High-content particulate matter tail gas absorption tower

By installing an inlet pipe and spray structure in the exhaust gas absorption tower, and utilizing multiple sedimentation and filtration structures, the problem of low sedimentation absorption efficiency for high-content particulate matter is solved, achieving a highly efficient particulate matter removal effect.

CN221933499UActive Publication Date: 2024-11-01HUBEI MINGTAI TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323492284.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-11-01
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

Existing exhaust gas absorption towers have low efficiency in absorbing and settling high levels of particulate matter.

Method used

An inlet pipe and a spray structure are installed in the exhaust gas absorption tower. The inlet pipe sprays and settles the exhaust gas through the inlet pipe. After the exhaust gas enters the exhaust gas treatment box, it undergoes secondary settling through the spray head. The absorption of particulate matter is maximized by the combination of isolation nets, baffles and blocks.

Benefits of technology

It significantly improves the absorption efficiency of particulate matter in the exhaust gas absorption tower, and ensures the effective removal of high content particulate matter through the combination of multiple sedimentation and filtration structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221933499U_ABST
    Figure CN221933499U_ABST
Patent Text Reader

Abstract

The tail gas absorption tower comprises a tower body, a gas inlet is formed in the side wall of the bottom of the tower body, a gas inlet pipe is inserted into the gas inlet, a waste gas treatment box is arranged in the tower body, the end, located in the tower body, of the gas inlet pipe is communicated with the waste gas treatment box, and a spraying structure is arranged on the right side wall in the waste gas treatment box. The upper end of the gas outlet pipe is communicated with the top of the tower body, a gas outlet is formed in the top of the tower body and corresponds to the gas outlet pipe, partition plates are fixedly arranged in the gas outlet in a crossed mode, and check blocks are downwards arranged at the ends, away from the ends fixed to the gas outlet, of the partition plates; waste gas entering the waste gas treatment box is sprayed and settled through the spraying structure in the waste gas treatment box and then enters the gas outlet after being isolated through the isolation net, particulate matter in tail gas is absorbed to the maximum degree in cooperation with the partition plate and the check block, and the particulate matter absorption efficiency of the absorption tower is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tail gas treatment, in particular to a tail gas absorption tower with high content of particulate matter. Background Art

[0002] The exhaust gas absorption tower adopts gas-liquid countercurrent operation. The extracted exhaust gas enters from the air inlet at the bottom of the tower, flows from bottom to top, and is finally discharged from the air outlet at the top of the tower through an anti-corrosion fan. The spray is also evenly sprayed through a nozzle or a liquid distributor; it flows from top to bottom to the bottom of the tower; inside the absorption tower, the rising exhaust gas and the descending spray are constantly in contact, and the pollutants in the exhaust gas are continuously adsorbed. In addition, the tower plates installed in the tower body extend the distance of the exhaust gas's movement, which is beneficial to improve the absorption degree of the exhaust gas until it meets the treatment standard.

[0003] However, for some exhaust gases with high content of particulate matter, the existing exhaust gas absorption tower has the problem of low efficiency in settling and absorbing the particulate matter. Utility Model Content

[0004] In view of the technical problems in the above-mentioned prior art, the utility model provides an exhaust gas absorption tower with high content of particulate matter, aiming to solve the above-mentioned problems.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A tail gas absorption tower with high content of particulate matter, comprising a tower body, and further comprising:

[0007] An air inlet is opened on the bottom side wall of the tower body, and an air inlet pipe is inserted into the air inlet;

[0008] An exhaust gas treatment box is arranged in the tower body, and one end of the air inlet pipe located in the tower body is connected to the exhaust gas treatment box;

[0009] A spray structure, which is arranged on the right side wall of the exhaust gas treatment box, and the spray structure is connected to the external system;

[0010] An air outlet pipe is arranged at the top of the exhaust gas treatment box, the upper end of the air outlet pipe is communicated with the top of the tower body, and an air outlet is arranged at the top of the tower body corresponding to the air outlet pipe.

[0011] Preferably, the spray structure includes a plurality of first spray heads, which are respectively fixed on the right side wall of the exhaust gas treatment box. A conical collecting trough is provided on the lower side of the exhaust gas treatment box corresponding to the first spray head. A first collecting pipe is connected to the bottom of the conical collecting trough. The first collecting pipe passes through the tower body and is connected to the outside.

