Construction adit drainage arrangement structure of tailrace tunnel
By burying galvanized steel pipes in the sealing body of the tailrace tunnel construction branch to form a self-flowing drainage pipeline, the problem of water accumulation in the tailrace tunnel construction branch tunnel being unable to flow automatically is solved, reducing the cost and maintenance difficulty during the operation period, and achieving a simple and convenient construction process.
Patent Information
- Application Number
- CN202420339574.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The accumulated water in the tailrace tunnel construction branch cannot be drained by itself, resulting in high operating costs and difficult maintenance.
A construction branch tunnel drainage layout structure is designed. By burying galvanized steel pipes in the first blocking body and the tailrace tunnel, a gravity drainage pipe is formed, so that the accumulated water can be discharged to the end of the second construction branch tunnel on its own, canceling the original Some extraction equipment.
Artesian drainage at the end of the construction branch tunnel is realized, which reduces the cost and maintenance difficulty during the operation period. The overall structure is simple and construction is convenient.
Smart Images

Figure CN221919299U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water conservancy and hydropower engineering, and in particular to a drainage arrangement structure for a construction branch tunnel of a tailwater tunnel. Background Art
[0002] The construction of tailwater tunnels for hydropower projects generally requires one or several construction branch tunnels. After the construction of the tailwater tunnel is completed, the construction branch tunnels used for the construction of the tailwater tunnel need to be partially blocked so that the tailwater tunnel can operate normally. However, most of the construction branch tunnels have high openings and are excavated in a slope-down manner to the tailwater tunnel. Therefore, the accumulated water at the end of the sealing body of the tailwater tunnel construction branch tunnel cannot be drained by gravity and needs to be pumped out. Such a drainage solution will increase the cost during the operation period and is difficult to maintain. Utility Model Content
[0003] An embodiment of the present application provides a drainage arrangement structure for a construction branch tunnel of a tailwater tunnel. The drainage arrangement structure for the construction branch tunnel can convert the accumulated water at the end of the sealing body of the tailwater tunnel construction branch tunnel into gravity drainage, thereby greatly reducing the operating cost during the operation period and reducing the difficulty of maintenance.
[0004] The tailwater tunnel construction branch tunnel drainage arrangement structure provided in the embodiment of the present application comprises: at least one first construction branch tunnel, the first construction branch tunnel being connected to the tailwater tunnel, a first plugging body being provided at one end of the first construction branch tunnel close to the tailwater tunnel, the first plugging body extending into the first construction branch tunnel to a preset depth;
[0005] At least one second branch construction tunnel, the second branch construction tunnel is connected to the tailwater tunnel, and the height of the second branch construction tunnel in the gravity direction is lower than that of the first branch construction tunnel, and a second plugging body is provided at one end of the second branch construction tunnel close to the tailwater tunnel, and the second plugging body extends into the second branch construction tunnel to a preset depth;
[0006] A drainage pipe, wherein the drainage pipe extends along the inner wall direction of the tailwater tunnel, one end of the drainage pipe is close to the end of the first sealing body, and the other end of the drainage pipe is close to the end of the second sealing body. The drainage pipe has a drainage state. In the drainage state, water at the end of the first sealing body is discharged by gravity through the drainage pipe to the end of the second construction branch tunnel.
[0007] In addition, the construction branch hole drainage arrangement structure provided in the embodiment of the present application may also have the following additional technical features:
[0008] In an optional scheme, the construction branch tunnel drainage arrangement structure also includes a grit tank and a water collecting tank. The grit tank is located at the end of the first sealing body, and the water collecting tank is connected to the grit tank. The accumulated water gathered at the end of the first sealing body flows into the water collecting tank after sedimentation in the grit tank. The drainage pipe is connected to the water collecting tank at one end close to the first sealing body.
[0009] In an optional solution, the first construction branch tunnel includes a first opening, the first opening is located on a side of the first construction branch tunnel away from the tailwater tunnel, and the height of the first opening in the gravity direction is higher than the body of the first construction branch tunnel;
[0010] The second construction branch tunnel includes a second opening, which is located on a side of the second construction branch tunnel away from the tailwater tunnel, and a height of the second opening in the gravity direction is lower than a tunnel body of the second construction branch tunnel.
[0011] In an optional solution, the drainage pipe includes a plurality of galvanized steel pipes, and two adjacent galvanized steel pipes are connected by welding. The model of the galvanized steel pipe is DN100.
[0012] In an optional scheme, after welding, the plurality of galvanized steel pipes can remain leak-free for 8 hours under a static water pressure of 0.7 MPa, and for 30 minutes under a dynamic water pressure of 1.25 times of 0.875 MPa, and for 10 minutes under a dynamic water pressure of 1.5 times of 1.05 MPa.
