By filling the backwater side of the gravity dam with anti-seepage clay material and setting up a stepped structure that reinforces the support wall, the problem of difficulty in reinforcing small and medium-sized gravity dams is solved, and the stability of the dam body is improved and leakage control is achieved.

CN221919266UActive Publication Date: 2024-10-29POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420218178.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-10-29
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

Due to the large number of cracks and large amounts of water leakage in small and medium-sized gravity dams, it is difficult to apply conventional grouting solutions to reinforce the dam body. In addition, the stability of the dam body is low, and design engineers are faced with the problem of reinforcement and reinforcement.

Method used

The backfill structure behind the dam is filled with anti-seepage clay material on the backwater side of the gravity dam, and a reinforced support wall is set up on the far side. Prefabricated blocks are used to form a stepped reinforced support wall, and blind drainage pipes and reinforcements are pre-embedded in the backfill structure. Reinforced geotechnical mats for improved stability.

Benefits of technology

Through this method, low-cost reinforcement and reinforcement of small and medium-sized gravity dams can be achieved, the stability of the dam body is improved, the construction is simple and the cost is low, and the occurrence of leakage is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919266U_ABST
    Figure CN221919266U_ABST
Patent Text Reader

Abstract

The utility model provides a gravity dam reinforcing structure which comprises a dam rear backfilling structure arranged on the backwater side of a gravity dam, the dam rear backfilling structure comprises anti-seepage clay materials filled on the backwater side of the gravity dam, and a reinforcing supporting wall is arranged on the side, away from the gravity dam, of the dam rear backfilling structure. The backfill structure behind the dam with the anti-seepage clay materials is filled on the backwater side of the gravity dam, the reinforcing supporting wall is arranged on the side, away from the gravity dam, of the backfill structure behind the dam, the small and medium-sized gravity dams are reinforced with low cost, and the stability of the dams is guaranteed; the reinforcing prefabricated blocks forming the reinforcing supporting wall are all prefabricated products, the structure is simple, and construction is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of civil engineering, in particular to a gravity dam reinforcement structure. Background Art

[0002] For gravity dams, due to the high water pressure, cracks often appear at the bottom of the dam, that is, the heel of the dam. If the cracks are long enough, these cracks may cause leakage. In serious cases, it will affect the normal operation of the dam and have an adverse impact on the economic and property safety of the people and even their lives. Therefore, it is necessary to reinforce the cracks in the dam body to prevent leakage from continuing. At present, the reinforcement of gravity dams usually adopts the grouting solution, but some small and medium-sized gravity dams have more cracks and a large amount of water leakage, which makes grouting more difficult and the stability of the dam body is relatively low. What kind of structure can be used to reinforce such gravity dams has become a major difficulty for design engineers. Utility Model Content

[0003] The purpose of the utility model is to overcome the deficiencies of the above-mentioned prior art and provide a gravity dam reinforcement structure, which can solve the problem that small and medium-sized gravity dams with many cracks and large amounts of seepage water are difficult to reinforce with conventional grouting schemes.

[0004] To this end, the utility model adopts the following technical solutions:

[0005] A gravity dam reinforcement structure comprises a dam backfill structure arranged on the backwater side of the gravity dam, wherein the dam backfill structure comprises an anti-seepage clay material filled on the backwater side of the gravity dam, and a reinforcement support wall is arranged on the side of the dam backfill structure away from the gravity dam.

[0006] On the basis of adopting the above technical solutions, the present invention can also adopt the following further technical solutions, or use these further technical solutions in combination:

[0007] A drainage blind pipe is pre-buried in the backfill structure behind the dam, the water inlet end of the drainage blind pipe faces the gravity dam, the water outlet end of the drainage blind pipe is connected to a drainage pipe, and the water outlet end of the drainage pipe extends through the interior of the reinforced support wall to communicate with the outside.

[0008] The reinforced supporting wall is composed of a plurality of reinforced prefabricated blocks which are stacked and laid in a stepped manner from bottom to top.

[0009] The reinforcing prefabricated blocks include a first reinforcing prefabricated block and a bottom reinforcing prefabricated block of the same size, the bottom reinforcing prefabricated block having a first inclined surface formed by cutting a right angle along two adjacent surfaces of a cuboid, the first reinforcing prefabricated block having a second inclined surface with the same inclination angle as the first inclined surface, the lower part of the first reinforcing prefabricated block close to the second inclined surface is cut inward at a right angle to form a splicing groove, the upper ends of the bottom reinforcing prefabricated block and the first reinforcing prefabricated block are both fitted with the splicing groove, the first inclined surface and a plurality of the second inclined surfaces are always parallel and together constitute the inclined wall surface of the reinforced support wall.

