooves of the two boxes; and multiple mounting plates, which are respectively installed above and below the two boxes; wherein, the staff can install the two boxes under the pump body through the two mounting plates using fastening bolts, and the rubber pads can improve the connection sealing of the two boxes.

[0007] Preferably, a discharge pipe is installed at the lower side of the front box body, and the inner walls of the two boxes are inclined.

[0008] Preferably, the early warning device includes: a support rod installed at the bottom of the inner wall of the box body at the front; a gear rod sleeved on the outer wall of the support rod; a floating plate installed at the bottom of the gear rod; a spring installed at the top of the support rod and fixedly connected to the inner wall of the gear rod; a rotating rod rotatably connected to the inner wall of the box body at the front through a bearing; a gear installed at one end of the rotating rod and meshing with the outer wall of the gear rod; wherein, when the pump body leaks, the floating plate will drive the gear rod to move along the top of the support rod, and at the same time drive the rotating rod to rotate through the gear.

[0009] Preferably, the emergency shut-off device includes: a switch, which is installed at the bottom of the inner wall of the box at the front and is electrically connected to the pump body; an isolation ring, which is sleeved on the outer wall of the switch and fixedly connected to the top of the inner wall of the box at the front; wherein, when the pump body leaks on a large scale, the switch can quickly shut down the pump body, and the isolation ring can isolate and protect the switch.

[0010] Beneficial Effects

[0011] The utility model provides a cooling tower water pump anti-leakage device. It has the following beneficial effects: the cooling tower water pump anti-leakage device can isolate the connection position between the pump body and the external conduit through the cooperation of the pump body, the closing device and the early warning device, thereby preventing the transported water source from leaking into the surrounding environment, and can also remind the staff to carry out timely maintenance when leakage occurs to avoid further expansion of the leakage phenomenon, so that the use quality of the water pump can be effectively guaranteed and the use of the staff is convenient;

[0012] With the cooperation of the emergency shut-off device, the pump body can be automatically shut down when the leakage is serious, avoiding further expansion of the leakage and thus causing danger. This can greatly improve the safety performance of the water pump when in use, and thus bring convenience to the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the structure of the utility model;

[0014] Figure 2 for Figure 1 A cross-sectional view of

[0015] Figure 3 yes Figure 2 Schematic diagram of the structure of the pump body, rotating rod and gear;

[0016] Figure 4 yes Figure 2 Schematic diagram of the structure of the mounting plate, box and switch.

[0017] In the figure: 1. pump body, 2. early warning device, 201. support rod, 202. floating plate, 203. gear rod, 204. spring, 205. gear, 206. rotating rod, 3. emergency shut-off device, 301. switch, 302. isolation ring, 4. closing device, 401. box body, 402. mounting plate, 403. rubber pad, 5. support frame, 6. placement table, 7. discharge pipe. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.

[0020] The current cooling tower needs to use a water pump to circulate the cooling water. Since the connection between the water pump and the conduit is mostly flange docking, and then installed by bolting, and the water pump will vibrate when working, which will cause the connection between the water pump and the conduit to loosen after long-term operation, resulting in leakage, which will affect the overall use quality of the cooling tower, thus causing inconvenience to the staff;

[0021] In view of this, the utility model provides a leakage prevention device for a cooling tower water pump. Through the cooperation of the pump body, the closing device and the early warning device, the connection position between the pump body and the external conduit can be isolated, thereby preventing the transported water source from leaking into the surrounding environment, and when a leak occurs, the utility model can remind the staff to carry out timely maintenance and avoid further expansion of the leakage. Therefore, the use quality of the water pump can be effectively guaranteed and the use of the staff is convenient.

