Bridgehead structure for preventing bumping at bridgehead in road-bridge transition section
By arranging lap boards, corbels and air bags in the bridge head structure, the vehicle load is dispersed and the air bag pressure is adjusted, which solves the problem of vehicle jumping at the bridge head, improves the stability of the road-bridge transition section and structural reliability, and simplifies maintenance work.
Patent Information
- Application Number
- CN202420358283.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-10-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The phenomenon of vehicle jumping at the bridge head is caused by uneven settlement of the road-bridge transition section, which is difficult to effectively avoid with existing technology. Especially under soft base conditions, the high-speed impact of vehicles causes settlement at the connection between the bridge head slab and the road structure, causing a sudden change in the longitudinal slope of the road, affecting driving comfort. sex and safety.
A bridge head structure is designed, including abutment components, lap boards, corbels, roadbed filling layers and pavement layers. The lap boards are set between the abutment components and corbels, equipped with rubber cushions and waterproof measures. There are air bags and inflatable pipes on the bottom side of the beam. The air bag adjusts the air pressure to prevent the slab from settling. The multi-layer structure is used to disperse the vehicle load and reduce stress concentration.
It effectively avoids the uneven settlement of the bridge head slab, improves the stiffness and stability of the road-bridge transition section, reduces the occurrence of bridge head jumping, simplifies the maintenance work during the road operation period, and enhances the reliability and durability of the structure.
Smart Images

Figure CN221895548U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of road and bridge construction, and in particular relates to a bridge head structure for preventing vehicles from jumping off the bridge head in a road-bridge transition section. Background Art
[0002] Bridge jumping refers to the differential settlement at the junction of the highway bridge head and the bridge approach, which forms a steep slope or step on the road surface, causing vehicles traveling at high speed in this area to experience relatively large up and down vibration or ups and downs. With the acceleration of the modernization process, the construction of roads and bridges has developed rapidly. However, actual investigations have found that many major traffic arteries have obvious "bridge jumping" problems during the operation period, which seriously threatens the comfort and safety of driving.
[0003] In response to the problem of bridgehead jumping caused by uneven settlement of the road-bridge transition section, domestic and foreign scholars have conducted research and exploration from many aspects such as bridgehead slab and soil reinforcement backfill. Among them, the bridgehead slab is a key technical structure connecting the roadbed and the bridge. It is a practical and effective way to control bridgehead jumping, and is mostly used in urban roads and high-grade highways with high driving requirements. However, the settlement behind the platform is difficult to avoid, and the bridgehead slab will still sink due to design defects and construction quality. Especially when it is in a soft base, even if you pay more attention to the backfill material and its construction process, the long-term high-speed impact of vehicles will cause the connection between the bridgehead slab and the road surface structure to sink, causing the longitudinal slope of the road surface to show a sudden change, resulting in bridgehead jumping. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a bridge head structure for preventing vehicles from jumping off the bridge head in a road-bridge transition section, so as to solve the above technical problems.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A bridgehead structure for preventing vehicles from jumping off a bridgehead in a road-bridge transition section is arranged at the junction of a bridgehead and a roadbed, and comprises an abutment assembly, a slab, a bolster, a roadbed filling layer and a road pavement layer. The slab is arranged between the abutment assembly and the bolster, and the road pavement layer is arranged on the upper surface of the abutment assembly and the slab. A back corbel support is arranged on the back side of the abutment assembly for placing the slab, a rubber buffer pad is laid between the back corbel and the slab, the bridge deck of the abutment assembly is flush with the slab, a geogrid is arranged at the junction of the slab and the abutment assembly, and a waterproof material is filled in the gap between the slab and the abutment assembly.
