Wire embedding device for water conservancy project
By adopting the design of the trolley body, universal wheels and clamping components in the wire embedding device for water conservancy projects, the problem of cable deviation and interweaving during the pulling process is solved, and the wire embedding efficiency and construction speed are improved.
Patent Information
- Application Number
- CN202323552256.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-26
AI Technical Summary
Existing wire embedding devices used in water conservancy projects cannot fix and limit the cables when pulling the cables, causing the cables to easily shift, intertwine, and become entangled, which increases the complexity and time of the wire embedding process.
A cable embedding device for water conservancy projects is designed. The cart body is equipped with universal wheels and clamping components. The cables are fixed and limited through the drive motor and rotating column. The spring and clamping block mechanism is used to prevent the cables from deflecting and interlacing. , and achieve stable adjustment through guide blocks and springs.
It effectively avoids the deviation and interweaving of cables during the pulling process, improves the efficiency of wire embedding, and shortens the construction time of water conservancy projects.
Smart Images

Figure CN221885872U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy project line laying, in particular to a line burying device for water conservancy projects. Background Art
[0002] A hydraulic project is a project used to control and allocate natural surface water and groundwater, aiming to achieve the purpose of eliminating harm and promoting benefits. A hydraulic project, also known as a water project, mainly regulates and distributes water resources to meet the needs of people's lives and production by building various hydropower stations, reservoirs, channels, pumping stations and other facilities. During the construction of hydraulic projects, in order to ensure the demand for electricity, cables are usually buried underground, which not only protects the cables from damage by the external environment, but also avoids affecting the hydraulic project facilities.
[0003] However, the existing cable burying devices for water conservancy projects usually sleeve the rolled-up cables on the outer wall of the roller, and then manually pull one end of the cables. When pulling the cables, the cables cannot be fixed and limited, which can easily cause the cables to shift, become intertwined and entangled with each other, and require more time and effort to organize, thereby increasing the complexity of the cable burying process and increasing the construction time. Utility Model Content
[0004] The purpose of the utility model is to provide a cable burying device for water conservancy projects in view of the existing background technology. Usually, the rolled-up cable is sleeved on the outer wall of the roller, and then one end of the cable is manually pulled. When the cable is pulled, it is impossible to fix the cable in a limited position, which easily causes the cable to deviate, and the cables are intertwined and entangled with each other. It takes more time and effort to sort them out, thereby increasing the complexity of the cable burying process and increasing the construction time of the project.
[0005] The technical solution of the utility model: a cable burying device for water conservancy projects, comprising: a trolley body, and universal wheels are arranged at the four corners of the bottom surface of the trolley body, a trolley handle is fixedly arranged on one side of the upper surface of the trolley body; and a group of fixed blocks are fixedly arranged on one side of the upper surface of the trolley body, and a clamping assembly for fixing and limiting the cable is arranged between the fixed blocks; a mounting frame is fixedly arranged on the upper surface of the trolley body, a driving motor is fixedly installed on one side of the mounting frame, and the output end of the driving motor passes through the mounting frame and extends to be connected with a rotating column.
[0006] Optionally, the positioning assembly includes a first shaft rod, a plurality of first rollers movably sleeved on the outer wall of the first shaft rod, first finished rods are rotatably connected at both ends of the first shaft rod, a mounting shaft block is movably sleeved on one end of the first finished rod, one end of the mounting shaft block is fixedly connected to a fixed block, a second support rod is fixedly sleeved on the outer wall of the mounting shaft block, a second shaft rod is rotatably arranged between the second support rods, a plurality of second rollers are movably sleeved on the outer wall of the second shaft rod, and a clamping assembly for positioning is arranged on the sides of the first roller and the second roller, a mounting block is fixedly arranged on one side of the first finished rod, a first spring is arranged between the mounting block and the first finished rod, one end of the first spring is fixedly connected to the first finished rod, and the other end of the first spring is fixedly connected to the mounting block.
[0007] Optionally, the clamping assembly includes two symmetrical mounting grooves opened on the side walls of the first roller and the second roller, two guide rods are fixedly arranged inside the mounting grooves, the outer walls of the guide rods are movably sleeved with a first clamping block, the outer walls of the guide rods are sleeved with a second spring, one end of the second spring is fixedly connected to the mounting groove, and the other end of the second spring is fixedly connected to the first clamping block.
