Positioning device for FRP rib concrete bonding slippage pull-out test
By designing the positioning device to ensure the vertical and horizontal arrangement of the FRP bars and steel casing, the deflection problem caused by the inconsistent center points of the FRP bars and the steel casing in the traditional pull-out test was solved, and the reliability and positioning accuracy of the test results were improved.
Patent Information
- Application Number
- CN202420275968.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-05
AI Technical Summary
In traditional FRP bar concrete pull-out tests, the steel pipe sleeve may cause initial deflection and eccentric loading of the bar during grouting, affecting the test results, especially when the center points of the FRP bars and the steel pipe sleeve are not in a straight line.
A positioning device for concrete bonding slip-pull test of FRP bars is designed, which includes a first positioning structure and a second positioning structure. The FRP bars are fixed through scale rods and arc-shaped splints, and fastening components such as jack wires are used to fix steel casings. , ensure that the FRP bars and steel casing are arranged vertically and horizontally, and the center points are consistent.
It effectively avoids the initial deflection and eccentric loading of the FRP bars, improves the reliability of the pull-out test, ensures positioning accuracy, has a simple structure, low cost and is easy to disassemble and assemble.
Smart Images

Figure CN221883308U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of FRP bar pull-out test, in particular to a positioning device for FRP bar concrete bonding slip pull-out test. Background Art
[0002] RP bar is the abbreviation of fiber reinforced polymer / plastic, which is a composite material formed by reinforcing fiber and matrix material through a molding process. Compared with steel, FRP material has outstanding properties such as light weight, high strength, fatigue resistance and corrosion resistance. It is mainly used in engineering structure reinforcement in corrosive environments, tensile zones of concrete structures, prestressed cables, etc. As an advanced non-metallic composite material, FRP bars are considered to be one of the best choices to replace ordinary steel bars and prestressed steel bars for corrosive environments and special projects. When FRP bars are used in these structures, it is necessary to understand their bonding properties with concrete. Generally, the center pull-out test is used to study the bonding properties between FRP bars and concrete.
[0003] The pull-out test usually includes the following steps: 1) Prepare the specimen. Make a concrete test block containing FRP bars. These test blocks are usually cylindrical or cubic in shape, and the size is determined according to the test standard. Ensure that the FRP bars are correctly placed when pouring concrete and that their length extends a certain distance from the concrete test block so that they can be pulled out during the test. 2) Curing. Allow the concrete test block to cure under specified conditions to achieve the design strength. 3) Install the test device. Fix the test block on the pull-out test machine to ensure that the test block does not move or rotate during the test, and align the FRP bars with the clamps of the pull-out machine to ensure that the tensile force can act directly on the FRP bars. 4) Apply the tensile force. Increase the tensile force gradually at a constant speed or according to a predetermined loading schedule; record the tensile force and the corresponding displacement data, usually automatically using a data acquisition system. 5) Observe and record. Observe the bonding behavior between the FRP bars and concrete, such as slippage, crack development, etc.; record any abnormal phenomena during the test, such as concrete splitting, FRP bar rupture, etc. 6) Terminate the test. The test is terminated when the FRP bar is completely pulled out of the concrete or when the predetermined failure mode is reached (such as the FRP bar breaks). 7) Data processing and analysis. Draw a tension-displacement curve based on the recorded data. Determine key parameters such as maximum pull-out force, bond strength, and slip from the curve. Analyze the test results and evaluate the bonding performance between the FRP bar and concrete.
[0004] Among them, the FRP bars need to be reinforced with steel pipes before the pull-out test. However, the traditional steel pipe sleeve may cause the initial deflection of the bars during grouting, resulting in eccentric loading, which will affect the test results, especially when the FRP bars and the center point of the steel pipe sleeve are not in a straight line, which will have a greater impact on the test results. Utility Model Content
[0005] The utility model provides a positioning device for FRP bar concrete bonding slip pull test, so as to solve the technical problem in the prior art that the center points of the FRP bar and the steel pipe sleeve are not in a straight line in the pull test, thus affecting the test result.
