Device for measuring hot air pressure in blast furnace tuyere
By designing a tuyere, coal gun, coal injection and gas supply mechanism, and anti-blocking mechanism inside the blast furnace tuyeres, the problem of inaccurate pressure difference measurement inside the blast furnace was solved, and accurate measurement and safe monitoring of hot blast pressure inside the blast furnace were achieved.
Patent Information
- Application Number
- CN202420598152.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-26
AI Technical Summary
Existing technology cannot accurately measure the actual pressure difference inside the blast furnace. Due to the obstruction of the air supply system pipeline, it cannot truly reflect the production status inside the blast furnace.
A device for measuring the hot blast pressure inside a blast furnace tuyeres was designed, comprising a tuyeres, a coal gun, a coal injection mechanism, a gas supply mechanism, a pressure gauge mechanism, and an anti-blocking mechanism. By measuring the hot blast pressure online, combined with anti-blocking and anti-burn-through blast purging mechanisms, the device ensures unobstructed pipelines and equipment safety.
It enables precise measurement of hot blast pressure inside the blast furnace, reduces the impact of duct blockage in the air supply system on operation, and improves the accuracy and safety of monitoring the blast furnace production status.
Smart Images

Figure CN221940541U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of blast furnace ironmaking, in particular to a device for measuring hot air pressure in a blast furnace tuyere. Background Art
[0002] An important indicator of the normal and smooth production of a blast furnace is the pressure difference ΔP0, which is used to judge the stable and smooth state of the blast furnace. At present, a certain amount of air volume needs to be blown into the blast furnace by a blower during blast furnace production. After a certain amount of industrial oxygen (blast furnace oxygen enrichment) is added to the air supply pipe, the blown air volume enters the blast furnace after being preheated to above 1000°C by the hot blast furnace. The pressure difference ΔP0 = hot blast pressure P0-furnace top pressure P0. The hot blast pressure P0 is currently measured at the joint of the blast furnace hot blast surrounding pipe and the hot blast main pipe, 1 meter close to the hot blast main pipe section. The furnace top pressure P0 measurement position is selected on the furnace top riser.
[0003] In actual production, the current hot blast pressure P0 measurement point is still some distance away from the blast furnace. After passing the hot blast pressure measurement point, the air volume needs to pass through the hot blast surrounding pipe, and then the hot blast surrounding pipe distributes the air volume, passes through the branch short pipe, expansion pipe, wind tube, and finally passes through each tuyere and blows into the blast furnace. Therefore, the current method of pressure difference ΔP0 = hot blast pressure P0-furnace top pressure P0 cannot actually reflect the pressure resistance loss of the actual material column in the blast furnace. This is because there is air volume distribution in the distance between the hot blast pressure measurement point and the tuyere, the pipeline diameter keeps changing, and the blast flow direction keeps changing, which leads to a difference between the air pressure at the tuyere before entering the blast furnace and the hot blast pressure. In particular, due to certain equipment and process accidents, the inner diameter of this section of the pipeline may change at a certain point, such as the falling of refractory materials in the pipeline, slag pouring into the hot blast pipe under abnormal conditions of the blast furnace, etc. This change will cause the pressure loss in the pipeline to change, and the change in pipeline loss will inevitably cause the change in hot blast pressure. That is, under the same production conditions, only paying attention to the change in the current pressure difference cannot represent the change in the actual pressure difference in the blast furnace.
[0004] At the same time, in actual production, the blast furnace tuyere equipment is a device that is connected to the blast furnace body and the contact surface of the wind tube as a whole through a spherical rigid seal. Water cooling is adopted inside, and there is no opening on the tuyere equipment to change the structure of the tuyere equipment to install a pressure gauge.
[0005] Therefore, a device is needed to measure the hot air pressure P1 of the hot air passing through the tuyere without changing the existing air supply system, and adopt the method of ΔP1 = hot air pressure P1 - furnace top pressure P0 of the material column in the blast furnace to obtain the accurate pressure difference in the blast furnace, which can more truly reflect the smooth production status in the blast furnace and eliminate the influence of pressure loss in the air supply system pipeline on the operation of the blast furnace.