[0010] A drainage pipe is embedded in the lower part of the bottom reinforcement prefabricated block, and a drainage blind pipe with its water inlet facing the gravity dam is embedded in the backfill structure behind the dam. One end of the drainage pipe is connected to the water outlet of the drainage blind pipe, and the other end is connected to the outside.

[0011] The backfill structure behind the dam also includes foundation backfill material, and the foundation backfill material is filled between the anti-seepage clay material and the reinforced supporting wall.

[0012] A plurality of reinforced geomats are arranged in layers in the foundation backfill material.

[0013] The reinforced geomat is folded downward and anchored at one side close to the reinforced support wall.

[0014] The anti-seepage clay material on the backwater side of the gravity dam is filled in contact with the backwater side slope of the gravity dam, and the inclination angle of the filled anti-seepage clay material toward one side of the gravity dam is less than ninety degrees.

[0015] Compared with the prior art, the utility model has the following advantages and beneficial effects: by constructing a dam backfill structure with anti-seepage clay material on the backwater side of the gravity dam, and arranging a reinforced support wall on the side of the dam backfill structure away from the gravity dam, small and medium-sized gravity dams can be reinforced at a relatively low cost to ensure the stability of the dam; the reinforced prefabricated blocks constituting the reinforced support wall are all prefabricated products, with a simple structure and convenient construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the utility model.

[0017] Figure 2 It is a schematic diagram of the cross-sectional structure of the bottom reinforcement prefabricated block of the utility model.

[0018] Figure 3 It is a schematic diagram of the cross-sectional structure of the first reinforced prefabricated block of the utility model. DETAILED DESCRIPTION

[0019] In order to enable those skilled in the art to better understand the technical solution of the present utility model, the preferred implementation scheme of the present utility model is described below in conjunction with specific embodiments. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent elements with the same or similar functions. However, it should be understood that the accompanying drawings are only used for illustrative purposes and cannot be understood as limitations on the present utility model. In order to better illustrate the present embodiment, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the accompanying drawings may be omitted, and the positional relationship described in the accompanying drawings is only used for illustrative purposes and cannot be understood as limitations on the present utility model.

[0020] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0021] The utility model provides a gravity dam reinforcement structure, including a dam backfill structure 3 arranged on the backwater side of the gravity dam 1, the dam backfill structure 3 includes an anti-seepage clay material 31 filled on the backwater side of the gravity dam 1, and a reinforcement support wall is provided on the side of the dam backfill structure 3 away from the gravity dam 1.

[0022] A drainage blind pipe 4 is pre-buried in the backfill structure 3 behind the dam. The water inlet end of the drainage blind pipe 4 faces the gravity dam 1. The water outlet end of the drainage blind pipe 4 is connected to a drainage pipe 5. The water outlet end of the drainage pipe 5 extends through the inside of the reinforced support wall to connect to the outside.

[0023] The reinforced supporting wall is composed of a plurality of reinforced prefabricated blocks 6 which are stacked and laid in a stepped manner from bottom to top.

[0024] The reinforced prefabricated blocks 6 are all reinforced concrete structures.

[0025] The reinforcement prefabricated block 6 includes a first reinforcement prefabricated block 61 and a bottom reinforcement prefabricated block 62 of the same size. The bottom reinforcement prefabricated block 62 has a first inclined surface 621 formed by cutting a right angle along two adjacent surfaces of the cuboid. The first reinforcement prefabricated block 61 has a second inclined surface 611 with the same inclination angle as the first inclined surface 621. The lower part of the first reinforcement prefabricated block 61 close to the second inclined surface 611 is cut inward at a right angle to form a groove 612. The upper ends of the bottom reinforcement prefabricated block 62 and the first reinforcement prefabricated block 61 are both fitted with the groove 612. The first inclined surface 621 and several second inclined surfaces 611 are always parallel and together constitute the inclined wall surface of the reinforced support wall.

[0026] The bottom reinforcement prefabricated block 62 is located at the bottom layer, and a plurality of first reinforcement prefabricated blocks 61 are sequentially assembled on the top of the bottom reinforcement prefabricated block 62.

[0027] A drainage pipe 5 is embedded in the lower part of the bottom reinforcement prefabricated block 62, and a drainage blind pipe 4 with its water inlet facing the gravity dam 1 is embedded in the backfill structure 3 behind the dam. One end of the drainage pipe 5 is connected to the water outlet of the drainage blind pipe 4, and the other end is connected to the outside.

[0028] The backfill structure 3 behind the dam also includes foundation backfill material 32 , and the foundation backfill material 32 is filled between the anti-seepage clay material 31 and the reinforced supporting wall.

[0029] A plurality of reinforced geomats 2 are arranged in layers in the foundation backfill material 32 .

[0030] The side of the reinforced geomat 2 close to the reinforced supporting wall is folded downward and anchored.

