Basement top plate construction joint waterproof structure
By installing waterproof rubber sheets and water sump at the construction joints of the basement roof, combined with multiple joints and adjustable drainage pipes, the problems of poor anti-seepage effect and poor drainage are solved, and better waterproofing and drainage effects are achieved.
Patent Information
- Application Number
- CN202420116628.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-17
AI Technical Summary
The waterproof structure of the existing basement roof construction joints has poor anti-seepage effect and cannot drain seepage water quickly, resulting in poor drainage effect.
Use waterproof rubber sheets to wrap the sides of the roof and pour them in succession, and set up U-shaped water collection tanks under the construction joints. Multiple joints and drainage pipes are used to achieve simultaneous drainage in multiple places, and the direction of the drainage pipes can be adjusted to connect to the drainage pipe network.
The anti-seepage effect and drainage efficiency are improved, ensuring that water does not penetrate into the concrete, and the drainage effect is improved through multiple drainage pipes.
Smart Images

Figure CN221919536U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of waterproofing of construction joints of basement top plates, and in particular to a waterproofing structure of construction joints of basement top plates. Background Art
[0002] During the pouring process of the basement top slab, it needs to be poured in sections. A construction joint is formed between the first poured top slab and the later poured top slab. Water seepage is prone to occur at the construction joint. In order to avoid damage to the building caused by water seepage at the construction joint and affect the use of the basement, the construction joint needs to be waterproofed.
[0003] A Chinese patent with announcement number CN218060790U discloses a waterproof structure for a construction joint of a basement roof, comprising a waterproof rubber sheet arranged below the construction joint, one side of the waterproof rubber sheet being fixedly connected to the bottom of the first cast roof, and the other side of the waterproof rubber sheet being fixedly connected to the bottom of the later cast roof, and a water storage ditch with an opening facing upward is provided at a position above and below the waterproof rubber sheet and the construction joint, and the water storage ditch is arranged along the length direction of the construction joint; water leaking from the construction joint will be collected in the water storage ditch, and a drainage pipe is provided in the water storage ditch, one end of the drainage pipe is connected to the bottom of the water storage ditch, and the other end of the drainage pipe is connected to the drainage system, so that the water collected in the water storage ditch is discharged into the drainage system; therefore, in the waterproof structure for the construction joint of the basement roof of the utility model, water leaking from the construction joint will not drip below the construction joint, thereby ensuring the normal use of the basement.
[0004] When water penetrates into the construction joint of the above-mentioned basement top slab construction joint waterproof structure, water will penetrate from the sides of the first cast top slab and the later cast top slab and seep downward, thereby affecting the strength of the concrete and having poor anti-seepage effect. At the same time, the seeping water is collected by the water storage ditch and then drained only through the drainage pipe set in the water storage ditch. If this drainage method only uses one drainage pipe for drainage, it cannot achieve the rapid drainage of the collected seepage water, and the drainage effect is poor. Utility Model Content
[0005] In order to solve the above-mentioned problems that the waterproof structure of the construction joint of the basement roof is not good in anti-seepage effect and cannot quickly drain the collected seepage water, and the drainage effect is poor, the present application provides a waterproof structure of the construction joint of the basement roof.
[0006] The present application provides a basement roof construction joint waterproof structure that adopts the following technical solutions:
[0007] A basement roof construction joint waterproofing structure comprises a first cast roof and a second cast roof, a construction joint is formed between the first cast roof and the second cast roof, and the first cast roof and the second cast roof are wrapped with waterproof rubber sheets on one side facing the construction joint, a sealing strip for filling the gap is plugged in the gap between the left and right waterproof rubber sheets, and a pressure-bearing plate is laid on the upper side of the sealing strip, a U-shaped water collecting trough is provided on the lower side of the construction joint of the first cast roof and the second cast roof, and the left and right sides of the water collecting trough are respectively fixedly connected to the first cast roof and the second cast roof by two expansion screws, a plurality of evenly arranged joints are threadedly installed on the lower surface of the water collecting trough, and a drainage pipe whose drainage direction can be rotated and adjusted is connected to the lower end of the joint.
[0008] By adopting the above technical scheme, the waterproof rubber sheet is set to wrap the side of the first cast top plate and the later cast top plate facing the construction joint to prevent water from penetrating from the side and affecting the strength of the concrete, which has a better anti-seepage effect. At the same time, multiple joints and drain pipes installed on the lower surface of the sump can achieve simultaneous drainage at multiple locations, greatly improving the drainage efficiency, and the drainage pipe with rotatable and adjustable drainage direction can be better connected to the nearby drainage network, thereby better improving the drainage effect.