[0006] Based on this, the utility model is dedicated to providing a device that can realize online measurement of the pressure of hot air passing through the tuyere under different air supply smelting conditions. Utility Model Content
[0007] The purpose of the utility model is to provide a device for measuring the hot air pressure in the tuyere of a blast furnace, so as to solve the following technical problems:
[0008] How to measure online the pressure of hot air passing through the tuyere under different air supply smelting conditions?
[0009] The purpose of the utility model can be achieved through the following technical solutions:
[0010] A device for measuring the hot air pressure in the tuyere of a blast furnace comprises a tuyere and a tuyere installed at the tuyere outlet end, a coal gun is provided on the side wall of the tuyere, the head of the coal gun extends to the inside of the tuyere, and the tail is connected to the head end of a main pipe, a main pipe cut-off valve is installed on the main pipe, and:
[0011] A coal injection mechanism, used for injecting coal into the coal gun;
[0012] A gas supply mechanism for injecting gas into the pipes and coal guns in the device;
[0013] A pressure gauge mechanism to detect the pressure in the coal gun;
[0014] Among them, an anti-blocking mechanism is provided between the air supply mechanism and the pressure gauge mechanism to clear the pipeline in the device.
[0015] As a further solution of the utility model: the coal injection mechanism includes a coal injection distributor, a coal injection cut-off valve and a coal injection branch pipe, one end of the coal injection branch pipe is connected to the coal injection distributor, and the other end is installed on the main pipe at the tail of the coal gun, and the installation position is located between the end of the main pipe and the main pipe cut-off valve; the coal injection cut-off valve is installed on the coal injection branch pipe.
[0016] As a further solution of the utility model: the air supply mechanism includes a compressed air source, a compressed air shut-off valve and a compressed air branch pipe, one end of the compressed air branch pipe is connected to the compressed air source, and the other end is connected to the end of the main pipe at the tail of the coal gun, and the compressed air shut-off valve is installed on the compressed air branch pipe.
[0017] As a further solution of the utility model: the pressure gauge mechanism includes a hot air pressure gauge, an isolating cut-off valve and a pressure gauge branch pipe, one end of the pressure gauge branch pipe is connected to the hot air pressure gauge, and the other end is installed on the main pipe at the tail of the coal gun, and its installation position is located between the coal gun and the main pipe cut-off valve; the isolating cut-off valve is installed on the pressure gauge branch pipe.
[0018] As a further solution of the utility model: the anti-blocking mechanism includes an anti-blocking purge cut-off valve and an anti-blocking branch pipe, one end of the anti-blocking branch pipe is connected to the pipeline between the main cut-off valve and the compressed air cut-off valve, and the other end is installed on the pressure gauge branch pipe, and the installation position is located between the hot air pressure gauge and the isolation cut-off valve; the anti-blocking purge cut-off valve is installed on the anti-blocking branch pipe.
[0019] As a further solution of the utility model: a coal gun cut-off valve is provided on the coal gun.
[0020] As a further solution of the utility model: the device also includes an anti-burn-through wind blowing mechanism for cooling the interior of the device.
[0021] As a further solution of the utility model: the anti-burn through wind blowing mechanism includes an anti-burn through wind cleaning device, an anti-burn through wind blowing shut-off valve and an anti-burn through wind blowing branch pipe, one end of the anti-burn through wind blowing branch pipe is connected to the anti-burn through wind device, and the other end is connected to the pipeline between the main shut-off valve and the compressed air shut-off valve; the anti-burn through wind blowing shut-off valve is installed on the anti-burn through wind blowing branch pipe.
[0022] Beneficial effects of the utility model:
[0023] The utility model can realize online measurement of the hot air pressure in the furnace through the pressure gauge mechanism, and before the hot air pressure gauge measures the pressure, the relevant pipelines and coal guns are firstly treated to prevent blocking; that is: the anti-blocking purge shut-off valve and the isolation shut-off valve are opened, and the main shut-off valve is closed at the same time, and the compressed air is blown through the anti-blocking branch pipe, the pressure gauge branch pipe, the main pipe and the coal gun, so that the impurities and blockages inside them are blown away to ensure the smooth flow of the measuring pipeline; at the same time, the anti-burn-through blowing purge shut-off valve is opened, the anti-burn-through blowing device is turned on, and the air is blown to the outside through the anti-burn-through blowing purge branch pipe, so as to reduce the temperature of the air duct, the coal gun and the measuring pipeline to ensure safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The utility model is further described below in conjunction with the accompanying drawings.
