Pile driver for hydraulic engineering construction

By using the angle adjustment mechanism of hydraulic telescopic rods and clamping blocks in the construction of water conservancy projects, mechanized straightening of pipe piles is achieved, solving the problem of time-consuming and labor-intensive manual straightening, improving construction efficiency and reducing costs.

CN221895772UInactive Publication Date: 2024-10-25山东省水网运行调度中心青岛分中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420456082.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of water conservancy projects, the process of manually straightening pipe piles is time-consuming and labor-intensive, resulting in high labor costs and low work efficiency.

Method used

A hydraulic engineering construction pile driver is designed, which adopts an angle adjustment mechanism, including a hydraulic telescopic rod and a clamping block. Through the adjustment of the hydraulic telescopic rod, the mechanized straightening of pipe piles is achieved, reducing manual intervention.

Benefits of technology

It achieves efficient mechanized straightening of pipe piles, improves construction efficiency, reduces the need for manual straightening, and reduces labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895772U_ABST
    Figure CN221895772U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydraulic engineering construction pile driver which comprises a base, a pile driver body is installed on the top of the base, and an angle adjusting mechanism is installed on the lower portion of the base. The angle adjusting mechanism comprises two fixed frames arranged up and down, a height adjusting assembly is arranged between the two fixed frames, first hydraulic telescopic rods are installed on the inner bottom faces of the fixed frames, movable frames are installed at the movable ends of the first hydraulic telescopic rods, and second hydraulic telescopic rods are symmetrically installed on the two sides in the movable frames. A clamping block is mounted at the movable end of the second hydraulic telescopic rod, two sets of mounting grooves are formed in the inner side of the clamping block, and rolling wheels are mounted in the mounting grooves. According to the pipe pile centralizer, the second hydraulic telescopic rods extend to enable the clamping blocks to clamp and fix a pipe pile, the inclination angle of the pipe pile can be preliminarily adjusted, the inclination angle of the pipe pile can be secondarily adjusted through telescopic cooperation of the two first hydraulic telescopic rods, mechanical centralizing of the pipe pile is achieved, efficiency is high, and the pipe pile centralizer is suitable for large-scale popularization and application. Manual centering is not needed, and time and labor are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy engineering, in particular to a pile driver for water conservancy engineering construction. Background Art

[0002] Water conservancy projects are a general term for various engineering projects built to control, utilize and protect surface and underground water resources and the environment. In the process of water conservancy project construction, pile driving is usually required to strengthen the foundation, increase the stability and water resistance of the project, prevent seepage and springs, control the evolution of the riverbed, and ensure the safe operation and long-term stability of the water conservancy project.

[0003] During the piling construction process, it is usually necessary to manually align the pipe pile with the pile position and then straighten it before the pile pile can be hammered into the drill hole by the pile hammer of the pile driver. This solution of manual alignment and manual straightening has high labor costs and low work efficiency. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the above technical defects and provide a pile driver for water conservancy project construction.

[0005] In order to solve the above problems, the technical solution of the utility model is: a hydraulic engineering construction pile driver, comprising a base, a pile driver body is installed on the top of the base, and an angle adjustment mechanism is installed at the lower part of one end of the base;

[0006] The angle adjustment mechanism includes two fixed frames arranged up and down, a height adjustment component is provided between the two fixed frames, a first hydraulic telescopic rod is installed on the bottom surface of the fixed frame, a movable frame is installed on the movable end of the first hydraulic telescopic rod, second hydraulic telescopic rods are symmetrically installed on both sides of the movable frame, a clamping block is installed on the movable end of the second hydraulic telescopic rod, the inner side of the clamping block is a semicircular surface, and two groups of mounting grooves are opened on the semicircular surface, and rollers are installed in the mounting grooves.

[0007] Furthermore, the upper fixing frame is fixedly mounted on the bottom of the base via connecting columns.

[0008] Furthermore, the height adjustment assembly includes a fixed cylinder, a connecting plate is inserted inside the fixed cylinder, and a plurality of fixing bolts are threadedly connected to one side. The top of the fixed cylinder is fixedly connected to the upper fixing frame, and the bottom of the connecting plate is fixedly connected to the lower fixing frame.

[0009] Furthermore, the fixed frame and the movable frame are both U-shaped frames.

[0010] Furthermore, sliding blocks are symmetrically fixed on two sides of the outer portion of the movable frame, and sliding grooves adapted to the sliding blocks are symmetrically provided on two sides of the inner portion of the fixed frame.

[0011] Furthermore, the two groups of mounting slots are arranged vertically, and each group of mounting slots is provided with three.

[0012] The advantages of the utility model compared with the existing technology are: the utility model can adjust the positions of the movable frame and the clamping block by extending and retracting the first hydraulic telescopic rod, and can enable the clamping block to clamp and fix the pipe pile by extending the second hydraulic telescopic rod; when the telescopic lengths of the two second hydraulic telescopic rods inside the movable frame are different, the inclination angle of the pipe pile can be preliminarily adjusted, and the inclination angle of the pipe pile can be secondarily adjusted by coordinating the extension and retraction of the upper and lower first hydraulic telescopic rods, so that mechanized straightening of the pipe pile can be realized, the efficiency is high, and no manual straightening is required, which saves time and effort. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a stereogram of the utility model.

[0014] Figure 2 It is a structural diagram of the angle adjustment mechanism of the utility model.

[0015] Figure 3 It is a cross-sectional view of the connection structure of the fixed frame of the utility model.

