Roadbed settlement monitoring device
By installing a subgrade settlement monitoring device with settlement components and a laser rangefinder on the subgrade, it can monitor the subgrade settlement in real time and provide automatic early warning, solving the problems of time-consuming manual monitoring and traffic obstruction, and achieving efficient and safe subgrade settlement monitoring.
Patent Information
- Application Number
- CN202420313116.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-20
AI Technical Summary
The existing roadbed settlement monitoring method requires manual regular observation, consumes a lot of manpower, may block traffic during the monitoring process of busy urban roads, and poses personal safety risks.
Design a roadbed settlement monitoring device that uses settlement parts and laser rangefinders to measure the roadbed settlement in real time, and automatically monitors and warns through data acquisition units and early warning devices to avoid manual regular observations and ensure smooth traffic and safety.
It realizes roadbed settlement monitoring without manual regular observation, saves manpower, improves efficiency, avoids traffic accidents, reduces safety risks for inspection personnel, and does not block traffic.
Smart Images

Figure CN221919558U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of roadbed settlement monitoring, and in particular to a roadbed settlement monitoring device. Background Art
[0002] In order to ease the pressure of ground traffic, urban underground space is constantly being developed and utilized, and underground crossing projects are becoming more and more frequent. The disturbance caused by underground crossing projects to existing roads during construction will induce deformation or even collapse of existing roads, leading to traffic accidents.
[0003] In order to avoid traffic accidents, the roadbed settlement is generally monitored to obtain the roadbed settlement deformation information of underground crossing projects during construction, and to provide accurate assessment data for the safety of existing roads. At present, the common roadbed settlement monitoring is to manually use a level to observe the settlement of observation points regularly. This monitoring method consumes a lot of manpower. On the other hand, in the process of monitoring busy roads in cities, it not only blocks traffic, but also puts the personal safety risks of observers at high risk during the operation. Utility Model Content
[0004] Based on this, it is necessary to provide a roadbed settlement monitoring device that can monitor the roadbed settlement without the need for manual regular settlement observations at observation points, thus saving manpower and not blocking traffic.
[0005] A roadbed settlement monitoring device is provided, wherein a roadbed is provided with holes, and the roadbed includes a roadbed layer. The roadbed settlement monitoring device includes:
[0006] a sinker, the sinker being disposed in the hole and connected to the roadbed, the sinker comprising a measured portion; and
[0007] A distance measuring member is arranged opposite to and at a distance from the measured part, and is used to measure the distance between the distance measuring member and the measured part.
[0008] In one embodiment, the distance measuring device is a laser distance meter, and the laser distance meter includes a transmitting end for emitting laser light and a receiving end for receiving the laser light, and the transmitting end is opposite to the measured part and is spaced apart from the measured part.
[0009] In one of the embodiments, a reflective layer is provided on a side of the measured portion facing the distance measuring element.
[0010] In one of the embodiments, the roadbed settlement monitoring device further includes a data acquisition unit and an early warning device, and the data acquisition unit is electrically connected to the distance measuring device and the early warning device.
[0011] In one embodiment, the roadbed also includes a hardened layer, which is located above the road base layer; the hardened layer is provided with a receiving groove, the data acquisition unit is arranged in the receiving groove, the notch of the receiving groove is provided with a protective cover, and the early warning device is arranged on the outer surface of the protective cover.
[0012] In one of the embodiments, a connecting hole is provided at the bottom of the accommodating groove, and the accommodating groove is connected with the hole through the connecting hole; the distance measuring component is installed on the side of the data acquisition unit facing the sinker, and the distance measuring component is arranged in the hole through the connecting hole.
[0013] In one embodiment, the protective cover is transparent; the roadbed settlement monitoring device also includes a solar panel, which is installed on one side of the protective cover located in the receiving groove, and the solar panel is electrically connected to the distance measuring device, the data acquisition unit and the early warning device.
[0014] In one embodiment, the sinker is a sinker nail, which includes a nail body and a top cap. The nail body extends along the height direction of the hole, the top cap is arranged on the top of the nail body, and the measured part is arranged on the side of the top cap away from the nail body.