[0025] Figure 1 The utility model is a schematic structural diagram of a device for measuring the hot air pressure in a blast furnace tuyere in one embodiment.
[0026] In the figure: 1. air outlet; 2. air cylinder; 3. coal gun shut-off valve; 4. coal gun; 5. hot air pressure gauge; 6. isolation shut-off valve; 7. coal injection distributor; 8. coal injection shut-off valve; 9. main shut-off valve; 10. compressed air shut-off valve; 11. compressed air source; 12. anti-burn-through air purge shut-off valve; 13. anti-burn-through air device; 14. anti-clogging purge shut-off valve. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] See also Figure 1 As shown, the utility model is a device for measuring the hot air pressure in the tuyere of a blast furnace, comprising a tuyere 2 and a tuyere 1 installed at the air outlet end of the tuyere 2, a coal gun 4 is pierced through the side wall of the tuyere 2, and a coal gun cut-off valve 3 is provided on the coal gun 4; at the same time, the head of the coal gun 4 extends to the inside of the tuyere 1, that is, the pressure taking point inside the tuyere 1, the tail of the coal gun 4 is connected to the head end of a main pipe, and a main pipe cut-off valve 9 is installed on the main pipe, and a coal injection mechanism, an air supply mechanism and a pressure gauge mechanism are also installed.
[0029] in:
[0030] The coal injection mechanism is composed of a coal injection distributor 7, a coal injection shut-off valve 8 and a coal injection branch pipe. One end of the coal injection branch pipe is connected to the coal injection distributor 7, and the other end is installed on the main pipe at the tail end of the coal gun 4, and the installation position is between the end of the main pipe and the main pipe shut-off valve 9; the coal injection shut-off valve 8 is installed on the coal injection branch pipe; when the coal injection shut-off valve 8, the main pipe shut-off valve 9 and the coal gun shut-off valve 3 are opened at the same time, coal powder is sprayed out from the coal injection distributor 7, and enters the tuyere 1 through the coal injection branch pipe, the main pipe and the coal gun 4 in sequence, thereby realizing coal injection.
[0031] The air supply mechanism is composed of a compressed air source 11, a compressed air shut-off valve 10 and a compressed air branch pipe. One end of the compressed air branch pipe is connected to the compressed air source 11, and the other end is connected to the end of the main pipe at the tail of the coal gun 4. The compressed air shut-off valve 10 is installed on the compressed air branch pipe. When the compressed air shut-off valve 10, the coal injection shut-off valve 8, the main pipe shut-off valve 9 and the coal gun shut-off valve 3 are opened at the same time, when the compressed air source 11 outputs compressed air, the compressed air carrier gas drives the coal powder to be sprayed, thereby providing power for the coal powder to be sprayed.
[0032] The pressure gauge mechanism is composed of a hot air pressure gauge 5, an isolating shut-off valve 6 and a pressure gauge branch pipe. One end of the pressure gauge branch pipe is connected to the hot air pressure gauge 5, and the other end is installed on the main pipe at the tail of the coal gun 4, and its installation position is between the coal gun 4 and the main pipe shut-off valve 9; the isolating shut-off valve 6 is installed on the pressure gauge branch pipe; when the main pipe shut-off valve 9 is closed and the coal gun shut-off valve 3 is opened, the hot air pressure at the air outlet 1 will be transmitted back to the hot air pressure gauge 5 through the coal gun 4, the main pipe and the pressure gauge branch pipe in sequence.