[0016] As shown in the figure: 1. Base; 2. Pile driver body; 3. Fixed frame; 4. First hydraulic telescopic rod; 5. Movable frame; 6. Second hydraulic telescopic rod; 7. Clamping block; 8. Roller; 9. Connecting column; 10. Fixed cylinder; 11. Connecting plate; 12. Slider. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0018] like Figure 1 As shown, a pile driver for water conservancy engineering construction comprises a base 1, a pile driver body 2 is installed on the top of the base 1, and an angle adjustment mechanism is installed at the lower part of one end of the base 1.

[0019] like Figures 2 to 3As shown, the angle adjustment mechanism includes two fixed frames 3 arranged in an upper and lower manner, the upper fixed frame 3 is fixedly installed on the bottom of the base 1 through a connecting column 9, a height adjustment component is provided between the two fixed frames 3, a first hydraulic telescopic rod 4 is installed on the inner bottom surface of the fixed frame 3, a movable frame 5 is installed on the movable end of the first hydraulic telescopic rod 4, the fixed frame 3 and the movable frame 5 are both U-shaped frames, sliders 12 are symmetrically fixedly connected to the outer sides of the movable frame 5, and sliding grooves compatible with the sliders 12 are symmetrically opened on the inner sides of the fixed frame 3. Second hydraulic telescopic rods 6 are symmetrically installed on both sides of the movable frame 5, and a clamping block 7 is installed on the movable end of the second hydraulic telescopic rod 6. The inner side of the clamping block 7 is a semicircular surface, and two groups of mounting grooves are opened on the semicircular surface. The two groups of mounting grooves are arranged up and down, and each group of mounting grooves is provided with three, and rollers 8 are installed in the mounting grooves.

[0020] The height adjustment assembly includes a fixed cylinder 10, a connecting plate 11 is inserted inside the fixed cylinder 10, and a plurality of fixing bolts are threadedly connected to one side. The top of the fixed cylinder 10 is fixed to the upper fixed frame 3, and the bottom of the connecting plate 11 is fixed to the lower fixed frame 3.

[0021] In specific use, the device can be installed on a ship or equipment platform through the base 1. After the pipe pile is moved to the pile position through the external lifting mechanism, the position of the movable frame 5 and the clamp block 7 can be adjusted by the extension of the first hydraulic telescopic rod 4, and the clamp block 7 can clamp and fix the pipe pile through the extension of the second hydraulic telescopic rod 6. When the two second hydraulic telescopic rods 6 inside the movable frame 5 have different extension lengths, the tilt angle of the pipe pile can be initially adjusted, and then the tilt angle of the pipe pile can be adjusted again by the cooperation of the upper and lower first hydraulic telescopic rods 4. The mechanized straightening of the pipe pile can be realized, which is efficient and does not require manual straightening, saving time and effort. When the pile is driven by the pile driver body 2, the clamp block 7 can maintain the clamping state of the pipe pile, and the roller 8 will rotate when the pipe pile descends, so that the vertical piling of the pipe pile can be maintained by the clamp block 7. The depth of the connecting plate 11 inserted into the fixed tube 10 is adjusted and fixed by the fixing bolts, and the spacing between the two fixed frames 3 can be adjusted according to the length of the pipe pile.

[0022] The undisclosed parts in the present invention are all prior art, and their specific structures and working principles are not described in detail.

[0023] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

[0025] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A pile driver for water conservancy engineering construction, comprising a base (1), a pile driver body (2) being mounted on the top of the base (1), characterized in that: An angle adjustment mechanism is installed at the lower part of one end of the base (1); The angle adjustment mechanism comprises two fixed frames (3) arranged one above the other, a height adjustment assembly being arranged between the two fixed frames (3), a first hydraulic telescopic rod (4) being installed on the inner bottom surface of the fixed frame (3), a movable frame (5) being installed on the movable end of the first hydraulic telescopic rod (4), second hydraulic telescopic rods (6) being symmetrically installed on both sides of the movable frame (5), a clamping block (7) being installed on the movable end of the second hydraulic telescopic rod (6), the inner side of the clamping block (7) being a semicircular surface, and two groups of mounting grooves being opened on the semicircular surface, and rollers (8) being installed in the mounting grooves.

2. A pile driver for water conservancy engineering construction according to claim 1, characterized in that: The upper fixing frame (3) is fixedly mounted on the bottom of the base (1) via a connecting column (9).

3. A pile driver for water conservancy engineering construction according to claim 1, characterized in that: The height adjustment assembly comprises a fixing cylinder (10), a connecting plate (11) is inserted inside the fixing cylinder (10), a plurality of fixing bolts are threadedly connected to one side, the top of the fixing cylinder (10) is fixedly connected to an upper fixing frame (3), and the bottom of the connecting plate (11) is fixedly connected to a lower fixing frame (3).

4. A pile driver for water conservancy engineering construction according to claim 1, characterized in that: The fixed frame (3) and the movable frame (5) are both U-shaped frames.

5. A pile driver for water conservancy engineering construction according to claim 1, characterized in that: Slide blocks (12) are symmetrically fixedly connected to the two sides of the outside of the movable frame (5), and slide grooves matching the slide blocks (12) are symmetrically opened on the two sides of the inside of the fixed frame (3).

6. A pile driver for water conservancy engineering construction according to claim 1, characterized in that: The two groups of mounting slots are arranged vertically, and each group of mounting slots is provided with three.