[0009] Optionally, the sealing strip includes a horizontally arranged rib, a plug plate is fixed vertically downward at the center of the lower surface of the rib, and a plurality of support strips evenly arranged from top to bottom are fixed to the left and right sides of the plug plate.
[0010] By adopting the above technical solution, the sealing strip seals the upper end of the gap between the waterproof rubber plates on both sides through the retaining edge, and fills the gap through the plug plate and the support strip to achieve sealing and waterproofing.
[0011] Optionally, the waterproof rubber sheet is fixed with multiple embedded edges evenly arranged from top to bottom on one side facing the first cast top plate or the later cast top plate, and the waterproof rubber sheet is fixed with edging on both the upper and lower ends facing the first cast top plate or the later cast top plate.
[0012] By adopting the above technical solution, the waterproof rubber sheet is fixed in the first cast top plate or the later cast top plate by pre-embedded edges so as to be fixedly embedded.
[0013] Optionally, a water retaining edge extending downward is fixed to the lower surface of the lower side edging, and the water retaining edge is tightly matched with the inner wall of the water collecting trough.
[0014] By adopting the above technical solution, the edge is sealed with the inner wall of the water collecting trough to prevent the collected water from leaking outward.
[0015] Optionally, mounting plates are fixed on both left and right sides of the water collecting tank, and threaded holes are provided on the inner bottom surface of the water collecting tank.
[0016] By adopting the above technical solution, the water collecting tank can be conveniently installed and fixed to the joint through the threaded holes at the bottom.
[0017] Optionally, a threaded head is fixed at the upper end of the joint, and a sealing ring is mounted on the outer side of the threaded head near the lower end, a retaining ring is fixed on the outer side of the joint near the threaded head, and a threaded sleeve is mounted on the lower end of the joint, and a hanging ring is fixed at the lower end of the joint to block and limit the threaded sleeve.
[0018] By adopting the above technical solution, the joint is installed and fixed on the water collection tank through the threaded head, and is used for installing the drainage pipe through the hanging ring and the threaded sleeve.
[0019] Optionally, a connecting sleeve for fitting the hanging ring is fixed to the upper end of the drain pipe, a rubber gasket is installed at the inner bottom of the connecting sleeve, and an external thread is provided on the outer side of the connecting sleeve.
[0020] By adopting the above technical solution, the drain pipe is mounted on the hanging ring through the connecting sleeve and is sealed by the provided rubber gasket, thereby achieving a rotatable connection between the drain pipe and the joint.
[0021] In summary, this application includes the following beneficial technical effects:
[0022] By setting up a waterproof rubber sheet, the first cast top plate and the second cast top plate facing the construction joint are wrapped to prevent water from penetrating from the side and affecting the strength of the concrete, which has a better anti-seepage effect. At the same time, multiple joints and drain pipes installed on the lower surface of the sump can achieve simultaneous drainage at multiple locations, greatly improving the drainage efficiency. The drainage pipe with rotatable and adjustable drainage direction can be better connected to the nearby drainage network, thereby better improving the drainage effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure in an embodiment of the present application;
[0024] Figure 2 is a schematic diagram of a sealing strip in an embodiment of the present application;
[0025] Figure 3 It is a schematic diagram of a waterproof rubber sheet in an embodiment of the present application;
[0026] Figure 4 is a schematic diagram of a water collection tank in an embodiment of the present application;
[0027] Figure 5 is a schematic diagram of a joint in an embodiment of the present application;
[0028] Figure 6 It is a schematic diagram of a drain pipe in an embodiment of the present application.
[0029] Explanation of the reference numerals in the accompanying drawings: 1. Cast the top plate first; 2. Pressure plate; 3. Sealing strip; 31. Retaining edge; 32. Plug plate; 33. Support strip; 4. Waterproof rubber sheet; 41. Edge wrapping; 42. Embedded edge; 43. Water retaining edge; 5. Cast the top plate later; 6. Drain pipe; 61. External thread; 62. Rubber gasket; 63. Connecting sleeve; 7. Connector; 71. Threaded head; 72. Sealing ring; 73. Retaining ring; 74. Threaded sleeve; 75. Hanging ring; 8. Sump; 81. Mounting plate; 82. Threaded hole; 9. Expansion screw. DETAILED DESCRIPTION
[0030] The present application is further described in detail below in conjunction with the accompanying drawings.