[0013] The beneficial effects of the embodiments of the present application are:
[0014] The construction branch tunnel drainage arrangement structure in the embodiment of the present application eliminates the original pumping and drainage equipment of the first construction branch tunnel and replaces it with galvanized steel pipes buried in the first sealing body, the tailwater tunnel and the second sealing body, so that the accumulated water at the end of the first construction branch tunnel has the conditions for self-drainage, reducing the technical difficulty and the cost during the operation period. Its overall structure is simple and the construction is convenient.
[0015] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A schematic diagram of the plan layout of the construction branch hole drainage arrangement structure provided for this application;
[0017] Figure 2 A schematic diagram of the arrangement structure of the first blocking body provided in this application;
[0018] Figure 3 This is a schematic diagram of the arrangement structure of the second blocking body provided in this application.
[0019] Figure numerals: first construction branch tunnel 1, first tunnel opening 11, tailwater tunnel 2, first blocking body 3, second construction branch tunnel 4, second tunnel opening 41, second blocking body 5, drainage pipe 6, sand settling tank 7, water collection tank 8.
[0020] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION
[0021] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0022] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0023] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0024] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0025] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.
[0026] like Figure 1-3As shown, the embodiment of the present application provides a drainage arrangement structure for a construction branch tunnel of a tailwater tunnel, which can change the accumulated water at the end of the sealing body of the construction branch tunnel of the tailwater tunnel from pumping to gravity drainage, and specifically includes at least one first construction branch tunnel 1, at least one second construction branch tunnel 4 and a drainage pipe 6, the first construction branch tunnel 1 is connected to the tailwater tunnel 2, and a first sealing body 3 is provided at one end of the first construction branch tunnel 1 close to the tailwater tunnel 2, and the first sealing body 3 extends into the first construction branch tunnel 1 to a preset depth; the second construction branch tunnel 4 is connected to the tailwater tunnel 2, Moreover, the height of the second construction branch tunnel 4 in the gravity direction is lower than that of the first construction branch tunnel 1. A second sealing body 5 is provided at one end of the second construction branch tunnel 4 close to the tailwater tunnel 2, and the second sealing body 5 extends to a preset depth into the second construction branch tunnel 4; a drainage pipe 6 extends along the inner wall direction of the tailwater tunnel 2, one end of the drainage pipe 6 is close to the end of the first sealing body 3, and the other end of the drainage pipe 6 is close to the end of the second sealing body 5. The drainage pipe 6 is in a drainage state. In the drainage state, the water at the end of the first sealing body 3 is discharged to the end of the second construction branch tunnel 4 by gravity through the drainage pipe 6.
[0027] In this embodiment, the first plugging body 3 and the second plugging body 5 can respectively partially plug the first construction branch tunnel 1 and the second construction branch tunnel 4 so that the tailwater tunnel 2 can operate normally. The plugging depth can be adjusted according to the local environment, etc., so this article does not make specific restrictions. The drainage arrangement structure of the construction branch tunnel cancels the original pumping and drainage equipment of the first construction branch tunnel 1 and replaces it with a drainage pipe 6 buried in the first plugging body 3, the tailwater tunnel 2 and the second plugging body 5, so that the accumulated water at the end of the first construction branch tunnel 1 has the conditions for self-drainage, reducing the technical difficulty and the cost of the operation period. Its overall structure is simple and the construction is convenient.
[0028] like Figure 1-2 As shown, in a specific embodiment, the drainage arrangement structure of the construction branch tunnel also includes a grit chamber 7 and a water collecting tank 8. The grit chamber 7 is located at the end of the first blocking body 3, and the water collecting tank 8 is connected to the grit chamber 7. The accumulated water at the end of the first blocking body 3 flows into the water collecting tank 8 after being precipitated in the grit chamber 7, and the end of the drainage pipe 6 close to the first blocking body 3 is connected to the water collecting tank 8. In the process that the accumulated water at the end of the first blocking body 3 flows into the water collecting tank 8 after being precipitated in the grit chamber 7, the grit chamber 7 can precipitate the silt and impurities in the accumulated water, and then the water flows into the water collecting tank 8, and finally is discharged through the drainage pipe 6.
[0029] like Figure 1-3As shown, in a specific embodiment, the first construction branch tunnel 1 includes a first opening 11, which is located on a side of the first construction branch tunnel 1 away from the tailwater tunnel 2, and the height of the first opening 11 in the gravity direction is higher than the tunnel body of the first construction branch tunnel 1; the second construction branch tunnel 4 includes a second opening 41, which is located on a side of the second construction branch tunnel 4 away from the tailwater tunnel 2, and the height of the second opening 41 in the gravity direction is lower than the tunnel body of the second construction branch tunnel 4.