[0006] In order to solve the above problems, the positioning device for FRP bar concrete bonding slip pull test provided by the utility model adopts the following technical solutions:
[0007] A positioning device for FRP bar concrete bonding slip pull-out test, comprising:
[0008] A positioning frame, the positioning frame having a vertical plate with a vertical horizontal plane, the vertical plate being provided with a first positioning structure for fixing the FRP bar in a vertical horizontal plane state and a second positioning structure for fixing the steel casing in a vertical horizontal plane state, the steel casing being installed on the outer periphery of the FRP bar so that the FRP bar and the steel casing are coaxially arranged;
[0009] A concrete test block is also fixed to the outer periphery of the FRP bar, and the upper end of the FRP bar passes through the concrete test block to be clamped by the pull-out testing machine.
[0010] Furthermore, the first positioning structure includes two scale rods spaced apart from each other, each of which is movably fixed to the vertical plate in a horizontal direction, and a clamping assembly for clamping the FRP rib is arranged at one end of each scale rod away from the vertical plate.
[0011] Furthermore, the clamping assembly includes two arc-shaped clamping plates, one of which is fixed to the end of the corresponding scale rod, the two arc-shaped clamping plates are connected by bolts and nuts, and a channel for the FRP rib to pass through is formed between the two arc-shaped clamping plates.
[0012] Furthermore, the two arc-shaped clamping plates are connected by two sets of bolts and nuts.
[0013] Furthermore, a supporting seat located on the upper side of the first positioning structure is fixed on the vertical plate, and the fixing seat is used to support the concrete test block.
[0014] Furthermore, the positioning frame also includes a horizontal plate located at the lower end of the vertical plate, the horizontal plate and the vertical plate are perpendicular to each other, and the second positioning structure is arranged at the position where the lower end of the vertical plate connects with the horizontal plate.
[0015] Furthermore, the second positioning structure includes a fixing seat having a circular hole coaxial with the channel, the circular hole is used to fix a steel casing, the steel casing is used for inserting the FRP bar, and the second positioning assembly also includes a fastening assembly for fastening the steel casing.
[0016] Furthermore, the fastening assembly includes four top screws, which are inserted into the circular hole along the side of the fixing seat to tighten the steel casing.
[0017] Furthermore, the fixing seat is connected to the vertical plate via a connecting rod.
[0018] Furthermore, the vertical plate, the connecting rod and the fixing seat are all made of metal, and the three are fixed by welding.
[0019] The beneficial effects of the positioning device for FRP bar concrete bonding slip pull test provided by the utility model are:
[0020] 1) The first positioning structure and the second positioning structure are used to fix the FRP bar and the steel casing respectively, and cooperate with each other to effectively ensure that the FRP bar and the steel casing are arranged in a vertical horizontal plane and the center point of the FRP bar and the steel casing is in a straight line, avoiding the initial deflection and eccentric loading of the FRP, and ensuring the reliability of the pull-out test;
[0021] 2) When the two clamping components of the first positioning structure fix the FRP reinforcement, by adjusting the scales on the two scale rods to correspond up and down, the verticality of the FRP reinforcement can be effectively ensured to ensure the positioning effect;
[0022] 3) The whole device has a simple structure, stable effect, low cost, convenient disassembly, assembly and adjustment, and high positioning accuracy.
[0023] In summary, through the above arrangement, the utility model effectively solves the technical problem in the prior art that the center points of the FRP ribs and the steel pipe sleeves are not in a straight line in the pull-out test, which affects the test results. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] By reading the detailed description below with reference to the accompanying drawings, the above and other purposes, features and advantages of the exemplary embodiments of the present invention will become easy to understand. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:
[0025] Figure 1 A three-dimensional schematic diagram of a positioning device for a FRP bar concrete bonding slip pull-out test provided by the utility model;
[0026] Figure 2 for Figure 1 The enlarged schematic diagram of point A in the middle;
[0027] Figure 3 for Figure 1 A magnified schematic diagram of point B in the middle.
