Concrete structure frame column steel bar positioning structure

By pre-embedding steel pillars on the concrete base and using adjustable tensioning components, the tilt problem of the steel frame caused by bending is solved, ensuring the vertical positioning of the columns and the stability of the concrete structure.

CN221920016UActive Publication Date: 2024-10-29ZHEJIANG CHONGDE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322955225.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-31
Publication Date
2024-10-29
Estimated Expiration
2033-10-31

AI Technical Summary

Technical Problem

The existing steel frame will bend due to its own weight after construction, causing the columns to tilt and affecting the length of the steel frame required for the wall beams.

Method used

Four steel pillars are pre-embedded on the concrete base, sleeves and horizontal L-shaped rods are set, and the tightness is adjusted by adjusting the tensioning component to ensure the vertical positioning of the steel pillars, including an inverted U-shaped frame, a two-way threaded screw and an adjustment L-shaped rods, tightening screws and other components enhance the positioning stability of the steel pillars.

Benefits of technology

It effectively avoids the tilt problem of the steel frame caused by bending, ensures the vertical positioning of the steel pillars, solves the influence of the length of the steel frame, and improves the stability of the concrete structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920016U_ABST
    Figure CN221920016U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete structure frame column reinforcing steel bar positioning structure which comprises a concrete base and further comprises four reinforcing steel bar supporting columns embedded in the concrete base in a bilateral symmetry mode, sleeves arranged on the reinforcing steel bar supporting columns in a sleeving mode and two transversely-arranged L-shaped rods symmetrically arranged on the sleeves, and the two transversely-arranged L-shaped rods are perpendicular to each other. An adjusting tensioning assembly is detachably arranged between the two transversely-arranged L-shaped rods with the central axes located on the same horizontal line, and the adjusting tensioning assembly can adjust the tightness degree and the bending degree between the two adjacent steel bar supporting columns, so that the four steel bar supporting columns are vertically located on the concrete base.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel bar positioning structures, and in particular to a steel bar positioning structure for a concrete structure frame column. Background Art

[0002] At present, the columns, beams and walls of a building all need to build a steel frame, and then pour concrete outside the steel frame through the mold. When it is necessary to cast the columns, walls and beams in an integrated manner, it is necessary to first erect the steel frame of the column, and then connect the wall and beam frames between the columns.

[0003] However, the existing steel skeleton has the following defects:

[0004] (1) Since the steel support has a certain height, after the steel frame is built, the steel has a certain degree of flexibility. Under the influence of its own weight, the column-shaped steel frame will bend downward. After bending, the column will tilt, which may affect the length of the steel frame required for the wall beam. Utility Model Content

[0005] In order to solve one or some technical problems existing in the prior art, the purpose of this application is to provide a concrete structure frame column steel bar positioning structure, which plays a role in positioning the four steel bar pillars and avoids affecting the use length of the steel bar skeleton due to its own bending.

[0006] In order to solve the above existing technical problems, one of the purposes of this application is achieved by adopting the following technical solution:

[0007] A steel bar positioning structure for a concrete structure frame column comprises a concrete base, and further comprises four steel bar pillars symmetrically embedded in the concrete base, a sleeve sleeved on the steel bar pillar, and two transverse L-shaped rods symmetrically arranged on the sleeve, wherein the two transverse L-shaped rods are perpendicular to each other, and an adjustment tensioning component is detachably provided between the two transverse L-shaped rods whose central axes are on the same horizontal line, and the adjustment tensioning component can adjust the tightness and curvature between two adjacent steel bar pillars, so that the four steel bar pillars are vertically positioned on the concrete base.

[0008] Furthermore, the adjusting and tightening assembly includes an inverted U-shaped frame, a bidirectional threaded screw horizontally penetrating the inverted U-shaped frame, and two adjusting L-shaped rods symmetrically screwed on the bidirectional threaded screw, and the adjusting L-shaped rods are connected to the corresponding transverse L-shaped rods.

[0009] Furthermore, the adjusting L-shaped rod is provided with an insertion hole, and the transverse L-shaped rod can be movably plugged into the adjusting L-shaped rod through the insertion hole.

[0010] Furthermore, a tightening screw is provided through the outer wall of the sleeve, and the tightening screw can be tightened on the steel bar pillar.

[0011] Furthermore, the concrete base includes a primary cast body, a connecting plate 1 is horizontally arranged in the primary cast body, and the bottoms of the four steel bar pillars are fixedly connected to the connecting plate 1.

[0012] Furthermore, a casting trough is provided on the top of the primary casting body, a secondary casting body is provided in the casting trough, a second connecting plate is abutted on the top of the secondary casting body, a clamping screw block is screwed on the steel support column, and the clamping screw block can clamp the second connecting plate.

