Mould for forming test piece for bonding and drawing test between asphalt mixture layers
By designing low-profile large Marshall and small Marshall test molds for asphalt mixtures, combined with annular hat-shaped connectors, the problems of damage and low efficiency of pavement core sampling in the existing technology are solved, and efficient evaluation in the laboratory is achieved Simulation and testing of interlayer bonding properties of asphalt mixtures.
Patent Information
- Application Number
- CN202420241724.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-31
AI Technical Summary
When the existing technology detects and evaluates the bonding effect between asphalt pavement layers, the pavement core drilling method used will damage the pavement, and the sampling is complicated and inefficient. Water needs to be used during sampling, which makes the mixture surface slippery and affects the epoxy resin. Use of adhesives.
A mold was designed for interlayer bonding and pull-out testing of shaped asphalt mixtures, including a dwarf large Marshall test mold and a dwarf small Marshall test mold, which were connected through an annular hat-shaped connector to simulate the actual multi-layer structure of asphalt pavement. , to achieve efficient bonding performance evaluation in the laboratory.
This mold can efficiently shape and simulate the multi-layer structure of asphalt pavement without damaging the road surface, achieve effective evaluation of the bonding performance between asphalt mixture layers, improve experimental efficiency and simplify the test process.
Smart Images

Figure CN221898908U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of interlayer pull-out test of asphalt mixture, in particular to a mold for molding asphalt mixture interlayer bonding pull-out test specimens. Background Art
[0002] my country's "Technical Specifications for Highway Asphalt Pavement Construction" (JTG F40-2004) requires that when asphalt pavement is constructed in layers, tack coat oil should be spread between the surface layers. However, the specification does not specify the testing method and evaluation index of the bonding effect of tack coat oil.
[0003] The current test method commonly used in the industry is to obtain test specimens by drilling cores from the road surface and conduct indoor or outdoor pull-out tests. However, this method will damage the road surface, and the core sampling process is complicated and inefficient. In addition, since water is required for sampling, the surface of the mixture becomes wet, making it impossible to immediately use epoxy resin for bonding, further affecting the efficiency of the test.
[0004] Therefore, there is an urgent need for a mold for molding asphalt mixture interlayer adhesion pull-out test specimens, which can simulate the multi-layer structure of the pavement in the laboratory and efficiently evaluate the interlayer adhesion performance of the pavement without damaging the pavement. Utility Model Content
[0005] The utility model aims to provide a mould for molding asphalt mixture interlayer bonding pull-out test specimens to solve the problems existing in the above-mentioned prior art.
[0006] To achieve the above purpose, the utility model provides the following solutions:
[0007] The utility model provides a mold for molding asphalt mixture interlayer bonding pull test specimens, comprising a dwarf large Marshall test mold, a dwarf small Marshall test mold is arranged above the dwarf large Marshall test mold, the dwarf large Marshall test mold is communicated with the dwarf small Marshall test mold, and the two are connected by an annular cap-shaped connecting piece.
[0008] Preferably, both ends of the short-type large Marshall test mold and both ends of the short-type small Marshall test mold are provided with steps, and the annular cap-shaped connecting piece is gap-matched with the steps.
[0009] Compared with the prior art, the utility model has achieved the following beneficial technical effects:
[0010] The utility model provides a mold for molding asphalt mixture interlayer adhesion pull-out test specimens, comprising a dwarf large Marshall test mold, a dwarf small Marshall test mold is arranged above the dwarf large Marshall test mold, the dwarf large Marshall test mold is connected to the dwarf small Marshall test mold, and the two are connected by an annular cap-shaped connecting piece; the above-mentioned mold can be used to mold a special specimen simulating the multi-layer structure of an actual asphalt pavement in the laboratory, thereby realizing the evaluation of the interlayer adhesion performance of the asphalt mixture. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0012] Figure 1 A schematic diagram of a mold structure for molding an asphalt mixture interlayer bonding pull-out test specimen provided by the utility model;
[0013] Figure 2 A schematic diagram of the structure of a medium-sized and short-sized large Marshall test mold for forming a specimen for a tensile test of an interlayer bonding of an asphalt mixture provided by the utility model;
[0014] Figure 3 A schematic diagram of the structure of a medium-sized short Marshall test mold and a ring-shaped cap-shaped connector provided by the utility model for forming a specimen for a tensile test of an interlayer bonding of an asphalt mixture;
[0015] Figure 4 A diagram showing the use status of a mold for forming an asphalt mixture interlayer bonding pull-out test specimen provided by the utility model;
[0016] Figure 5 The utility model provides a schematic diagram of a test piece structure made by a mold for molding an asphalt mixture interlayer bonding pull test piece. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] The utility model aims to provide a mould for forming a specimen for a pull-out test of an interlayer bonding of an asphalt mixture, so as to solve the problems existing in the prior art.