[0028] Description of reference numerals:
[0029] 1. Positioning frame; 101. Vertical plate; 102. Horizontal plate; 2. FRP reinforcement; 3. Steel casing; 4. Concrete test block; 5. Scale rod; 6. Arc clamp; 7. Bolt; 8. Channel; 9. Fixed seat; 10. Round hole; 11. Connecting rod; 12. Support seat. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Those skilled in the art should know that the embodiments described below are part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0031] It should be noted that the main idea of the present invention is that the first positioning structure and the second positioning structure are used to fix the FRP rib 2 and the steel casing 3 respectively, and cooperate with each other, which can effectively ensure that the FRP rib 2 and the steel casing 3 are arranged in a vertical horizontal plane and the center point of the FRP rib 2 is in a straight line with the center point of the steel pipe sleeve, avoiding the initial deflection and eccentric loading of the FRP, and ensuring the reliability of the pull-out test; the whole device has a simple structure, stable effect, low cost, convenient disassembly, assembly and adjustment, and high positioning accuracy, which solves the technical problem in the prior art that the center point of the FRP rib 2 and the steel pipe sleeve are not in a straight line in the pull-out test, which affects the test results.
[0032] After introducing the basic principle of the utility model, various non-limiting embodiments of the utility model are specifically introduced below. Any number of elements in the drawings is for illustration and not for limitation, and any naming is only for distinction and does not have any limiting meaning.
[0033] The principle and spirit of the present invention are explained in detail below with reference to several representative embodiments of the present invention.
[0034] Example 1 of the positioning device for FRP bar concrete bonding slip pull test provided by the utility model:
[0035] like Figures 1 to 3As shown, the positioning device for FRP bar concrete bonding slip pull-out test includes a positioning frame 1, the positioning frame 1 has a vertical plate 101 with a vertical horizontal plane, the vertical plate 101 is installed with a first positioning structure for fixing the FRP bar 2 in a vertical horizontal plane state and a second positioning structure for fixing the steel casing 3 in a vertical horizontal plane state, and the steel casing 3 is installed on the outer periphery of the FRP bar 2 so that the FRP bar 2 and the steel casing 3 are coaxially arranged.
[0036] In addition, a concrete test block 4 is fixed to the outer periphery of the FRP bar 2, and the upper end of the FRP bar 2 passes through the concrete test block 4 so as to be clamped by the pull-out testing machine.
[0037] First, the first positioning structure is introduced. The first positioning structure includes two scale rods 5 spaced apart from each other, each scale rod 5 is movably fixed on the vertical plate 101 in the horizontal direction, and a clamping assembly for clamping the FRP rib 2 is arranged at one end of each scale rod 5 away from the vertical plate 101.
[0038] About the clamping assembly. The clamping assembly includes two arc-shaped clamping plates 6, one of which is fixed to the end of the corresponding scale rod 5, and the two arc-shaped clamping plates 6 are connected by bolts 7 and nuts, and a channel 8 for the FRP rib 2 to pass through is formed between the two arc-shaped clamping plates 6.
[0039] During the specific connection, the two arc-shaped clamping plates 6 are connected by two groups of bolts 7 and nuts.
[0040] Regarding the placement of the concrete test block 4 , a supporting seat 12 located on the upper side of the first positioning structure is also fixed on the vertical plate 101 , and the fixing seat 9 is used to support the concrete test block 4 .
[0041] The second positioning structure is introduced below. The positioning frame 1 also includes a horizontal plate 102 located at the lower end of the vertical plate 101, the horizontal plate 102 and the vertical plate 101 are perpendicular to each other, and the second positioning structure is arranged at the position where the lower end of the vertical plate 101 and the horizontal plate 102 meet.
[0042] Specifically, the second positioning structure includes a fixing seat 9, which has a circular hole 10 coaxial with the channel 8. The circular hole 10 is used to fix the steel casing 3, and the steel casing 3 is used for inserting the FRP reinforcement 2. The second positioning component also includes a fastening component for fastening the steel casing 3.
[0043] Regarding the fastening assembly, the fastening assembly includes four top screws, which are inserted into the circular holes 10 along the side of the fixing seat 9 to tighten the steel casing 3 .
