Temporary anti-collapse cable clamp for old tie bar replacement and cutting construction of tied-arch bridge

By designing temporary anti-collapse cable clamps and using a combined structure of radial clamping casings and counter-tensile steel strands, the problem of collapse during cutting of the old tie rods was solved, and construction safety and stability were improved.

CN221895563UActive Publication Date: 2024-10-25CHINA RAILWAY 18TH CONSTR BUREAU (GRP) THE 5TH ENG LTD CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323574403.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-10-25
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

Old tie rods are prone to breakage when being cut and replaced under tension, causing potential safety hazards to personnel and surrounding structures. It is difficult to effectively prevent such accidents with existing technology.

Method used

Design a temporary anti-collapse cable clamp, which includes a radial clamping sleeve and a pair of tensile steel strands. The half-ring protective tile is fixed through high-strength bolts. It is combined with rubber pads and clips to form a double-flap structure to ensure that the tie rod is cut during cutting. Stable fixation and uniform stress distribution during the process.

Benefits of technology

It effectively prevents the tie rod from breaking due to excessive force during the cutting process, and improves the safety of replacing the old tie rod and the stability of the construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895563U_ABST
    Figure CN221895563U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary anti-collapse cable clamp for old tie bar replacement and cutting construction of a tied-arch bridge. The temporary anti-collapse cable clamp comprises two groups of radial clamping pile casings and a plurality of opposite-pulling steel strands, the radial clamping protection cylinders are radially clamped and fixed on an arch bridge tie bar, the opposite axial end faces of the two radial clamping protection cylinders are axially tensioned and stressed and are circumferentially and uniformly connected with a plurality of opposite-pulling steel strands, and a tie bar cutting construction area is reserved at the axial interval of the two radial clamping protection cylinders. The anti-collapse cable clamp is suitable for replacement and maintenance of an old bridge tie bar of a tied-arch bridge, and is simple and reasonable in structural design, convenient to use, low in mounting and manufacturing cost and high in practicability, and the replacement safety of the old tie bar is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prestressed construction, in particular to a temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tie arch bridge. Background Art

[0002] The tied arch bridge is a type of bridge that combines the advantages of both arch and beam. It combines the two basic structural forms of arch and beam to bear the load together, giving full play to the structural performance and combined effect of the beam under bending and the arch under compression. This type of arch bridge is a hyperstatic system inside and a statically determinate system outside, which has no effect on the uneven settlement of piers. Tied arch bridges account for an important proportion of my country's bridge structures, but they are difficult to maintain in the later stage. In particular, when old ties are cut and replaced under tension, they may break, causing serious damage to surrounding ties, structures and cutting personnel.

[0003] Therefore, in order to solve the above-mentioned personnel safety problem, a temporary anti-collapse cable clamp with simple structure, low production cost and convenient construction is urgently needed. Utility Model Content

[0004] The purpose of the utility model is to solve the deficiencies of the prior art and to propose a temporary anti-collapse cable clamp for the cutting and replacement of old tie bars of a tie arch bridge. The utility model is suitable for the replacement and maintenance of old tie bars of a tie arch bridge and has a simple and reasonable structural design, is easy to use, has a low installation and manufacturing cost, is highly practical, and improves the safety of replacing old tie bars.

[0005] A temporary anti-collapse cable clamp for replacing and cutting old ties of a tie-bar arch bridge comprises two sets of radial clamping casings and a plurality of tensioning steel strands; the radial clamping casings are radially clamped and fixed on the ties of the arch bridge, the axial end faces facing each other of the two radial clamping casings are axially tensioned and circumferentially evenly connected with a plurality of tensioning steel strands, and the axial interval between the two radial clamping casings is reserved as a tie-bar cutting construction area.

[0006] Preferably, the radial clamping casing is a double-petal structure, specifically comprising two semi-ring protective tiles spliced ​​opposite to each other; the semi-ring protective tiles comprise an arc-shaped steel plate, an arc-shaped reinforcing rib plate and a wedge-shaped plate, wherein arc-shaped reinforcing rib plates are welded and fixed at both ends and the middle of the outer arc surface of the arc-shaped steel plate, and a wedge-shaped plate is welded at one end of the arc-shaped steel plate; the side wall of the wedge-shaped plate is welded and fixed to the arc-shaped reinforcing rib plate, and the wedge-shaped plate penetrates and is circumferentially limited to hang the tensioned steel strands.

[0007] Preferably, a rubber pad is compositely bonded on the inner arc surface of the arc-shaped steel plate to increase the axial static friction between the radial clamping casing and the tie rod.

[0008] Preferably, when the arc-shaped steel plates are assembled opposite to each other, a plurality of high-strength bolts are penetrated and connected at the joints of the two arc-shaped steel plates, and nuts are engaged with the high-strength bolts.

[0009] Preferably, both ends of the tension steel strands are clamped and fixed with clips, and the clips are slidably matched with the slope side walls of the wedge plate to axially limit the two ends of the tension steel strands.

