Movable handrail for adjusting submersible bridge

By designing the automatic adjustment of the flood bridge movable railing, the automatic adjustment of the railing is achieved by using the articulated structure and locking mechanism, the problems of low manual disassembly efficiency and lack of protection during the non-flood period are solved, and the adjustment accuracy and safety are improved. Simplifies operation and enhances aesthetics.

CN221941111UActive Publication Date: 2024-11-01ZHEJIANG GUANGCHUAN ECOLOGICAL ENVIRONMENT ENGINEERING DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420502455.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-11-01
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The existing flood bridge guardrails need to be manually disassembled and installed during the flood season, which is inefficient and is not conducive to flood control. They lack protective measures during the non-flood season, which affects traffic safety and aesthetics.

Method used

A water-filled bridge adjustable movable railing is designed to automatically adjust the railing through the articulation structure and locking mechanism. The railing can be automatically flipped or fixed according to the water level changes. It adopts an iron chain guardrail and a stainless steel hollow structure to simplify operation and reduce energy consumption.

Benefits of technology

It improves the accuracy and stability of railing adjustment, reduces human errors and mechanical failures, simplifies operations, ensures flood traffic during flood season and safety protection during non-flood seasons, reduces environmental pollution, and improves aesthetics and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941111U_ABST
    Figure CN221941111U_ABST
Patent Text Reader

Abstract

The utility model provides an adjusting movable handrail for a submersible bridge, which relates to the field of bridge handrails, is arranged on two sides of a bridge floor and comprises a plurality of bases and handrails, two sides of the lower ends of the handrails are hinged on the bases, the handrails can turn over relative to the bases, the handrails are arranged between adjacent handrails, and locking mechanisms are arranged between the lower ends of the handrails and the bases. Fixing the handrail on the base, and locking the turnover of the handrail; the base comprises a bottom plate, a limiting plate and a set of supporting plates, the limiting plate is vertically arranged on one side of the bottom plate and prevents the handrail from overturning towards the limiting plate, the set of supporting plates are vertically arranged on the two sides of the bottom plate, a fixed rotating shaft is arranged on the set of supporting plates in a penetrating mode, and the lower end of the handrail is hinged to the fixed rotating shaft. According to the adjustable movable handrail of the submersible bridge, the manual regulation and control handrail of the submersible bridge hydrodynamic force is easy to operate, and professional skills and experience are not needed; in the flood season, flood discharge is not affected and sundries, garbage branches and the like in the flood cannot be blocked by regulating and controlling the handrails, safety and property of people on the two sides of the river channel are protected, and high practical value and economic value are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge railings, in particular to an adjustable movable railing for a flooded bridge. Background Art

[0002] A flood bridge is a special and simple bridge design, usually used to cross rivers, ditches or flooded areas. Its characteristic is that the impact of water flow is taken into consideration during the design. The bridge deck is usually higher than the surrounding ground to allow water to flow freely under the bridge and avoid buildings that hinder water flow and water pressure. Bridges designed in this way help to reduce the impact of floods on bridges while ensuring traffic connectivity.

[0003] The guardrails currently used on flood bridges are usually relatively simple. In the past, there were usually no railings on flood bridges or a few small concrete pillars were set as signs. However, the lack of railings is not conducive to the safety of pedestrians. Considering that during the flood season, setting up fixed railings will block debris, garbage, branches, etc. in the flood. For this reason, some flood bridges now have some detachable guardrails. When the flood comes, the guardrails are removed and then installed after the flood.

[0004] However, in actual application, the manual removal of the railings brings many inconveniences, and the manual operation efficiency is relatively low. Therefore, it is necessary to design a movable railing for flood bridge adjustment. During the flood season every year, through the water and rain detection forecast and early warning system, people can manually operate in advance and manually lower the adjustment railings, so as not to affect flood control. This design can adapt to the ability of water level changes to a certain extent.