[0019] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0020] Embodiment 1:
[0021] This embodiment provides a mold for forming an asphalt mixture interlayer bonding pull test specimen, such as Figure 1-3 As shown, it includes a dwarf large Marshall test mold 3, a dwarf small Marshall test mold 1 is arranged above the dwarf large Marshall test mold 3, the dwarf large Marshall test mold 3 is connected to the dwarf small Marshall test mold 1, and the two are connected by a ring-shaped cap-shaped connector 2.
[0022] Specifically, both ends of the short-type large Marshall test mold 3 and both ends of the short-type small Marshall test mold 1 are provided with steps, and the annular cap-shaped connecting piece 2 is matched with the step gap, so as to facilitate the assembly of the mold.
[0023] The utility model provides a mold for molding asphalt mixture interlayer bonding pull test specimens, and the mold can construct a "big Marshall-adhesive layer oil-small Marshall" specimen, such as Figure 4 and 5 As shown, the specimen adopts a step-by-step forming method, firstly, a tack coat is applied on the surface of the formed special large Marshall specimen, and then a small Marshall specimen is further formed on the surface coated with the tack coat. This forming method can effectively simulate the multi-layer structure of the actual asphalt pavement, and the specific steps include:
[0024] Step 1: Form a standard Marshall specimen, measure its height and mass, calculate density data, and then obtain the asphalt mixture mass required for the short-type large Marshall specimen 52 and the short-type small Marshall specimen 51;
[0025] Step 2: Take out the preheated short-type large Marshall test mold 3, short-type small Marshall test mold 1 and sleeve from the oven, wipe the sleeve, base and bottom surface of the hammer with engine oil, install the short-type large Marshall test mold 3 on the base, put a piece of oil paper, and weigh the mass required to form a short-type large Marshall test piece 52;
[0026] Step 3: Use a small shovel to shovel the mixture into the short-type large Marshall test mold 3, place the short-type large Marshall test mold 3 together with the base on the compaction table and fix it, cover the mixture with a piece of oil paper, put the compaction head equipped with a large compaction hammer and a guide rod into the short-type large Marshall test mold 3, turn on the motor, and let the large compaction hammer fall freely from a height of 457mm to reach the specified compaction times;
[0027] Step 4: Turn over the short large Marshall test mold 3 and compact the other side using the same method and number of times;
[0028] Step 5: After compaction is completed, use tweezers to remove the oil paper on the upper and lower sides of the specimen, remove the sleeve and base, and measure the height of the specimen. If the height does not meet the requirement of 47.6mm±10mm (i.e. half the height of the large Marshall specimen), the specimen should be discarded and the mass of the mixture should be adjusted. After cooling to room temperature, the formed short large Marshall specimen 52 should be removed;
[0029] Step 6: Connect the annular cap-shaped connector 2 and the short-type small Marshall test mold 1, place them on the large Marshall test piece 52 and fasten them tightly, and apply adhesive oil on the connection surface;
[0030] Step 7: Weigh the mass required for forming a short Marshall specimen 51, replace the large compacting hammer in step 3 with a standard compacting hammer, shovel the mixture into the short Marshall test mold 1 with a small shovel, place the short Marshall test mold 1 together with the base on the compacting table and fix it, cover the mixture with a piece of oil paper, put the compacting head equipped with the standard compacting hammer and the guide rod into the short Marshall test mold 1, turn on the motor, and let the standard compacting hammer fall freely from a height of 457 mm to reach the specified compaction times;
[0031] Step 8: After compaction is completed, immediately remove the paper on top, remove the sleeve and the base, and use a caliper to measure the height of the specimen. If the height does not meet the requirement of 79.4 mm ± 15 mm (i.e., the sum of half the height of the large Marshall specimen and half the height of the standard Marshall specimen), discard the specimen and adjust the mass of the mixture. After cooling to room temperature, obtain the molded specimen 5 and remove it for the pull-out test;
[0032] Step nine: Perform a pull-out test on the molded specimen 5 and evaluate the bonding performance between asphalt mixture layers based on the test results.
[0033] The utility model uses specific examples to illustrate the principle and implementation of the utility model. The above examples are only used to help understand the method and core idea of the utility model. At the same time, for those skilled in the art, according to the idea of the utility model, there will be changes in the specific implementation and application scope. In summary, the content of this specification should not be understood as limiting the utility model.
Claims
1. A mold for molding asphalt mixture interlayer bonding pull-out test specimens, Features: It comprises a dwarf large Marshall trial mold, a dwarf small Marshall trial mold is arranged above the dwarf large Marshall trial mold, the dwarf large Marshall trial mold is communicated with the dwarf small Marshall trial mold, and the two are connected by an annular cap-shaped connecting piece.
2. The mold for molding asphalt mixture interlayer adhesion pull-out test specimen according to claim 1, Features: Both ends of the short-type large Marshall test mold and both ends of the short-type small Marshall test mold are provided with steps, and the annular cap-shaped connecting piece is gap-matched with the steps.