[0031] The present application embodiment discloses a waterproof structure for construction joints of basement roof. Figure 1 , including a first cast top plate 1 and a second cast top plate 5, a construction joint is formed between the first cast top plate 1 and the second cast top plate 5, and the first cast top plate 1 and the second cast top plate 5 are wrapped with a waterproof rubber sheet 4 on one side facing the construction joint. The first cast top plate 1 and the second cast top plate 5 are wrapped with the waterproof rubber sheet 4 on one side facing the construction joint, thereby preventing water from penetrating from the side to affect the strength of the concrete, and having a better anti-seepage effect.
[0032] At the same time, a sealing strip 3 is installed in the gap between the left and right waterproof rubber sheets 4 to fill the gap, and a pressure plate 2 is laid on the upper side of the sealing strip 3. A U-shaped water collection trough 8 is provided on the lower side of the construction joint of the first cast top plate 1 and the later cast top plate 5, and the left and right sides of the water collection trough 8 are fixedly connected to the first cast top plate 1 and the later cast top plate 5 respectively by two expansion screws 9.
[0033] In addition, a plurality of evenly arranged joints 7 are threadedly installed on the lower surface of the sump 8, and a drain pipe 6 whose drainage direction can be rotatably adjusted is connected to the lower end of the joint 7. The plurality of joints 7 and drain pipe 6 installed on the lower surface of the sump 8 can achieve simultaneous drainage at multiple locations, greatly improving the drainage efficiency, and the drain pipe 6 whose drainage direction can be rotatably adjusted can be better connected to the nearby drainage network, thereby better improving the drainage effect.
[0034] Reference Figure 2 The sealing strip 3 includes a horizontally arranged rib 31, a plug plate 32 pointing vertically downward is fixed to the center of the lower surface of the rib 31, and a plurality of support strips 33 evenly arranged from top to bottom are fixed to the left and right sides of the plug plate 32. The support strips 33 can be elastically pressed against the inner wall of the gap when the plug plate 32 is inserted into the gap between the waterproof rubber plates 4 on both sides, thereby improving the sealing effect. The sealing strip 3 blocks the upper end of the gap between the waterproof rubber plates 4 on both sides through the rib 31, and fills the gap through the plug plate 32 and the support strips 33, thereby achieving sealing and waterproofing.
[0035] Reference Figure 3 A plurality of pre-embedded edges 42 evenly arranged from top to bottom are fixed to the side of the waterproof rubber sheet 4 facing the first cast top plate 1 or the later cast top plate 5. The waterproof rubber sheet 4 is pre-embedded and fixed in the first cast top plate 1 or the later cast top plate 5 through the pre-embedded edges 42 so as to be fixedly buried. The upper and lower ends of the waterproof rubber sheet 4 facing the first cast top plate 1 or the later cast top plate 5 are fixed with edging 41. The edging 41 better wraps the side of the first cast top plate 1 or the later cast top plate 5. A water retaining edge 43 extending downward is fixed to the lower surface of the lower side edging 41, and the water retaining edge 43 is tightly fitted with the inner side wall of the water collecting trough 8. The edging 41 is sealed with the inner side wall of the water collecting trough 8 to prevent the collected water from leaking outward, and also positions the water collecting trough 8 during installation.
[0036] Reference Figure 4 The left and right sides of the water collecting tank 8 are fixed with mounting plates 81, and the inner bottom surface of the water collecting tank 8 is provided with threaded holes 82. The water collecting tank 8 is convenient for installing and fixing the joint 7 through the threaded holes 82 at the bottom. At the same time, the joint 7 can also be installed at the threaded holes 82 at the corresponding positions according to the actual drainage path. Other unused threaded holes 82 are blocked with nylon waterproof plugs, which are more flexible to use.
[0037] Reference Figure 5 A threaded head 71 is fixed to the upper end of the joint 7, and the joint 7 is installed and fixed on the water collecting tank 8 through the threaded head 71. A sealing ring 72 is sleeved on the outer side of the threaded head 71 near the lower end for sealing when connected to the water collecting tank 8. A retaining ring 73 is fixed on the outer side of the joint 7 near the threaded head 71, and a threaded sleeve 74 is sleeved on the lower end of the joint 7. A hanging ring 75 is fixed to the lower end of the joint 7 to block and limit the threaded sleeve 74, so that the threaded sleeve 74 can be rotated on the joint 7 without falling off, and the hanging ring 75 and the threaded sleeve 74 are used to install the drain pipe 6.
