Blast furnace oxygen-free metallurgy electrified heating reforming gas smelting device
By designing an oxygen-free metallurgy electrified heating reforming gas smelting device in blast furnaces, using electric heating and CO2 reforming technology, the problems of excessive use of coke, high environmental pollution and carbon emissions in traditional blast furnaces have been solved, and efficient green refining has been achieved Improvement of iron and energy structure.
Patent Information
- Application Number
- CN202420641200.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-30
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-30
AI Technical Summary
The large amount of coke used in the ironmaking process of traditional blast furnaces leads to serious environmental pollution, high carbon emissions, high oxygen blowing and gas preheating costs, and the amount of gas supplied from the top of the furnace gas is removed from CO2, which affects the gas balance of steel enterprises.
A blast furnace oxygen-free metallurgy electrified heating reforming gas smelting device is designed, including metallurgical blast furnace, gas dust-containing dehydration treatment device, CO2 reforming device, electric heating device and composite air outlet device. The furnace top gas is provided through electric heating. CO2 reforming and heat recovery reduce coke use and improve energy structure.
The emission reduction of greenhouse gas CO2 has been achieved, carbon emissions have been reduced by 92.6%, the energy structure of the iron smelting process has been improved, the gas balance of steel enterprises has been stabilized, and high-quality raw material gas is provided for the chemical industry, realizing green iron smelting.
Smart Images

Figure CN221940537U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of ferrous metallurgy, and relates to an ironmaking device for blast furnace oxygen-free metallurgy electrification heating reforming coal gas smelting, which is suitable for blast furnace ironmaking process. Background Art
[0002] At present, 90% of the world's pig iron is produced by the traditional blast furnace ironmaking process. In the traditional blast furnace ironmaking process, the main fuel is coke and pulverized coal. Iron-containing charge and coke are loaded from the top of the furnace, and hot air and pulverized coal are sprayed from the furnace tuyere. Due to the high consumption of solid fuel, the greenhouse gas CO2 emission is high. In response to the problems of traditional blast furnaces, a new ironmaking process with oxygen blast and top gas circulation has been developed and applied. In order to overcome the shortcomings of insufficient bosh gas after full oxygen and upper cold and lower hot, the top gas needs to be de-CO2ed, preheated to 900-1300℃, and then recycled back to the blast furnace for use. This process can overcome the above-mentioned shortcomings of high CO2 emissions in traditional blast furnaces, but the cost of de-CO2ing the top gas is relatively high, the preheating process is costly, and the external supply of gas is reduced after recycling back to the blast furnace, which has an adverse effect on the gas balance of the entire steel enterprise. Summary of the invention
[0003] In order to solve the problems of large-scale use of coke in traditional blast furnaces, serious environmental pollution, high carbon emissions, and high costs for removing CO2 and preheating coal gas in oxygen blast furnaces, the utility model provides a device for blast furnace oxygen-free metallurgical electrification heating and reforming coal gas smelting.
[0004] The technical solution adopted by the utility model is: a blast furnace oxygen-free metallurgical electrification heating reforming coal gas smelting device, comprising a metallurgical blast furnace, the top of the metallurgical blast furnace is respectively connected to a charging device and a coal gas dust dehydration treatment device, the middle and bottom of the metallurgical blast furnace are respectively provided with a furnace body blowing device and a composite tuyere device; the gas outlet end of the coal gas dust dehydration treatment device is divided into two paths respectively connected to a residual coal gas treatment device, a coal gas heat exchange device and a coal gas CO2 reforming device; an electric heating device is provided at the bottom of the coal gas CO2 reforming device, and the lower part of the coal gas CO2 reforming device is also connected to a nitrogen source device through a coal injection device The top gas outlet end of the CO2 reforming device in coal gas is respectively connected to the coal gas heat exchange device and the furnace body blowing device and the composite tuyere device; the two gas outlet ends of the coal gas heat exchange device are respectively connected to the residual coal gas treatment device and the coal gas pressurizing device, and the gas outlet end of the coal gas pressurizing device is connected to the CO2 reforming device in coal gas through an electric heating device; the composite tuyere device is also connected to the oxygen source device and the coal injection device; a blast source device is also arranged on the pipeline connecting the coal gas dust dehydration treatment device and the CO2 reforming device in coal gas; and a piece cutting device is respectively arranged on the gas outlet pipeline of the coal gas dust dehydration treatment device.