[0012] Preferably, a first valve is provided at one end of the first collecting pipe outside the tower body.

[0013] Preferably, a liquid inlet pipe is provided on the left side of the tower body above the air inlet, the liquid inlet pipe passes through the tower body and extends into the air inlet pipe, a second spray head is provided at one end of the liquid inlet pipe located in the air inlet pipe toward the lower end, and the liquid inlet pipe is connected to the external system.

[0014] Preferably, the lower side of one end of the air inlet pipe outside the tower body is connected to a second collecting pipe, and a second valve is provided at the second collecting pipe.

[0015] Preferably, an isolation net is provided at the exhaust gas treatment box corresponding to the exhaust pipe.

[0016] Preferably, a partition is cross-fixed in the air outlet, and a stopper is provided downward at one end of the partition away from the end fixed to the air outlet.

[0017] Compared with the prior art, the utility model has the following beneficial effects:

[0018] The utility model provides an exhaust gas absorption tower with a high content of particulate matter. When air is taken in, the air inlet pipe is first sprayed through the liquid inlet pipe to settle the particles in the exhaust gas for the first time. When the exhaust gas enters the exhaust gas treatment box, it is settled for the second time through the second spray head, and then enters the exhaust pipe through the isolation net to reach the exhaust port. When passing through the exhaust port, the particulate matter in the exhaust gas is absorbed to the maximum extent through the cooperation of the partition and the block, thereby greatly improving the efficiency of the absorption tower in absorbing particulate matter. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is an overall schematic diagram of a tail gas absorption tower with high content of particulate matter according to the utility model;

[0020] Figure 2 This is an enlarged view of point A of an exhaust gas absorption tower with a high content of particulate matter described in the utility model.

[0021] In the figure: 1. tower body; 2. air inlet; 21. air inlet pipe; 3. exhaust gas treatment box; 4. spray structure; 41. first spray head; 42. conical collecting tank; 43. first collecting pipe; 44. first valve; 5. air outlet pipe; 51. isolation net; 6. liquid inlet pipe; 61. second spray head; 62. second collecting pipe; 63. second valve; 7. air outlet; 71. partition; 72. block. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1 and 2 In the embodiment proposed in the present application, an exhaust gas absorption tower with a high content of particulate matter is provided, including a tower body 1, an air inlet 2 is provided on the bottom side wall of the tower body 1, an air inlet pipe 21 is inserted at the air inlet, an exhaust gas treatment box 3 is provided in the tower body 1, one end of the air inlet pipe 21 located in the tower body 1 is connected with the exhaust gas treatment box 3, a spray structure 4 is provided on the right side wall of the exhaust gas treatment box 3, the spray structure 4 is connected with the external system, an exhaust gas treatment box 3 is provided with an exhaust pipe 5 on the top, an isolation net 51 is provided at the exhaust gas treatment box 3 corresponding to the exhaust pipe 5, the upper end of the exhaust pipe 5 is connected with the top of the tower body 1, an exhaust port 7 is provided at the top of the tower body 1 corresponding to the exhaust pipe 5, a partition 71 is cross-fixed in the exhaust port 7, and a stopper 72 is provided downwardly at the end of the partition 71 away from the exhaust port 7;

[0024] The waste gas entering the waste gas treatment box 3 is sprayed and settled by the spray structure 4 in the waste gas treatment box 3, and then enters the gas outlet 7 after being isolated by the isolation net 51. In combination with the partition 71 and the block 72, the particulate matter in the exhaust gas is absorbed to the maximum extent, greatly improving the efficiency of the absorption tower in absorbing particulate matter.

[0025] In another embodiment, see Figure 1 and 2 The spray structure 4 includes a plurality of first spray heads 41, which are respectively fixed on the right side wall of the exhaust gas treatment box 3. A conical collecting groove 42 is provided on the lower side of the exhaust gas treatment box 3 corresponding to the first spray head 41. A first collecting pipe 43 is connected to the bottom of the conical collecting groove 42. The first collecting pipe 43 passes through the tower body 1 and is connected to the outside. A first valve 44 is provided at one end of the first collecting pipe 43 outside the tower body 1.