[0007] The slats include an elastic buffer layer, a core reinforcement layer and a waterproof layer arranged in sequence, a waterproof coating is arranged on the upper and lower surfaces of the elastic buffer layer, a waterproof layer is arranged under the core reinforcement layer, blocking blocks are arranged at both ends of the waterproof layer, and protective layers are arranged on the upper and lower sides of the slat body, and the elastic buffer layer and the waterproof layer match the size specifications of the slat body;
[0008] A groove is provided on the bottom side of the bolster, an airbag is arranged inside the groove, the airbag is connected to the inflation pipe through a connector, the inflation pipe runs through the entire bolster and is connected to the inflation interface preset on the top of the bolster, an air pressure detection device is installed at the connector where the airbag and the inflation pipe are connected, and the air pressure detection device is connected to the control end through a wire led out from the top surface of the bolster.
[0009] As a further technical solution of the utility model, the lower part of the scaffolding is a roadbed filling layer, specifically the first layer is a compacted cement-stabilized gravel layer, the upper surface of the cement-stabilized gravel layer is flush with the upper surface of the rubber buffer pad on the back corbel and the upper surface of the pillow beam, and the scaffolding is tightly fitted to the upper surface of the cement-stabilized gravel layer; the second layer is a compacted foundation soil cushion layer.
[0010] As a further technical solution of the utility model, the lower part of the pillow beam is a roadbed filling layer, specifically, two layers of cement-stabilized gravel layers are arranged at the lower part of the pillow beam, and the third and fourth layers below are respectively a compacted gravel-soil mixture layer and a foundation soil cushion layer, which are arranged in a trapezoidal shape as a whole; a consolidation layer formed by pouring a mixture of cement and gravel is provided on the back side of the pillow beam (the side away from the abutment assembly), the upper surface of the consolidation layer is flush with the top surface of the pillow beam, and the consolidation layer is composed of a cement-stabilized gravel layer and a foundation soil cushion layer downwards.
[0011] As a further technical solution of the utility model, two layers of cement-stabilized gravel are arranged at the lower part of the sleeper beam, the upper layer is a 5% cement-stabilized gravel layer, and the lower layer is a 3% cement-stabilized gravel layer.
[0012] As a further technical solution of the utility model, waterproof felt is overlapped and geogrid is laid at the junction of the consolidation layer and the sleeper beam, an asphalt mixture layer is filled on the consolidation layer and is flush with the top surface of the slab, waterproof felt is overlapped and geogrid is laid at the junction of the asphalt mixture layer and the slab, and a road pavement layer is arranged above the asphalt mixture layer.
[0013] The utility model discloses a method for implementing a bridge head structure for preventing vehicle jumping at a bridge head in a road-bridge transition section, comprising the following steps:
[0014] S1: According to the actual on-site survey data and design information, the design and adjustment of the overall dimensions of the slab and the dimensions of each layer inside the slab are carried out to match the project requirements. The construction can choose to cast the slab on site or prefabricate the slab in the factory and transport it to the site for assembly;
[0015] S2: For the bolster part, the airbag, the inflation pipe, the connector and the air pressure detection device are arranged on the template where the bolster model is to be cast, the wire sleeve of the air pressure detection device is led out from the top of the bolster model, and the model is cast to complete the prefabrication of the bolster;
[0016] S3: Install the inflation interface on the inflation pipe of the prefabricated bolster, connect the inflation device to inflate the airbag, and connect the wire of the air pressure detection device to the control end to check the sealing of the airbag. If the sealing is good, the bolster can be transported to the construction site;
[0017] S4: After the various foundation cushion layers are compacted and laid on site, the pillow beam is hoisted into place. Before proceeding to the next step, the inflation device and the air pressure detection device need to be connected to inflate the airbag to maintain a certain air pressure in the airbag, and the inflation interface is sealed with a sturdy, well-sealed cover that is compatible with the inflation interface, and then the construction of the board and other base layers is carried out;
[0018] S5: If the bridgehead deck settles during road operation, the inflation interface and the wire can be connected to the inflation device and the air pressure detection control end respectively, and the airbag can be inflated to lift the bridgehead deck and eliminate the settlement;
[0019] S6: When the airbag is connected again, if the air pressure in the airbag is zero, it proves that the airbag is leaking and damaged. At this time, the airbag can be replaced through the inflation pipe or expanded materials such as solidified fly ash can be poured into the airbag to make the airbag expand and lift the bridge head cladding. The expansion effect of such materials can also be fully utilized to eliminate the bridge head jumping phenomenon.