[0030] When constructing the construction branch tunnel of the tailwater tunnel 2, the construction can be carried out according to the tunnel layout in this embodiment. Since the height of the first hole opening 11 in the gravity direction is higher than the hole body of the first construction branch tunnel 1, it is convenient for the accumulated water to be better gathered near the end of the first blocking body 3, and then flow into the water collection tank 8 and the sand settling tank 7. The height of the second hole opening 41 in the gravity direction is lower than the hole body of the second construction branch tunnel 4, which can facilitate the collection and discharge of water flowing into the second blocking body 5 and the first blocking body 3, forming a better self-flowing drainage effect.
[0031] In addition, in a specific embodiment, the drainage pipe 6 includes a plurality of galvanized steel pipes, and two adjacent galvanized steel pipes are connected by welding, and the model of the galvanized steel pipe is DN100. After welding, the plurality of galvanized steel pipes can maintain no leakage for 8 hours under a static water pressure of 0.7 MPa, and can maintain no leakage for 30 minutes under a dynamic water pressure of 1.25 times of 0.875 MPa, and can maintain no leakage for 10 minutes under a dynamic water pressure of 1.5 times of 1.05 MPa.
[0032] Specifically, a pressure test should be carried out after the galvanized steel pipe is welded and before concrete construction. The pressure test includes: (1) test pressure 0.7MPa (static water pressure), maintain 8 hours without leakage; (2) test pressure 0.875MPa (1.25 times dynamic water pressure), maintain 30 minutes without leakage; (3) test pressure 1.05MPa (1.5 times dynamic water pressure), maintain 10 minutes without leakage. The pressure test can ensure the sealing and welding strength of the welding of each galvanized steel pipe connection, thereby ensuring the service life of the galvanized steel pipe after welding and avoiding water leakage at the welding point of the galvanized steel pipe.
[0033] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A drainage arrangement structure for a construction branch tunnel of a tailwater tunnel, characterized in that: include: At least one first construction branch tunnel, the first construction branch tunnel being connected to the tailwater tunnel, a first plugging body being provided at one end of the first construction branch tunnel close to the tailwater tunnel, the first plugging body extending into the first construction branch tunnel to a preset depth; At least one second branch construction tunnel, the second branch construction tunnel is connected to the tailwater tunnel, and the height of the second branch construction tunnel in the gravity direction is lower than that of the first branch construction tunnel, and a second plugging body is provided at one end of the second branch construction tunnel close to the tailwater tunnel, and the second plugging body extends into the second branch construction tunnel to a preset depth; A drainage pipe, wherein the drainage pipe extends along the inner wall direction of the tailwater tunnel, one end of the drainage pipe is close to the end of the first sealing body, and the other end of the drainage pipe is close to the end of the second sealing body. The drainage pipe has a drainage state. In the drainage state, water at the end of the first sealing body is discharged by gravity through the drainage pipe to the end of the second construction branch tunnel.
2. The tailwater tunnel construction branch tunnel drainage arrangement structure according to claim 1, characterized in that: It also includes a grit chamber and a water collection tank. The grit chamber is located at the end of the first blocking body. The water collection tank is connected to the grit chamber. The accumulated water gathered at the end of the first blocking body flows into the water collection tank after being precipitated in the grit chamber. The drainage pipe is connected to the water collection tank at one end close to the first blocking body.
3. The tailwater tunnel construction branch tunnel drainage arrangement structure according to claim 1 or 2, characterized in that: The first construction branch tunnel comprises a first opening, the first opening is located on a side of the first construction branch tunnel away from the tailwater tunnel, and the height of the first opening in the gravity direction is higher than the body of the first construction branch tunnel; The second construction branch tunnel includes a second opening, which is located on a side of the second construction branch tunnel away from the tailwater tunnel, and a height of the second opening in the gravity direction is lower than a tunnel body of the second construction branch tunnel.
4. The tailwater tunnel construction branch tunnel drainage arrangement structure according to claim 3, characterized in that: The drainage pipe includes a plurality of galvanized steel pipes, and two adjacent galvanized steel pipes are connected by welding. The model of the galvanized steel pipe is DN100.
5. The tailwater tunnel construction branch tunnel drainage arrangement structure according to claim 4, characterized in that: After welding, the plurality of galvanized steel pipes can remain leak-free for 8 hours under a static water pressure of 0.7 MPa, for 30 minutes under a dynamic water pressure of 1.25 times of 0.875 MPa, and for 10 minutes under a dynamic water pressure of 1.5 times of 1.05 MPa.