Flocculation tank capable of adjusting flocculation time

By introducing a temperature/turbidity online analyzer and PLC control system into the flocculation tank, the flocculation time is adjusted in real time, and the problem of fixed flocculation time in the existing flocculation tank is solved, which improves the adaptability of water treatment effect.

CN221940224UActive Publication Date: 2024-11-01WUHAN SISHUI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420283683.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-11-01
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

The flocculation time of the existing flocculation tank is fixed and cannot be adjusted in real time according to the water quality conditions of the raw water, resulting in poor treatment effect under different climatic conditions.

Method used

A type of water inlet pipe, raw water sampling pipe, temperature/turbidity online analyzer, PLC control cabinet, flocculation pool, long rod gate valve, water outlet pipe, water hole, control line, mud discharge pipe, mud discharge bucket The adjustable flocculation tank of the shaft partition wall, by monitoring the raw water temperature and turbidity data online, adjust the opening of the long rod gate valve in real time, and dynamically control the flocculation time.

Benefits of technology

The flocculation time is adjusted in real time according to the water quality conditions of the raw water, the water treatment effect is improved, and the water quality changes under different climatic conditions are adapted.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221940224U_ABST
    Figure CN221940224U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of water treatment, in particular to a flocculation basin capable of adjusting flocculation time. Comprising a water inlet pipe, a raw water sampling pipe, a temperature / turbidity online analyzer, a PLC control cabinet, a flocculation basin, a long-rod gate valve, a water outlet pipe, a water passing hole, a control circuit, a sludge discharge pipe, a sludge discharge hopper and a vertical shaft partition wall, the water inlet pipe is connected with the upper portion of the flocculation basin, the long-rod gate valve is arranged above the flocculation basin, the water passing hole is formed in the flocculation basin, the water outlet pipe is connected with the upper portion of the flocculation basin, and the control circuit is connected with the vertical shaft partition wall. A raw water sampling pipe is arranged on the water inlet pipe, the raw water sampling pipe is connected to a temperature / turbidity online analyzer and monitors the temperature and turbidity of raw water in real time, the temperature / turbidity online analyzer is connected to a PLC control cabinet and feeds back the temperature and turbidity data of the raw water to a control system, and the PLC control cabinet adjusts the opening degree of the long-rod gate valve in real time according to the temperature and turbidity data of the raw water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of water treatment equipment, in particular to a flocculation tank with adjustable flocculation time. Background Art

[0002] Flocculation is one of the most basic treatment methods in the field of water treatment. Usually, by adding appropriate flocculants, suspended particles in water or liquid are aggregated and enlarged or form flocs, thereby accelerating the coagulation of particles and achieving the purpose of solid-liquid separation. Flocculation time refers to the residence time of water flow in the flocculation tank. According to the current national standard specification "Outdoor Water Supply Design Standard" GB50013-2018, the flocculation time of the bar or grid flocculation tank should be 12min-20min. When treating low-temperature and low-turbidity water, the flocculation time can be extended to 20 min-30min. When treating highly turbid water, the flocculation time can be 10min-15min. The same is true for other types of flocculation tanks. However, for the flocculation tanks on the market, once the structure is formed, the flocculation time of the tank body is determined and cannot be changed. However, the water quality conditions of raw water are constantly changing with climatic conditions. During the rainy season or flood period, the raw water is highly turbid, and the flocculation time should be appropriately shortened to 10-15min. During winter, the raw water is low-temperature and low-turbidity water, and the flocculation time should be appropriately extended to 20-30min. Utility Model Content

[0003] In order to overcome the deficiencies of the prior art, the utility model provides a flocculation tank capable of adjusting the flocculation time in real time according to the turbidity of water quality.

[0004] The technical solution of the utility model: a flocculation tank with adjustable flocculation time, characterized in that it comprises a water inlet pipe, a raw water sampling pipe, a temperature / turbidity online analyzer, a PLC control cabinet, a flocculation tank, a long-stem gate valve, a water outlet pipe, a water passage, a control circuit, a mud discharge pipe, a mud discharge bucket and a shaft partition wall, the water inlet pipe is connected to the upper part of the flocculation tank, a long-stem gate valve is arranged above the flocculation tank, a water passage is arranged in the flocculation tank, the water outlet pipe is connected to the upper part of the flocculation tank, a raw water sampling pipe is arranged on the water inlet pipe, the raw water sampling pipe is connected to the temperature / turbidity online analyzer, and the raw water temperature and turbidity are monitored in real time, the temperature / turbidity online analyzer is connected to the PLC control cabinet, and the raw water temperature and turbidity data are fed back to the control system, and the PLC control cabinet adjusts the opening of the long-stem gate valve in real time according to the raw water temperature and turbidity data.

[0005] Preferably, the flocculation tank is divided into several vertical shafts by walls, and flow holes are opened at the upper and lower parts of the vertical shafts in sequence according to the water flow to ensure the flocculation time. A mud discharge bucket and a mud discharge pipe are provided at the bottom of the vertical shaft to discharge the mud collected at the bottom.