[0008] Optionally, two mutually symmetrical guide blocks are fixedly provided on the outer walls of the first shaft and the second shaft, and two guide grooves corresponding to the guide blocks are formed on the inner annular surfaces of the first roller and the second roller, and the guide grooves are connected to the mounting grooves.
[0009] Optionally, a clamping groove is formed on an outer wall of the first roller, and a second clamping block corresponding to the clamping groove is fixedly provided on the outer wall of the second roller, and the clamping groove and the second clamping block are clamped with each other.
[0010] Optionally, a push groove is formed on one side of the first clamping block.
[0011] Optionally, a handle is fixedly provided on the outer side wall of the first manufactured rod.
[0012] Compared with the prior art, the utility model has the following beneficial technical effects:
[0013] The utility model drives the first roller to rotate by pulling the handle to place the cable between the first roller and the second roller for fixed limit, and limits the cable by the elastic force of the first spring, which can avoid the cable from deviating during the cable pulling and rotating process, and prevent the cables from interweaving and entangled with each other, thereby improving the efficiency of cable burying and shortening the construction time of water conservancy projects;
[0014] Furthermore, the utility model pushes the card block to slide on the outer wall of the guide rod through the push groove, and resets the first card block through the elastic force of the second spring, and cooperates with the guide block to hold it in a limited position, so as to conveniently adjust the position of the first roller and the second roller, thereby improving the stability of pulling the cable and improving the working effect of burying the cable. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A schematic structural diagram of a wire burying device for water conservancy projects of the utility model is given;
[0016] Figure 2 Provide the utility model Figure 1 A schematic diagram of the structure of the middle card position component;
[0017] Figure 3 Provide the utility model Figure 2 A schematic diagram of the connection structure of the first roller and the second roller;
[0018] Figure 4 Provide the utility model Figure 3 The enlarged structural diagram in the middle.
[0019] Reference numerals:
[0020] 1. Cart body; 2. Universal wheel; 3. Cart handle; 4. Fixed block;
[0021] 5. Positioning assembly; 51. First shaft rod; 52. First roller; 53. First manufacturing rod; 54. Mounting shaft block; 55. Second support rod; 56. Second shaft rod; 57. Second roller; 58. Mounting block; 59. First spring;
[0022] 6. Mounting frame; 7. Driving motor; 8. Rotating column; 9. Mounting slot; 10. Guide rod; 11. First clamping block; 12. Second spring; 13. Guide block; 14. Guide slot; 15. Clamping slot; 16. Second clamping block; 17. Pushing slot; 18. Handle. DETAILED DESCRIPTION
[0023] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments. Example
[0024] like Figures 1 to 4As shown, the utility model proposes a cable burying device for water conservancy projects, comprising: a trolley body 1, and universal wheels 2 are arranged at the four corners of the bottom surface of the trolley body 1, a trolley handle 3 is fixedly arranged on one side of the upper surface of the trolley body 1, the trolley handle 3 is inclined, and the universal wheel 2 and the trolley handle 3 are integrally formed, which is convenient for pulling the trolley body 1 to move; and a group of fixed blocks 4 are fixedly arranged on one side of the upper surface of the trolley body 1, and the fixed blocks 4 are symmetrically arranged, and a clamping assembly 5 for fixing and limiting the cable is arranged between the fixed blocks 4; a mounting frame 6 is fixedly arranged on the upper surface of the trolley body 1 by bolts, a driving motor 7 is fixedly installed on one side of the mounting frame 6, and the output end of the driving motor 7 passes through the mounting frame 6 and is extended to be connected with a rotating column 8, which is convenient for loosening the wound cable to avoid burying the cable.