[0015] In one of the embodiments, the roadbed further includes a concrete layer, which is disposed at the bottom of the hole, and the concrete layer connects the sinker to the roadbed layer.
[0016] In one embodiment, a sleeve is provided in the hole, the measured part is provided in the sleeve, the sleeve is provided between the concrete layer and the bottom of the receiving groove, one end of the sleeve abuts against the concrete layer, and the other end of the sleeve abuts against the bottom of the receiving groove.
[0017] When the above-mentioned roadbed settlement monitoring device is in use, the distance measuring component measures the distance between it and the measured part in real time. If the roadbed sinks, the settlement component connected to the roadbed will also sink, so that the distance between the measured part and the distance measuring component gradually increases. If the distance between the distance measuring component and the measured part is greater than the preset value, it means that the roadbed is seriously deformed and may even be at risk of collapse. By monitoring the roadbed settlement, construction personnel can deal with it in time to avoid traffic accidents. In this way, the roadbed settlement monitoring device of this embodiment does not require manual regular settlement observation of the observation point, which saves manpower, improves efficiency, and does not block traffic. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] FIG1 is a cross-sectional view of a roadbed settlement monitoring device according to an embodiment of the present application.
[0019] FIG. 2 is a top view of the roadbed settlement monitoring device shown in FIG. 1 .
[0020] Description of Figure Numbers:
[0021] 10. Roadbed; 11. Road base; 12. Bonding layer; 13. Hardened layer; 131. Receiving groove; 132. Protective cover; 14. Hole; 15. Concrete layer; 20. Sinking piece; 21. Nail body; 22. Top cap; 221. Measured part; 222. Reflective layer; 30. Distance measuring piece; 40. Casing; 50. Early warning device; 60. Data acquisition unit; 70. Solar panel. DETAILED DESCRIPTION
[0022] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0023] 1 , a roadbed settlement monitoring device provided in an embodiment of the present application provides a roadbed 10. The roadbed 10 is provided with holes 14.
[0024] In this embodiment, referring to FIG1 , the roadbed 10 includes a roadbed 11, a tie layer 12, and a hardened layer 13. The tie layer 12 is located above the roadbed 11, and the hardened layer 13 is located above the tie layer 12. It can be understood that the side of the hardened layer 13 away from the tie layer 12 is the road surface of the roadbed 10.
[0025] 1 , the roadbed settlement monitoring device includes a settlement member 20 and a distance measuring member 30. The settlement member 20 is disposed in the hole 14 and connected to the roadbed layer 11, and includes a measured portion 221. The distance measuring member 30 is arranged opposite to the measured portion 221 and spaced apart, and the distance measuring member 30 is used to measure the distance between the distance measuring member 30 and the measured portion 221.
[0026] In this embodiment, the distance measuring element 30 is located in the hole 14 .
[0027] When in use, the distance measuring component 30 measures the distance between itself and the measured part 221 in real time. If the roadbed 11 sinks, the settlement component 20 connected to the roadbed 11 will also sink, so that the distance between the measured part 221 and the distance measuring component 30 gradually increases. If the distance between the distance measuring component 30 and the measured part 221 is greater than the preset value, it means that the roadbed 10 is seriously deformed and may even be at risk of collapse. By monitoring the settlement of the roadbed, construction personnel can deal with it in time to avoid traffic accidents. In this way, the roadbed settlement monitoring device of this embodiment does not need manual regular settlement observation of the observation point, which saves manpower and improves efficiency. At the same time, it will not block traffic and reduce the safety risks of detection personnel.
[0028] In one embodiment, the distance measuring element 30 is a laser distance meter. Specifically, the laser distance meter includes a transmitting end for emitting laser light and a receiving end for receiving laser light, wherein the transmitting end faces the measured portion 221 and is arranged opposite to and spaced from the measured portion 221. When in use, the transmitting end of the laser distance meter emits laser light toward the measured portion 221, and the laser light is received by the receiving end after being reflected by the measured portion 221, thereby obtaining the distance between the distance measuring element 30 and the measured portion 221.