[0031] During construction, the height of the backfill structure 3 behind the dam is gradually raised by filling upward from the bottom of the gravity dam 1. In this embodiment, two reinforced geomats 2 are provided on one side of each reinforced prefabricated block 6, and the drainage blind pipe 4 is pre-buried under the reinforced geomat 2.

[0032] The anti-seepage clay material 31 on the backwater side of the gravity dam 1 is filled in close contact with the backwater side slope of the gravity dam 1 , and the inclination angle of the filled anti-seepage clay material 31 toward one side of the gravity dam is less than ninety degrees.

[0033] According to the description and drawings of the utility model, those skilled in the art can easily manufacture or use a gravity dam reinforcement structure of the utility model, and can produce the positive effects recorded in the utility model.

[0034] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present utility model and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be an internal connection between two mechanisms, elements or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.

[0035] In the description of the present invention, it should be understood that the terms "one end", "the other end", "outside", "inside", "horizontal", "end", "length", "outer end", "left", "right" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the mechanism or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present invention. The terms "first" and "second" are also used only for the simplicity of description, and do not indicate or imply relative importance.

[0036] Furthermore, in practicing the claims of the present invention, those skilled in the art may understand and affect variations to the disclosed embodiments by studying the drawings, disclosure, and appended claims. In addition, in the claims and the specification, words such as "comprises", "comprising", etc. do not exclude other elements or steps, and non-plural nouns do not exclude their plural forms.

[0037] The above is only a preferred embodiment of the present invention and is not intended to limit the scope of implementation of the present invention. That is, all equivalent changes and modifications made according to the present invention are covered by the scope of the claims of the present invention and will not be listed one by one here.

Claims

1. A gravity dam reinforcement structure, wherein the interior of the gravity dam (1) has a plurality of cracks causing leakage, characterized in that: The invention comprises a backfill structure (3) arranged on the backwater side of a gravity dam (1), wherein the backfill structure (3) comprises an anti-seepage clay material (31) filled on the backwater side of the gravity dam (1), and a reinforced support wall is arranged on a side of the backfill structure (3) away from the gravity dam (1).

2. A gravity dam reinforcement structure as claimed in claim 1, characterized in that: A drainage blind pipe (4) is pre-buried in the backfill structure (3) behind the dam, the water inlet end of the drainage blind pipe (4) faces the gravity dam (1), the water outlet end of the drainage blind pipe (4) is connected to a drainage pipe (5), and the water outlet end of the drainage pipe (5) extends through the interior of the reinforced support wall to communicate with the outside.

3. A gravity dam reinforcement structure as claimed in claim 1, characterized in that: The reinforced supporting wall is composed of a plurality of reinforced prefabricated blocks (6) stacked and laid in a stepped manner from bottom to top.

4. A gravity dam reinforcement structure as claimed in claim 3, characterized in that: The reinforcing prefabricated block (6) comprises a first reinforcing prefabricated block (61) and a bottom reinforcing prefabricated block (62) of the same size; the bottom reinforcing prefabricated block (62) has a first inclined surface (621) formed by cutting off a right angle along two adjacent surfaces of a rectangular parallelepiped; the first reinforcing prefabricated block (61) has a second inclined surface (611) having the same inclination angle as the first inclined surface (621); a lower portion of the first reinforcing prefabricated block (611) close to the second inclined surface (611) is cut inward at a right angle to form a groove (612); the upper ends of the bottom reinforcing prefabricated block (62) and the first reinforcing prefabricated block (61) are both fitted into the groove (612); the first inclined surface (621) and a plurality of the second inclined surfaces (611) are always parallel and together constitute the inclined wall surface of the reinforced support wall.

5. A gravity dam reinforcement structure as claimed in claim 4, characterized in that: A drainage pipe (5) is pre-buried in the lower part of the bottom reinforcement prefabricated block (62); a drainage blind pipe (4) with its water inlet end facing the gravity dam (1) is pre-buried in the dam rear backfill structure (3); one end of the drainage pipe (5) is connected to the water outlet end of the drainage blind pipe (4), and the other end is connected to the outside.

6. A gravity dam reinforcement structure as claimed in claim 1, characterized in that: The backfill structure (3) behind the dam further comprises foundation backfill material (32), wherein the foundation backfill material (32) is filled between the anti-seepage clay material (31) and the reinforced support wall.

7. A gravity dam reinforcement structure as claimed in claim 6, characterized in that: A plurality of reinforced geomats (2) are arranged in layers within the foundation backfill material (32).

8. A gravity dam reinforcement structure as claimed in claim 7, characterized in that: The reinforced geomat (2) is folded downward and anchored on one side close to the reinforced support wall.

9. A gravity dam reinforcement structure as claimed in claim 1, characterized in that: The anti-seepage clay material (31) on the backwater side of the gravity dam (1) is filled in contact with the backwater side slope of the gravity dam (1), and the inclination angle of the filled anti-seepage clay material (31) toward one side of the gravity dam is less than ninety degrees.