[0020] The utility model has significant technical effects by adopting the above technical solutions:
[0021] (1) A slab is installed on the back of the bridge abutment. The slab is placed on the abutment back corbel through a rubber pad, which can absorb the impact force generated when a vehicle passes over the slab, playing a buffering role. The vehicle load is dispersed and transmitted to the abutment, the bolster, and the cushion layer between the abutment and the bolster through the slab, thereby improving the stiffness of the road-bridge transition section and avoiding uneven settlement of the roadbed caused by load concentration. At the same time, geogrids and waterproofing measures are installed at the joints between the abutment and the slab and at the junction of the slab and the bolster to prevent moisture from penetrating into the filler cushion layer between the abutment and the bolster, causing the slab to become empty, so that the slab can play a role in alleviating vehicle jumping at the bridge head for a long time, and the reliability and durability of the slab are enhanced.
[0022] (2) One part of the corbel is in contact with the bridgehead slab, while the other part is connected to the pavement structure. Waterproof measures and geogrids are installed at the connection point, forming a transition zone between the bridgehead slab and the pavement structure. This prevents moisture from penetrating into the base layer and effectively improves the stiffness of the pavement structure, thereby reducing the differential settlement between the slab and the pavement structure.
[0023] (3) The two cement-stabilized gravel layers and the gravel-soil mixture layer set at the bottom of the bolster, together with the elastic effect of the inflatable airbag at the bottom of the bolster, can effectively reduce the road surface settlement caused by stress concentration at the bolster. At the same time, inflating the airbag or pouring solidified expandable materials such as fly ash can prevent or repair the uneven settlement of the transition section and effectively avoid the occurrence of vehicle jumping at the bridge head.
[0024] In summary, the utility model arranges a slat, a bolster, and an airbag on a composite bottom structure of multiple sections of the platform back, so that the vehicle load is dispersed on three different bottom structures through the slat, thereby reducing the uneven settlement of the road-bridge transition section caused by stress concentration, improving the stability of the roadbed, and improving the bridge head jump disease; the airbag jacking adjusted by inflation can minimize the occurrence of settlement misalignment, greatly facilitating the maintenance work during the road operation period. The utility model has a reasonable and simple structural design, can achieve a good effect in treating bridge head jump, and has good use and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 A schematic diagram of the bridgehead roadbed structure of an embodiment of the utility model;
[0026] Figure 2 This is a schematic diagram of the board structure of an embodiment of the utility model;
[0027] Figure 3 This is a schematic diagram of the bolster structure of an embodiment of the utility model;
[0028] The digital numbers of the accompanying drawings are described as follows:
[0029] 1. Abutment assembly; 11. Abutment back corbel; 12. Rubber cushion; 13. Waterproof material; 14. Geogrid; 2. Clamping board; 21. Protective layer; 22. Elastic cushion layer; 23. Core reinforcement layer; 24. Waterproof layer; 25. Waterproof coating; 3. Pillar; 31. Air bag; 32. Connector; 33. Air pressure detection device; 34. Inflatable pipe; 35. Inflatable interface; 36. Groove; 4. Foundation soil cushion layer; 411. 3% cement stabilized gravel layer; 412. 5% cement stabilized gravel layer; 42. Gravel-soil mixture layer; 43. Asphalt mixture layer; 44. Consolidation layer; 5. Pavement layer; D. Length of the inflation pipe above the top surface of the pillow beam. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.
