Drainage pipeline construction device

By designing a drainage pipe construction device with a moving block and gear system, the problem that the existing device cannot adapt to pipes of different lengths is solved, the stable hoisting and fixing of the pipes is achieved, and the construction efficiency and flexibility are improved.

CN221894542UActive Publication Date: 2024-10-25GANSU JIANTOU MUNICIPAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420512939.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-10-25
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

The existing drainage pipe construction equipment cannot adapt to pipes of different lengths, and the spacing between the fixing sleeves cannot be changed, resulting in the inability to effectively fix pipes shorter than this spacing.

Method used

A construction device including a hanging plate, connecting frame, moving block, motor, rotating rod, connecting rod, gear and clamping block is designed. The rotating rod and gear system are driven by the motor to realize the relative movement of the moving block and the clamping block. and swivel to accommodate pipes of different lengths, and secure the pipes with clamping blocks.

Benefits of technology

It achieves stable lifting and fixing of pipelines of different lengths, improves construction efficiency and flexibility, and ensures the stability of pipelines during installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221894542U_ABST
    Figure CN221894542U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy construction equipment, and discloses a drainage pipeline construction device which comprises a hanging plate, hanging rings are fixedly connected to the left side and the right side of the upper surface of the hanging plate, a connecting frame is fixedly connected to the lower surface of the hanging plate, and moving blocks are movably connected to the left side and the right side of the inner surface of the connecting frame. The number of the moving blocks is two. Through the arrangement of the connecting frame, the moving blocks, the first motor, the rotating rod and the connecting rods, when the first motor operates, the circular shaft can drive the rotating rod to start rotating, the two connecting rods can start rotating under the driving of the rotating rod, and in the process, the other ends of the two connecting rods can drive the two moving blocks to be a whole respectively; and the two moving blocks integrally start to move in opposite directions under the limiting of the inner surface of the connecting frame, so that the distance between the two moving blocks integrally is gradually reduced, and the lifting plate integrally can lift pipelines with different lengths.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy construction equipment, and more specifically, to a drainage pipeline construction device. Background Art

[0002] Water conservancy projects are a general term for various engineering projects built to control, utilize and protect surface and underground water resources and the environment. According to different construction purposes, they can be divided into flood control projects, farmland water conservancy projects, hydropower projects, waterways and port projects, water supply and drainage projects, environmental water conservancy projects, and tidal flat reclamation projects. The construction of water conservancy projects is the foundation of a region's economic development and the most important part of municipal engineering.

[0003] When installing drainage pipes, operators often use drainage pipe construction devices to hoist the drainage pipes to the construction site, thereby facilitating the installation of the pipes. In actual use, although the existing drainage pipe construction devices have basic hoisting functions, the existing drainage pipe construction devices generally have two fixed sleeves installed in them to fix the pipes. The spacing between the two fixed sleeves cannot be changed. When the length of the drainage pipe is shorter than this spacing, the construction device cannot fix the drainage pipe, so it needs to be improved. Utility Model Content

[0004] In order to overcome the deficiencies of the prior art, the utility model provides a drainage pipeline construction device, which has the advantage of being able to hoist pipelines of different lengths.

[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a drainage pipeline construction device, comprising:

[0006] A hanging plate, wherein the left and right sides of the upper surface of the hanging plate are fixedly connected with hanging rings, the lower surface of the hanging plate is fixedly connected with a connecting frame, and the left and right sides of the inner surface of the connecting frame are movably connected with moving blocks, the number of the moving blocks is two, and the bottom ends of the two moving blocks penetrate the connecting frame and extend to the bottom end of the connecting frame;

[0007] A moving mechanism, wherein the moving mechanism is arranged inside the connecting frame;

[0008] Among them, the moving mechanism includes a No. 1 motor, which is fixedly installed on the upper surface of the hanger plate, and the bottom end of the No. 1 motor passes through the hanger plate and extends to the bottom of the hanger plate. The other end of the output shaft of the No. 1 motor is fixedly sleeved with a round shaft, and the outer surface of the round shaft is fixedly sleeved with a rotating rod located on the inner side of the connecting frame. Both ends of the rotating rod are hinged with connecting rods, and the number of the connecting rods is two. The other ends of the two connecting rods are respectively hinged to the upper surfaces of the two moving blocks. The rotation of the rotating rod will cause the two connecting rods to drive the two moving blocks to move toward each other as a whole.

[0009] As a preferred technical solution of the utility model, the lower surfaces of the two moving blocks are fixedly connected with installation boxes, and the inner surface of the installation box is fixedly sleeved with a fixing ring.

