Construction engineering cost on-site surveying and mapping device
By designing a cost-effective on-site surveying and mapping device for construction projects with a protective frame and adjustment components, the problems in the existing technology that the surveyor and plotter are easily damaged and the height cannot be adjusted are solved, and effective protection and highly flexible adjustment of the surveyor and plotter are achieved.
Patent Information
- Application Number
- CN202323592089.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2033-12-27
AI Technical Summary
Existing on-site cost surveying and mapping devices for construction projects are difficult to protect during use of the surveying and mapping instrument, and it is difficult to adjust the height of the surveying and mapping instrument, resulting in the instrument being easily damaged and inflexible in use.
A device including a fixed plate, an adjustment component and a support component is designed. The surveyor is positioned and protected through the protective frame and insertion rod on the support component, and the height of the surveyor is adjusted and fixed through the telescopic rod in the adjustment component.
Effectively protect the surveyor and plotter from damage, and improve the flexibility and stability of the surveyor and plotter.
Smart Images

Figure CN221897429U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering surveying and mapping, in particular to a construction engineering cost on-site surveying and mapping device. Background Art
[0002] Construction projects refer to engineering entities formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. There are at least the following disadvantages in the use of existing cost surveying and mapping devices for construction projects: 1. It is not easy to protect the surveying instrument during use in the existing cost surveying and mapping devices for construction projects, and the surveying instrument is easily damaged during use and placement; 2. It is not easy to adjust the use height of the surveying instrument in the existing cost surveying and mapping devices for construction projects. Therefore, we introduce a new cost surveying and mapping device for construction projects. Utility Model Content
[0003] The main purpose of the utility model is to provide a construction cost on-site surveying and mapping device for construction engineering, which can effectively solve the problems in the background technology.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0005] A construction cost on-site surveying and mapping device, comprising a fixed plate, a limit rod is fixedly connected to the middle of the lower end of the fixed plate, a connecting assembly is sleeved on the lower part of the outer surface of the limit rod, an adjusting assembly is fixedly connected to the upper end of the fixed plate, a supporting assembly is fixedly connected to the upper end of the adjusting assembly, three extension rods are movably connected to the lower end of the fixed plate through a bearing annular array, support rods are sleeved on the outer surfaces of the three extension rods, positioning cones are fixedly connected to the lower ends of the three support rods, and the three support rods are movably connected to the connecting assembly;
[0006] The adjustment assembly comprises a support block, a telescopic rod is inserted and fixedly connected to the upper end of the support block, a round block is fixedly connected to the upper end of the telescopic rod, a movable bearing is fixedly connected to the upper end of the round block, and the support block is fixedly connected to the fixed plate.
[0007] Preferably, the support assembly includes a support plate, a drawer is inserted and connected to the front end of the support plate, a surveying instrument body is fixedly connected to the middle of the upper end of the support plate, a protective frame is fixedly connected to the upper end of the support plate, positioning blocks are fixedly connected to the lower left and right ends of the protective frame, and the support plate is fixedly connected to the adjustment assembly.
[0008] Preferably, the support plate comprises a plate body, a groove body is formed at the front end of the plate body, a card slot is formed at the middle of the upper end of the plate body, two plug rods are fixedly connected to the left and right upper ends of the plate body, and the groove body is sleeved with the drawer.
[0009] Preferably, the surveying instrument body is interlacedly connected with the card slot.
[0010] Preferably, the four insertion rods are all interlaced and connected with the protection frame.
[0011] Preferably, the surveying instrument body is located inside the protective frame.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] 1. By setting the support assembly, the protective frame on the support assembly is connected with the four plug rods, and the screws are respectively passed through the two positioning blocks and connected with the support plate, so that the position of the protective frame can be positioned, and the protective frame can be used to protect the surveying instrument body to prevent the surveying instrument body from being damaged during use, thereby improving stability;
[0014] 2. By setting an adjustment component to support and adjust the support component, by adjusting the use length of the telescopic rod and fixing the adjusted length of the telescopic rod with a screw, the use height of the support component fixed on the movable bearing can be adjusted and fixed to improve flexibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall structure of a construction cost on-site surveying and mapping device for construction engineering of the utility model;
[0016] Figure 2 This is a schematic diagram of the overall structure of an adjustment component of a construction cost on-site surveying and mapping device for a construction project according to the utility model;
[0017] Figure 3 This is a schematic diagram of the overall structure of a support assembly of a construction cost on-site surveying and mapping device for construction engineering according to the utility model;
[0018] Figure 4 The utility model is a schematic diagram of the overall structure of a support plate of a construction cost on-site surveying and mapping device for construction engineering.
[0019] In the figure: 1. fixing plate; 2. limiting rod; 3. connecting assembly; 4. adjusting assembly; 5. extension rod; 6. supporting rod; 7. positioning cone; 8. supporting assembly; 41. supporting block; 42. telescopic rod; 43. round block; 44. movable bearing; 81. supporting plate; 82. drawer; 83. protective frame; 84. positioning block; 85. surveying instrument body; 811. plate body; 812. slot body; 813. card slot; 814. plug rod. DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0021] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0023] See also Figure 1-4 , the utility model provides a technical solution:
[0024] A construction cost on-site surveying and mapping device, comprising a fixed plate 1, a limit rod 2 is fixedly connected to the middle of the lower end of the fixed plate 1, a connection assembly 3 is sleeved on the lower part of the outer surface of the limit rod 2, an adjustment assembly 4 is fixedly connected to the upper end of the fixed plate 1, a support assembly 8 is fixedly connected to the upper end of the adjustment assembly 4, three extension rods 5 are movably connected to the lower end of the fixed plate 1 through a bearing annular array, support rods 6 are sleeved on the outer surfaces of the three extension rods 5, positioning cones 7 are fixedly connected to the lower ends of the three support rods 6, and the three support rods 6 are movably connected to the connection assembly 3;
[0025] In this embodiment, the adjustment component 4 includes a support block 41, a telescopic rod 42 is inserted and fixedly connected to the upper end of the support block 41, a round block 43 is fixedly connected to the upper end of the telescopic rod 42, a movable bearing 44 is fixedly connected to the upper end of the round block 43, and the support block 41 is fixedly connected to the fixed plate 1. The use height of the support component 8 can be adjusted by setting the adjustment component 4, and the use length of the telescopic rod 42 can be adjusted and fixed by screws, thereby improving flexibility.