[0044] Regarding the installation method of the fixing seat 9. The fixing seat 9 is connected to the vertical plate 101 through the connecting rod 11. Specifically, the vertical plate 101, the connecting rod 11 and the fixing seat 9 are all made of metal, and the three are fixed by welding.
[0045] The working principle of the positioning device for FRP bar concrete adhesion slip pull-out test provided by the utility model is: a concrete test block 4 with FRP bars 2 is placed on a supporting seat 12, the FRP bars 2 are clamped and fixed by the clamping components on the two scale rods 5, and the scales of the two scale rods 5 are made to correspond up and down to ensure the positioning accuracy, the steel casing 3 is installed on the outside of the FRP bars 2, and at the same time, the steel casing 3 is tightened by four top screws to complete the positioning of the steel casing 3, and finally the upper end of the FRP bars 2 is pulled by the pulling plate test equipment (not shown in the figure) to carry out the test.
[0046] Example 2 of the positioning device for FRP bar concrete bonding slip pull test provided by the utility model:
[0047] The main difference between it and Example 1 is:
[0048] In Example 1, the vertical plate, the connecting rod and the fixing seat are all made of metal, and the three are fixed by welding.
[0049] In this embodiment, a slot for inserting the connecting rod is provided on the vertical plate, and a top screw for tightening the connecting rod is provided on the side wall of the vertical plate to fix the connecting rod.
[0050] Example 3 of the positioning device for FRP bar concrete bonding slip pull test provided by the utility model:
[0051] The main difference between it and Example 1 is:
[0052] In Example 1, the fastening assembly includes four top screws, and the four top screws are inserted into the circular hole along the side of the fixing seat to tighten the steel casing.
[0053] In this embodiment, the number of the top screws is three or six.
Claims
1. A positioning device for FRP bar concrete bonding slip pull test, It is characterized in that include: A positioning frame, the positioning frame having a vertical plate with a vertical horizontal plane, the vertical plate being provided with a first positioning structure for fixing the FRP bar in a vertical horizontal plane state and a second positioning structure for fixing the steel casing in a vertical horizontal plane state, the steel casing being installed on the outer periphery of the FRP bar so that the FRP bar and the steel casing are coaxially arranged; A concrete test block is also fixed to the outer periphery of the FRP bar, and the upper end of the FRP bar passes through the concrete test block to be clamped by the pull-out testing machine.
2. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 1, Features: The first positioning structure includes two scale rods spaced apart from each other, each of which is movably fixed to the vertical plate in a horizontal direction, and a clamping assembly for clamping the FRP rib is arranged at one end of each scale rod away from the vertical plate.
3. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 2, Features: The clamping assembly includes two arc-shaped clamping plates, one of which is fixed to the end of the corresponding scale rod, the two arc-shaped clamping plates are connected by bolts and nuts, and a channel for the FRP rib to pass through is formed between the two arc-shaped clamping plates.
4. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 3, Features: The two arc-shaped clamping plates are connected by two sets of bolts and nuts.
5. The positioning device for FRP bar concrete bonding slip pull-out test according to any one of claims 1 to 4, Features: A supporting seat located on the upper side of the first positioning structure is also fixed on the vertical plate, and the fixing seat is used to support the concrete test block.
6. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 3 or 4, Features: The positioning frame also includes a horizontal plate located at the lower end of the vertical plate, the horizontal plate and the vertical plate are perpendicular to each other, and the second positioning structure is arranged at the position where the lower end of the vertical plate connects with the horizontal plate.
7. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 6, Features: The second positioning structure includes a fixing seat having a circular hole coaxial with the channel, the circular hole is used to fix a steel casing, the steel casing is used for inserting the FRP bar, and the second positioning structure also includes a fastening assembly for fastening the steel casing.
8. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 7, Features: The fastening assembly comprises four top screws, which are inserted into the circular holes along the side surfaces of the fixing seat to tighten the steel sleeve.
9. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 7 or 8, Features: The fixing seat is connected to the vertical plate through a connecting rod.
10. The positioning device for FRP bar concrete bonding slip pull-out test according to claim 9, Features: The vertical plate, the connecting rod and the fixing seat are all made of metal and are fixed together by welding.