[0025] like Figure 2 and Figure 3 As shown, the positioning assembly 5 includes a first shaft rod 51, and the outer wall of the first shaft rod 51 is movably sleeved with a plurality of first rollers 52, and the first two ends of the first shaft rod 51 are rotatably connected with first manufacturing rods 53, and one end of the first manufacturing rod 53 is movably sleeved with a mounting shaft block 54, and one end of the mounting shaft block 54 is fixedly connected to the fixing block 4, so that the first manufacturing rod 53 can rotate to adjust the position of the first roller 52, and the outer wall of the mounting shaft block 54 is fixedly sleeved with a second support rod 55, and a second shaft rod 56 is rotatably arranged between the second support rods 55, and the outer wall of the second shaft rod 56 is movably sleeved with a plurality of first rollers 52. A second roller 57 is provided, and the second roller 57 corresponds to the position of the first roller 52. The sides of the first roller 52 and the second roller 57 are provided with a clamping assembly for positioning. A mounting block 58 is fixedly provided on one side of the first manufacturing rod 53. A first spring 59 is provided between the mounting block 58 and the first manufacturing rod 53. One end of the first spring 59 is fixedly connected to the first manufacturing rod 53, and the other end of the first spring 59 is fixedly connected to the mounting block 58, so as to facilitate the first roller 52 and the second roller 57 to be clamped with each other. At the same time, their behavior is carried out to improve the stability of the clamping.
[0026] like Figure 4 As shown, the clamping assembly includes two symmetrical mounting grooves 9 opened on the side walls of the first roller 52 and the second roller 57, two guide rods 10 are fixedly arranged inside the mounting grooves 9, the outer wall of the guide rod 10 is movably sleeved with a first clamping block 11, the outer wall of the guide rod 10 is sleeved with a second spring 12, one end of the second spring 12 is fixedly connected to the mounting groove 9, and the other end of the second spring 12 is fixedly connected to the first clamping block 11, so that the first clamping block 11 can be reset and limited at the same time.
[0027] like Figure 2 and Figure 3As shown, the outer walls of the first shaft 51 and the second shaft 56 are fixedly provided with two mutually symmetrical guide blocks 13, and the side walls of the guide blocks 13 are provided with engaging grooves, which can be stably engaged with the first engaging block 11 to improve the stability of the limit, and the inner annular surfaces of the first roller 52 and the second roller 57 are provided with two guide grooves 14 corresponding to the guide blocks 13, and the guide grooves 14 are connected with the mounting grooves 9, so as to facilitate the horizontal adjustment of the positions of the first roller 52 and the second roller 57 and facilitate the burying of the cables.
[0028] Furthermore, a slot 15 is provided on the outer wall of the first roller 52, and a second block 16 corresponding to the slot 15 is fixedly provided on the outer wall of the second roller 57. The slot 15 and the second block 16 are mutually engaged, which can improve the stability of the connection between the first roller 52 and the second roller 57 and make the cable fixing limit more stable.
[0029] Secondly, a push groove 17 is provided on one side of the first clamping block 11 to facilitate pushing the first clamping block 11 to move, thereby facilitating adjusting the horizontal positions of the first roller 52 and the second roller 57 .
[0030] Furthermore, a handle 18 is fixedly provided on the outer side wall of the first manufacturing rod 53 to facilitate pulling the first roller 52 to move and to facilitate passing the cable between the first roller 52 and the second roller 57.
[0031] The working principle of this embodiment is as follows: when in use, the cart handle 3 is pulled to drive the cart body 1 to move above the embedded pit, and the universal wheels 2 are located on both sides of the embedded pit, and then the positions of the first roller 52 and the second roller 57 are adjusted according to the width of the embedded pit. First, the first clamping block 11 is pushed to slide on the outer wall of the guide rod 10 through the push groove 17, and then the first roller 52 and the second roller 57 are pushed to slide horizontally on the outer walls of the first shaft rod 51 and the second shaft rod 56. When sliding to a suitable position, the first clamping block 11 is released, and the first clamping block 11 is reset by the elastic force of the second spring 12, so that one end of the first clamping block 11 is tightly clamped on the outer wall of the guide block 13.
[0032] After that, the rolled cable is sleeved on the outer wall of the rotating column 8, and the handle 18 is pulled to drive the first roller 52 to rotate with the mounting shaft block 54 as the center axis, and one end of the cable is passed between the first roller 52 and the second roller 57 to place the cable in the pre-buried pit. Then, the handle 18 is released, and the mounting block 58 is reset by pulling the first spring 59. The mounting block 58 drives the first manufacturing rod 53 to reset the first roller 52, so that the second clamping block 16 is clamped in the clamping groove 15, and the cable is stably limited between the first roller 52 and the second roller 57 to avoid interweaving and entanglement during rotation.