[0013] Compared with the prior art, the beneficial effects of the present invention are:

[0014] (1) The tensioning assembly can adjust the tightness between two adjacent steel bars. After the tightness between two adjacent steel bars is adjusted, the curvature thereof will also be adjusted, so that the four steel bars are vertically positioned on the concrete base, thereby playing a positioning role for the four steel bars, and avoiding the use length of the steel skeleton being affected by its own bending. Compared with the prior art, the invention solves the technical problem that the steel skeleton bends downward, and after bending, the column tilts, which easily causes the use length of the steel skeleton required for the wall beam to be affected to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is an overall schematic diagram of the present application, showing a schematic diagram of the structure of a concrete base and an adjusting and tightening assembly;

[0016] Figure 2 A schematic diagram of the structure of four steel reinforcement pillars for this application;

[0017] In the figure: 1. concrete base; 2. primary casting body; 3. secondary casting body; 4. casting trough; 5. connecting plate 1; 6. steel support pillar; 7. connecting plate 2; 8. clamping screw block; 9. sleeve; 10. tightening screw; 11. horizontal L-shaped rod; 12. socket; 13. adjusting L-shaped rod; 14. bidirectional threaded screw; 15. inverted U-shaped frame; 16. adjusting tensioning assembly. DETAILED DESCRIPTION

[0018] Below, the present application is further described in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.

[0019] In the description of the present application, it should be understood that the terms "up", "down", "left", "right", etc., indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present application.

[0020] The terms "first", "second", etc. in this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described herein, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the previously associated objects are in an "or" relationship of a concrete structure frame column steel bar positioning structure.

[0021] Embodiment 1:

[0022] like Figure 1-Figure 2 As shown, this embodiment provides a steel bar positioning structure for a concrete structure frame column, which includes a concrete base 1, and also includes four steel bar pillars 6 symmetrically embedded in the concrete base 1, a sleeve 9 sleeved on the steel bar pillars 6, and two transverse L-shaped rods 11 symmetrically arranged on the sleeve 9. The two transverse L-shaped rods 11 are perpendicular to each other, and a detachable adjustment tensioning component 16 is provided between the two transverse L-shaped rods 11 whose central axes are on the same horizontal line. The adjustment tensioning component 16 can adjust the tightness and curvature between two adjacent steel bar pillars 6, so that the four steel bar pillars 6 are vertically positioned on the concrete base 1.

[0023] A reinforcement positioning structure for a concrete structure frame column comprises a concrete base 1, and also comprises four reinforcement pillars 6 symmetrically embedded in the concrete base 1, wherein a sleeve 9 is sleeved on each reinforcement pillar 6, and two transverse L-shaped rods 11 are symmetrically arranged on the sleeve 9, and the two transverse L-shaped rods 11 are perpendicular to each other, so as to facilitate the connection and adjustment of a tensioning component 16 in the subsequent process, and an adjustment tensioning component 16 is detachably arranged between the two transverse L-shaped rods 11 whose central axes are on the same horizontal line, and the adjustment tensioning component 16 can adjust the tightness between two adjacent reinforcement pillars 6, and after the tightness between two adjacent reinforcement pillars 6 is adjusted, the curvature thereof will also be adjusted, so that the four reinforcement pillars 6 are vertically positioned on the concrete base 1, and the four reinforcement pillars 6 are positioned, so as to avoid affecting the use length of the reinforcement skeleton due to their own bending, and compared with the prior art, the technical problem that the reinforcement skeleton bends downward, and after bending, the column tilts, which easily causes the use length of the reinforcement skeleton required for the wall beam to be affected to a certain extent is solved.

[0024] In order to further prevent the steel bar pillar 6 from being affected by its own long length, a plurality of adjusting and tightening components 16 may be arranged in parallel in the vertical direction to further position the steel bar pillar 6 .

[0025] Furthermore, the adjustment and tensioning assembly 16 includes an inverted U-shaped frame 15, a bidirectional threaded screw 14 horizontally penetrating the inverted U-shaped frame 15, and two adjustment L-shaped rods 13 symmetrically screwed on the bidirectional threaded screw 14, and the adjustment L-shaped rods 13 are connected to the corresponding transverse L-shaped rods 11.

[0026] The adjusting and tightening assembly 16 includes an inverted U-shaped frame 15, and a bidirectional threaded screw 14 is horizontally arranged through the inverted U-shaped frame 15, so that one end of the bidirectional threaded screw 14 is screwed on the inverted U-shaped frame 15, and the other end is rotatably connected to the inner wall of the inverted U-shaped frame 15, and two adjusting L-shaped rods 13 are symmetrically screwed on the bidirectional threaded screw 14, and the adjusting L-shaped rod 13 is connected to the corresponding transverse L-shaped rod 11. When in use, by screwing the bidirectional threaded screw 14, the bidirectional threaded screw 14 drives the adjusting L-shaped rod 13 to move, the adjusting L-shaped rod 13 drives the transverse L-shaped rod 11 to move, the transverse L-shaped rod 11 drives the sleeve 9 to move, and the sleeve 9 drives the steel bar pillar 6 to move, so as to tighten or loosen the tightness between two adjacent steel bar pillars 6, which helps to ensure that the steel bar pillar 6 is vertically arranged on the concrete base 1.

