Blast furnace oxygen-free metallurgy electrified smelting device

By adopting CO2 reforming and electric heating technology in blast furnace metallurgy electrification smelting equipment, the problem of high CO2 emissions in traditional blast furnaces is solved, anaerobic metallurgy and heat recovery are achieved, coke consumption and electricity consumption are reduced, and the effect of zero-carbon metallurgy is achieved. .

CN221940535UActive Publication Date: 2024-11-01XINJIANG BAYI IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420640581.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-30
Publication Date
2024-11-01
Estimated Expiration
2034-03-30

AI Technical Summary

Technical Problem

The traditional blast furnace ironmaking process leads to high greenhouse gas CO2 emissions, and the cost of removing CO2 from the top gas on the furnace is high. After the circulation is returned, the amount of gas supplied from the outside is reduced, affecting the gas balance of steel enterprises.

Method used

Design a blast furnace oxygen-free metallurgy electrification smelting device, including composite air outlet device, furnace body spraying device, gas dust-containing dehydration treatment device, CO2 reforming device, gas heat exchange device, electric heating device and oxygen source, through CO2 reforming With electric heating, it realizes anaerobic smelting in the furnace, reduces coke consumption, and uses the CO2 in the furnace top gas to react with coal powder to form a reducing agent to achieve efficient reduction in the furnace.

Benefits of technology

The CO2 reforming and heat recovery of the furnace top gas is realized, coke consumption and electricity consumption are reduced, and the CO2 emission reduction effect of greenhouse gas is achieved, achieving zero-carbon metallurgy effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221940535U_ABST
    Figure CN221940535U_ABST
Patent Text Reader

Abstract

The utility model discloses a blast furnace oxygen-free metallurgical electrified smelting device which comprises a metallurgical blast furnace, a composite tuyere device arranged at the bottom of the metallurgical blast furnace, a furnace body blowing device arranged in the middle of the metallurgical blast furnace, and a charging batching device and a coal gas dust-containing dehydration treatment device respectively arranged at the top of the metallurgical blast furnace, the gas outlet end of the coal gas dust-containing dehydration treatment device is divided into two paths which respectively enter the coal gas CO2 reforming device and the coal gas heat exchange device; the gas outlet end of the coal gas CO2 reforming device is respectively communicated with the coal gas heat exchange device, the furnace body injection device and the composite tuyere device; the lower part of the coal gas CO2 reforming device is connected with the coal injection device; an electric heating device is arranged at the bottom of the in-coal-gas CO2 reforming device, and the coal gas dust-containing dehydration treatment device is connected with the in-coal-gas CO2 reforming device; and the composite tuyere device is also connected with an oxygen source device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of ferrous metallurgy and relates to a device for electrification smelting of blast furnace oxygen-free metallurgy. Background Art

[0002] At present, 90% of the world's pig iron is produced by the traditional blast furnace ironmaking process. In the traditional blast furnace ironmaking process, the main fuel is coke and pulverized coal. Iron-containing charge and coke are loaded from the top of the furnace, and hot air and pulverized coal are sprayed from the furnace tuyere. Due to the high consumption of solid fuel, the greenhouse gas CO2 emission is high. In response to the problems of traditional blast furnaces, a new ironmaking process with oxygen blast and top gas circulation has been developed and applied. In order to overcome the shortcomings of insufficient bosh gas after full oxygen and "cold on top and hot on bottom", the top gas needs to be deCO2ed, preheated to 900-1300℃, and then recycled back to the blast furnace for use. This process can overcome the above-mentioned shortcomings of high CO2 emissions in traditional blast furnaces, but the cost of deCO2ing the top gas is high, the cost of the preheating process is high, and the external gas supply is reduced after recycling back to the blast furnace, which has an adverse effect on the gas balance of the entire steel enterprise. Summary of the invention

[0003] The utility model provides a device for electrified smelting of oxygen-free metallurgy in blast furnaces, which only needs to ensure the minimum coke consumption required for the skeleton and molten iron carburization required for blast furnace smelting and the direct reduction of Si, Mn and P elements, and has a certain greenhouse gas CO2 emission reduction effect.

[0004] The technical scheme adopted by the utility model is: a blast furnace oxygen-free metallurgical electrification smelting device, including a metallurgical blast furnace, characterized in that: a composite tuyere device is arranged at the bottom of the metallurgical blast furnace, a furnace body blowing device is arranged in the middle of the metallurgical blast furnace, a charging device and a gas dust dehydration treatment device are arranged at the top of the metallurgical blast furnace, and the top gas of the metallurgical blast furnace is divided into two paths through the gas outlet end of the gas dust dehydration treatment device and enters the CO2 reforming device in the gas and the gas heat exchange device respectively;

[0005] The gas outlet of the CO2 reforming device in coal gas is divided into two branch pipelines, one branch pipeline is connected to the coal gas heat exchange device, and the other branch pipeline is respectively connected to the furnace body injection device and the composite tuyere device; the lower part of the CO2 reforming device in coal gas is also connected to the nitrogen source device through the coal injection device; the bottom of the CO2 reforming device in coal gas is also provided with an electric heating device, and the gas outlet of the coal gas dust dehydration treatment device enters the CO2 reforming device in coal gas through the electric heating device;

[0006] The gas heat exchange device is respectively connected to the gas pressurizing device, the gas burning device and the residual gas processing device, and the outlet end of the gas pressurizing device is connected to the electric heating device; the gas burning device is connected to the chemical device for processing the gas;

[0007] The composite tuyere device is also connected to an oxygen source device.