[0005] During the non-flood season, the water level drops and the water power of the flood bridge is raised by manually adjusting the railings to play the role of protective railings. This design can ensure that people remain safe and beautiful when passing through the flood bridge, and protect the lives and property of the people on both sides of the river. Utility Model Content

[0006] 1. Technical issues to be resolved

[0007] In view of the deficiencies in the prior art, the utility model provides an adjustable movable railing for a flooded bridge, which solves the problems raised in the above-mentioned background technology.

[0008] (II) Technical solution

[0009] To achieve the above purpose, the utility model is implemented through the following technical solutions: an adjustable movable railing for a flooded bridge, arranged on both sides of the bridge deck: comprising a plurality of bases and railings, both sides of the lower end of the railings are hinged on the bases, the railings can be flipped relative to the bases, guardrails are arranged between adjacent railings, a locking mechanism is arranged between the lower end of the railings and the base, the railings are fixed to the bases, and the flipping is locked;

[0010] The base includes a bottom plate, a limit plate, and a group of support plates. The limit plate is vertically arranged on one side of the bottom plate to prevent the railing from flipping toward the limit plate. A group of support plates are vertically installed on both sides of the bottom plate. A fixed rotating shaft is passed through one group of support plates, and the lower end of the railing is hinged on the fixed rotating shaft.

[0011] Preferably, the base plate is fixed to the bridge deck by metal expansion anchor bolts.

[0012] Preferably, the guardrail is an iron chain, and there are fixing ears on both sides of the corresponding railing, and the two ends of the iron chain are mounted on the fixing ears.

[0013] Preferably, the locking mechanism is a bolt, and a screw hole 1 is provided at the lower end of the support plate, and the screw hole 1 is located below the fixed rotating shaft. A corresponding screw hole 2 is provided on the railing. When the railing is vertical, the screw hole 1 and the screw hole 2 are in a straight line, and the bolt engages with the screw hole 1 and the screw hole 2 to lock the railing. The head of the bolt is also connected to a pull rope, and the other end of the pull rope is tied to the support plate.

[0014] Preferably, the locking mechanism is a latch, a pin hole 1 is provided at the lower end of the support plate, the pin hole 1 is located below the fixed rotating shaft, a corresponding pin hole 2 is provided on the railing, when the railing is vertical, the pin hole 1 and the pin hole 2 are in a straight line, the latch engages with the pin hole 1 and the pin hole 2 to lock the railing, and a spring is also sleeved on the latch, and both ends of the spring are connected between the cap head of the latch and the support plate.

[0015] Preferably, the railing is a stainless steel hollow structure.

[0016] (III) Beneficial effects

[0017] The utility model provides an adjustable movable railing for a flooded bridge, which has the following beneficial effects:

[0018] The design of the adjustable movable railing of the flood bridge improves the accuracy and stability of the railing adjustment, effectively avoids human errors and mechanical failures, reduces energy consumption, and reduces pollution to the environment; the manual adjustment of the water power of the flood bridge is simple to operate, and does not require professional skills and experience; when encountering flood season, the railing is adjusted, which will not affect the flow of water and block debris, garbage, branches, etc. in the flood, protecting the safety and property of the people on both sides of the river. In summary, the flood bridge water power automatic adjustment railing scheme proposed by the utility model has high practical value and economic value. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of a structure of a movable railing for a flood bridge according to the utility model. Figure 1 ;

[0020] Figure 2 This is a structural schematic diagram of a locking mechanism of the utility model;

[0021] Figure 3 This is a schematic diagram of the second structure of the locking mechanism of the utility model;

[0022] Figure 4 It is a schematic diagram of the handrail adjustment structure of the utility model.

[0023] In the figure: 1. base; 2. handrail; 3. bottom plate; 4. limit plate; 5. support plate; 6. fixed shaft; 7. metal expansion anchor bolt; 8. iron chain; 9. fixing ear; 10. bolt; 11. screw hole 1; 12. screw hole 2; 13. pull rope; 14. latch; 15. pin hole 1; 16. pin hole 2; 17. spring. DETAILED DESCRIPTION

[0024] The flooded bridge has no guardrails, which poses a hidden danger to the residents on both sides of the river. In principle, the railings 2 should not be set up in the case of a bridge that can be used for traffic, because the railings 2 will affect the ability to block flood discharge if there is water and impurities come down. If a simple protective setting is used, it is not only not beautiful enough, but also has no protective effect, and accidents are prone to occur, which poses a huge safety hazard. The technology of the present invention provides a flooded bridge adjustable movable railing 2, which can also be customized according to local cultural characteristics to blend with the surrounding environment and achieve a beautiful effect. This design not only improves the aesthetics of the bridge, but also reduces safety hazards and improves the travel safety of residents.

