High-rise building settlement observation device
By designing a device that simultaneously lifts and lowers multiple observation components and a magnetic recording board, it solves the problems of easy damage and large errors of existing settlement observation devices, achieves accurate detection and data recording of settlement of high-rise buildings, and enhances the protection and usability of the equipment. .
Patent Information
- Application Number
- CN202323570392.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-26
AI Technical Summary
Existing high-rise building settlement observation devices are susceptible to man-made damage and corrosion, and the detection error of a single observation rod is large, which can easily lead to deviations in detection results and affect the accuracy of observation.
A high-rise building settlement observation device including a fixed box, a support plate, a threaded rod, a lifting plate, an observation component and a recording board is designed. Through the simultaneous lifting and lowering of multiple observation components and the magnetic connection of the recording board, multi-point contact detection and data are realized. Record, reduce errors and enhance equipment protection.
The device contacts the ground synchronously through multiple contact pads, reducing detection errors, and facilitates data recording and protection through the magnetic connection of the recording board, improving the accuracy of settlement observations and the service life of the equipment.
Smart Images

Figure CN221882526U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building safety detection, in particular to a high-rise building settlement observation device. Background Art
[0002] Under the load of the building, the foundation soil is compressed and causes vertical deformation or sinking. Uniform settlement generally does little harm to the building, but when it is too large, it will also reduce the elevation of the building and affect its use; uneven settlement is more harmful to the building, causing additional stress in the building and causing cracks, or even partial component fractures, endangering the safety of the building. When designing the foundation, the settlement should be estimated, so the settlement observation of the building is extremely important.
[0003] The publication number CN 215639401 U discloses a high-rise building settlement observation device, including a wall, a rotating shaft, a transverse rod, a longitudinal accommodating tube, an observation rod and a spring. The wall is provided with an inverted L-shaped groove, and the inverted L-shaped groove includes a transverse groove and a longitudinal groove. The transverse groove is arranged horizontally, and the longitudinal groove is arranged vertically, and the top of the longitudinal groove is connected to one end of the transverse groove. The rotating shaft is arranged vertically at the other end of the transverse groove. One end of the transverse rod is rotatably connected to the rotating shaft, and the other end of the transverse rod is connected to the top of the longitudinal accommodating tube. The top of the observation rod is displaceably inserted into the longitudinal accommodating tube. The spring is located in the longitudinal accommodating tube, and the two ends of the spring are respectively abutted against the longitudinal accommodating tube and the observation rod. A longitudinal scale is arranged on the outer wall of the observation rod. The technical solution is used to solve the problem that the existing building settlement observation device is susceptible to human damage and corrosion.
[0004] However, the observation device has the following shortcomings: when in use, the device can only detect buildings through a single observation rod. However, due to the large error of a single detection sample and the fact that the rod is easily stretched or retracted when it is damaged, the detection results are easily biased, affecting the observation.
[0005] Therefore, the utility model provides a high-rise building settlement observation device to solve the above problems. Utility Model Content
[0006] In view of the deficiencies in the prior art, the utility model provides a high-rise building settlement observation device to solve the above problems.
[0007] To achieve the above purpose, the utility model is implemented through the following technical solutions: a high-rise building settlement observation device, including a fixed box, a support plate is fixedly connected in the fixed box, two threaded rods are rotatably connected to the support plate, and a lifting plate is threadedly sleeved on the two threaded rods, an extension rod is fixedly connected to one side of the lifting plate, and the bottom end of the extension rod slides and extends outside the fixed box, and the bottom ends of the two extension rods are fixedly connected to the same adjustment plate, and a plurality of observation components are arranged on the adjustment plate;
[0008] The observation assembly includes a mounting tube that is connected through the adjustment plate, the bottom of the mounting tube is slidably and interlacedly connected with an observation tube, the bottom end of the observation tube is fixedly connected with a contact pad, the outer wall of the observation tube is provided with a scale, a positioning rod is fixedly connected inside the mounting tube, the bottom end of the positioning rod slides and extends into the observation tube, a spring is slidably sleeved on the positioning rod, the top end of the spring is connected to the mounting tube, and the bottom end of the spring is connected to the observation tube.
[0009] Preferably, a synchronous wheel is fixedly sleeved on the two threaded rods, and a same synchronous belt is wound between the two synchronous wheels. By using the synchronous wheel and the synchronous belt in combination, the two threaded rods can be conveniently controlled to rotate synchronously, thereby driving the adjustment plate to rise and fall smoothly.
[0010] Preferably, a driven gear is fixedly sleeved on the corresponding threaded rod, a transmission shaft is rotatably penetrated and connected to the top of the fixed box, a driving gear is fixedly connected to the bottom end of the transmission shaft, the driving gear is meshed with the driven gear, and a handwheel is fixedly connected to the top end of the transmission shaft. The driven gear, transmission shaft, driving gear and handwheel are used in combination to conveniently control the connected threaded rod to rotate, which is convenient for operation and use.