[0022] Embodiment 1: By Figure 1 , 2 , 3 and 4 show that a leakage prevention device for a water pump for a cooling tower includes a pump body 1. The model of the pump body 1 is not specifically limited as long as it meets the use requirements. Two support frames 5 are attached to the bottom of the pump body 1, and two placement tables 6 are arranged under the pump body 1. The leakage prevention device for a water pump for a cooling tower also includes: a closing device 4, which is installed under the pump body 1; an early warning device 2, which is arranged inside the closing device 4; and an emergency shut-off device 3, which is arranged above the early warning device 2; wherein the closing device 4 can seal and isolate the connection between the pump body 1 and the external conduit, the early warning device 2 can give an early warning when the pump body 1 leaks, and the emergency shut-off device 3 can shut down the pump body 1 urgently when the pump body 1 leaks on a large scale;

[0023] In the specific implementation process, it is worth pointing out that the pump body 1 is a water circulation device currently used in cooling towers. Its installation position and installation structure are not limited, and it only needs to meet the use requirements. At the same time, this case has not made any innovations or structural improvements to it, and this is a well-known technology for those skilled in the art, so it will not be described in detail. Those skilled in the art should understand it in a broad sense. The placement table 6 can support and place the anti-leakage device of the cooling tower water pump. The closing device 4 can isolate and protect the connection between the pump body 1 and the external conduit to prevent the circulating water source from spreading to the surrounding environment. The early warning device 2 and the emergency shut-off device 3 can remind the staff whether there is leakage between the pump body 1 and the external conduit, and when the leakage is serious, the pump body 1 can be automatically closed;

[0024] Specifically, when using the cooling tower water pump anti-leakage device, the staff first installs the closing device 4 at the connection position between the pump body 1 and the external conduit, and then starts to put it into use. When a leakage occurs, the early warning device 2 can remind the staff to perform maintenance in time. When the leakage incident is serious, the pump body 1 can be automatically closed to avoid the continuous occurrence of leakage incidents.

[0025] Embodiment 2: By Figure 1 , 2 , 3 and 4, the closing device 4 includes: two boxes 401, which are respectively sleeved under the pump body 1 and fixedly connected to the tops of the two placement tables 6; two rubber pads 403, which are respectively installed in the grooves of the two boxes 401; multiple mounting plates 402 are provided, which are respectively installed above and below the two boxes 401; wherein, the staff can install the two boxes 401 under the pump body 1 by fastening bolts through the two mounting plates 402, and the rubber pads 403 can improve the connection sealing of the two boxes 401;

[0026] In the specific implementation process, it is worth pointing out that the mounting plate 402 can mount the two boxes 401 under the pump body 1 by fastening bolts, and the rubber pad 403 can improve the sealing performance when the two boxes 401 are connected;

[0027] Furthermore, a discharge pipe 7 is installed below one side of the front box 401, and the inner walls of the two boxes 401 are inclined;

[0028] In the specific implementation process, it is worth pointing out that the design of the discharge pipe 7 allows the staff to discharge the water source inside the box 401 more conveniently;

[0029] Specifically, based on the above-mentioned embodiment 1, when the staff needs to install the closing device 4, the staff first connects the two boxes 401 and puts them under the pump body 1, and then uses external fastening bolts to install and fix the two boxes 401 through the mounting plate 402. When the installation is completed, it can be put into use.

[0030] Embodiment 3: By Figure 1 , 2 As can be seen from Figures 3 and 4, the early warning device 2 includes: a support rod 201, which is installed at the bottom of the inner wall of the front box body 401; a gear rod 203, which is sleeved on the outer wall of the support rod 201; a floating plate 202, which is installed at the bottom of the gear rod 203; a spring 204, which is installed at the top of the support rod 201 and is fixedly connected to the inner wall of the gear rod 203; a rotating rod 206, which is rotatably connected to the inner wall of the front box body 401 through a bearing; a gear 205, which is installed at one end of the rotating rod 206 and meshes with the outer wall of the gear rod 203; wherein, when the pump body 1 leaks, the floating plate 202 will drive the gear rod 203 to move along the upper side of the support rod 201, and at the same time drive the rotating rod 206 to rotate through the gear 205;

[0031] In the specific implementation process, it is worth pointing out that when the spring 204 is stretched, it will drive the gear rod 203 to move along the outer wall of the support rod 201, thereby causing a false alarm to occur when there is no water source inside the box 401. The staff can judge whether a leakage event occurs based on whether the angle of the rotating rod 206 changes;

[0032] Specifically, on the basis of the above-mentioned embodiments 1 and 2, when leakage occurs at the connection position between the pump body 1 and the external conduit, the water level inside the box body 401 begins to rise, and the floating plate 202 can drive the gear rod 203 to move along the outer wall of the support rod 201, and at the same time, the gear 205 drives the rotating rod 206 to rotate. At this time, the staff can find the leakage at the connection position between the pump body 1 and the external conduit according to the change in the angle of the rotating rod 206, and can then perform maintenance in time.