[0010] As a preferred technical solution of the utility model, a No. 2 motor located below the connecting frame is fixedly installed on the top of the outer surface of the installation box, and the other end of the output shaft of the No. 2 motor is fixedly sleeved with a rotating shaft, and the other end of the rotating shaft passes through the installation box and extends to the interior of the installation box.

[0011] As a preferred technical solution of the utility model, the outer surface of the rotating shaft is fixedly sleeved with a No. 1 gear located inside the installation box, the outer surface of the No. 1 gear is meshingly connected with an outer gear ring, the inner surface of the outer gear ring is fixedly connected with a connecting block, the inner surface of the connecting block is fixedly connected with an inner gear ring, and the outer surfaces of the outer gear ring, the connecting block and the inner gear ring are all movably connected to the inner surface of the installation box.

[0012] As a preferred technical solution of the utility model, the inner surface of the mounting box is fixedly connected with a support shaft located between the outer gear ring and the inner gear ring, the number of the support shafts is three, and the outer surfaces of the three support shafts are movably connected to the inner surface of the outer gear ring.

[0013] As a preferred technical solution of the utility model, the inner surface of the inner gear ring is meshedly connected with the second gear, the inner surface of the second gear is movably sleeved with a fixing pile, and the fixing pile is fixedly connected to the inner surface of the installation box.

[0014] As a preferred technical solution of the utility model, a hinge block is hinged on the inner side of the No. 2 gear, a clamping block is hinged on the other end of the hinge block, the other end of the clamping block passes through the fixed ring and extends to the interior of the fixed ring, and the outer surface of the clamping block and the inner surface of the fixed ring are movably connected.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0016] 1. The utility model sets a connecting frame, a moving block, a No. 1 motor, a rotating rod and a connecting rod. When the No. 1 motor is running, the circular shaft will drive the rotating rod to start rotating, and the two connecting rods will start rotating under the drive of the rotating rod. In this process, the other ends of the two connecting rods will respectively drive the two moving blocks as a whole, so that the two moving blocks as a whole start to move toward each other under the limit of the inner surface of the connecting frame, which gradually reduces the distance between the two moving blocks as a whole, so that the hanging plate as a whole can hoist pipes of different lengths.

[0017] 2. The utility model sets a No. 1 gear, an outer gear ring, an inner gear ring, a No. 2 gear and a clamping block. When the No. 2 motor is running, the rotating shaft will drive the No. 1 gear to start rotating. Since the No. 1 gear is meshed with the outer gear ring, the outer gear ring as a whole will start rotating driven by the No. 1 gear, which in turn makes the No. 2 gear start rotating driven by the meshing of the inner gear ring. During this process, the rotation of the No. 2 gear will drive the hinge block to rotate, and the rotation of the hinge block will drive the clamping block, so that the clamping block starts to move inward along the inner surface of the fixing ring, and finally the three clamping blocks fix the pipeline, thereby ensuring the stability of the pipeline during installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 It is a structural schematic diagram of the rotating rod of the utility model;

[0020] Figure 3 It is a cross-sectional structural schematic diagram of the utility model;

[0021] Figure 4 This is a schematic diagram of the cross-sectional structure of the interior of the installation box of the utility model;

[0022] Figure 5 This is a schematic diagram of the structure of the second gear of the utility model.

[0023] In the figure: 1. hanging plate; 2. connecting frame; 3. moving block; 4. mounting box; 5. No. 1 motor; 6. round shaft; 7. rotating rod; 8. connecting rod; 9. fixing ring; 10. No. 2 motor; 11. rotating shaft; 12. No. 1 gear; 13. outer gear ring; 14. connecting block; 15. inner gear ring; 16. supporting shaft; 17. No. 2 gear; 18. fixing pile; 19. hinge block; 20. clamping block; 21. lifting ring. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] like Figures 1 to 5 As shown, the utility model provides a drainage pipeline construction device, including:

[0026] A hanging plate 1, the left and right sides of the upper surface of the hanging plate 1 are fixedly connected with hanging rings 21, the lower surface of the hanging plate 1 is fixedly connected with a connecting frame 2, the left and right sides of the inner surface of the connecting frame 2 are movably connected with moving blocks 3, the number of the moving blocks 3 is two, the bottom ends of the two moving blocks 3 both penetrate the connecting frame 2 and extend to the bottom end of the connecting frame 2;

[0027] A moving mechanism, the moving mechanism is arranged inside the connecting frame 2;

[0028] Among them, the moving mechanism includes a No. 1 motor 5, which is fixedly installed on the upper surface of the hanger plate 1. The bottom end of the No. 1 motor 5 passes through the hanger plate 1 and extends to the bottom of the hanger plate 1. The other end of the output shaft of the No. 1 motor 5 is fixedly sleeved with a round shaft 6. The outer surface of the round shaft 6 is fixedly sleeved with a rotating rod 7 located on the inner side of the connecting frame 2. Both ends of the rotating rod 7 are hinged with connecting rods 8. There are two connecting rods 8. The other ends of the two connecting rods 8 are respectively hinged to the upper surfaces of the two moving blocks 3. The rotation of the rotating rod 7 will cause the two connecting rods 8 to drive the two moving blocks 3 to move toward each other as a whole.