[0029] 1 , a reflective layer 222 is disposed on the side of the measured portion 221 facing the distance measuring element 30. Since the reflective layer 222 is disposed on the side of the measured portion 221 facing the distance measuring element 30, the reflective layer 222 can reduce the error caused by diffuse reflection, thereby improving the measurement accuracy.
[0030] In one embodiment, referring to FIG. 1 and FIG. 2 , the roadbed settlement monitoring device further includes a data acquisition unit 60 and an early warning device 50, and the data acquisition unit 60 is electrically connected to the distance measuring component 30 and the early warning device 50. When in use, the distance measuring component 30 measures the distance between it and the measured part 221 in real time, and feeds the distance back to the data acquisition unit 60, and the data acquisition unit 60 analyzes and calculates the distance and determines whether it exceeds the preset value. If the distance between the distance measuring component 30 and the measured part 221 exceeds the preset value, the data acquisition unit 60 controls the early warning device 50 to send out an early warning signal to remind the construction personnel to handle it in time.
[0031] Optionally, referring to FIG. 2 , the warning device 50 is a red-yellow warning light. The preset value includes a first preset value and a second preset value, and the first preset value is less than the second preset value. When the distance between the distance measuring member 30 and the measured part 221 is greater than the first preset value, the red-yellow warning light is activated and emits yellow light. When the distance between the distance measuring member 30 and the measured part gradually increases and is greater than the second preset value, the red-yellow warning light emits red light.
[0032] By setting up red and yellow warning lights, the flashing lights can remind patrol personnel and citizens to take timely precautions. At the same time, the warning can be accurately located quickly, facilitating targeted emergency management.
[0033] Of course, in other embodiments, the warning device 50 may also be a buzzer, but is not limited thereto.
[0034] In one embodiment, referring to FIG. 1 , the hardening layer 13 is provided with a receiving groove 131, and a connecting hole is provided at the bottom of the receiving groove 131, and the receiving groove 131 is connected with the hole 14 through the connecting hole. The data acquisition unit 60 is arranged in the receiving groove 131, and a protective cover 132 is provided at the notch of the receiving groove 131. By providing the receiving groove 131 in the hardening layer 13, the receiving groove 131 provides an installation position for the data acquisition unit 60, thereby preventing the data acquisition unit 60 from being exposed. By providing the protective cover 132 at the notch of the receiving groove 131, the protective cover 132 can shield the notch of the receiving groove 131, thereby preventing foreign matter from entering the receiving groove 131 and causing damage to the data acquisition unit 60, thereby improving the service life of the data acquisition unit 60.
[0035] Referring to Figure 1, since the data acquisition unit 60 is arranged in the receiving groove 131 located in the hardened layer 13, the hardened layer 13 will not settle with the settlement of the road base layer 11. This can improve the stability of the data acquisition unit 60 and avoid the shaking of the data acquisition unit 60 to cause inaccurate monitoring results. At the same time, it can also avoid the data acquisition unit 60 from being damaged due to multiple shaking, thereby improving the service life of the data acquisition unit 60.
[0036] Further, referring to Fig. 2, the warning device 50 is disposed on the outer surface of the protective cover 132. It can be understood that the outer surface of the protective cover 132 refers to the side of the protective cover 132 outside the receiving groove 131. In this way, it is convenient for construction workers to observe the warning device 50.
[0037] In one embodiment, referring to FIG. 1 , the distance measuring member 30 is installed at the bottom of the data acquisition unit 60, and the distance measuring member 30 is disposed in the hole 14 through the connecting hole. In this way, the data acquisition unit 60 provides an installation position for the distance measuring member 30, which facilitates the installation of the distance measuring member 30. In addition, the distance measuring member 30 is installed at the bottom of the data acquisition unit 60, which can improve the stability of the distance measuring member 30, prevent the distance measuring member 30 from shaking, and thus improve the accuracy of the distance measuring member 30.