[0026] In this embodiment, the support assembly 8 includes a support plate 81, a drawer 82 is inserted and connected at the front end of the support plate 81, a surveying instrument body 85 is fixedly connected to the middle of the upper end of the support plate 81, a protective frame 83 is fixedly connected to the upper end of the support plate 81, and a positioning block 84 is fixedly connected to the lower left and right ends of the protective frame 83, and the support plate 81 is fixedly connected to the adjustment assembly 4; the support plate 81 includes a plate body 811, a groove body 812 is opened at the front end of the plate body 811, a card groove 813 is opened in the middle of the upper end of the plate body 811, two plug rods 814 are fixedly connected to the left and right parts of the upper end of the plate body 811, and the groove body 812 is sleeved with the drawer 82; the surveying instrument body The body 85 is connected with the card slot 813 through insertion; the four insertion rods 814 are connected with the protective frame 83 through insertion; the surveying instrument body 85 is located on the inner side of the protective frame 83, and the surveying instrument body 85 is supported by setting the support assembly 8, the surveying instrument body 85 is connected with the card slot 813 through insertion, and then the protective frame 83 is sleeved with the four insertion rods 814, and screws are respectively passed through the two positioning blocks 84 and connected with the support plate 81 through insertion, so that the position of the protective frame 83 can be positioned, and the surveying instrument body 85 is protected by the protective frame 83 to avoid damage to the surveying instrument body 85 and improve stability. The drawer 82 can be used to place and store surveying and mapping documents.
[0027] It should be noted that the utility model is a cost site surveying and mapping device for construction projects. During use, the adjustment component 4 is fixedly connected to the fixed plate 1 to locate the position of the adjustment component 4, and the surveying instrument body 85 on the support component 8 is inserted and connected with the card slot 813 to locate the position of the surveying instrument body 85. Then the protective frame 83 is sleeved with the four insertion rods 814, and the position of the protective frame 83 is located by two screws. The surveying instrument body 85 is protected by the protective frame 83 to avoid damage to the surveying instrument body 85 and improve stability. The surveying and mapping files can be placed and stored through the drawer 82. During the surveying and mapping process, the use height of the support component 8 on the adjustment component 4 can be adjusted and fixed by adjusting the use length of the telescopic rod 42 and fixing it with screws, which is convenient for the cost site surveying and mapping process for construction projects and improves flexibility.
[0028] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A construction cost on-site surveying and mapping device for a construction project, comprising a fixing plate (1), characterized in that: The middle part of the lower end of the fixed plate (1) is fixedly connected to a limiting rod (2), the lower part of the outer surface of the limiting rod (2) is sleeved with a connecting assembly (3), the upper end of the fixed plate (1) is fixedly connected to an adjusting assembly (4), the upper end of the adjusting assembly (4) is fixedly connected to a supporting assembly (8), the lower end of the fixed plate (1) is movably connected to three extension rods (5) through a bearing annular array, the outer surfaces of the three extension rods (5) are sleeved with supporting rods (6), the lower ends of the three supporting rods (6) are fixedly connected to positioning cones (7), and the three supporting rods (6) are movably connected to the connecting assembly (3); The adjustment assembly (4) comprises a support block (41), a telescopic rod (42) is inserted and fixedly connected to the upper end of the support block (41), a round block (43) is fixedly connected to the upper end of the telescopic rod (42), a movable bearing (44) is fixedly connected to the upper end of the round block (43), and the support block (41) is fixedly connected to the fixed plate (1).
2. The construction cost on-site surveying and mapping device for construction engineering according to claim 1, characterized in that: The support assembly (8) comprises a support plate (81), a drawer (82) is inserted and connected at the front end of the support plate (81), a surveying instrument body (85) is fixedly connected at the middle of the upper end of the support plate (81), a protection frame (83) is fixedly connected at the upper end of the support plate (81), and positioning blocks (84) are fixedly connected at the lower left end and the lower right end of the protection frame (83), and the support plate (81) is fixedly connected to the adjustment assembly (4).
3. The construction cost on-site surveying and mapping device for construction engineering according to claim 2, characterized in that: The support plate (81) comprises a plate body (811), a groove body (812) is formed at the front end of the plate body (811), a clamping groove (813) is formed at the middle of the upper end of the plate body (811), two insertion rods (814) are fixedly connected to the upper left and upper right parts of the plate body (811), and the groove body (812) is sleeved with the drawer (82).
4. The construction cost on-site surveying and mapping device for construction engineering according to claim 2, characterized in that: The surveying instrument body (85) is interlacedly connected with the card slot (813).
5. The construction cost on-site surveying and mapping device for construction engineering according to claim 3, characterized in that: The four insertion rods (814) are all connected to the protection frame (83) through insertion.
6. The construction cost on-site surveying and mapping device for construction engineering according to claim 2, characterized in that: The surveying instrument body (85) is located inside the protection frame (83).