[0011] Preferably, two symmetrically distributed sliding rods are fixedly connected to the bottom of the support plate, and the sliding rods slide through the corresponding lifting plates. The lifting plates can be limited by the provided sliding rods to prevent them from rotating with the threaded rods, allowing them to move smoothly.
[0012] Preferably, two placement boxes are fixedly connected to the bottom of the adjustment plate, and the inner walls of one side of the two placement boxes are fixedly connected with a first magnet. A recording board is slidably and interlacedly connected to one side of the placement box, and a plurality of posting pads are fixedly connected to one side of the recording board. A second magnet is fixedly connected to one side of the recording board, and the second magnet is magnetically connected to the first magnet. The recording board can be convenient for posting papers recording sedimentation data, thereby facilitating the processing personnel to record the sedimentation data. At the same time, the recording board can be stored and protected by the placement box, which is convenient for use.
[0013] Preferably, three protective pads are fixedly connected to the outer wall of the fixed box, and grooves are provided on the protective pads. The protective pads and the grooves are used in combination to protect the outside of the fixed box and prevent it from being easily damaged after being hit.
[0014] Preferably, a fastening bracket is fixedly connected to one side of the fixing box, and a plurality of screw holes are provided on the fastening bracket. The fixing box can be conveniently installed and used by using the fastening bracket and the screw holes in combination.
[0015] Beneficial Effects
[0016] The utility model provides a high-rise building settlement observation device. Compared with the prior art, it has the following beneficial effects:
[0017] (1) The high-rise building settlement observation device can drive multiple observation components to rise and fall synchronously through the provided lifting plate, so that multiple contact pads can all contact the ground to prevent the ground from having a slope, thereby facilitating multiple observation components to perform settlement detection on high-rise buildings, facilitating use and reducing errors.
[0018] (2) The high-rise building settlement observation device can conveniently post papers recording settlement data through the recording board, so as to facilitate the processing personnel to record the settlement data. At the same time, the recording board can be stored and protected through the placement box, which is convenient for use. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional diagram of the external structure of the utility model;
[0020] Figure 2 It is a front view cross-sectional structural schematic diagram of the utility model;
[0021] Figure 3 It is a schematic cross-sectional structural diagram of the observation assembly in the utility model;
[0022] Figure 4 It is a schematic diagram of the internal cross-sectional structure of the placement box in the utility model;
[0023] Figure 5 It is an assembly drawing of the recording board in the utility model;
[0024] Figure 6 It is a relevant assembly drawing of the threaded rod and the extension rod in the utility model.
[0025] In the figure: 1. fixing box; 2. supporting plate; 3. threaded rod; 4. lifting plate; 5. extension rod; 6. adjustment plate; 7. observation assembly; 701. mounting tube; 702. observation tube; 703. contact pad; 704. scale; 705. positioning rod; 706. spring; 8. synchronous wheel; 9. synchronous belt; 10. driven gear; 11. transmission shaft; 12. driving gear; 13. hand wheel; 14. sliding rod; 15. placement box; 16. first magnet; 17. recording board; 18. posting pad; 19. second magnet; 20. protective pad; 21. groove; 22. fastening bracket; 23. screw hole. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Embodiment 1:
[0028] See also Figure 1 , Figure 2 and Figure 3 A high-rise building settlement observation device comprises a fixed box 1, a support plate 2 is fixedly connected inside the fixed box 1, two threaded rods 3 are rotatably connected to the support plate 2, a lifting plate 4 is threadedly sleeved on the two threaded rods 3, an extension rod 5 is fixedly connected to one side of the lifting plate 4, the bottom end of the extension rod 5 slides and extends to the outside of the fixed box 1, the bottom ends of the two extension rods 5 are fixedly connected to the same adjustment plate 6, and a plurality of observation components 7 are penetrated on the adjustment plate 6;
[0029] The observation assembly 7 includes a mounting tube 701 which is connected through the adjustment plate 6, an observation tube 702 is slidably inserted into the bottom of the mounting tube 701, a contact pad 703 is fixedly connected to the bottom end of the observation tube 702, a scale 704 is provided on the outer wall of the observation tube 702, a positioning rod 705 is fixedly connected inside the mounting tube 701, the bottom end of the positioning rod 705 slides and extends into the observation tube 702, a spring 706 is slidably sleeved on the positioning rod 705, the top end of the spring 706 is connected to the mounting tube 701, and the bottom end of the spring 706 is connected to the observation tube 702.