[0038] In one embodiment, referring to FIG. 1 and FIG. 2 , the protective cover 132 is transparent. The roadbed settlement monitoring device further includes a solar panel 70, which is mounted on one side of the protective cover 132 located in the receiving groove 131, and the solar panel 70 is electrically connected to the distance measuring device 20, the data acquisition unit 60 and the early warning device 50. During the day, the solar panel 70 obtains the energy of the sun and converts it into electrical energy to power the distance measuring device 20, the data acquisition unit 60 and the early warning device 50. In this way, the roadbed settlement monitoring device of this embodiment does not need to be provided with an additional power supply, and is easy to use.
[0039] In one embodiment, the sinker 20 is a sinker nail. Specifically, referring to FIG1 , the sinker nail includes a nail body 21 and a top cap 22. The top cap 22 is disposed at the top of the nail body 21. The nail body 21 and the top cap 22 are smaller than the diameter of the sleeve 40. The measured portion 221 is disposed on the side of the top cap 22 away from the nail body 21. In this way, the sinker nail will not completely fill the sleeve 40, so that a water accumulation area is reserved in the sleeve 40. In this way, even if rainwater enters the sleeve 40 through the receiving groove 131, it can be gathered at the bottom of the sleeve 40, thereby preventing the distance measuring member 30 from being soaked in rainwater and damaged.
[0040] In one embodiment, referring to Fig. 1, the roadbed 10 further includes a concrete layer 15, which is disposed at the bottom of the hole 14, and the concrete layer 15 connects the sinker 20 to the roadbed 11. Concrete blocks are poured at the bottom of the hole 14, and after the concrete blocks are solidified, the concrete layer 15 is formed, and the sinker 20 is connected to the roadbed 11 through the concrete layer 15, so that the sinker 20 can be fixed.
[0041] In this embodiment, the concrete layer 15 is disposed at the bottom of the hole 14, and the height of the concrete layer 15 is lower than the height of the roadbed 11. The lower part of the sinker nail is disposed in the concrete layer 15.
[0042] In one embodiment, referring to FIG. 1 , a sleeve 40 is provided in the hole 14, and the measured portion 221 of the sinker 20 is provided in the sleeve 40. Specifically, the sleeve 40 is provided between the concrete layer 15 and the bottom of the receiving groove 131, one end of the sleeve 40 abuts against the concrete layer 15, and the other end of the sleeve 40 abuts against the bottom of the receiving groove 131. The diameter of the sleeve 40 is slightly smaller than the diameter of the hole 14, so that the sleeve 40 can be provided in the hole 14, and the outer wall of the sleeve 40 abuts against the inner wall of the hole 14. In this way, by providing the sleeve 40 in the hole 14, it is possible to prevent the hole from collapsing, and ensure that the settlement monitoring of the roadbed 10 can be carried out normally. By providing the measured portion 221 in the sleeve 40, it is possible to prevent the soil from covering the measured portion 221 after the hole collapses, and ensure that the settlement monitoring of the roadbed is carried out normally.
[0043] Optionally, the sleeve 40 is a PVC (Polyvinyl chloride) tube. Of course, in other embodiments, the sleeve 40 may also be made of other materials, and is not limited thereto.
[0044] It should be noted that the shape of the hole 14 and the cross-sectional shape of the sleeve 40 can be set according to actual needs and are not specifically limited here.
[0045] In this embodiment, the hole 14 is a circular hole, and the cross section of the sleeve 40 is also circular.
[0046] The materials used in the roadbed settlement monitoring device of this embodiment are green and environmentally friendly, easy to install and reusable.
[0047] The construction steps of the roadbed settlement monitoring device of this embodiment are as follows:
[0048] (1) Drilling with professional drilling equipment to the roadbed 11 to form a hole 14;
[0049] (2) pouring a concrete block at the bottom of the hole 14, and forming a concrete layer 15 after the concrete block solidifies, and fixing the sinker 20 through the concrete layer 15;
[0050] (3) The top of the sinker 20 is coated with a reflective layer;
[0051] (4) Lower the casing 40 to prevent hole collapse;
[0052] (5) Installing a roadbed settlement monitoring device, which includes a laser rangefinder and a data acquisition unit 60 for real-time monitoring and automatic early warning;
[0053] (6) Install a transparent protective cover 132 to protect the roadbed settlement monitoring device from foreign matter and water intrusion;
[0054] (7) A solar panel 70 and red and yellow warning lights are fixed on the transparent protective cover 132. The solar panel 70 is used to continuously supply power to the laser rangefinder, the data acquisition unit 60 and the red and yellow warning lights;
[0055] (8) After the installation and commissioning of the roadbed settlement monitoring device is completed, the monitoring command is sent through the data acquisition unit 60, and the laser rangefinder starts working. If the distance between the laser rangefinder and the top of the settlement nail exceeds the preset value, the data acquisition unit 60 immediately sends an early warning command, and the red and yellow early warning lights start flashing. The relevant early warning information is synchronously sent to the mobile phone of the project manager.