[0010] Compared with the related art, the utility model has the following beneficial effects:

[0011] The utility model discloses a temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tie arch bridge, which can fix two half-ring protective tiles oppositely by tightening high-strength bolts to form a complete radial clamping casing, and cooperate with rubber pads to make the radial clamping casing firmly fix the old tie bars to be cut, and prevent the tie bars from breaking and rebounding by pulling steel strands, thereby effectively preventing the occurrence of rebounding and the like due to excessive force and lack of effective restraint during the cutting process of the old tie bars. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0013] Figure 2 It is a side view of the utility model;

[0014] In the figure: 1- radial clamping casing; 2- tensioning steel strands; 3- rubber pads; 4- arc-shaped steel plates; 5- arc-shaped reinforcing rib plates; 6- high-strength bolts; 7- nuts; 8- wedge plates; 9- clips; 10- cutting construction area. DETAILED DESCRIPTION

[0015] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0016] The utility model discloses a temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tie arch bridge, comprising two groups of radial clamping casings 1 and a plurality of tensioning steel strands 2; the radial clamping casings are radially clamped and fixed on the tie bars of the arch bridge, the two radial clamping casings are axially tensioned on their facing axial end faces and are circumferentially evenly connected with a plurality of tensioning steel strands, and the axial interval between the two radial clamping casings is reserved as a tie bar cutting construction area.

[0017] Preferably, the radial clamping casing is a double-petal structure, specifically comprising two semi-ring protective tiles spliced ​​opposite to each other; the semi-ring protective tiles include an arc-shaped steel plate 4, an arc-shaped reinforcing rib plate 5 and a wedge-shaped plate 8, wherein arc-shaped reinforcing rib plates are welded and fixed at both ends and the middle of the outer arc surface of the arc-shaped steel plate, and a wedge-shaped plate is welded at one end of the arc-shaped steel plate; the side wall of the wedge-shaped plate is welded and fixed to the arc-shaped reinforcing rib plate, and the wedge-shaped plate penetrates and is circumferentially limited to hang the tensioned steel strands.

[0018] Preferably, a rubber pad 3 is compositely bonded on the inner arc surface of the arc-shaped steel plate to increase the axial static friction between the radial clamping casing and the tie rod.

[0019] Preferably, when the arc-shaped steel plates are assembled opposite to each other, a plurality of high-strength bolts 6 are penetrated and connected at the joints of the two arc-shaped steel plates, and nuts 7 are engaged with the high-strength bolts.

[0020] Preferably, both ends of the tension steel strands are clamped and fixed with clips 9, which are slidably matched with the slope side walls of the wedge plate to axially limit the two ends of the tension steel strands.

[0021] In order to more clearly illustrate the specific implementation of the utility model, an embodiment is provided below:

[0022] The utility model discloses a temporary anti-collapse cable clamp for the cutting construction of replacing the old tie rods of a tie-bar arch bridge. During the construction, the old tie rods of the existing bridge are firstly taken as the axis, and the semi-ring protective tiles are symmetrically embraced and fixed symmetrically on the old tie rods by high-strength bolts to form two radial clamping casings. At this time, the axial spacing position of the two radial clamping casings is the cutting construction area; then the two radial clamping casings are axially connected by steel strands to keep the tensioning steel strands in a taut stress state all the time; finally, the old tie rods are cut, and the pulling force after the original integrated tie rods are cut off is borne by the multiple steel strands; finally, the new tie rods are welded and fixed on the cutting section, thereby completing the construction work of replacing and cutting the old tie rods of the tie-bar arch bridge.

[0023] Finally, all the parts not fully described in the present invention adopt mature products and mature technical means in the prior art.

[0024] Although embodiments of the utility model have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the utility model, and that the scope of the utility model is defined by the claims and their equivalents.

Claims

1. A temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tied arch bridge, characterized in that: It comprises two groups of radial clamping casings and a plurality of tensioning steel strands; the radial clamping casings are radially clamped and fixed on the tie rods of the arch bridge, the axial end faces of the two radial clamping casings facing each other are axially tensioned and circumferentially evenly connected with a plurality of tensioning steel strands, and the axial interval between the two radial clamping casings is reserved as a tie rod cutting construction area; The radial clamping casing is a double-petal structure, specifically comprising two semi-ring protective tiles spliced ​​opposite to each other; the semi-ring protective tiles comprise an arc-shaped steel plate, an arc-shaped reinforcing rib plate and a wedge-shaped plate, wherein arc-shaped reinforcing rib plates are welded and fixed at both ends and the middle of the outer arc surface of the arc-shaped steel plate, and a wedge-shaped plate is welded at one end of the arc-shaped steel plate; the side wall of the wedge-shaped plate is welded and fixed to the arc-shaped reinforcing rib plate, and the wedge-shaped plate penetrates and is circumferentially limited to hang the tensioned steel strands.

2. According to claim 1, a temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tied arch bridge is characterized in that: A rubber pad is compositely bonded on the inner arc surface of the arc-shaped steel plate to increase the axial static friction between the radial clamping casing and the tie rod.

3. The temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tied arch bridge according to claim 1 is characterized in that: When the arc-shaped steel plates are assembled opposite to each other, a plurality of bolts are penetrated and connected at the butt joints of the two arc-shaped steel plates, and nuts are engaged and sleeved on the bolts.

4. The temporary anti-collapse cable clamp for replacing and cutting old tie bars of a tied arch bridge according to claim 1 is characterized in that: Both ends of the tension steel strands are clamped and fixed with clips, and the clips are slidably matched with the slope side walls of the wedge plate to axially limit the two ends of the tension steel strands.