[0033] Then, the drive motor 7 is started by the switch, and the output end of the drive motor 7 drives the rotating column 8 to rotate. The rotating column 8 rotates to make the wire sleeved on the outer wall, and one end of the cable is manually pulled to fix the limit, so that the cable rotates and relaxes. During the rotation process, the first roller 52 and the second roller 57 are driven to rotate at the same time. The first roller 52 and the second roller 57 drive the first shaft rod 51 and the second shaft rod 56 to rotate, so that the cable rotation process is more stable. During the cable rotation process, the trolley handle 3 is used to pull the trolley body 1 to move according to the trajectory of the pre-buried pit, and the cable is placed in the pre-buried pit, thereby improving the construction efficiency and avoiding the cables from being intertwined and entangled. Finally, the cable is covered and buried with soil after being laid.
[0034] The above-mentioned specific embodiments are only several optional embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.
Claims
1. A wire embedding device for water conservancy projects, characterized in that: include: A trolley body (1), wherein universal wheels (2) are arranged at four corners of the bottom surface of the trolley body (1), and a trolley handle (3) is fixedly arranged on one side of the upper surface of the trolley body (1); and, a group of fixing blocks (4) fixedly arranged on one side of the upper surface of the cart body (1), wherein a clamping assembly (5) for fixing and limiting the position of the cable is arranged between the fixing blocks (4); A mounting frame (6) is fixedly arranged on the upper surface of the cart body (1), a driving motor (7) is fixedly mounted on one side of the mounting frame (6), and an output end of the driving motor (7) passes through the mounting frame (6) and extends to be connected to a rotating column (8).
2. A wire embedding device for water conservancy engineering according to claim 1, characterized in that: The positioning assembly (5) comprises a first shaft rod (51), the outer wall of the first shaft rod (51) is movably sleeved with a plurality of first rollers (52), both ends of the first shaft rod (51) are rotatably connected with first finished rods (53), one end of the first finished rod (53) is movably sleeved with a mounting shaft block (54), one end of the mounting shaft block (54) is fixedly connected to a fixed block (4), the outer wall of the mounting shaft block (54) is fixedly sleeved with a second support rod (55), and a second shaft rod (55) is rotatably arranged between the second support rods (55). 6), a plurality of second rollers (57) are movably sleeved on the outer wall of the second shaft rod (56), and the sides of the first roller (52) and the second roller (57) are provided with a clamping assembly for positioning, a mounting block (58) is fixedly provided on one side of the first finished rod (53), a first spring (59) is provided between the mounting block (58) and the first finished rod (53), one end of the first spring (59) is fixedly connected to the first finished rod (53), and the other end of the first spring (59) is fixedly connected to the mounting block (58).
3. A wire embedding device for water conservancy engineering according to claim 2, characterized in that: The clamping assembly comprises two mutually symmetrical mounting grooves (9) formed on the side walls of the first roller (52) and the second roller (57), two guide rods (10) being fixedly arranged inside the mounting grooves (9), a first clamping block (11) being movably sleeved on the outer wall of the guide rod (10), a second spring (12) being sleeved on the outer wall of the guide rod (10), one end of the second spring (12) being fixedly connected to the mounting groove (9), and the other end of the second spring (12) being fixedly connected to the first clamping block (11).
4. A wire embedding device for water conservancy engineering according to claim 2, characterized in that: Two mutually symmetrical guide blocks (13) are fixedly disposed on the outer walls of the first shaft (51) and the second shaft (56); two guide grooves (14) corresponding to the guide blocks (13) are formed on the inner annular surfaces of the first roller (52) and the second roller (57); and the guide grooves (14) are communicated with the mounting grooves (9).
5. The cable embedding device for water conservancy engineering according to claim 2, characterized in that: The outer wall of the first roller (52) is provided with a clamping groove (15), and the outer wall of the second roller (57) is fixedly provided with a second clamping block (16) corresponding to the clamping groove (15), and the clamping groove (15) and the second clamping block (16) are clamped with each other.
6. The cable embedding device for water conservancy engineering according to claim 3, characterized in that: A push groove (17) is provided on one side of the first clamping block (11).
7. A wire embedding device for water conservancy engineering according to claim 2, characterized in that: A handle (18) is fixedly provided on the outer side wall of the first manufacturing rod (53).