[0031] like Figure 1 As shown, a bridgehead structure for preventing vehicles from jumping off the bridgehead at the transition section between a road and a bridge is arranged at the junction of the bridgehead and the roadbed, and includes an abutment assembly 1, a bridgehead slab 2, a bolster 3, a roadbed filling layer, and a road pavement layer 5. A back bracket 11 is provided on the back side of the abutment assembly 1 to support the slab 2, and a rubber cushion 12 is laid between the back bracket 11 and the slab 2 to absorb the impact force generated when a vehicle passes over the bridgehead slab 2, playing a buffering role. After the slab 2 is set, it is flush with the bridge deck, and a geogrid 14 is laid at the junction of the slab 2 and the abutment, and a waterproof material 13 is filled in the gap between the slab 2 and the abutment assembly 1.
[0032] like Figure 2 As shown, the main body of the slat 2 is divided into an elastic buffer layer 22, a core reinforcement layer 23 and a waterproof layer 24. Waterproof coatings 25 are arranged on the upper and lower surfaces of the elastic buffer layer 22. A waterproof layer 24 is arranged under the core reinforcement layer 23. Blocking blocks are arranged at both ends of the waterproof layer 24. Protective layers 21 are arranged on the upper and lower parts of the main body of the slat 2. The slat 2 can be cast on site or assembled after prefabrication according to the needs of the project. The thickness of the elastic buffer layer 22 and the waterproof layer 24 match the size specifications of the main body of the slat 2.
[0033] After the foundation soil cushion layer 4 between the abutment assembly 1 and the pillow beam 3 is compacted, a 3% cement stabilized gravel layer 411 is laid and compacted. The thickness of the 3% cement stabilized gravel layer 411 is designed according to engineering needs and should not be less than 30 cm. After compaction, the upper surface of this layer is flush with the upper surface of the rubber buffer pad 12 on the abutment back corbel 11 and the upper surface of the pillow beam 3. After the slat 2 is placed, it fits tightly with the upper surface of this layer.
[0034] like Figure 3 As shown, a groove 36 is provided at the bottom of the bolster 3, and the airbag 31 is placed inside the groove 36. The airbag 31 is connected to the inflation pipe 34 through the connector 32. The inflation pipe 34 runs through the entire bolster 3 and is connected to the inflation interface 35 preset at the top of the bolster 3. The dimension D in the figure is the length of the inflation pipe 34 above the top surface of the bolster, which is determined according to the thickness of the slat 2 and the road pavement layer 5. The connector 32 at the connection between the airbag 31 and the inflation pipe 34 is equipped with an air pressure detection device 33, and the air pressure detection device 33 is connected to the control end through a wire drawn from the top surface of the bolster 3. The size and number of the grooves 36 at the bottom of the bolster 3 are set according to the size of the airbag 31 and the width of the slat 2, and the strength is calculated according to the design data.
[0035] Two layers of cement-stabilized gravel are set at the lower part of the corbel 3. The upper layer is a 5% cement-stabilized gravel layer 412, the thickness of which is designed according to the needs of the project and should not be less than 15 cm. The lower layer is a 3% cement-stabilized gravel layer 411, the thickness of which is designed according to the needs of the project and should not be less than 15 cm. The third and fourth layers are respectively a compacted gravel-soil mixture layer 42 and a compacted foundation soil cushion layer 4, the thickness of which is designed according to the needs of the project and should not be less than 20 cm. The overall arrangement is trapezoidal. A consolidation layer 44 formed by mixing cement and gravel is set on the back side of the corbel 3 (away from the abutment side). The upper surface of the consolidation layer 44 is flush with the top surface of the corbel 3. The consolidation layer 44 is composed of a 3% cement-stabilized gravel layer 411 and a compacted foundation soil cushion layer 4.