[0008] The beneficial effects of the utility model are as follows: a metallurgical electrification smelting hydrogen-rich carbon cycle oxygen blast furnace with no oxygen in the blast furnace and CO2 reforming of the top gas is provided, which can use no or minimal coke and has a certain greenhouse gas CO2 emission reduction effect. The utility model provides heat through electric heating, realizes the reaction of CO2 with C in coal powder in the reforming device, and can realize green ironmaking. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a schematic diagram of the process structure of the utility model;

[0010] In the figure: 1-metallurgical blast furnace, 2-charging device, 3-dust dehydration treatment device for coal gas, 4-CO2 reforming device in coal gas, 5-coal gas heat exchange device, 6-nitrogen source device, 7-coal injection device, 8-electric heating device, 9-coal gas pressurizing device, 10-compound tuyere device, 11-furnace body blowing device, 12-residual coal gas treatment device, 13-fuel gas device, 14-chemical device for treating coal gas, 15-oxygen source device. DETAILED DESCRIPTION

[0011] See also Figure 1A device for electrified smelting of oxygen-free metallurgy in a blast furnace. Coke and charge are added into the furnace by a charging device 2. The top circulating coal gas generated at the initial stage of furnace opening is dehumidified and dehydrated by a coal gas dust dehydration treatment device 3, and then enters a CO2 reforming device 4 in the coal gas to react with C in the coal injection provided by a coal injection device 7 for reforming. After the circulating coal gas volume is sufficient, an oxygen source device 15 stops supplying oxygen, and oxygen-free smelting is adopted. Coke only provides skeleton and carburizing of molten iron and desulfurization of Si, Mn, P, and the heat required for reduction in the furnace is provided by a gas electric heating device 8. During oxygen-free smelting and minimum coke, the generated top circulating coal gas is removed from the coal gas by the dust dehydration treatment device 3, and then all enters the CO2 reforming device 4 in the coal gas. The N2 of the nitrogen source device 6 is transported to the coal injection device 7, and the coal powder provided by the coal injection device 7 is sprayed into the CO2 reforming device 4 in the coal gas. The CO2 in the coal gas reacts with the C in the coal powder in the CO2 reforming device to generate the reducing agent CO. The reducing agent at this time merges with the original reducing agent in the coal gas at the top of the furnace in the CO2 reforming device 4 and then flows out from the top. The reducing agent with reducing property that flows out is divided into three parts. The first part is sprayed into the furnace by the composite device 10 of the tuyere, the second part is sprayed into the furnace by the furnace body blowing device 11, and the third part is the surplus high-temperature reducing agent of the blast furnace. After the heat is transferred to the top branch coal gas through the coal gas heat exchange device 5, it enters the remaining coal gas treatment device 12, the gas combustion device 13, and the chemical device 14 for treating coal gas, so as to achieve zero-carbon metallurgy with full utilization of CO2. The branch coal gas is divided into two branches before the top coal gas enters the CO2 reforming device. One branch directly enters the CO2 reforming device 4 in the coal gas, and the other branch goes to the coal gas heat exchange device and exchanges heat with the remaining high-temperature coal gas heat exchange device 5 after the CO2 reforming device, and then is mixed back into the first top coal gas directly entering the CO2 reforming device through the coal gas pressurizing device 9, ensuring the heat recovery of the remaining high-temperature coal gas after reforming, and also providing the process conditions of the coal gas temperature for the next process of chemical carbon fixation. At the same time, due to the heat recovery, the power consumption of the electric heating device can be reduced, the power consumption can be reduced, or the number of electric heating devices can be reduced. The coal injection device 7 has the function of simultaneously conveying coal powder to the CO2 reforming device 4 in the coal gas. This device can generate qualified molten iron and by-product slag, and at the same time generate by-product residual coal gas for chemical devices to perform energy-saving storage or chemical carbon fixation utilization, so as to achieve a zero-carbon metallurgical device that fully utilizes CO2.

Claims

1. A device for blast furnace oxygen-free metallurgical electrification smelting, comprising a metallurgical blast furnace, characterized in that: A composite tuyere device is arranged at the bottom of the metallurgical blast furnace, a furnace body blowing device is arranged in the middle of the metallurgical blast furnace, a charging device and a gas dust dehydration treatment device are arranged at the top of the metallurgical blast furnace, and the top gas of the metallurgical blast furnace is divided into two paths through the gas outlet end of the gas dust dehydration treatment device and enters the CO2 reforming device in the gas and the gas heat exchange device respectively; The gas outlet of the CO2 reforming device in coal gas is divided into two branch pipelines, one branch pipeline is connected to the coal gas heat exchange device, and the other branch pipeline is respectively connected to the furnace body injection device and the composite tuyere device; the lower part of the CO2 reforming device in coal gas is also connected to the nitrogen source device through the coal injection device; the bottom of the CO2 reforming device in coal gas is also provided with an electric heating device, and the gas outlet of the coal gas dust dehydration treatment device enters the CO2 reforming device in coal gas through the electric heating device; The gas heat exchange device is respectively connected to the gas pressurizing device, the gas burning device and the residual gas processing device, and the outlet end of the gas pressurizing device is connected to the electric heating device; the gas burning device is connected to the chemical device for processing the gas; The composite tuyere device is also connected to an oxygen source device.