Integrated sand setting well structure

By setting up a non-powered sand settling component inside the sand settling well body and using the agitated water body to increase the shear force and impact force of the sediment particles, the problem of slow settling speed in the existing sand settling wells is solved and a more efficient mud sedimentation process is achieved. Sand settling and treatment reduces energy consumption and operating costs.

CN221919737UActive Publication Date: 2024-10-29SHANGHAI SHOUAN GAODA SOIL TREATMENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420533452.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-10-29
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

When existing sand settling wells handle high-concentration sand-containing water, they settle slowly, causing the sediment to be easily discharged directly through drainage pipes, affecting the sand settling effect.

Method used

An unpowered sand settling component is installed inside the sand settling well body, including a powerless driving disk, a rotating shaft and a spiral swirl blade. By stirring the water body, the shear force and impact force of the sediment particles are increased, and the collision and collision between particles are promoted. combined, thereby increasing the settling velocity.

Benefits of technology

Without increasing power consumption, it improves the sedimentation speed and processing efficiency of sediment, reduces operating costs, and enhances the sedimentation effect of sediment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919737U_ABST
    Figure CN221919737U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of sand setting wells, in particular to an integrated sand setting well structure, which comprises a well cover, a sand setting well body and an unpowered sand settling component which is positioned in the sand setting well body and is used for improving the sand setting effect, the well cover is buckled at the top of the sand setting well body, and the sand setting well body is of a conical structure with a small top structure and a small bottom structure. The bottom of the sand setting well body is connected with a sand storage tank, and the bottom of the sand storage tank is connected with sand setting auger lifting equipment; the unpowered sand settling and settling assembly is arranged in the sand settling well body, under the condition that power consumption is not increased, the sediment settling speed is increased, dependence on electric power can be effectively reduced, the settling efficiency is improved, the unpowered sand settling and settling assembly stirs a water body, sediment particles are subjected to larger shearing force and impact force, and the sediment settling and settling efficiency is improved. In addition, mutual collision and combination of sediment particles can be promoted through stirring, so that the adhesive force between the particles is enhanced, the sediment is easier to settle to the bottom, and the treatment efficiency of the sediment can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sand settling wells, in particular to an integrated sand settling well structure. Background Art

[0002] A sand trap is a traditional sewage interception, impurity removal and water purification equipment, which is mainly used to intercept and remove suspended matter, sediments and sludge in rivers, lakes, reservoirs and other water bodies to protect the water ecological environment and the sustainable use of water resources.

[0003] A sedimentation well is a facility used to treat high concentrations of sand. It is usually composed of one or more vertically placed troughs, called "wellbores". Each wellbore has a fixed lining and filter media, such as quartz sand or other granular materials. When water flows through the wellbore, it will rub and wear against the lining. Some solid particles will be intercepted by the lining and flow into the next wellbore with the water flow, so that the suspended matter in the water can be gradually removed. Since the filter media inside each wellbore is different, different media can be selected as needed to achieve the best treatment effect.

[0004] The sand settling well includes a well shaft and a well cover. Pipe connection slots connected to the drainage pipe are opened on both sides of the well shaft. The well cover is used to close the well mouth to prevent external impurities from entering. After the sewage passes through the well shaft, it settles to the bottom of the well shaft by gravity. The existing sand settling well does not have a sedimentation component inside, which affects the sedimentation speed. When the water flow is too large, the sand and water are easily discharged directly through the drainage pipe, affecting the sand settling effect. Utility Model Content

[0005] The purpose of the utility model is to provide an integrated sand settling well structure to solve the problems raised in the above background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] An integrated sand settling well structure comprises a well cover, a sand settling well body and a non-powered sand reduction component located inside the sand settling well body for improving the sand settling effect, the well cover is snapped on the top of the sand settling well body, the sand settling well body is a conical structure with a top structure and a small bottom structure, a sand storage tank is connected to the bottom of the sand settling well body, the bottom of the sand storage tank is connected to a sand settling dragon lifting device, a discharge inlet connected to a drainage pipe is opened on one side above the sand settling well body, and a discharge outlet connected to the drainage pipe is opened on the other side above the sand settling well body.

[0008] As a preferred solution of the utility model, the unpowered sand reduction component is located inside the sand settling well body, the unpowered sand reduction component includes an unpowered drive disk, an unpowered rotating shaft and an unpowered dust reduction cyclone component, the unpowered drive disk is located inside the sand settling well body close to the discharge port, drive plates are evenly distributed on the unpowered drive disk, the top of the unpowered rotating shaft is vertically fixed to the bottom of the unpowered drive disk, a bearing is sleeved and connected on the middle outer wall of the unpowered rotating shaft, and the unpowered dust reduction cyclone component displaces the bottom of the unpowered rotating shaft.

[0009] As a preferred solution of the utility model, the unpowered dust reduction cyclone assembly includes a cyclone rod and spiral cyclone blades, the spiral cyclone blades are distributed on the outer circumferential wall of the cyclone rod, and the top of the cyclone rod is fixed to the bottom of the unpowered rotating shaft through a coupling.