[0033] Embodiment 4: By Figure 2 and 3 It can be seen that the emergency shut-off device 3 includes: a switch 301, which is installed at the bottom of the inner wall of the front box 401 and is electrically connected to the pump body 1; an isolation ring 302, which is sleeved on the outer wall of the switch 301 and is fixedly connected to the top of the inner wall of the front box 401; wherein, when the pump body 1 leaks in a large range, the switch 301 can quickly shut down the pump body 1, and the isolation ring 302 can isolate and protect the switch 301;

[0034] In the specific implementation process, it is worth pointing out that the switch 301 is electrically connected to the pump body 1. When the gear rod 203 contacts the switch 301, the switch 301 can cut off the pump body 1 from the external circuit, thereby preventing the leakage event from further expanding. The material of the isolation ring 302 can be soft rubber or other materials. The specific material is not limited, as long as it meets the use requirements.

[0035] Specifically, based on the above-mentioned embodiments 1, 2 and 3, when a serious leakage occurs between the pump body 1 and the external conduit, the gear rod 203 moves upward to trigger the switch 301, and the switch 301 can then close the pump body 1, thereby preventing the leakage event from continuing to expand.

[0036] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0037] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A cooling tower water pump anti-leakage device, comprising a pump body (1), Features: Two support frames (5) are attached to the bottom of the pump body (1), and two placement platforms (6) are arranged under the pump body (1). The anti-leakage device for the cooling tower water pump also includes: A sealing device (4) installed below the pump body (1); An early warning device (2) is arranged inside the closing device (4); An emergency shutoff device (3) is arranged above the early warning device (2); The sealing device (4) can seal and isolate the connection between the pump body (1) and the external conduit, the warning device (2) can issue a warning reminder when the pump body (1) leaks, and the emergency shut-off device (3) can shut down the pump body (1) in an emergency when the pump body (1) leaks on a large scale.

2. A cooling tower water pump anti-leakage device according to claim 1, Features: The sealing device (4) comprises: Two boxes (401) are provided, which are respectively sleeved under the pump body (1) and are respectively fixed to the tops of the two placement tables (6); Two rubber pads (403) are provided and respectively installed in the grooves of the two boxes (401); A plurality of mounting plates (402) are provided and are respectively mounted above and below the two boxes (401); The staff can install the two boxes (401) below the pump body (1) through the two mounting plates (402) using fastening bolts, and the rubber pad (403) can improve the connection sealing of the two boxes (401).

3. A cooling tower water pump anti-leakage device according to claim 2, Features: A discharge pipe (7) is installed at the lower side of one side of the front box body (401), and the inner walls of the two boxes (401) are both inclined.

4. A cooling tower water pump anti-leakage device according to claim 2, Features: The early warning device (2) comprises: A support rod (201) is installed at the bottom of the inner wall of the box body (401) at the front; A gear rod (203) sleeved on the outer wall of the support rod (201); A floating plate (202) is installed at the bottom of the gear rod (203); A spring (204) is installed on the top of the support rod (201) and is fixedly connected to the inner wall of the gear rod (203); A rotating rod (206) is rotatably connected to the inner wall of the box body (401) at the front through a bearing; A gear (205) is mounted on one end of the rotating rod (206) and meshes with the outer wall of the gear rod (203); When the pump body (1) leaks, the floating plate (202) drives the gear rod (203) to move along the top of the support rod (201), and at the same time drives the rotating rod (206) to rotate through the gear (205).

5. A cooling tower water pump anti-leakage device according to claim 2, Features: The emergency shut-off device (3) comprises: A switch (301) is installed at the bottom of the inner wall of the front box (401) and is electrically connected to the pump body (1); An isolation ring (302) is sleeved on the outer wall of the switch (301) and fixedly connected to the top of the inner wall of the box (401) in front; When the pump body (1) leaks on a large scale, the switch (301) can quickly close the pump body (1), and the isolation ring (302) can isolate and protect the switch (301).