[0029] When motor No. 1 5 is running, the circular shaft 6 will drive the rotating rod 7 to start rotating, and the rotation of the rotating rod 7 will cause the two connecting rods 8 to start rotating. At this time, the other ends of the two connecting rods 8 will respectively drive the two moving blocks 3 as a whole, so that the two moving blocks 3 as a whole start to move towards each other under the limit of the inner surface of the connecting frame 2.

[0030] The lower surfaces of the two moving blocks 3 are fixedly connected with the installation boxes 4 , and the inner surface of the installation box 4 is fixedly sleeved with a fixing ring 9 .

[0031] When the two moving blocks 3 start to move, the two installation boxes 4 as a whole will move together driven by the two moving blocks 3 respectively.

[0032] Among them, a No. 2 motor 10 located below the connecting frame 2 is fixedly installed on the top of the outer surface of the installation box 4, and a rotating shaft 11 is fixedly sleeved on the other end of the output shaft of the No. 2 motor 10. The other end of the rotating shaft 11 passes through the installation box 4 and extends to the inside of the installation box 4.

[0033] When the second motor 10 is running, the rotating shaft 11 starts to rotate.

[0034] Among them, the outer surface of the rotating shaft 11 is fixedly sleeved with a No. 1 gear 12 located inside the installation box 4, the outer surface of the No. 1 gear 12 is meshingly connected with an outer ring gear 13, the inner surface of the outer ring gear 13 is fixedly connected with a connecting block 14, the inner surface of the connecting block 14 is fixedly connected with an inner ring gear 15, and the outer surfaces of the outer ring gear 13, the connecting block 14 and the inner ring gear 15 are all movably connected to the inner surface of the installation box 4.

[0035] Since the outer surfaces of the first gear 12 and the outer gear ring 13 are meshed, when the first gear 12 is driven to rotate by the rotating shaft 11 , the outer gear ring 13 as a whole starts to rotate driven by the first gear 12 .

[0036] The inner surface of the mounting box 4 is fixedly connected with a support shaft 16 located between the outer gear ring 13 and the inner gear ring 15 . There are three support shafts 16 , and the outer surfaces of the three support shafts 16 are movably connected to the inner surface of the outer gear ring 13 .

[0037] Due to the design of the support shaft 16, the stability of the outer gear ring 13 during overall rotation is ensured.

[0038] The inner surface of the inner gear ring 15 is meshedly connected with the second gear 17 , the inner surface of the second gear 17 is movably sleeved with a fixing pile 18 , and the fixing pile 18 is fixedly connected to the inner surface of the installation box 4 .

[0039] When the inner gear ring 15 starts to rotate, due to the meshing between the inner gear ring 15 and the second gear 17 , the second gear 17 starts to rotate around the fixing post 18 as the axis driven by the inner gear ring 15 .

[0040] Among them, a hinge block 19 is hinged on the inner side of the second gear 17, and a clamping block 20 is hinged on the other end of the hinge block 19. The other end of the clamping block 20 penetrates the fixed ring 9 and extends to the inside of the fixed ring 9. The outer surface of the clamping block 20 and the inner surface of the fixed ring 9 are movably connected.

[0041] When the second gear 17 rotates, the hinge block 19 will start to rotate driven by the second gear 17. At this time, the other end of the hinge block 19 will drive the clamping block 20, so that the clamping block 20 starts to move along the inner surface of the fixing ring 9 toward the outer surface of the pipe, and finally the three clamping blocks 20 clamp the pipe.

[0042] The working principle and use process of this utility model:

[0043] First, the operator installs the hanging plate 1 as a whole on the lifting equipment, and then starts the No. 1 motor 5. The operation of the No. 1 motor 5 will cause the circular shaft 6 to start to drive the rotating rod 7 to rotate, and the rotation of the rotating rod 7 will drive the two connecting rods 8, so that the two connecting rods 8 start to rotate with the two ends of the rotating rod 7 as the axis. At the same time, the other ends of the two connecting rods 8 will respectively drive the two moving blocks 3, so that the two moving blocks 3 as a whole start to move towards each other under the limit of the inner surface of the connecting frame 2, until the distance between the two moving blocks 3 as a whole is less than the length of the pipeline.