[0036] The consolidation layer 44 and the bolster 3 are overlapped with waterproof felt and geogrid 14 is laid, and the upper part is filled with asphalt mixture layer 43 until it is flush with the top surface of the slat 2. The asphalt mixture layer 43 and the slat 2 are overlapped with waterproof felt and geogrid 14 at the junction, which can alleviate the stress concentration phenomenon at the far end of the slat 2, improve the stress state of the asphalt concrete at this place, diffuse the impact force of the vehicle, reduce the uneven settlement of the roadbed and the slat 2, and reduce the secondary jumping phenomenon at the far end of the slat 2 and the generation of road surface reflection cracks at the far end and near end of the slat 2. After the setting is completed, the road pavement layer 5 is made on the upper surface.
[0037] A specific implementation method of the structure of the utility model that effectively avoids uneven settlement of the bridge head slab comprises the following steps:
[0038] S1: According to the actual on-site survey data and design information, the design and adjustment of the materials and specifications of the entire slab 2 and each layer inside the slab are carried out to make the slab 2 match the engineering requirements. The construction can choose to cast the slab 2 on site or prefabricate the slab 2 in the factory and transport it to the site for assembly;
[0039] S2: For the bolster 3, the airbag 31, the inflation pipe 34, the connector 32 and the air pressure detection device 33 are arranged on the template where the bolster 3 model is to be cast, the wire sleeve of the air pressure detection device 33 is led out from the top of the bolster 3 model, and the model is cast to complete the prefabrication of the bolster 3;
[0040] S3: Install the inflation interface 35 on the inflation pipe 34 of the prefabricated bolster 3, connect the inflation device to inflate the airbag 31, and connect the wire of the air pressure detection device 33 to the control end to check the sealing of the airbag 31. If the sealing is good, the bolster 3 can be transported to the construction site;
[0041] S4: After the various foundation cushion layers are compacted and laid on site, the bolster 3 is hoisted in place. Before proceeding to the next step, the airbag 31 needs to be inflated with the air pressure detection device 33 to maintain a certain air pressure in the airbag 31, and the airbag interface is sealed with a strong, well-sealed cover that is compatible with the airbag interface 35, and then the slab 2 and other base layers are constructed;
[0042] S5: If the bridgehead slab 2 sinks during road operation, the inflation interface 35 and the wire can be connected to the inflation device and the air pressure detection control end respectively, and the airbag 31 can be inflated to lift the bridgehead slab 2 to eliminate the sinking;
[0043] S6: When the airbag 31 is connected again, if the air pressure in the airbag 31 is zero, it proves that the airbag 31 is leaking and damaged. At this time, the airbag 31 can be replaced through the inflation pipe 34 or expanded materials such as solidified fly ash can be poured into the airbag 31 to expand the airbag 31 to lift the bridge head cladding 2. The expansion effect of such materials can also be fully utilized to eliminate the bridge head jumping phenomenon.
[0044] In summary, the utility model arranges scaffolding, pillow beams and airbags on a composite underlying structure of multiple sections of the platform back, so that the vehicle load is dispersed on three different underlying structures through the scaffolding, thereby reducing the uneven settlement of the road-bridge transition section caused by stress concentration, improving the stability of the roadbed, and improving the bridge head bouncing disease; the jacking of the airbag adjusted by inflation can minimize the occurrence of settlement and platform misalignment, greatly facilitating the maintenance work during the road operation period.