[0025] The utility model embodiment provides a flood bridge adjustable movable railing 2, such as Figure 1-4 As shown, it is arranged on both sides of the bridge deck: it includes a plurality of bases 1 and railings 2, and the lower ends of the railings 2 are hinged on the bases 1, as shown in FIG. Figure 4 As shown, the railing 2 can be flipped relative to the base 1, a guardrail is arranged between adjacent railings 2, and a locking mechanism is arranged between the lower end of the railing 2 and the base 1 to fix the railing 2 on the base 1 to lock its flipping; the railing 2 can be designed in a variety of cultural railing 2 forms according to different projects.

[0026] The base 1 includes a bottom plate 3, a limit plate 4, and a group of support plates 5. The limit plate 4 is vertically arranged on one side of the bottom plate 3 to prevent the railing 2 from turning toward the limit plate 4. A group of support plates 5 are vertically installed on both sides of the bottom plate 3. A group of support plates 5 are penetrated with a fixed shaft 6. The lower end of the railing 2 is hinged on the fixed shaft 6. The fixed shaft 6 is a key component for manually adjusting the railing 2 and is responsible for the entire adjustment process. Each part is connected by a precision mechanical structure to achieve an efficient and stable movable adjustment function.

[0027] Preferably, Figure 1 As shown, the base plate 3 is fixed on the bridge deck by metal expansion anchor bolts 710 . Specifically, the metal expansion anchor bolts 710 are installed on the bridge according to predetermined positions, and then the base 1 is installed on the metal expansion anchor bolts 710 .

[0028] The guardrails between the railings 2 can be in various forms, such as Figure 1 As shown, the guardrail is an iron chain 8, and the corresponding railing 2 has fixing ears 9 on both sides, and the two ends of the iron chain 8 are sleeved on the fixing ears 9. Figure 2 As shown in .3, the fixing ear 9 includes an L-shaped bracket and a bolt 10. One end of the L-shaped bracket is welded to the railing 2, and a screw hole is opened on the other end. A corresponding screw hole is also opened on the railing 2. The bolt 10 passes through the L-shaped bracket and engages with the L-shaped bracket and the railing 2 in turn, thereby fixing the iron chain 8. The iron chain 8 can also be removed for replacement.

[0029] Preferably, Figure 2 As shown, the locking mechanism is a bolt 10, a screw hole 11 is provided at the lower end of the support plate 5, the screw hole 11 is located below the fixed shaft 6, and a screw hole 2 12 is provided on the corresponding railing 2. When the railing 2 is vertical, the screw hole 11 and the screw hole 2 12 are in a straight line, and the bolt 10 is engaged with the screw hole 11 and the screw hole 2 12 to lock the railing 2. The head of the bolt 10 is also connected to a pull rope 13, and the other end of the pull rope 13 is tied to the support plate 5 to prevent the bolt 10 from being lost. When the railing 2 needs to be flipped, the bolt 10 is turned to disengage the bolt 10 from the railing 2 and the support plate 5.

[0030] Preferably, Figure 3 As shown, the locking mechanism is a latch 14, a pin hole 15 is provided at the lower end of the support plate 5, the pin hole 15 is located below the fixed shaft 6, and a pin hole 2 16 is provided on the corresponding railing 2. When the railing 2 is vertical, the pin hole 15 and the pin hole 2 16 are in a straight line, and the latch 14 is engaged with the pin hole 15 and the pin hole 2 16 to lock the railing 2. A spring 17 is also sleeved on the latch 14, and both ends of the spring 17 are connected between the cap head of the latch 14 and the support plate 5. When the railing 2 needs to be flipped, the latch 14 is pulled outward to disengage the latch 14 from the railing 2.