[0033] An anti-blocking mechanism is provided between the air supply mechanism and the pressure gauge mechanism, and the anti-blocking mechanism is composed of an anti-blocking purge cut-off valve 14 and an anti-blocking branch pipe. One end of the anti-blocking branch pipe is connected to the pipeline between the main cut-off valve 9 and the compressed air cut-off valve 10, and the other end is installed on the pressure gauge branch pipe, and the installation position is located between the hot air pressure gauge 5 and the isolation cut-off valve 6; the anti-blocking purge cut-off valve 14 is installed on the anti-blocking branch pipe;
[0034] Since the pressure taking point of the hot air pressure gauge 5 is on the main pipe at the tail end of the coal gun 4, under normal production conditions, the compressed air carrier gas drives the coal powder to be sprayed, which may cause coal powder quality problems, such as problems with debris and high moisture content, and then the pipeline through which the coal powder passes and the inside of the coal gun 4 are blocked; at the same time, when the hot air pressure gauge 5 measures the pressure, the airflow in the air duct 1 is reversely conducted to the hot air pressure gauge 5 to measure the pressure. During the reverse conduction of the airflow, there is a risk that the airflow will bring solid materials such as crushed coke in the blast furnace into the coal gun 4, the pipeline it passes through, and the hot air pressure gauge 5, thereby causing blockage of the pipeline and the hot air pressure gauge 5, thereby causing the problem of failure to measure the pressure; therefore, it is necessary to solve this problem through an anti-blocking mechanism;
[0035] Specifically, before the hot air pressure gauge 5 measures the pressure, the relevant pipelines and coal gun 4 are first treated to prevent blocking; that is: open the anti-blocking purge shut-off valve 14 and the isolation shut-off valve 6, and close the main shut-off valve 9 at the same time, then the compressed air is blown through the anti-blocking branch pipe, the pressure gauge branch pipe, the main pipe and the coal gun 4, thereby blowing away the impurities and blockages inside, ensuring that the measuring pipeline is unobstructed.
[0036] The device also includes an anti-burn-through blowing and blowing mechanism, which is composed of an anti-burn-through blowing device 13, an anti-burn-through blowing and blowing cut-off valve 12 and an anti-burn-through blowing and blowing branch pipe. One end of the anti-burn-through blowing and blowing branch pipe is connected to the anti-burn-through blowing device 13, and the other end is connected to the pipeline between the main cut-off valve 9 and the compressed air cut-off valve 10; the anti-burn-through blowing and blowing cut-off valve 12 is installed on the anti-burn-through blowing and blowing cut-off branch pipe;
[0037] During the ironmaking process in the blast furnace, the theoretical combustion temperature of the area of tuyere 1 is about 2000°C. When measuring the hot air pressure inside tuyere 1, the airflow at tuyere 1 is reversely conducted to the hot air pressure gauge 5, and the airflow is in a non-circulating state. Therefore, the high temperature in tuyere 1 will be conducted to the coal gun 4 and the pressure gauge mechanism along with the hot air, and there is a risk of equipment burning out. Therefore, it is necessary to solve this problem through an anti-burning wind blowing mechanism.
[0038] Specifically, while removing impurities and blockages through the anti-blocking mechanism, the anti-burn through blowing and purge shut-off valve 12 is opened, the anti-burn through blowing device 13 is turned on, and air is blown to the outside through the anti-burn through blowing and purge branch pipe, thereby reducing the temperature of the wind tube 1, the coal gun 4, and the measuring pipeline to ensure safety.
[0039] When using this device to measure the hot air pressure in the air outlet 1, follow the steps below:
[0040] (1) Close the coal injection cut-off valve 8, stop the coal injection distributor 7 from injecting coal, and at the same time open the compressed air cut-off valve 10. The coal injection mechanism supplies air through the compressed air source 11, and the coal injection branch pipe corresponding to the tuyere where the hot air pressure is required to be measured stops supplying coal for 1 minute;
[0041] (2) Open the anti-clogging purge cut-off valve 14 and the isolation cut-off valve 6, and at the same time close the main cut-off valve 9, and start the anti-clogging purge to ensure that the measuring pipeline is unobstructed;
[0042] (3) While carrying out step (2), the anti-burning and blowing shut-off valve 12 is opened, the anti-burning and blowing device 13 is turned on, and the temperature of the wind tube 2, the coal gun 4, and the measuring pipeline is lowered to ensure safety;
[0043] (4) Close the anti-clogging purge cut-off valve 14 and stop the anti-clogging purge. Then the hot air pressure in the tuyere is reversely transmitted to the hot air pressure gauge 5 through the coal gun 4 and its tail main pipe and the pressure gauge branch pipe. After the pressure gauge measurement value stabilizes, the hot air pressure in the tuyere 1 is measured;
[0044] (5) After the pressure measurement in the tuyere is completed, the pressure gauge isolation cut-off valve 6 is closed, and the hot air pressure gauge 5 is safely isolated from the furnace;
[0045] (6) After step (5) is completed, the compressed air shut-off valve 10 and the anti-burn-through air purge shut-off valve 12 are closed, the anti-burn-through air blowing device 13 is turned off, the compressed air source 11 stops supplying air, and then the main shut-off valve 9 and the coal injection shut-off valve 8 are immediately opened, and the coal gun 4 resumes supplying coal, and the measurement process is completed.