[0045] Finally, it should be noted that the above is only a preferred embodiment of the utility model, and does not limit the protection scope of the present application. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments, or replace some of the technical principles and features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A bridgehead structure for preventing vehicle jumping at the bridgehead in a road-bridge transition section, which is arranged at the junction of the bridgehead and the roadbed. It is characterized in that The invention comprises an abutment assembly (1), a slab (2), a bolster (3), a roadbed filling layer and a road pavement layer (5), wherein the slab (2) is arranged between the abutment assembly (1) and the bolster (3), and the road pavement layer (5) is arranged on the upper surface of the abutment assembly (1) and the slab (2); a back support bracket (11) is arranged on the back side of the abutment assembly (1) for placing the slab (2); a rubber buffer pad (12) is laid between the back support bracket (11) and the slab (2); the bridge deck of the abutment assembly (1) is flush with the slab (2); a geogrid (14) is arranged at the junction of the slab (2) and the abutment assembly (1), and a waterproof material (13) is filled in the gap; The butt board (2) comprises an elastic buffer layer (22), a core reinforcement layer (23) and a waterproof layer (24) which are arranged in sequence; a waterproof coating (25) is arranged on the upper and lower surfaces of the elastic buffer layer (22); a waterproof layer (24) is arranged under the core reinforcement layer (23); blocking blocks are arranged at both ends of the waterproof layer (24); protective layers (21) are arranged on the upper and lower parts of the butt board (2) body; and the elastic buffer layer (22) and the waterproof layer (24) match the size specifications of the butt board (2) body; A groove (36) is provided on the bottom side of the bolster (3), an air bag (31) is arranged inside the groove (36), the air bag (31) is connected to an inflation pipe (34) via a connector (32), the inflation pipe (34) runs through the entire bolster (3) and is connected to an inflation interface (35) preset at the top of the bolster (3), an air pressure detection device (33) is installed at the connector (32) at the connection between the air bag (31) and the inflation pipe (34), and the air pressure detection device (33) is connected to a control end via a wire extending from the top surface of the bolster (3).
2. A bridge head structure for preventing vehicle jumping at a bridge head in a road-bridge transition section according to claim 1, It is characterized in that The lower part of the slab (2) is a roadbed filling layer, specifically the first layer is a compacted cement-stabilized gravel layer, the upper surface of the cement-stabilized gravel layer is flush with the upper surface of the rubber buffer pad (12) on the platform back corbel (11) and the upper surface of the pillow beam (3), and the slab (2) is tightly fitted to the upper surface of the cement-stabilized gravel layer; the second layer is a compacted foundation soil cushion layer (4).
3. A bridgehead structure for preventing vehicle jumping at a bridgehead in a road-bridge transition section according to claim 2, It is characterized in that The lower part of the pillow beam (3) is a roadbed filling layer, specifically, two layers of cement-stabilized crushed stone layers are arranged at the lower part of the pillow beam (3), and the third and fourth layers below are respectively a compacted crushed stone-soil mixture layer (42) and a foundation soil cushion layer (4), which are arranged in a trapezoidal shape as a whole; a consolidation layer (44) formed by pouring a mixture of cement and crushed stone is arranged on the side of the pillow beam (3) away from the abutment assembly (1), and the upper surface of the consolidation layer (44) is flush with the top surface of the pillow beam (3), and the consolidation layer (44) is composed of a cement-stabilized crushed stone layer and a foundation soil cushion layer (4) in sequence below.
4. A bridgehead structure for preventing vehicle jumping at a bridgehead in a road-bridge transition section according to claim 3, It is characterized in that Two layers of cement-stabilized crushed stone are arranged at the lower part of the bolster (3), the upper layer being a 5% cement-stabilized crushed stone layer (412) and the lower layer being a 3% cement-stabilized crushed stone layer (411).
5. A bridgehead structure for preventing vehicle jumping at a bridgehead in a road-bridge transition section according to claim 3, It is characterized in that A waterproof felt is overlapped at the junction of the consolidation layer (44) and the bolster (3), and a geogrid (14) is arranged. An asphalt mixture layer (43) is filled and arranged on the consolidation layer (44), flush with the top surface of the slab (2). A waterproof felt is overlapped at the junction of the asphalt mixture layer (43) and the slab (2), and a geogrid (14) is arranged. A road pavement layer (5) is arranged above the asphalt mixture layer (43).
Citation Information
Cited By
Anti-sedimentation foam light soil roadbed reinforcing structure
CN120331083A
Bridgehead structure for preventing bumping at bridgehead in road-bridge transition section
CN224299782U
A weak foundation road and bridge transition section active settlement reduction system
CN224997390U