[0031] Preferably, the railing 2 is a stainless steel hollow structure, which can reduce weight and improve adjustment efficiency.

[0032] The railing 2 of the flood bridge is mainly used for safety. There are no street lights in the countryside at night, which may cause safety accidents. However, railings 2 cannot be installed on general flood bridges, which will affect flood control. Our setting not only does not block floods, but is also easy to operate. The style of the railing 2 can be set with culture as an improvement of the beautiful countryside.

[0033] Working principle: The process flow of the utility model mainly includes the following steps: the first step is to install the metal expansion anchor bolt 710 at the bottom of the bridge; the second step is to connect the customized base 1 (galvanized square steel) to the metal expansion anchor bolt 710; the third step is to install and fix the fixed shaft 6 (hidden) to the support plate 5 of the customized base 1; the fourth step is to set and adjust the railing 2 according to the needs; the sixth step is to adjust the manual control railing 2 of the flood bridge hydrodynamics according to actual needs to achieve a better adjustment effect.

[0034] In summary, the adjustable movable railing 2 of the flood bridge is an innovative technology, which takes into account both the practicality and aesthetics of the bridge and provides reliable protection for the travel of residents on both sides of the river.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A flood bridge adjustable movable guardrail, arranged on both sides of the bridge deck, characterized in that: The utility model comprises a plurality of bases (1) and railings (2), wherein the lower ends of the railings (2) are hinged on the bases (1) at both sides, the railings (2) can be flipped relative to the bases (1), guardrails are arranged between adjacent railings (2), and a locking mechanism is arranged between the lower ends of the railings (2) and the bases (1) to fix the railings (2) on the bases (1) and lock the railings (2) from flipping; The base (1) comprises a bottom plate (3), a limiting plate (4), and a group of supporting plates (5); the limiting plate (4) is vertically arranged on one side of the bottom plate (3) to prevent the railing (2) from turning in the direction of the limiting plate (4); a group of supporting plates (5) are vertically arranged on both sides of the bottom plate (3); a fixed rotating shaft (6) is passed through a group of supporting plates (5), and the lower end of the railing (2) is hinged on the fixed rotating shaft (6).

2. The adjustable movable guardrail of a flood bridge according to claim 1, characterized in that: The bottom plate (3) is fixed on the bridge deck via metal expansion anchor bolts (7).

3. The adjustable movable guardrail of a flood bridge according to claim 1, characterized in that: The guardrail is an iron chain (8), and the corresponding two sides of the railing (2) are provided with fixing ears (9), and the two ends of the iron chain (8) are sleeved on the fixing ears (9).

4. The adjustable movable guardrail of a flood bridge according to claim 1, characterized in that: The locking mechanism is a bolt (10). A screw hole (11) is provided at the lower end of the support plate (5). The screw hole (11) is located below the fixed rotating shaft (6). A screw hole (12) is provided on the corresponding railing (2). When the railing (2) is vertical, the screw hole (11) and the screw hole (12) are in a straight line. The bolt (10) is engaged with the screw hole (11) and the screw hole (12) to lock the railing (2). The head of the bolt (10) is also connected to a pull rope (13), and the other end of the pull rope (13) is tied to the support plate (5).

5. The adjustable movable guardrail of a flood bridge according to claim 4, characterized in that: The locking mechanism is a latch (14). A pin hole (15) is provided at the lower end of the support plate (5). The pin hole (15) is located below the fixed rotating shaft (6). A pin hole (16) is provided on the corresponding railing (2). When the railing (2) is vertical, the pin hole (15) and the pin hole (16) are in a straight line. The latch (14) engages with the pin hole (15) and the pin hole (16) to lock the railing (2). A spring (17) is also sleeved on the latch (14). The two ends of the spring (17) are connected between the cap of the latch (14) and the support plate (5).

6. The adjustable movable guardrail of a flood bridge according to claim 1, characterized in that: The handrail (2) is a stainless steel hollow structure.