[0005] The utility model solves the problem that traditional blast furnaces use a lot of coke, cause serious environmental pollution, high carbon emissions, and high costs for removing CO2 and preheating coal gas in oxygen blast furnaces. It has a certain greenhouse gas CO2 emission reduction effect, realizes the reduction of coke and increase of coal in the blast furnace production process, improves the energy structure of ironmaking process, stabilizes the coal gas balance of steel enterprises, and can provide high-quality raw gas for the chemical industry. Based on electric heating to provide heat, green electricity is used completely. Compared with traditional blast furnaces, the utility model reduces carbon emissions by 92.6%, and can achieve green ironmaking. BRIEF DESCRIPTION OF THE DRAWINGS
[0006] Figure 1 It is the process flow structure diagram of the utility model;
[0007] Specific markings in the figure: 1-metallurgical blast furnace, 2-charging device, 3-dust dehydration treatment device for coal gas, 4-CO2 reforming device in coal gas, 5-coal gas heat exchange device, 6-nitrogen source device, 7-coal injection device, 8-electric heating device, 9-coal gas pressurizing device, 10-compound tuyere device, 11 furnace body blowing device, 12, 13, 14-residual coal gas treatment device, 15-blast source device, 16-oxygen source device. 13 cutting devices: a, b, c, d, e, f, g, h, i, j, k, L, m. Implementation
[0008] A device for smelting blast furnace oxygen-free metallurgy by electrification heating reforming coal gas, such as Figure 1 As shown, it comprises a metallurgical blast furnace 1, at the top of which are connected a charging device 2 and a gas dust dehydration treatment device 3, respectively; the middle and bottom of the metallurgical blast furnace 1 are respectively provided with a furnace body blowing device 11 and a composite tuyere device 10; the gas outlet end of the gas dust dehydration treatment device 3 is divided into two paths, which are respectively connected to the residual gas treatment devices 12, 13, 14 and the gas heat exchange device 5 and the gas CO2 reforming device 4; the bottom of the gas CO2 reforming device 4 is provided with an electric heating device 8, the lower part of the gas CO2 reforming device 4 is also connected to a nitrogen source device 6 through a coal injection device 7, and the top gas outlet end of the gas CO2 reforming device 4 is divided into The two gas outlet ends of the gas heat exchange device 5 are respectively connected to the residual gas treatment devices 12, 13 and the gas pressurizing device 9, and the gas outlet end of the gas pressurizing device 9 is connected to the CO2 reforming device 4 in the gas through the electric heating device 8; the composite tuyere device 10 is also connected to the oxygen source device 16 and the coal injection device 7; a blast source device 15 is also arranged on the pipeline connecting the gas dust dehydration treatment device 3 and the CO2 reforming device 4 in the gas; 13 cutting devices are respectively arranged on the gas outlet pipeline of the gas dust dehydration treatment device 3. Example
[0009] Before the device is put into production, the opening and closing status of 13 main disconnecting devices are confirmed, such as the process Figure 1 As shown, the cutting devices a, e, j, L, and m are adjusted to the open state, and the cutting devices b, c, d, f, g, h, i, and k are adjusted to the closed state.
[0010] The charge of the blast furnace 1 is added into the furnace by the charging device 2 on the furnace top. The charge includes ore and coke. The ore matching structure mainly adopts alkaline ore, acidic ore and natural lump ore. The blast supplied by the blast source device 15 heated by the electric heating device is blown into the furnace through the multi-media input hole channel of the composite tuyere 10 at the lower part of the furnace cylinder. At the same time, the coal powder provided by the coal injection device 7 is transported by N2 from the nitrogen source 6 and sprayed into the furnace through the composite tuyere 10. The oxygen source device 16 provides oxygen and sprays it into the furnace through the composite tuyere 10. The high-temperature blast burns with the coal powder, coke and oxygen to generate heat and reducing gas, and an oxidation-reduction reaction occurs in the furnace to generate reducing coal gas, which takes away oxygen from the ore to generate qualified molten iron and by-product slag. At the same time, the coal gas generated is dedused and dehydrated at the furnace top and enters the residual coal gas treatment devices 12 and 13.
[0011] The utility model device also has the function of switching from blast to reforming gas, confirming the open and closed states of 13 main cut-off devices, switching the operation or keeping the state unchanged according to the flow direction of gas heating in the process requirements, such as the process Figure 1 As shown, the cut-off device a is switched from the open state to the closed state; the cut-off devices e, j, L, and m continue to be in the open state of the basic scheme; the cut-off devices c, f, g, h, and i continue to be in the closed state of the basic scheme; the cut-off devices b, d, and k are switched from the closed state to the open state. The switching operation is carried out in the blast furnace rest state under the premise of ensuring intrinsic safety.