[0046] In the description of the present utility model, it should be understood that the terms "upper", "lower", "left", "right", etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation, and therefore, cannot be understood as a limitation on the present utility model. In addition, "first" and "second" are only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0047] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0048] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.
Claims
1. A device for measuring the hot air pressure in a blast furnace tuyere, comprising a tuyere (2) and a tuyere (1) installed at the tuyere (2) outlet end. It is characterized in that A coal gun (4) is provided on the side wall of the wind tube (2). The head of the coal gun (4) extends into the interior of the wind port (1) and the tail is connected to the head end of a main pipe. The main pipe is provided with a main pipe cut-off valve (9) and is also provided with: A coal injection mechanism, used for injecting coal into the coal gun (4); A gas supply mechanism for injecting gas into the pipes and coal guns (4) in the device; A pressure gauge mechanism for detecting the pressure in the coal gun (4); Among them, an anti-blocking mechanism is provided between the air supply mechanism and the pressure gauge mechanism to clear the pipeline in the device.
2. The device for measuring the hot air pressure in the blast furnace tuyere according to claim 1, It is characterized in that The coal injection mechanism comprises a coal injection distributor (7), a coal injection shut-off valve (8) and a coal injection branch pipe, one end of the coal injection branch pipe is connected to the coal injection distributor (7), and the other end is installed on the main pipe at the tail end of the coal gun (4), and the installation position is located between the end of the main pipe and the main pipe shut-off valve (9); the coal injection shut-off valve (8) is installed on the coal injection branch pipe.
3. The device for measuring hot air pressure in a blast furnace tuyere according to claim 1, It is characterized in that The air supply mechanism comprises a compressed air source (11), a compressed air shut-off valve (10) and a compressed air branch pipe, one end of the compressed air branch pipe is connected to the compressed air source (11), and the other end is connected to the end of the main pipe at the tail of the coal gun (4), and the compressed air shut-off valve (10) is installed on the compressed air branch pipe.
4. The device for measuring hot air pressure in a blast furnace tuyere according to claim 1, It is characterized in that The pressure gauge mechanism comprises a hot air pressure gauge (5), an isolating shut-off valve (6) and a pressure gauge branch pipe. One end of the pressure gauge branch pipe is connected to the hot air pressure gauge (5), and the other end is installed on the main pipe at the tail end of the coal gun (4), and its installation position is located between the coal gun (4) and the main pipe shut-off valve (9); the isolating shut-off valve (6) is installed on the pressure gauge branch pipe.
5. The device for measuring hot air pressure in a blast furnace tuyere according to claim 1, It is characterized in that The anti-blocking mechanism comprises an anti-blocking purge shut-off valve (14) and an anti-blocking branch pipe, one end of the anti-blocking branch pipe is connected to the pipeline between the main shut-off valve (9) and the compressed air shut-off valve (10), and the other end is installed on the pressure gauge branch pipe, and the installation position is located between the hot air pressure gauge (5) and the isolation shut-off valve (6); the anti-blocking purge shut-off valve (14) is installed on the anti-blocking branch pipe.
6. The device for measuring hot air pressure in a blast furnace tuyere according to claim 1, It is characterized in that The coal gun (4) is provided with a coal gun cut-off valve (3).
7. The device for measuring hot air pressure in a blast furnace tuyere according to claim 1, It is characterized in that The device also includes an anti-burn-through wind blowing mechanism to reduce the temperature of the device.
8. The device for measuring hot air pressure in a blast furnace tuyere according to claim 7, It is characterized in that The anti-burn-through wind blowing mechanism comprises an anti-burn-through wind cleaning device (13), an anti-burn-through wind blowing shut-off valve (12) and an anti-burn-through wind blowing branch pipe, one end of the anti-burn-through wind blowing branch pipe is connected to the anti-burn-through wind device (13), and the other end is connected to the pipeline between the main shut-off valve (9) and the compressed air shut-off valve (10); the anti-burn-through wind blowing shut-off valve (12) is installed on the anti-burn-through wind blowing branch pipe.