[0030] Embodiment 2:
[0031] See also Figures 1 to 6, this embodiment provides a technical solution based on Embodiment 1: Synchronous wheels 8 are fixedly sleeved on both of the two threaded rods 3, and the same synchronous belt 9 is wound between the two synchronous wheels 8; Driven gears 10 are fixedly sleeved on the corresponding threaded rods 3, a transmission shaft 11 is rotatably penetrated and connected to the top of the fixed box 1, a driving gear 12 is fixedly connected to the bottom end of the transmission shaft 11, the driving gear 12 meshes with the driven gear 10, a hand wheel 13 is fixedly connected to the top end of the transmission shaft 11; Two symmetrically distributed sliding rods 14 are fixedly connected to the bottom of the support plate 2, and the sliding rods 14 slidably penetrate through the corresponding lifting plates 4; Two placement boxes 15 are fixedly connected to the bottom of the adjusting plate 6, first magnets 16 are fixedly connected to the inner walls of one sides of the two placement boxes 15, a recording board 17 is slidably inserted and connected to one side of the placement box 15, a plurality of posting pads 18 are fixedly connected to one side of the recording board 17, a second magnet 19 is fixedly connected to one side of the recording board 17, and the second magnet 19 is magnetically connected to the first magnet 16; Three protective pads 20 are fixedly connected to the outer wall of the fixed box 1, the protective pads 20 are in a U-shaped shape and are made of rubber material, and grooves 21 are formed in the protective pads 20; A fastening bracket 22 is fixedly connected to one side of the fixed box 1, and a plurality of screw holes 23 are formed in the fastening bracket 22.
[0032] Meanwhile, the content not described in detail in this specification belongs to the prior art well known to those skilled in the art.
[0033] During operation, first, the fixed box 1 is installed on the outside of a high-rise building through the fastening bracket 22 and the screw holes 23, and then the hand wheel 13 is rotated. The hand wheel 13 drives the driving gear 12 to rotate through the transmission shaft 11. The driving gear 12 drives the driven gear 10 meshing with it to rotate. The driven gear 10 drives the connected threaded rod 3 to rotate. The threaded rod 3 drives the other threaded rod 3 to rotate through the synchronous wheel 8 and the synchronous belt 9. At this time, the two threaded rods 3 rotate synchronously. The threaded rod 3 drives the lifting plate 4 threadedly connected to it to descend. The lifting plate 4 drives the adjusting plate 6 to descend through the extension rod 5 until the contact pad 703 abuts against the ground, preventing the contact pad 703 from failing to contact the ground due to installation position deviation. Subsequently, the staff can take pictures of the joint between the scale 704 and the installation cylinder 701 by means of taking pictures or paper records, and then stick the recorded paper on the posting pad 18. After a period of time, record and compare the position of the scale 704, and compare it with the previously recorded data. Multiple groups of data are used to reduce errors.
[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A high-rise building settlement observation device, comprising a fixed box (1), characterized in that: A support plate (2) is fixedly connected inside the fixed box (1), two threaded rods (3) are rotatably connected to and penetrate the support plate (2), a lifting plate (4) is threadedly sleeved on the two threaded rods (3), an extension rod (5) is fixedly connected to one side of the lifting plate (4), the bottom end of the extension rod (5) slides and extends outside the fixed box (1), the bottom ends of the two extension rods (5) are fixedly connected to the same adjustment plate (6), and a plurality of observation components (7) are penetrated on the adjustment plate (6); The observation assembly (7) comprises a mounting tube (701) connected to the adjustment plate (6); the bottom of the mounting tube (701) is slidably connected with an observation tube (702); the bottom end of the observation tube (702) is fixedly connected with a contact pad (703); the outer wall of the observation tube (702) is provided with a scale (704); a positioning rod (705) is fixedly connected inside the mounting tube (701); the bottom end of the positioning rod (705) slides and extends into the observation tube (702); a spring (706) is slidably sleeved on the positioning rod (705); the top end of the spring (706) is connected to the mounting tube (701), and the bottom end of the spring (706) is connected to the observation tube (702).
2. A high-rise building settlement observation device according to claim 1, characterized in that: A synchronous wheel (8) is fixedly sleeved on each of the two threaded rods (3), and a synchronous belt (9) is wound between the two synchronous wheels (8).
3. A high-rise building settlement observation device according to claim 2, characterized in that: A driven gear (10) is fixedly sleeved on the corresponding threaded rod (3); a transmission shaft (11) is rotatably connected to the top of the fixed box (1); a driving gear (12) is fixedly connected to the bottom end of the transmission shaft (11); the driving gear (12) is meshed with the driven gear (10); and a hand wheel (13) is fixedly connected to the top end of the transmission shaft (11).
4. A high-rise building settlement observation device according to claim 1, characterized in that: The bottom of the support plate (2) is fixedly connected to two symmetrically distributed sliding rods (14), and the sliding rods (14) slide through the corresponding lifting plates (4).
5. A high-rise building settlement observation device according to claim 1, characterized in that: Two placement boxes (15) are fixedly connected to the bottom of the adjustment plate (6), one inner wall of each of the two placement boxes (15) is fixedly connected to a first magnet (16), one side of the placement box (15) is slidably connected to a recording plate (17), one side of the recording plate (17) is fixedly connected to a plurality of posting pads (18), one side of the recording plate (17) is fixedly connected to a second magnet (19), and the second magnet (19) is magnetically connected to the first magnet (16).
6. A high-rise building settlement observation device according to claim 1, characterized in that: Three protection pads (20) are fixedly connected to the outer wall of the fixed box (1), and grooves (21) are formed on the protection pads (20).
7. A high-rise building settlement observation device according to claim 1, characterized in that: A fastening bracket (22) is fixedly connected to one side of the fixing box (1), and a plurality of screw holes (23) are provided on the fastening bracket (22).