[0012] The charge ore and coke of the blast furnace 1 are added into the furnace by the charging device 2 on the furnace top. The oxygen with an oxygen content of 85-99% provided by the oxygen source device 16 is sprayed into the furnace by the composite tuyere device 10. At the same time, the coal powder of the coal injection device 7 is sprayed into the furnace through the N2 conveying device 7 of the nitrogen source device 6. After the coal gas is dusted and dehydrated at the furnace top, it is divided into two paths. One path of the furnace top coal gas is heated by the electric heating device 8 and then enters the CO2 reforming device 4. The coal powder provided by the N2 conveying device 7 of the nitrogen source device 6 is sprayed into CO2 reforming device 4, the reducing agent at this time merges with the original reducing agent in the coal gas at the top of the furnace in the CO2 reforming device and then flows out from the top, and the flowing reducing agent with reducing properties is divided into two parts, one part of the reducing agent is sprayed into the furnace by the composite device 10 of the tuyere, and the other part of the reducing agent is sprayed into the furnace by the furnace body blowing device 11; the other residual coal gas after the dust removal and dehydration of the top coal gas enters the power generation device or gas cabinet of the residual coal gas treatment device 12 or 13 for energy-saving utilization or storage.
[0013] All furnace top gas reforming, heat exchange and residual gas as chemical raw material gas switching process, a blast furnace oxygen-free metallurgical electrification heating reforming gas smelting device also has the function of reforming gas heat exchange and as chemical raw material, 13 main cutting devices are opened and closed to implement operation switching, according to the process requirements of the gas heating flow direction to switch the operation or keep the state unchanged, such as the process Figure 1 As shown, the cut-off device a maintains the closed state; the cut-off devices b, d, and k maintain the open state; the cut-off devices e, j, L, and m switch from the open state to the closed state; and the cut-off devices c, f, g, h, and i switch from the closed state of the transition scheme to the open state. The switching operation is preferably performed at the end of the blast furnace transition scheme to implement the production state switching or to consider the inherent safety when switching in the blast furnace rest state.
[0014] The charge ore and coke 50kg / t of the blast furnace 1 are added into the furnace by the charging device 2, the oxygen source device 3 is stopped by the m cutting device, the N2 of the nitrogen source device 6 is transported and the coal powder of the coal injection device 7 is sprayed into the CO2 reforming device 4, and all the top gas enters the CO2 reforming device, and flows out from the top after merging in the CO2 reforming device. The flowing out reducing agent with reducing property is divided into three parts. The first part is sprayed into the furnace by the composite device 10 of the tuyere, the second part is sprayed into the furnace by the furnace body blowing device 11, and the third part is the surplus high-temperature reducing agent of the blast furnace. After the heat is transferred to the top branch gas through the gas heat exchange device 5, it enters the gas cabinet or chemical device of the processing device of the remaining gas for energy-saving storage or chemical carbon fixation utilization, so as to achieve zero-carbon metallurgy with full utilization of CO2.
[0015] The branch coal gas is divided into two branches before the furnace top gas enters the CO2 reforming device. One branch directly enters the CO2 reforming device, and the other branch goes to the gas heat exchange device to exchange heat with the remaining high-temperature coal gas after the CO2 reforming device. The branch gas is then mixed back into the first furnace top gas that directly enters the CO2 reforming device through the gas pressurizing device, thereby ensuring the heat recovery of the remaining high-temperature coal gas after reforming, and also providing the process conditions of the coal gas temperature for the next chemical carbon fixation process. At the same time, due to the heat recovery, the power consumption of the electric heating device can be reduced, the electricity consumption can be reduced, or the number of electric heating devices can be reduced.
Claims
1. A device for smelting blast furnace oxygen-free metallurgical electrification heating reforming coal gas, comprising a metallurgical blast furnace, characterized in that: The top of the metallurgical blast furnace is connected to the charging device and the gas dust dehydration treatment device, and the middle and bottom of the metallurgical blast furnace are respectively provided with a furnace body blowing device and a composite tuyere device; the gas outlet end of the gas dust dehydration treatment device is divided into two paths, which are respectively connected to the residual gas treatment device, the gas heat exchange device and the gas CO2 reforming device; the bottom of the gas CO2 reforming device is provided with an electric heating device, and the lower part of the gas CO2 reforming device is also connected to the nitrogen source device through the coal injection device, and the top gas outlet end of the gas CO2 reforming device is respectively connected to the coal The gas heat exchange device and the furnace body blowing device and the composite tuyere device; the two gas outlet ends of the gas heat exchange device are respectively connected with the residual gas treatment device and the gas pressurizing device, and the gas outlet end of the gas pressurizing device is connected with the CO2 reforming device in the gas through the electric heating device; the composite tuyere device is also connected with the oxygen source device and the coal injection device; a blast source device is also arranged on the pipeline connecting the gas dust dehydration treatment device and the CO2 reforming device in the gas; and a piece cutting device is respectively arranged on the gas outlet pipeline of the gas dust dehydration treatment device.