[0056] In the description of the present application, it should be understood that if the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. appear, the orientation or position relationship indicated by these terms is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.
[0057] In addition, if the terms "first" or "second" appear, these terms are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, if the term "plurality" appears, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0058] In this application, unless otherwise clearly specified and limited, if the terms "installed", "connected", "connected", "fixed" and the like appear, these terms should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0059] In the present application, unless otherwise clearly specified and limited, if there is a description that a first feature is "above" or "below" a second feature, etc., or similar descriptions appear, it may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0060] It should be noted that if an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. If an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. If any, the terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used in this application are for illustrative purposes only and do not represent the only implementation method.
[0061] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0062] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A roadbed settlement monitoring device, characterized in that: A roadbed is provided, wherein the roadbed is provided with holes, the roadbed includes a roadbed layer, and the roadbed settlement monitoring device includes: a sinker, the sinker being disposed in the hole and connected to the roadbed, the sinker comprising a measured portion; and A distance measuring member is arranged opposite to and at a distance from the measured part, and is used to measure the distance between the distance measuring member and the measured part.
2. The roadbed settlement monitoring device according to claim 1, characterized in that: The distance measuring component is a laser distance meter, which includes a transmitting end for emitting laser light and a receiving end for receiving the laser light. The transmitting end is opposite to the measured part and is arranged at a distance.
3. The roadbed settlement monitoring device according to claim 1, characterized in that: A reflective layer is provided on a side of the measured portion facing the distance measuring element.
4. The roadbed settlement monitoring device according to claim 1, characterized in that: The roadbed settlement monitoring device also includes a data acquisition unit and an early warning device, and the data acquisition unit is electrically connected to the distance measuring component and the early warning device.
5. The roadbed settlement monitoring device according to claim 4, characterized in that: The roadbed also includes a hardened layer, which is located above the roadbed layer; the hardened layer is provided with a receiving groove, the data acquisition unit is arranged in the receiving groove, the notch of the receiving groove is provided with a protective cover, and the early warning device is arranged on the outer surface of the protective cover.
6. The roadbed settlement monitoring device according to claim 5, characterized in that: A connecting hole is provided at the bottom of the accommodating groove, and the accommodating groove is connected with the hole through the connecting hole; the distance measuring component is installed on the side of the data acquisition unit facing the sinker, and the distance measuring component is arranged in the hole through the connecting hole.
7. The roadbed settlement monitoring device according to claim 5, characterized in that: The protective cover is transparent; The roadbed settlement monitoring device also includes a solar panel, which is installed on one side of the protective cover located in the accommodating groove, and is electrically connected to the distance measuring component, the data acquisition unit and the early warning device.
8. The roadbed settlement monitoring device according to any one of claims 5 to 7, characterized in that: The roadbed also includes a concrete layer, which is arranged at the bottom of the hole, and the concrete layer connects the sinker to the roadbed.
9. The roadbed settlement monitoring device according to claim 8, characterized in that: A sleeve is provided in the hole, the measured part is provided in the sleeve, the sleeve is provided between the concrete layer and the bottom of the receiving groove, one end of the sleeve abuts against the concrete layer, and the other end of the sleeve abuts against the bottom of the receiving groove.
10. The roadbed settlement monitoring device according to any one of claims 1 to 7, characterized in that: The sinker is a sinker nail, which includes a nail body and a top cap. The nail body extends along the height direction of the hole, the top cap is arranged on the top of the nail body, and the measured part is arranged on a side of the top cap away from the nail body.