[0026] Liquid is supplied to the first spray head 41 through an external system to flush particles in the exhaust gas in the exhaust gas treatment box and settle them in the first collecting pipe 43 , and are periodically cleared through the first valve 44 .

[0027] In another embodiment, see Figure 1 and 2 A liquid inlet pipe 6 is provided on the left side of the tower body 1 above the air inlet 2. The liquid inlet pipe 6 passes through the tower body 1 and extends into the air inlet pipe 21. A second spray head 61 is provided at the lower end of the end of the liquid inlet pipe 6 located in the air inlet pipe 21. The liquid inlet pipe 6 is connected to the external system. A second collecting pipe 62 is provided at the lower side of the end of the air inlet pipe 21 located outside the tower body 1. A second valve 63 is provided at the second collecting pipe 62 for regular cleaning.

[0028] After the exhaust gas enters the intake pipe 21, the exhaust gas in the intake pipe 21 is initially precipitated through the external system and the liquid inlet pipe 6 to reduce the particulate matter in the exhaust gas, reduce the burden on the subsequent sedimentation and absorption process, and improve the sedimentation and absorption efficiency of the subsequent sedimentation equipment.

[0029] Working principle: The utility model provides an exhaust absorption tower with a high content of particulate matter. When taking in air, the intake pipe 21 is first sprayed through the liquid inlet pipe 6 to settle the particles in the exhaust gas for the first time. When the exhaust gas enters the exhaust gas treatment box 3, it is settled for the second time through the second spray head 61, and then enters the exhaust pipe 5 through the isolation net 51, and then reaches the outlet port 7. When passing through the outlet port 7, the absorption of particulate matter in the exhaust gas is maximized through the cooperation of the partition 71 and the block 72, thereby greatly improving the efficiency of the absorption tower in absorbing particulate matter.

[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0031] In the description of the present invention, unless otherwise specified, "plurality" means two or more; the terms "upper", "lower", "left", "right", "inside", "outside", "front end", "rear end", "head", "tail", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high-content particulate matter tail gas absorption tower, comprising a tower body (1), characterized in that: Also includes: An air inlet (2) is provided on the bottom side wall of the tower body (1); an air inlet pipe (21) is inserted at the air inlet (2); a liquid inlet pipe (6) is provided on the left side of the tower body (1) above the air inlet (2); the liquid inlet pipe (6) passes through the tower body (1) and extends into the air inlet pipe (21); a second spray head (61) is provided at one end of the liquid inlet pipe (6) located in the air inlet pipe (21) and facing the lower end; and the liquid inlet pipe (6) is connected to an external system; An exhaust gas treatment box (3) is arranged in the tower body (1); one end of the air inlet pipe (21) located in the tower body (1) is connected to the exhaust gas treatment box (3); and an isolation net (51) is arranged in the exhaust gas treatment box (3) at a position corresponding to the exhaust pipe (5); A spray structure (4), which is arranged on the right side wall of the exhaust gas treatment box (3), and the spray structure (4) is connected to an external system; An air outlet pipe (5) is arranged at the top of the exhaust gas treatment box (3); the upper end of the air outlet pipe (5) is connected to the top of the tower body (1); the top of the tower body (1) is provided with an air outlet (7) corresponding to the air outlet pipe (5); a partition (71) is cross-fixed in the air outlet (7); and a stopper (72) is provided downwardly at one end of the partition (71) away from the end fixed to the air outlet (7).

2. A high-content particulate matter tail gas absorption tower according to claim 1, characterized in that: The spray structure (4) comprises a plurality of first spray heads (41), which are respectively fixedly arranged on the right side wall of the exhaust gas treatment box (3); a conical collecting trough (42) is provided on the lower side of the exhaust gas treatment box (3) corresponding to the first spray heads (41); a first collecting pipe (43) is provided at the bottom of the conical collecting trough (42); and the first collecting pipe (43) passes through the tower body (1) and is in communication with the outside.

3. A high-content particulate matter tail gas absorption tower according to claim 2, characterized in that: A first valve (44) is provided at one end of the first collecting pipe (43) located outside the tower body (1).

4. The tail gas absorption tower with high content of particulate matter according to claim 1, characterized in that: The lower side of one end of the air inlet pipe (21) outside the tower body (1) is connected to a second collecting pipe (62), and a second valve (63) is provided at the second collecting pipe (62).