[0006] Preferably, long-stem gate valves are provided in the several vertical shafts, and the gate valves accurately control the opening of the gate valves in different vertical shafts through the raw water temperature and turbidity data fed back by the control cabinet. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 The schematic diagram of the structure and water flow path of the utility model when the raw water is highly turbid;

[0008] Figure 2 When the raw water is low-temperature and low-turbidity water, the structure diagram and water flow path diagram of the utility model are shown;

[0009] Figure 3 When the raw water is non-high turbidity water and low-temperature low turbidity water, the structure diagram and water flow path diagram of the utility model are shown. DETAILED DESCRIPTION

[0010] In order to enable those skilled in the art to better understand the purpose and technical solutions of the present application, the technical solutions in the present application will be clearly described below in conjunction with the accompanying drawings and embodiments. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Therefore, based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0011] See also Figure 1 , Figure 2 and Figure 3 The water inlet pipe (1) is connected to the upper part of the flocculation tank (6). A long-stem gate valve (5) is arranged above the flocculation tank (6). A water passage hole (7) is arranged in the flocculation tank (6). The water outlet pipe (8) is connected to the upper part of the flocculation tank (6). A raw water sampling pipe (2) is arranged on the water inlet pipe (1). The raw water sampling pipe (2) is connected to a temperature / turbidity online analyzer (3) to monitor the raw water temperature and turbidity in real time. The temperature / turbidity online analyzer (3) is connected to a PLC control cabinet (4) to feed back the raw water temperature and turbidity data to the control system. The PLC control cabinet (4) adjusts the opening of the long-stem gate valve in real time according to the raw water temperature and turbidity data. When the raw water turbidity is high turbidity, the long-stem gate valve at the bottom water passage hole is lowered and the long-stem gate valve at the top water passage hole is raised. At this time, the water flow path is shorter and the flocculation time can be controlled between 10 minutes and 15 minutes. The long-stem gate valve (5) is opened as follows: Figure 1 As shown in the figure, when the raw water turbidity is low temperature and low turbidity water, by raising the long-stem gate valve of the bottom water passage and lowering the long-stem gate valve of the top water passage, the water flow path is longer at this time, and the flocculation time can be controlled between 20min and 30min. The long-stem gate valve (5) is opened as follows: Figure 2As shown in the figure, when the raw water turbidity is neither low-temperature low-turbidity water nor high-turbidity water, by only raising the long-stem gate valve at the bottom water passage or only lowering the long-stem gate valve at the top water passage, the water flow path is moderate and the flocculation time can be controlled between 12 minutes and 20 minutes. The long-stem gate valve (5) is opened as follows: Figure 3 shown.

[0012] Although the embodiments of the present application have been shown and described, the above embodiments are preferred implementation modes of the present application, and the implementation modes of the present application are not limited to the above embodiments. For ordinary technicians in this field, any changes, modifications, substitutions, combinations, and simplifications made without departing from the principles and spirit of the present application should be equivalent replacement methods and are included in the scope of protection of the present application.

Claims

1. A flocculation tank with adjustable flocculation time, It is characterized in that The invention comprises a water inlet pipe (1), a raw water sampling pipe (2), a temperature / turbidity online analyzer (3), a PLC control cabinet (4), a flocculation tank (6), a long-stem gate valve (5), a water outlet pipe (8), a water passage hole (7), a control circuit (9), a mud discharge pipe (10), a mud discharge bucket (11) and a shaft partition wall (12). The water inlet pipe (1) is connected to the upper part of the flocculation tank (6). A long-stem gate valve (5) is arranged above the flocculation tank (6). A water passage hole is arranged in the flocculation tank (6). (7), the outlet pipe (8) is connected to the upper part of the flocculation tank (6), the inlet pipe (1) is provided with a raw water sampling pipe (2), the raw water sampling pipe (2) is connected to the temperature / turbidity online analyzer (3), and the raw water temperature and turbidity are monitored in real time. The temperature / turbidity online analyzer (3) is connected to the PLC control cabinet (4), and the raw water temperature and turbidity data are fed back to the control system. The PLC control cabinet (4) adjusts the opening of the long-stem gate valve (5) in real time according to the raw water temperature and turbidity data.

2. A flocculation tank with adjustable flocculation time according to claim 1, It is characterized in that The flocculation tank (6) is divided into a plurality of vertical shafts by a vertical shaft partition wall (12). Water holes (7) are opened at the upper and lower parts of the vertical shafts in sequence according to the water flow order to ensure the flocculation time. A mud discharge bucket (11) and a mud discharge pipe (10) are provided at the bottom of the vertical shaft to discharge the mud collected at the bottom.

3. The flocculation tank according to claim 2, It is characterized in that The plurality of vertical shafts are each provided with a long-stem gate valve (5), and the long-stem gate valve (5) can accurately control the opening of the long-stem gate valve (5) in different vertical shafts through raw water temperature and turbidity data fed back by the PLC control cabinet (4).