[0038] Reference Figure 6 A connecting sleeve 63 for fitting the hanging ring 75 is fixed to the upper end of the drain pipe 6, and a rubber gasket 62 is installed on the inner bottom of the connecting sleeve 63. The drain pipe 6 is fitted on the hanging ring 75 through the connecting sleeve 63 and sealed by the rubber gasket 62 to achieve a rotatable connection between the drain pipe 6 and the joint 7. An external thread 61 is provided on the outer side of the connecting sleeve 63, and the connecting sleeve 63 is threadedly connected to the threaded sleeve 74 through the external thread 61.
[0039] The implementation principle of the basement roof construction joint waterproof structure of the embodiment of the present application is: the waterproof rubber sheet 4 is used to wrap the first cast roof 1 and the second cast roof 5 facing the construction joint. When water enters the construction joint, the water will flow downward along the construction joint and will not penetrate into the first cast roof 1 and the second cast roof 5 from the side.
[0040] In addition, when sealing and waterproofing, the plug plate 32 of the sealing strip 3 is inserted into the gap to fill it so as to prevent water from flowing downward from the gap;
[0041] In addition, when water seepage occurs in the gap, the water collecting trough 8 collects the seeping water and discharges it to the drainage network through the joint 7 and the drainage pipe 6, thereby completing the waterproof protection.
[0042] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A basement roof construction joint waterproof structure, comprising a first cast roof (1) and a second cast roof (5), characterized in that: A construction joint is formed between the first cast top plate (1) and the second cast top plate (5), and the first cast top plate (1) and the second cast top plate (5) are wrapped with waterproof rubber sheets (4) on one side facing the construction joint. A sealing strip (3) for filling the gap is inserted in the gap between the left and right waterproof rubber sheets (4), and a pressure bearing plate (2) is laid on the upper side of the sealing strip (3). A U-shaped water collecting trough (8) is arranged on the lower side of the construction joint of the first cast top plate (1) and the second cast top plate (5), and the left and right sides of the water collecting trough (8) are respectively fixedly connected to the first cast top plate (1) and the second cast top plate (5) by two expansion screws (9). A plurality of evenly arranged joints (7) are threadedly installed on the lower surface of the water collecting trough (8), and a drainage pipe (6) capable of rotationally adjusting the drainage direction is connected to the lower end of the joint (7).
2. A basement roof construction joint waterproof structure according to claim 1, characterized in that: The sealing strip (3) comprises a horizontally arranged retaining edge (31), a plug plate (32) vertically downwards is fixed at the centre of the lower surface of the retaining edge (31), and a plurality of support strips (33) evenly arranged from top to bottom are fixed to the left and right side surfaces of the plug plate (32).
3. A basement roof construction joint waterproof structure according to claim 1, characterized in that: A plurality of pre-embedded edges (42) evenly arranged from top to bottom are fixed to the side of the waterproof rubber sheet (4) facing the first cast top plate (1) or the second cast top plate (5), and edging (41) is fixed to both upper and lower ends of the side of the waterproof rubber sheet (4) facing the first cast top plate (1) or the second cast top plate (5).
4. A basement roof construction joint waterproof structure according to claim 3, characterized in that: A water retaining edge (43) extending downward is fixed to the lower surface of the edge wrapping (41) located at the lower side, and the water retaining edge (43) is tightly fitted with the inner side wall of the water collecting trough (8).
5. A basement roof construction joint waterproof structure according to claim 1, characterized in that: Mounting plates (81) are fixed to both left and right sides of the water collecting trough (8), and a threaded hole (82) is provided on the inner bottom surface of the water collecting trough (8).
6. A basement roof construction joint waterproof structure according to claim 5, characterized in that: A threaded head (71) is fixed to the upper end of the joint (7), and a sealing ring (72) is sleeved on the outer side of the threaded head (71) near the lower end; a retaining ring (73) is fixed on the outer side of the joint (7) near the threaded head (71), and a threaded sleeve (74) is sleeved on the lower end of the joint (7); and a hanging ring (75) is fixed at the lower end of the joint (7) for blocking and limiting the threaded sleeve (74).
7. A basement roof construction joint waterproof structure according to claim 6, characterized in that: A connecting sleeve (63) for fitting the hanging ring (75) is fixed to the upper end of the drainage pipe (6), a rubber gasket (62) is installed on the inner bottom of the connecting sleeve (63), and an external thread (61) is formed on the outer side of the connecting sleeve (63).
Citation Information
Cited By
Pile foundation structure
CN120537271A