[0010] As a preferred solution of the utility model, the outer wall of the bearing is connected with a fixed cross bar, and each end of the fixed cross bar is connected to the inner wall of the sand setting well.

[0011] As a preferred solution of the utility model, the sand settling dragon lifting equipment includes a screw conveyor, which is arranged in an inclined structure. A sand settling box connected to the sand storage tank is arranged at the top of one end of the screw conveyor, and a solid discharge port is arranged at the bottom of the other end of the screw conveyor.

[0012] As a preferred solution of the utility model, the spiral swirl blades are arranged in a structure with a large top and a reduced bottom.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] In response to the problems raised in the background technology, the present application increases the sedimentation speed of the sediment without increasing power consumption by setting an unpowered sand settling component inside the sand settling well, which can effectively reduce the dependence on electricity, improve the sedimentation efficiency, and also reduce the operating cost;

[0015] The unpowered sand settling component stirs the water body, causing the sediment particles to be subjected to greater shear and impact forces, thereby accelerating the sedimentation rate. In addition, stirring can also promote the mutual collision and combination of sediment particles, so that the adhesion between particles is enhanced, making it easier to settle to the bottom. This can not only save energy, but also improve the efficiency of sediment treatment, thereby reducing overall costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is the main view of the overall structure of the utility model;

[0017] Figure 2This is a schematic diagram of the unpowered sand settling component of the utility model;

[0018] Figure 3 This is a schematic diagram of the connection between the unpowered driving disc and the unpowered dust reduction cyclone component of the utility model;

[0019] Figure 4 It is a side view of the sand storage tank and the screw conveyor of the utility model.

[0020] In the figure: 1. Manhole cover; 2. Sand settling well body; 21. Discharge inlet; 22. Discharge outlet; 3. Unpowered sand settling assembly; 31. Unpowered driving disk; 32. Unpowered rotating shaft; 33. Unpowered dust settling cyclone assembly; 331. Cyclone rod; 332. Spiral cyclone blades; 34. Driving plate; 35. Bearing; 351. Fixed cross bar; 4. Sand storage tank; 5. Screw conveyor. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the embodiments of the present invention.

[0022] Example

[0023] See also Figure 1-4 The utility model provides a technical solution: an integrated sand settling well structure, comprising a well cover 1, a sand settling well body 2 and a non-powered sand settling component 3 located inside the sand settling well body 2 for improving the sand settling effect. The well cover 1 is buckled and located at the top of the sand settling well body 2. The sand settling well body 2 is a conical structure with a top structure and a small bottom structure. A sand storage tank 4 is connected to the bottom of the sand settling well body 2. The bottom of the sand storage tank 4 is connected to a sand settling dragon lifting device. A discharge inlet 21 connected to a drainage pipe is provided on one side above the sand settling well body 2, and a discharge outlet 22 connected to the drainage pipe is provided on the other side above the sand settling well body 2; the sand settling dragon lifting device comprises a screw conveyor 5, which is arranged in an inclined structure. A sand settling box connected to the sand storage tank 4 is provided on the top of one end of the screw conveyor 5, and a solid discharge port is provided at the bottom of the other end of the screw conveyor 5. The precipitated solids are transported out through the screw conveyor 5.

[0024] It should be noted that, by arranging the unpowered sand settling assembly 3 inside the sand settling well 2, the present application increases the sedimentation speed of the sediment without increasing the power consumption, which can effectively reduce the dependence on electricity, improve the sedimentation efficiency, and also reduce the operating cost;

[0025] The unpowered sand settling component 3 stirs the water body so that the sediment particles are subjected to greater shear force and impact force, thereby accelerating the sedimentation rate. In addition, stirring can also promote the mutual collision and combination of sediment particles, so that the adhesion between the particles is enhanced, making it easier to settle to the bottom, which can not only save energy but also improve the sediment treatment efficiency, thereby reducing the overall cost.

[0026] See also Figure 2 and 3 The unpowered sand settling component 3 is located inside the sand settling well 2. The unpowered sand settling component 3 includes an unpowered driving disc 31, an unpowered rotating shaft 32 and an unpowered dust settling cyclone component 33. The unpowered driving disc 31 is located inside the sand settling well 2 near the discharge port 21. Driving plates 34 are evenly distributed on the unpowered driving disc 31. The top of the unpowered rotating shaft 32 is vertically fixed to the bottom of the unpowered driving disc 31. A bearing 35 is sleeved and connected on the outer wall of the middle part of the unpowered rotating shaft 32. The bearing 35 is connected to The outer wall is connected to a fixed cross bar 351, and each end of the fixed cross bar 351 is connected to the inner wall of the sand settling well body 2; the unpowered dust reduction cyclone assembly 33 displaces the bottom of the unpowered rotating shaft 32; the unpowered dust reduction cyclone assembly 33 includes a cyclone rod 331 and a spiral cyclone blade 332, and the spiral cyclone blade 332 is distributed on the outer circumferential wall of the cyclone rod 331, and the top of the cyclone rod 331 is fixed to the bottom of the unpowered rotating shaft 32 through a coupling; the spiral cyclone blade 332 is arranged in a structure with a large top and a reduced bottom.