[0027] Furthermore, a socket 12 is provided on the adjusting L-shaped rod 13, and the transverse L-shaped rod 11 can be movably plugged into the adjusting L-shaped rod 13 through the socket 12. In this way, a detachable connection between the adjusting tensioning assembly 16 and two adjacent transverse L-shaped rods 11 is achieved, and the adjusting L-shaped rod 13 can be quickly removed from or installed on the transverse L-shaped rod 11.

[0028] Furthermore, a tightening screw 10 is provided through the outer wall of the sleeve 9, and the tightening screw 10 is threadedly connected to the outer wall of the sleeve 9. The tightening screw 10 can be tightened on the steel support 6. The setting of the tightening screw 10 plays a role in tightening and positioning the installation position of the sleeve 9.

[0029] Furthermore, the concrete base 1 includes a primary casting body 2, in which a connecting plate 5 is horizontally arranged, and the bottoms of four steel support pillars 6 are fixedly connected to the connecting plate 5. By fixing the bottoms of the four steel support pillars 6 to the connecting plate 5, the self-anchoring ability of the steel support pillars 6 in the concrete base 1 can be enhanced, thereby avoiding displacement of the steel support pillars 6 caused by interference during subsequent construction.

[0030] Furthermore, a casting trough 4 is provided on the top of the primary casting body 2, and a secondary casting body 3 is provided in the casting trough 4. A second connecting plate 7 is abutted on the top of the secondary casting body 3, so that the second connecting plate 7 is movably sleeved on four steel support pillars 6. A compression screw block 8 is screwed on the steel support pillar 6, and the compression screw block 8 can compress the second connecting plate 7. In this way, it is equivalent to that the lower part of the steel support pillar 6 has two supporting points in the concrete base 1, one is the first connecting plate 5, and the other is the second connecting plate 7, which helps to further enhance the connection stability of the steel support pillar 6 on the concrete base 1.

[0031] The above-mentioned implementation modes are only preferred implementation modes of the present application and cannot be used to limit the scope of protection of the present application. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present application shall fall within the scope of protection required by the present application.

Claims

1. A reinforcement positioning structure for a concrete structure frame column, comprising a concrete base (1), characterized in that: It also comprises four steel bar pillars (6) symmetrically embedded in the concrete base (1), a sleeve (9) sleeved on the steel bar pillars (6), and two transverse L-shaped rods (11) symmetrically arranged on the sleeves (9), wherein the two transverse L-shaped rods (11) are perpendicular to each other, and an adjustable tensioning assembly (16) is detachably provided between the two transverse L-shaped rods (11) whose central axes are on the same horizontal line, and the adjustable tensioning assembly (16) can adjust the tightness and curvature between two adjacent steel bar pillars (6), so that the four steel bar pillars (6) are vertically positioned on the concrete base (1).

2. A concrete structure frame column steel bar positioning structure according to claim 1, characterized in that: The adjusting and tightening assembly (16) comprises an inverted U-shaped frame (15), a bidirectional threaded screw (14) horizontally penetrating the inverted U-shaped frame (15), and two adjusting L-shaped rods (13) symmetrically screwed to the bidirectional threaded screw (14); the adjusting L-shaped rods (13) are connected to the corresponding transverse L-shaped rods (11).

3. A concrete structure frame column steel bar positioning structure according to claim 2, characterized in that: The adjusting L-shaped rod (13) is provided with an insertion hole (12), and the transverse L-shaped rod (11) can be movably inserted into the adjusting L-shaped rod (13) through the insertion hole (12).

4. A concrete structure frame column steel bar positioning structure according to claim 1, characterized in that: A tightening screw (10) is provided through the outer wall of the sleeve (9), and the tightening screw (10) can be tightened onto the steel bar support (6).

5. The concrete structure frame column steel bar positioning structure according to claim 1, characterized in that: The concrete base (1) comprises a primary cast body, a connecting plate 1 (5) is horizontally arranged in the primary cast body, and the bottoms of the four steel support columns (6) are fixedly connected to the connecting plate 1 (5); a casting trough (4) is provided on the top of the primary cast body, a secondary cast body (3) is arranged in the casting trough (4), a connecting plate 2 (7) is abutted on the top of the secondary cast body (3), and a clamping screw block (8) is screwed on the steel support column (6), and the clamping screw block (8) can clamp the connecting plate 2 (7).