[0044] At this time, the operator places the pipeline inside the two fixed rings 9 and starts the No. 2 motor 10. The operation of the No. 2 motor 10 will cause the rotating shaft 11 and the No. 1 gear 12 to start rotating. Due to the meshing between the No. 1 gear 12 and the outer gear ring 13, the No. 1 gear 12 will drive the outer gear ring 13 to cause the outer gear ring 13, the connecting block 14 and the inner gear ring 15 to start rotating, which in turn causes the No. 2 gear 17 to start rotating under the meshing drive of the inner gear ring 15. At the same time, the rotation of the No. 2 gear 17 will drive the hinge block 19, so that the other end of the hinge block 19 drives the clamping block 20 and causes the three clamping blocks 20 to start moving along the inner surface of the fixed ring 9 toward the outer surface of the pipeline. Finally, the three clamping blocks 20 will contact the outer surface of the pipeline to complete the fixation of the pipeline, which is convenient for the operator to install the pipeline.

[0045] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A drainage pipeline construction device, characterized in that: Included are: A hanging plate (1), wherein the left and right sides of the upper surface of the hanging plate (1) are fixedly connected to hanging rings (21), the lower surface of the hanging plate (1) is fixedly connected to a connecting frame (2), and the left and right sides of the inner surface of the connecting frame (2) are movably connected to moving blocks (3), the number of the moving blocks (3) is two, and the bottom ends of the two moving blocks (3) penetrate the connecting frame (2) and extend to the bottom end of the connecting frame (2); A moving mechanism, the moving mechanism being arranged inside the connecting frame (2); The moving mechanism comprises a No. 1 motor (5), the No. 1 motor (5) is fixedly mounted on the upper surface of the hanging plate (1), the bottom end of the No. 1 motor (5) passes through the hanging plate (1) and extends to the bottom of the hanging plate (1), the other end of the output shaft of the No. 1 motor (5) is fixedly sleeved with a round shaft (6), the outer surface of the round shaft (6) is fixedly sleeved with a rotating rod (7) located on the inner side of the connecting frame (2), both ends of the rotating rod (7) are hinged with connecting rods (8), the number of the connecting rods (8) is two, the other ends of the two connecting rods (8) are respectively hinged with the upper surfaces of the two moving blocks (3), and the rotation of the rotating rod (7) causes the two connecting rods (8) to drive the two moving blocks (3) to move towards each other as a whole.

2. A drainage pipeline construction device according to claim 1, characterized in that: The lower surfaces of the two moving blocks (3) are fixedly connected to a mounting box (4), and the inner surface of the mounting box (4) is fixedly sleeved with a fixing ring (9).

3. A drainage pipeline construction device according to claim 2, characterized in that: A second motor (10) located below the connecting frame (2) is fixedly mounted on the top of the outer surface of the installation box (4); a rotating shaft (11) is fixedly sleeved on the other end of the output shaft of the second motor (10); and the other end of the rotating shaft (11) passes through the installation box (4) and extends to the interior of the installation box (4).

4. A drainage pipeline construction device according to claim 3, characterized in that: The outer surface of the rotating shaft (11) is fixedly sleeved with a No. 1 gear (12) located inside the installation box (4); the outer surface of the No. 1 gear (12) is meshingly connected with an outer gear ring (13); the inner surface of the outer gear ring (13) is fixedly connected with a connecting block (14); the inner surface of the connecting block (14) is fixedly connected with an inner gear ring (15); the outer surfaces of the outer gear ring (13), the connecting block (14) and the inner gear ring (15) are all movably connected to the inner surface of the installation box (4).

5. A drainage pipeline construction device according to claim 2, characterized in that: The inner surface of the installation box (4) is fixedly connected to a support shaft (16) located between the outer gear ring (13) and the inner gear ring (15), and the number of the support shafts (16) is three, and the outer surfaces of the three support shafts (16) are movably connected to the inner surface of the outer gear ring (13).

6. A drainage pipeline construction device according to claim 4, characterized in that: The inner surface of the inner gear ring (15) is meshedly connected with a second gear (17), and the inner surface of the second gear (17) is movably sleeved with a fixing pile (18), and the fixing pile (18) is fixedly connected to the inner surface of the installation box (4).

7. A drainage pipeline construction device according to claim 6, characterized in that: The inner side of the second gear (17) is hinged with a hinge block (19), the other end of the hinge block (19) is hinged with a clamping block (20), the other end of the clamping block (20) penetrates the fixing ring (9) and extends to the inside of the fixing ring (9), and the outer surface of the clamping block (20) is movably connected to the inner surface of the fixing ring (9).