[0027] It should be noted that, in the present embodiment, the unpowered sand settling component 3 includes an unpowered driving disc 31, an unpowered rotating shaft 32 and an unpowered dust settling cyclone component 33. The unpowered driving disc 31 is located on the side of the sand settling well body 2 close to the discharge port 21. The unpowered driving disc 31 is evenly distributed with driving plates 34. When sewage enters the sand settling well body 2 through the discharge port 21, the sewage impacts the driving plate 34 on the unpowered driving disc 31 to rotate. The bottom of the unpowered driving disc 31 is connected to a spiral swirl blade 332 through a swirl rod 331. The spiral swirl blade 332 is a structure with a large top and a reduced bottom. The unpowered driving disc 31 rotates while driving The dynamic spiral swirl blades 332 rotate and stir the water body, so that the sediment particles are subjected to greater shear force and impact force, thereby accelerating the sedimentation rate. In addition, stirring can also promote the mutual collision and combination of sediment particles, so that the adhesion between the particles is enhanced, and it is easier to settle to the bottom, which can not only save energy but also improve the sediment processing efficiency, thereby reducing the overall cost. The sediment particles after sedimentation enter the sand storage tank 4, and are transported out by the screw conveyor 5 connected to the bottom of the sand storage tank 4. Without increasing power consumption, the sedimentation rate of the sediment is increased, which can effectively reduce the dependence on electricity, improve the sedimentation efficiency, and also reduce the operating cost.

[0028] The utility model workflow:

[0029] When in use, when sewage enters the sand settling well 2 through the discharge inlet 21, the sewage impacts the driving plate 34 on the unpowered driving disc 31 to rotate. The bottom of the unpowered driving disc 31 is connected to a spiral swirl blade 332 through a swirl rod 331. The spiral swirl blade 332 is arranged in a structure with a large top and a reduced bottom. When the unpowered driving disc 31 rotates, the spiral swirl blade 332 is driven to rotate and stir the water body, so that the sediment particles are subjected to greater shear force and impact force, thereby accelerating the sedimentation speed. In addition, stirring can also promote the mutual collision and combination of sediment particles, so that the adhesion between the particles is enhanced, and it is easier to settle to the bottom, which can not only save energy, but also improve the sedimentation efficiency, thereby reducing the overall cost. The sedimented sediment particles enter the sand storage tank 4, and are transported out by the screw conveyor 5 connected to the bottom of the sand storage tank 4. Without increasing power consumption, the sedimentation speed of the sediment is increased, which can effectively reduce the dependence on electricity, improve the sedimentation efficiency, and also reduce the operating cost.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integrated sand trap structure, comprising a manhole cover (1), a sand trap body (2), and a non-powered sand trap assembly (3) located inside the sand trap body (2) for improving the sand trap effect, characterized in that: The manhole cover (1) is buckled and located on the top of the sand settling well body (2). The sand settling well body (2) is arranged in a conical structure with a large top structure and a small bottom structure. A sand storage tank (4) is connected to the bottom of the sand settling well body (2). The bottom of the sand storage tank (4) is connected to a sand settling dragon lifting device. A discharge inlet (21) connected to a drainage pipe is provided on one side above the sand settling well body (2), and a discharge outlet (22) connected to a drainage pipe is provided on the other side above the sand settling well body (2).

2. The integrated sand trap structure according to claim 1, characterized in that: The unpowered sand settling component (3) is located inside the sand settling well (2), and comprises an unpowered driving disc (31), an unpowered rotating shaft (32) and an unpowered dust settling cyclone component (33). The unpowered driving disc (31) is located inside the sand settling well (2) on a side close to the discharge port (21), and driving plates (34) are evenly distributed on the unpowered driving disc (31). The top of the unpowered rotating shaft (32) is vertically fixed to the bottom of the unpowered driving disc (31), and a bearing (35) is sleeved and connected on the outer wall of the middle part of the unpowered rotating shaft (32). The unpowered dust settling cyclone component (33) is located at the bottom of the unpowered rotating shaft (32).

3. The integrated sand trap structure according to claim 2, characterized in that: The unpowered dust reduction cyclone assembly (33) comprises a cyclone rod (331) and spiral cyclone blades (332), wherein the spiral cyclone blades (332) are distributed on the outer circumferential wall of the cyclone rod (331), and the top of the cyclone rod (331) is fixed to the bottom of the unpowered rotating shaft (32) via a coupling.

4. The integrated sand trap structure according to claim 2, characterized in that: The two outer walls of the bearing (35) are connected with fixed cross bars (351), and each end of the fixed cross bars (351) is connected to the inner wall of the sand trap body (2).

5. The integrated sand trap structure according to claim 1, characterized in that: The sand settling dragon lifting device comprises a screw conveyor (5), which is arranged in an inclined structure. A sand settling box connected to the sand storage tank (4) is arranged through the top of one end of the screw conveyor (5), and a solid discharge port is arranged at the bottom of the other end of the screw conveyor (5).